Item 3.9 South Central Wellfield Development Phase 1A Project Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Utilities Utility Manager Neidermeier August 24, 2026 PRESENTER(s) REVIEWED BY: ITEM #: Consent AE2S Engineer Hanson City Administrator/Finance Director Flaherty 3.9 – South Central Wellfield STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City Staff recommend the City Council approve project change orders and amend an engineering agreement. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? Yes No BACKGROUND/JUSTIFICATION: The South Central Wellfield Siting Study is being completed to evaluate potential locations for future Tunnel City- Wonewoc aquifer wells, estimate the capacity of those wells, and assess potential impacts to nearby private wells. To support the study, the City retained Traut Companies to construct two public water supply wells, two test pumping wells, and three monitoring wells to facilitate aquifer testing and groundwater drawdown monitoring. During drilling of one of the proposed public water supply wells (Well 13) at the South Central Water Treatment Facility site, unfavorable geologic conditions were encountered that are expected to significantly limit the anticipated Tunnel City-Wonewoc well capacity. Based on these findings, the engineer and hydrogeologist recommend completing Well 13 as a Mt. Simon aquifer well. This recommendation aligns with the City's CIP, which includes a future Mt. Simon aquifer well at this site in 2027-2028. To maintain the original objectives of the aquifer testing program, an additional test pumping well and monitoring well are also recommended. Traut Companies has submitted proposals for labor and materials to continue drilling and develop Well 13 as a Mt. Simon well and to construct an additional monitoring well, resulting in a contract increase of $374,476.80 and a new contract amount of $1,617,569.35. Following completion of the monitoring well, the Engineer and project team will review the drilling and geologic data to determine whether the additional pumping well should be developed as a test well or a full-size public water supply well. An additional test well is estimated to cost $160,000, while a full-size public water supply well is estimated to cost $400,000. These costs are not included in the current change order request. In addition, AE2S has requested an amendment to the Owner-Engineer Agreement in the amount of $45,700 to provide engineering services associated with this change in scope. The amendment also includes additional services provided during the preliminary study phase, as well as construction administration and on-site observation services associated with the South Central Wellfield Phase 1A construction project. The amendment and change orders were presented to the Public Works Subcommittee on August 19, 2026. City staff have reviewed the requests and found them reasonable and consistent with the project’s needs. The City Attorney is currently reviewing the AE2S amendment language, with no expectations for comments. Staff recommend approval of the amendment to allow AE2S to continue providing construction support services through project final completion. SUPPORTING DOCUMENTS ATTACHED: • Change Order Request – Well 13 • Change Order Request – Monitoring Well • Amendment No. 1 to Owner-Engineer Agreement POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to approve Change Order Proposals as indicated above in the amount of $374,476.80 to Traut Companies; and to approve “Amendment to Owner-Engineering Agreement, Amendment No. 1” – a professional services contract amendment in the amount of $45,700 with Advanced Engineering and Environmental Services, LLC. BUDGET INFORMATION FUNDING: BUDGETED: Fund 601 – Drinking Water Utility Yes Project: DATE: NAME: ADDRESS: CONTACT: PHONE # EMAIL: JOB #20 Additional Notes: Line Item Unit QTY Total E.01 LS 1 32,300.00$ E.02 LF 175 36,750.00$ E.03 CY 6.5 3,185.00$ E.04 LF 85 15,300.00$ E.05 CuYd 9 8,055.00$ E.06 LF 65 5,525.00$ E.07 LS 1 2,370.00$ E.08 LB 100 8,500.00$ E.09 CuYd 800 128,000.00$ E.10 HR 40 21,000.00$ E.11 CuYd 800 40,000.00$ E.12 LS 1 3,100.00$ E.13 HR 24 600.00$ E.14 DAY 7 4,200.00$ E.15 EA 1 2,250.00$ Total:311,135.00$ 1,243,092.55$ 1,243,092.55$ 1,554,227.55$ 311,135.00$ Traut Companies Travis Traut Travis Traut Dual Rotary Drilling Manager Date August 5, 2026 F.I.R. Test Pumping Equipment for 1000 GPM Testing Generator 24-HR Capacity Testing Generator 7-Day Aquifer Pumping Test Geophysical Log 85.00$ 2,370.00$ 160.00$ 525.00$ 3,100.00$ 25.00$ 600.00$ 2,250.00$ Change Order #1 Request - Convert PW13 to Mt. Simon Otsego South Central Wellfield Development - Phase 1A August 5, 2026 Well Details City of Otsego First Bedrock: Tunnel City 13400 90th Street NE Aquifer: Mt. Simon Otsego, MN 55301 Well Size: 24x18 Description Unit Price Kurt Neidermeier Well Type: Open Hole 763-428-9215 Drilling Method: Dual Rotary Kneidermeier@otsegomn.gov Well Depth: 390' I-16315 Est. Work Days Mobilization/Demobilization/Sitework 32,300.00$ Drill Nominal 24-Inch Open Hole 210.00$ Furnish Pea Rock to Backfill Hole 490.00$ Previous Change Order(s): Furnish & Install 18-Inch Casing 180.00$ Grout Annular Space Between 18" and 24" Casings 895.00$ Blasting with Explosives 85.00$ Disposal of Rock/Sandstone 50.00$ Original Contract Amount: Remove Pea Rock from 24-Inch Hole F.I.R. Development Equipment Rock/Sandstone Removal by Air Lift Development by Pressure & Release Surging Contract Amount Prior to this Change Order: New Contract Amount: Prepared By Approved By Authorized Signature Authorized Signature Name (Printed) Name (Printed) Title Title Date Value of this Change Order: 32640 County Road 133 St. Joseph, MN 56374 320-251-5090 travist@trautcompanies.com Additional units & some price changes to convert PW13 into a Mt. Simon Well. Assuming 290' of 18" Casing, TWD of 390', 900 total yards of sand, 450 lbs. of dyanmite, additional 40 hours of development, 1000 GPM yield and test pump. Mobilization adder includes: moving off the the well and moving back, extra crew expense, bond increase,and project management. PROPOSAL Job #I-23257 Date: 08/19/2026 Job Manager: Daryl Karasch Phone: 320-406-2651 Email: darylk@trautcompanies.com Contact Ryan Hanson Mobile: 612-220-0154 Email: ryan.hanson@ae2s.com Bill To: City of Otsego 13400 90th Street NE Otsego MN 55301 Work Site: OW-2WON NA 76th St NE Otsego MN 55330 Scope: OW-3WON - Expected Geology: 0-145' Drift, 145'-190' Tunnel City, 190'-240' Wonewoc 1 (240') 4" Continuous Core x 6", 8" Sonic Liner, 10" Sonic Liner to 145' , Convert into 4" OB Well w/ LC Steel Riser w/ Grout Basket at (190') Neat Cement Grout Bedrock, HS Bentonite Grout Unconsolidated. 8" Protop w/ Locking Cap, Develop Assume thin spread drill fluid and cuttings into field Service Unit Qty Rate Total OW-1WON (240') 4" Open Hole OB Well (E.01) Mobilization EA 1 $8,000.00 $8,000.00 (E.03) Drill and Sample FT 270 $149.95 $40,486.50 (E.04) 4" Casing & Grout Basket EA 206 $32.55 $6,705.30 (E.05) Grout Annulus FT 204 $25.00 $5,100.00 (E.08) 8" Protective Casing with Locking Cap EA 1 $750.00 $750.00 (E.06) Development Equipment & Setup LS 1 $500.00 $500.00 (E.07) Development HR 2 $400.00 $800.00 (E.09) IDW Waste Management EA 1 $1,000.00 $1,000.00 Proposed Job Total:$63,341.80 By:                                                                                 Date: 08/19/2026 -Traut Companies. By:                                                                                 Date:                                          Print Name:          AE2S           Terms, conditions and disclosures This proposal is based on the information provided and is valid for 120 days from the bid date, unless otherwise mutually agreed upon. After this period, pricing and terms may be subject to change due to fluctuations in labor, material, or fuel costs. The client is responsible for obtaining any site-specific permits, excluding well or sealing permits. All locations, regardless of project size, must be clearly marked at least 72 business hours in advance to ensure proper public locates can be called, unless otherwise agreed upon in writing. Additionally, the client is required to locate and clearly mark all private underground installations or utilities. If needed, Traut can assist in arranging a private locator at the owner's expense. Traut Companies will not be held liable for any damage to utilities or improvements that are not clearly and accurately marked. While Traut Companies will make reasonable efforts to complete the work within the agreed-upon timeline, delays may occur due to unforeseen circumstances such as adverse weather, supply chain issues, or changes in the project scope. The client will be notified of any delays as soon as possible. Additionally, in the event of unforeseen geological changes or unsafe drilling conditions, drilling may continue on a time and materials basis or be halted at Traut’s discretion. The prices provided assume standard labor rates with no work hour restrictions, and any changes to the scope of work may result in additional costs. Payment Terms If the invoice remains open and unpaid after 60 days, Traut Companies will send a 60-day notice and flag the invoice. If the invoice is still open and unpaid after 90 days, Traut Companies will send a 90-day late notice, and the unpaid balance will begin accruing interest at a rate of 1.5% per month on the amount due. Additionally, Traut requests a 30-day and 60-day invoice status update to ensure timely communication regarding payment progress. Acceptance By accepting this quote, the client agrees to the terms and conditions outlined above. Any deviations from these terms must be agreed to in writing by both parties. Should you wish to discuss this further, please do not hesitate to contact our Traut Companies team. -Traut Companies trautcompanies.com 32640 Co Rd 133, St. Joseph, MN 56374 320.251.5090 or 800.728.5091 Amendment No. 1 Page 1 AE2S PROJECT NO.: P05409-2023-009 AMENDMENT TO OWNER-ENGINEER AGREEMENT Amendment No. 1 Effective Date of Owner-Engineer Agreement: January 22, 2024 Owner: City of Otsego Engineer: Advanced Engineering and Environmental Services, LLC Specific Project: South Central Water Treatment Plant Siting Study Nature of Amendment: X Modifications of services performed by Engineer X Additional services to be performed by Engineer X Modification of payment to Engineer X Modifications to time(s) for rendering services Description of Modifications: a. The Scope of Services currently authorized to be performed by Engineer in accordance with the Agreement and previous amendments, if any, is modified as follows: • Additional alternative site evaluations during the preliminary study phase. • Test pumping shifting from the originally scoped construction timeline from 2025 to 2026. • Design changes and State approval to change the proposed Well 13 from a Tunnel-City Wonewoc well to a Mt. Simon Hinkley well. • Additional design and State approval to add one additional Tunnel-City Wonewoc well to the construction project. b. Engineer shall perform the following Additional Services: E1.05 Construction Phase 1. As Basic Services, Engineer shall: • General Administration of Construction Contract: Consult with Owner and act as Owner’s representative as provided in the Construction Contract. The extent and limitations of the duties, responsibilities, and authority of Engineer shall be as assigned in EJCDC® C-700, Standard General Conditions of the Construction Contract (2013 Edition), prepared by the Engineers Joint Contract Documents Committee, or other construction general conditions specified in the Agreement. If Owner, or Owner and Contractor, modify the duties, responsibilities, and authority of Engineer in the Construction Contract, or modify other terms of the Construction Contract having a direct bearing on Engineer, then Owner shall compensate Engineer for any related increases in the cost to provide Construction Phase services. Engineer shall not be required to furnish or perform services contrary to Engineer’s responsibilities as a licensed professional. All of Owner’s instructions to Contractor will be issued through Engineer, which shall have authority to act on behalf of Owner Amendment No. 1 Page 2 in dealings with Contractor to the extent provided in this Agreement and the Construction Contract except as otherwise provided in writing. • Selection of Independent Testing Laboratory: Assist Owner in the selection of an independent testing laboratory to perform the testing services. • Pre-Construction Conference: Participate in a pre-construction conference prior to commencement of Work at the Site. • Electronic Transmittal Protocols: If the Construction Contract Documents do not specify protocols for the transmittal of Project-related correspondence, documents, text, data, drawings, information, and graphics, in electronic media or digital format, either directly, or through access to a secure Project website, then together with Owner and Contractor jointly develop such protocols for transmittals between and among Owner, Contractor, and Engineer during the Construction Phase and Post- Construction Phase. • Original Documents: If requested by Owner to do so, maintain and safeguard during the Construction Phase at least one original printed record version of the Construction Contract Documents, including Drawings and Specifications signed and sealed by Engineer and other design professionals in accordance with applicable Laws and Regulations. Throughout the Construction Phase, make such original printed record version of the Construction Contract Documents available to Contractor and Owner for review. • Schedules: Receive, review, and determine the acceptability of any and all schedules that Contractor is required to submit to Engineer, including the Progress Schedule, Schedule of Submittals, and Schedule of Values. • Baselines and Benchmarks: As appropriate, establish baselines and benchmarks for locating the Work which in Engineer’s judgment are necessary to enable Contractor to proceed. • Visits to Site and Observation of Construction: In connection with observations of Contractor’s Work while it is in progress: i. Make visits to the Site at intervals appropriate to the various stages of construction, as Engineer deems necessary, to observe as an experienced and qualified design professional the progress of Contractor’s executed Work. Such visits and observations by Engineer, and the Resident Project Representative, if any, are not intended to be exhaustive or to extend to every aspect of the Work or to involve detailed inspections of the Work beyond the responsibilities specifically assigned to Engineer in the Agreement, this Task Order, and the Construction Contract Documents, but rather are to be limited to spot checking, selective sampling, and similar methods of general observation of the Work based on Engineer’s exercise of professional judgment, as assisted by the Resident Project Representative, if any. Based on information obtained during such visits and observations, Engineer will determine in general if the Work is proceeding in accordance with the Construction Contract Documents, and Engineer shall keep Owner informed of the progress of the Work. Amendment No. 1 Page 3 ii. The purpose of Engineer’s visits to the Site, and representation by the Resident Project Representative, if any, at the Site, will be to enable Engineer to better carry out the duties and responsibilities assigned to and undertaken by Engineer during the Construction Phase, and, in addition, by the exercise of Engineer’s efforts as an experienced and qualified design professional, to provide for Owner a greater degree of confidence that the completed Work will conform in general to the Construction Contract Documents and that Contractor has implemented and maintained the integrity of the design concept of the completed Project as a functioning whole as indicated in the Construction Contract Documents. Engineer shall not, during such visits or as a result of such observations of the Work, supervise, direct, or have control over the Work, nor shall Engineer have authority over or responsibility for the means, methods, techniques, sequences, or procedures of construction selected or used by any Constructor, for security or safety at the Site, for safety precautions and programs incident to any Constructor’s work in progress, for the coordination of the Constructors’ work or schedules, nor for any failure of any Constructor to comply with Laws and Regulations applicable to furnishing and performing of its work. Accordingly, Engineer neither guarantees the performance of any Constructor nor assumes responsibility for any Constructor’s failure to furnish or perform the Work, or any portion of the Work, in accordance with the Construction Contract Documents. • Defective Work: Reject Work if, on the basis of Engineer’s observations, Engineer believes that such Work is defective under the terms and standards set forth in the Construction Contract Documents. Provide recommendations to Owner regarding whether Contractor should correct such Work or remove and replace such Work, or whether Owner should consider accepting such Work as provided in the Construction Contract Documents. • Compatibility with Design Concept: If Engineer has express knowledge that a specific part of the Work that is not defective under the terms and standards set forth in the Construction Contract Documents is nonetheless not compatible with the design concept of the completed Project as a functioning whole, then inform Owner of such incompatibility, and provide recommendations for addressing such Work. • Clarifications and Interpretations: Accept from Contractor and Owner submittal of all matters in question concerning the requirements of the Construction Contract Documents (sometimes referred to as requests for information or interpretation— RFIs), or relating to the acceptability of the Work under the Construction Contract Documents. With reasonable promptness, render a written clarification, interpretation, or decision on the issue submitted, or initiate an amendment or supplement to the Construction Contract Documents. • Field Orders: Subject to any limitations in the Construction Contract Documents, Engineer may prepare and issue Field Orders requiring minor changes in the Work. • Change Orders and Work Change Directives: Recommend Change Orders and Work Change Directives to Owner, as appropriate, and prepare Change Orders and Work Change Directives as required. Amendment No. 1 Page 4 • Differing Site Conditions: Respond to any notice from Contractor of differing site conditions, including conditions relating to underground facilities such as utilities, and hazardous environmental conditions. Promptly conduct reviews, obtain information, and prepare findings, conclusions, and recommendations for Owner’s use, subject to the limitations and responsibilities under the Agreement and the Construction Contract. • Non-reviewable matters: If a submitted matter in question concerns the Engineer’s performance of its duties and obligations, or terms and conditions of the Construction Contract Documents that do not involve (1) the performance or acceptability of the Work under the Construction Contract Documents, (2) the design (as set forth in the Drawings, Specifications, or otherwise), or (3) other engineering or technical matters, then Engineer will promptly give written notice to Owner and Contractor that Engineer will not provide a decision or interpretation. • Shop Drawings, Samples, and Other Submittals: Review and approve or take other appropriate action with respect to Shop Drawings, Samples, and other required Contractor submittals, but only for conformance with the information given in the Construction Contract Documents and compatibility with the design concept of the completed Project as a functioning whole as indicated by the Construction Contract Documents. Such reviews and approvals or other action will not extend to means, methods, techniques, sequences, or procedures of construction or to safety precautions and programs incident thereto. Engineer shall meet any Contractor’s submittal schedule that Engineer has accepted. • Substitutes and “or-equal”: Evaluate and determine the acceptability of substitute or “or-equal” materials and equipment proposed by Contractor. • Inspections and Tests: i. Receive and review all certificates of inspections, tests, and approvals required by Laws and Regulations or the Construction Contract Documents. Engineer’s review of such certificates will be for the purpose of determining that the results certified indicate compliance with the Construction Contract Documents and will not constitute an independent evaluation that the content or procedures of such inspections, tests, or approvals comply with the requirements of the Construction Contract Documents. Engineer shall be entitled to rely on the results of such inspections and tests. ii. As deemed reasonably necessary, request that Contractor uncover Work that is to be inspected, tested, or approved. iii. Pursuant to the terms of the Construction Contract, require additional inspections or testing of the Work, whether or not the Work is fabricated, installed, or completed. • Disagreements between Owner and Contractor. Render formal written decisions on all duly submitted issues relating to the acceptability of Contractor’s work or the interpretation of the requirements of the Construction Contract Documents pertaining to the execution, performance, or progress of Contractor’s Work; review each duly submitted Claim by Owner or Contractor, and in writing either deny such Claim in Amendment No. 1 Page 5 whole or in part, approve such Claim, or decline to resolve such Claim if Engineer in its discretion concludes that to do so would be inappropriate. In rendering such decisions, Engineer shall be fair and not show partiality to Owner or Contractor and shall not be liable in connection with any decision rendered in good faith in such capacity. • Applications for Payment: Based on Engineer’s observations as an experienced and qualified design professional and on review of Applications for Payment and accompanying supporting documentation: i. Determine the amounts that Engineer recommends Contractor be paid. Recommend reductions in payment (set-offs) based on the provisions for set- offs stated in the Construction Contract. Such recommendations of payment will be in writing and will constitute Engineer’s representation to Owner, based on such observations and review, that, to the best of Engineer’s knowledge, information and belief, Contractor’s Work has progressed to the point indicated, the Work is generally in accordance with the Construction Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Substantial Completion, to the results of any subsequent tests called for in the Construction Contract Documents, and to any other qualifications stated in the recommendation), and the conditions precedent to Contractor’s being entitled to such payment appear to have been fulfilled in so far as it is Engineer’s responsibility to observe the Work. In the case of unit price work, Engineer’s recommendations of payment will include final determinations of quantities and classifications of the Work (subject to any subsequent adjustments allowed by the Construction Contract Documents). ii. By recommending payment, Engineer shall not thereby be deemed to have represented that observations made by Engineer to check the quality or quantity of Contractor’s Work as it is performed and furnished have been exhaustive, extended to every aspect of Contractor’s Work in progress, or involved detailed inspections of the Work beyond the responsibilities specifically assigned to Engineer in the Agreement or this Task Order. Neither Engineer’s review of Contractor’s Work for the purposes of recommending payments nor Engineer’s recommendation of any payment including final payment will impose on Engineer responsibility to supervise, direct, or control the Work, or for the means, methods, techniques, sequences, or procedures of construction or safety precautions or programs incident thereto, or Contractor’s compliance with Laws and Regulations applicable to Contractor’s furnishing and performing the Work. It will also not impose responsibility on Engineer to make any examination to ascertain how or for what purposes Contractor has used the money paid to Contractor by Owner; to determine that title to any portion of the Work, including materials or equipment, has passed to Owner free and clear of any liens, claims, security interests, or encumbrances; or that there may not be other matters at issue between Owner and Contractor that might affect the amount that should be paid. • Contractor’s Completion Documents: Receive from Contractor, review, and transmit to Owner maintenance and operating instructions, schedules, guarantees, bonds, certificates or other evidence of insurance required by the Construction Contract Documents, certificates of inspection, tests and approvals, and Shop Drawings, Amendment No. 1 Page 6 Samples, and other data approved. Receive from Contractor, review, and transmit to Owner the annotated record documents which are to be assembled by Contractor in accordance with the Construction Contract Documents to obtain final payment. The extent of Engineer’s review of record documents shall be to check that Contractor has submitted all pages. • Substantial Completion: Promptly after notice from Contractor that Contractor considers the entire Work ready for its intended use, in company with Owner and Contractor, visit the Site to review the Work and determine the status of completion. Follow the procedures in the Construction Contract regarding the preliminary certificate of Substantial Completion, punch list of items to be completed, Owner’s objections, notice to Contractor, and issuance of a final certificate of Substantial Completion. Assist Owner regarding any remaining engineering or technical matters affecting Owner’s use or occupancy of the Work following Substantial Completion. • Final Notice of Acceptability of the Work: Conduct a final visit to the specific Project to determine if the Work is complete and acceptable so that Engineer may recommend, in writing, final payment to Contractor. Accompanying the recommendation for final payment, Engineer shall also provide a notice to Owner and Contractor, “Notice of Acceptability of Work”, that the Work is acceptable to the best of Engineer’s knowledge, information, and belief, and based on the extent of the services provided by Engineer under the Agreement and this Task Order. • Standards for Certain Construction-Phase Decisions: Engineer will render decisions regarding the requirements of the Construction Contract Documents, and judge the acceptability of the Work, pursuant to the specific procedures set forth in the Construction Contract for initial interpretations, Claims, and acceptance of the Work. In rendering such decisions and judgments, Engineer will not show partiality to Owner or Contractor, and will not be liable to Owner, Contractor, or others in connection with any proceedings, interpretations, decisions, or judgments conducted or rendered in good faith. 2. Duration of Construction Phase: The Construction Phase will commence with the execution of the first Construction Contract for the specific Project or any part thereof and will terminate upon written recommendation by Engineer for final payment to Contractors. If the specific Project involves more than one prime contract as indicated in Paragraph A1.03.C, then Construction Phase services may be rendered at different times in respect to the separate contracts. Subject to the provisions of Article 3, Engineer shall be entitled to an equitable increase in compensation if Construction Phase services (including Resident Project Representative services, if any) are required after the original date for completion and readiness for final payment of Contractor as set forth in the final Construction Contract under the Task Order. • Construction administration and on-site observation services associated with the construction of the South-Central Wellfield – Phase 1A construction project. c. For the modifications of services set forth above, Owner shall pay Engineer the following additional compensation on an hourly basis, not to exceed $45,700.00 without written authorization from the Owner. Amendment No. 1 Page 8 ADVANCED ENGINEERING AND ENVIRONMENTAL SERVICES, LLC 2026 HOURLY FEE AND EXPENSE SCHEDULE Labor Rates* Administrative 1 $73.00 Administrative 2 $88.00 Administrative 3 $103.00 Communications Specialist 1 $117.00 Communications Specialist 2 $137.00 Communications Specialist 3 $158.00 Communications Specialist 4 $190.00 Communications Specialist 5 $210.00 Construction Services 1 $140.00 Construction Services 2 $171.00 Construction Services 3 $190.00 Construction Services 4 $211.00 Construction Services 5 $232.00 Engineering Assistant 1 $94.00 Engineering Assistant 2 $111.00 Engineering Assistant 3 $140.00 Engineer 1 $152.00 Engineer 2 $182.00 Engineer 3 $213.00 Engineer 4 $246.00 Engineer 5 $264.00 Engineer 6 $279.00 Engineering Technician 1 $93.00 Engineering Technician 2 $117.00 Engineering Technician 3 $141.00 Engineering Technician 4 $158.00 Engineering Technician 5 $181.00 Financial Analyst 1 $126.00 Financial Analyst 2 $142.00 Financial Analyst 3 $171.00 Financial Analyst 4 $187.00 Financial Analyst 5 $209.00 GIS Specialist 1 $117.00 GIS Specialist 2 $142.00 GIS Specialist 3 $168.00 GIS Specialist 4 $188.00 GIS Specialist 5 $210.00 I&C Assistant 1 $112.00 I&C Assistant 2 $139.00 I&C 1 $166.00 I&C 2 $196.00 I&C 3 $221.00 I&C 4 $234.00 I&C 5 $246.00 IT 1 $145.00 IT 2 $196.00 IT 3 $241.00 Land Surveyor Assistant $107.00 Land Surveyor 1 $129.00 Land Surveyor 2 $156.00 Land Surveyor 3 $175.00 Land Surveyor 4 $193.00 Land Surveyor 5 $213.00 Operations Specialist 1 $112.00 Operations Specialist 2 $140.00 Operations Specialist 3 $173.00 Operations Specialist 4 $198.00 Operations Specialist 5 $222.00 Project Coordinator 1 $130.00 Project Coordinator 2 $145.00 Project Coordinator 3 $162.00 Project Coordinator 4 $178.00 Project Coordinator 5 $201.00 Project Manager 1 $229.00 Project Manager 2 $251.00 Project Manager 3 $269.00 Project Manager 4 $284.00 Project Manager 5 $303.00 Project Manager 6 $317.00 Sr. Designer 1 $199.00 Sr. Designer 2 $221.00 Sr. Designer 3 $238.00 Sr. Financial Analyst 1 $236.00 Sr. Financial Analyst 2 $257.00 Sr. Financial Analyst 3 $279.00 Technical Expert 1 $361.00 Technical Expert 2 Negotiable Amendment No. 1 Page 9 Reimbursable Expense Rates Transportation $0.83/mile Survey Vehicle $1.05/mile Laser Printouts/Photocopies $0.30/copy Plotter Printouts $1.00/s.f. UAS - Photo/Video Grade $100.00/day UAS/USV – Survey $50.00/hour Total Station – Robotic $35.00/hour Mapping GPS $60.00/day Fast Static/RTK GPS $50.00/hour All-Terrain Vehicle/Boat $100.00/day Cellular Modem $75.00/month Web Hosting $26.00/month Legal Services Reimbursement $302.00/hour Outside Services cost * 1.15 Geotechnical Services cost * 1.30 Out of Pocket Expenses cost * 1.15 Rental Car cost * 1.20 Project Specific Equipment Negotiable * Position titles are for labor rate grade purposes only. These rates are subject to adjustment each year on January 1.