RES 2026-96 Approving a Final Plat for Otsego Waterfront DistrictCITY OF OTSEGO
COUNTY OF WRIGHT
STATE OF MINNESOTA
RESOLUTION NO: 2026-96
APPROVING A FINAL PLAT FOR
OTSEGO WATERFRONT DISTRICT
WHEREAS, Modern Construction of Minnesota, Inc. ("Developer") has submitted application for a Final Plat for a subdivision
to be known as Otsego Waterfront District; and
WHEREAS, the legal description of the subject property ("Property") is attached as Exhibit A; and
WHEREAS, the Property is within the East Sewer District and guided for future Mixed Use land uses by the 2023
Comprehensive Plan; and
WHEREAS, the Property is zoned PUD, Planned Unit Development District; and
WHEREAS, a PUD Development Stage Plan for the Property was approved by the City Council on 9 June 2025; and
WHEREAS, the proposed subdivision consists of one lot and three outlots; and
WHEREAS, a preliminary plat for the proposed subdivision was approved by the City Council on 9 June 2025, subject to
conditions; and
WHEREAS, applications for final plat approval are processed in accordance with the provisions of Section 10-5-3 of the
Subdivision Ordinance; and
WHEREAS, the City Council considered the final plat at its meeting on 12 October 2026.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Otsego that the application for final plat approval is
approved based upon the foregoing information and applicable ordinances, subject to the following conditions:
1. The developer shall execute a Development Contract as drafted by the City Attorney and approved by the City
Council.
a. If the final plat and Development Contract are not recorded on or before 31 December 2026, all securities,
escrows, and fees required by it shall be revised in accordance with the Schedule of Fees established by
Section 1-3-2 of the City Code effective as of 1 January 2027.
2. The subject property shall be developed in accordance with the PUD Development Stage Plan submitted to the
City subject to the stipulations, limitations, and conditions as approved by the City Council.
3. The PUD Development Stage Plan shall be revised to provide for a 10-foot wide asphalt pedestrian connection
from Lot 1, Block 1 of the plat to Outlot A, Waterfront East subject to review and approval by the City Engineer;
said pedestrian trail is required to be constructed at the upon completion of the process to remove Outlot B from
the floodplain.
1
4. Dedication of right-of-way and construction of quantrelle Avenue, including sidewalks, signs, and street lights,
shall be subject to review and approval of the City Engineer.
5. All utility plans are subject to review and approval of the City Engineer.
6. The developer shall pay Utility Availability Charges for Lot 1, Block 1, of the plat, at the time of final plat approval.
7. The developer shall pay Utility Connection Charges forthe principal building on Lot 2, Block 1 at the time a building
permit is issued in accordance with the provisions of the City Code.
8. All floodplain, grading, drainage, and erosion control plans and issues shall be subject to review and approval by
the City Engineer.
9. All easements shall be subject to review and approval by the City Engineer; temporary drainage and utility easements
that expire upon approval of a final plat shall be dedicated over Outlot A, Outlot B, and Outlot C.
10. The developer shall pay Park Fees in lieu of land at the time of final plat approval in accordance with the fee
schedule in effect.
(remainder of page blank; signatures follow)
ADOPTED by the Otsego City Council this 12th day of October, 2026.
MOTION BY: Dunlap
SECONDED BY: Tanner
INFAVOR: Stockamp, Dunlap, Lund, and Tanner
OPPOSED: none
CITY OF OTSEGO
Jessica L. Stockamp, Mayo
ATTEST:
3
Audra Etzel, City Clerk
EXHIBIT A
LEGAL DESCRIPTION
Lots 1 and 2, Block 1, Outlot A and Lot 1, Block 2 Nathe 2"d Addition, Wright County, Minnesota