2026 April PC Mtg PresentationPRAIRIE PARK PHASE 1 IMPROVEMENTS
PARK COMMISSION MEETING
APRIL 21, 2026
Prairie Park - Phase 1 Improvements
Otsego, MN
AGENDA
1]
2]
3]
4]
5]
6]
1] PROJECT OVERVIEW
Prairie Park - Phase 1 Improvements
Otsego, MN
WHERE WE’VE BEEN ...
2023
2024 2025 2026
FALLFALLWINTER WINTERSPRINGWINTERSPRING SUMMERSUMMER FALL SUMMER
Prairie Park - Phase 1 Improvements
Otsego, MN
WHERE WE’RE GOING ...COMPLETEDNEAR-TERMLONG-TERM• Feb:
• March:
• April:
• Today:
• May 1st:
• May 12th:
• June 8th:
• June 16th:
• June 22nd:
• June/July: Award Grant Notification
• Fall ‘26:
• Winter ‘26/‘27:
• Spring ‘27:
• Fall ‘27:
Prairie Park - Phase 1 Improvements
Otsego, MN
PROJECT GOALS
• Budget: $7.8 million
• Top Priorities
»
»Ballfield Improvements
»
»
»
»
• Other Priorities Include
»
»
»
»
»
2] PROPOSED PARK PLAN
MASTER PLAN
(PHASE 1)
RC Track
Mowed Trails
Stormwater Pond
Soccer Fields
Multi-use FieldsExisting Parking Skate Park
NewAdventure Playground
Zip Line
Concrete Path
Prairie Restoration Area
Parking Lot Resurfacing and Expanion
NewPavilion
Basketball Court Resurfacing
Gaga Ball
Pickleball CourtExpansion
Sledding Hill Removal
Existing Parking Dog Park
Prairie Park Center
Splash Pad (To Remain)
Picnic Shelter (To Remain)
Otsego City Hall & Public Works
Existing ParkingArchery
Updated (4) Ballelds
Improved Trails
Future Public Works Expansion
Asphalt Path
Development of facilities accomplished with this grant
Future or other work outside project scope
Existing facilities that will remain Park Boundary
Entrance to the park
Accessible Route (Existing)
Accessible Route (Proposed)
0 50 100 200Nashua Ave NENashua Ave NE90th St N
E
Otsego Creek90th St NE90th St NE Napi
e
r Ave NE
• Key Features
»
»Ballfield Improvements
»
»
»
»
»
»
»
»
MASTER PLAN
Nashua Ave NENashua Ave NE90th St N
E
Otsego Creek90th St NE90th St NE Napi
e
r Ave NE
RC Track
Hiking Trail
Shelter
Stormwater Pond
O-Leash Dog Park
Existing Soccer Fields
(Add Lighting to
Northern Fields)
Pave Parking
Expand Parking
Skate Park
Adventure Playground
Zip Line
Park
Pavilion
Veterans Memorial
Concrete Path
Picnic Shelter
Splash Pad
Resurface
Basketball Court
Gaga
Ball
Add 4 Pickleball
Courts
Multi-use Fields
(Remove Sledding Hill)
New Parking
Stormwater
Pond
Prairie Park Center
Otsego City Hall & Public Works
Existing ParkingArchery
Sledding Hill
94 Spaces + 51 Spaces 60 Spaces60 Spaces60 Spaces185 Spaces
New
Parking
Update
Ballelds
Hockey Rink
Free Skate Area
Warming House
Future Road ConnectionRemove Outeld
Fence for Flexible
Event Space
Prairie
Restoration
Area
Prairie
Restoration
Area
Prairie
Restoration
Area
Prairie
Restoration
Area
62 Spaces 130 SpacesFuture Public Works
Expansion
Reserve for Potential Future Civic Facility
Asphalt Path
N 0 100 200 ft
• Future Improvements
»
»
»
»
»
»
»
3] SITE FEATURES
Prairie Park - Phase 1 Improvements
Otsego, MN
PAVILION WITH RESTROOMS, CONCESSIONS, AND OPEN-AIR SHELTER
• Budget: $1.75 million
• Style
»
fit/finish
• Vendor
»
• Building Program
»
»
»
»
• Proximity to existing
shelter
Prairie Park - Phase 1 Improvements
Otsego, MN Nashua Ave NENashua Ave NE90th St
N
E
Otsego Creek90th St NE90th St NE Napier Ave NE
RC Track
Hiking
Trail
Shelter
Stormwater
Pond
O-Leash
Dog Park
Existing Soccer Fields (Add Lighting to Northern Fields)Pave Parking
Expand Parking
Skate Park
Adventure
Playground
Zip Line
Park
Pavilion
Veterans
Memorial
Concrete Path
Picnic
Shelter
Splash Pad
Resurface
Basketball
Court
Gaga
Ball
Add 4
Pickleball
Courts
Multi-use Fields
(Remove Sledding Hill)
New
Parking
Stormwater
Pond
Prairie Park Center
Otsego City Hall & Public Works
Existing ParkingArchery
Sledding
Hill
94 Spaces + 51 Spaces 60 Spaces60 Spaces60 Spaces185 Spaces
New
Parking
Update
Ballelds
Hockey
Rink
Free
Skate
Area
Warming
House
Future Road ConnectionRemove Outeld
Fence for Flexible
Event Space
Prairie
Restoration
Area
Prairie
Restoration
Area
Prairie
Restoration
Area
Prairie
Restoration
Area
62 Spaces 130 SpacesFuture Public Works Expansion
Reserve for Potential
Future Civic Facility
Asphalt Path
N 0 100 200 ft
PAVILION ORIENTATION
Concessions
Open-Air Seating
RestroomRestroom
Drinking Fountains StorageStorage25’-0”
65’-0”36’-0”39’-0”• “Park Pavilion” is no longer
an enclosed building
• Evaluate best building
orientation
»
»
»
»
Prairie Park - Phase 1 Improvements
Otsego, MN
PLAYGROUND
CONCEPT A• Budget: $1.18 million
• Vendor: TBD
• Considerations
»
»
»
»
DESIGN BY: FLAGSHIP RECREATION
Prairie Park - Phase 1 Improvements
Otsego, MN
PLAYGROUND PRELIMINARY CONCEPTS
CONCEPT B CONCEPT C
DESIGN BY: FLAGSHIP RECREATION DESIGN BY: FLAGSHIP RECREATION
Prairie Park - Phase 1 Improvements
Otsego, MN
PLAYGROUND PRELIMINARY CONCEPTS
CONCEPT D
DESIGN BY: MIDWEST PLAYSCAPES
Prairie Park - Phase 1 Improvements
Otsego, MN
PLAYGROUND CUSTOM EXPLORATION
Prairie Park - Phase 1 Improvements
Otsego, MN
• Budget: $100k
• Considerations
»
VETERANS MEMORIAL
Prairie Park - Phase 1 Improvements
Otsego, MN
CHASKA VETERANS PARK ZIMMERMAN LEGION PARK VETERANS MEMORIAL CHAMPLIN VETERANS PARK
VETERANS MEMORIAL PRECEDENTS
Prairie Park - Phase 1 Improvements
Otsego, MN
BALLFIELD IMPROVEMENTS
• Budget: $850k
• Previous Ballfield Study
• Considerations
»
»
»
»No outfield fence at NE field
Prairie Park - Phase 1 Improvements
Otsego, MN
OTHER SITE FEATURES
4] COST ESTIMATE
Prairie Park - Phase 1 Improvements
Otsego, MN
COST ESTIMATE OVERVIEW
$7.7 MILLION IS THE OVERALL TARGET BUDGET
Prairie Park - Phase 1 Improvements
Otsego, MN
COST ESTIMATE ALTERNATES
• Alternates
»
»
• Other elements may be
added as we move through
the design process
5] COMMUNITY ENGAGEMENT
Prairie Park - Phase 1 Improvements
Otsego, MN
INPUT FROM THE COMMUNITY
• Goals
»
»
• In-Person Events
»
»
• Online Survey
»
»
ballfield
»
6] NEXT STEPS
Prairie Park - Phase 1 Improvements
Otsego, MN
NEXT STEPS
• Today:
• May 1st:
• May 12th:
• June 8th:
• June 16th:
• June 22nd:
• June/July: Award Grant Notification
• Fall ‘26:
• Winter ‘26/‘27:
• Spring ‘27:
• Fall ‘27:
THANK YOU!