Item 5.1 CIP Review Item 5.1
1
TO: Parks and Recreation Commission
FROM: Nick Jacobs, Parks and Recreation Director
DATE: November 10, 2025
RE: Capital Improvement Plan Review
Background Information
The City of Otsego follows a Capital Improvement Plan (CIP) to lay out a clear and transparent
road map of the year and funding for Parks and Recreation projects. The specific funds that
relate to Parks and Recreation are Trail Management (Fund 202) and Parks Capital Equipment
(Fund 205), which are funded through the general tax levy. Park Development (Fund 203) is
funded through park dedication.
Staff will have an informative presentation of the DRAFT CIP at the meeting. The discussion will
be focused on upcoming projects in 2026 and beyond. The proposed projects identified for
2026 pending council approval are:
• Annual Trail Maintenance and Renewal based on ratings (Trails throughout the City)
(Fund 202)
• Lily Pond Park Renovation (Fund 205)
• River Landing (probable parkland purchase) (Fund 203)
• Prairie Park Phase 1 Planning (Fund 203)
• Prairie Pointe Wetland Bridge (Fund 203)
• Lefebvre Creek Greenway Spur (Fund 203)
Requested Commission Action
Staff requests the Parks and Recreation Commission participate in discussion after the
presentation and provide feedback on the Parks and Trails CIP.
Item 5.1
2
Possible recommendation:
• N/A
Attachments:
• DRAFT Parks and Trails Capital Improvement Plan (PowerPoint)
Parks and Trails
Capital Improvement Plan
2026-2035 (DRAFT)
November 18, 2025
Parks and Recreation Director Jacobs
Fund 202 –Trail Management
PCI Index for Trails: Trails are rated yearly
Numbers below “55” are candidates for trail renewal projects
Trail Renewal Candidates:
Annual Maintenance to Preserve
Candidates:
TRAILS
•Trail Maintenance
($72,000)
•Crack filling
•Infrared patching cracks
•Fog Seal
•Trail Renewals($100,000)
•Mill and Overlay
•Removal and
Replacement
•Reclaim
Fund 203 – Park Development
*Ebner Landing* (Probable Parkland Purchase)
Description Cost:
Land Purchase $10,000
Staff time In kind (As time
allows)
6 Benches $4,200
3 Trash and 3
Recycle Receptacles
$700
Class 5 for Parking
Lot (Estimate) 150CY
$3,000
Curb Cut and Replace
(Estimate)
$2,500
Signage $700
Total: $21,100 (Estimate)
Consultants:Fees
HKGi and HAA
(Design and
Engineering)
$357,500
Prairie Park Phase 1-Planning-2026/2027
Prairie Park Phase 1-Consrutction-2027
Trails and Wetland Bridges:
2026-2030
2026-Prairie Pointe Wetland Bridge-60ft
$168,050
2026-Lefebvre Creek Greenway Spur-.31mi
$507,400
(Includes
Bridge)
2027-CSAH 36 (Randolph to CSAH 42)-1.14mi
$551,800
(Phased)
2028-Otsego Creek Greenway Phase 1-.11mi
$90,000
2028-Otsego Creek Greenway Phase 2-.13mi
$241,100
2029-Otsego Creek Greenway Phase 3-.35mi
$318,400
2029-Otsego Creek Greenway Phase 4-.4mi
$350,000 *Alternate Route
Could be Mason Ave*
2029-CSAH 39 (Odean to Nashua)-1.08mi
$540,000
2030-Maciver Ave (85th to CSAH 39)-.98mi
$804,000
Year:Segment:Cost:
2026 PP Wetland Bridge $168,050
2026 Lefebvre Greenway $507,400
2027 CSAH 36 $551,800
2028 Otsego Creek Phase 1 $90,000
2028 Otsego Creek Phase 2 $241,100
2029 Otsego Creek Phase 3 $318,400
2029 Otsego Creek Phase 4 $350,000
2029 CSAH 39 $540,000
2030 Maciver Ave $804,000
TOTAL:$3,570,750
Trails construction year and cost table:
LAND ACQUISITION
•INCLUDED, SPENT AT
COUNCIL’S DISCRETION
Fund 205 – Parks Capital
Equipment
•$580,000 FOR THE RENOVATION OF LILY POND PARK
•PARKS AND RECREATION COMMISSION HELD THE PUBLIC ENGAGEMENT EVENT AT THE JULY 2025 MEETING
•FEEDBACK WILL BE USED TO CREATE A PREFERRED CONCEPT PRESENTED TO THE COMMISSION AT THE NOVEMBER PARKS AND RECREATION COMMISSION MEETING
•PLAN FOR RENOVATION TO BEGIN SPRING
2026
Lily Pond Construction 2026
Renovation Schedule
Park:Year
Constructed:
Scheduled
Replacement:
Cost:
Lily Pond 2005 2026 $580,000
*Prairie Park*
(Playground)
2003 2027 $897,700
Kittredge Park 2006 2028 $562,400
Zimmer Park 2006 2030 $681,200
Beaudry Park 2007 2032 $756,700
Frankfort Park 2010 2034 $809,300
School Knoll
Shelters
2003 2035 $118,400
Total:$4,405,700
Beyond 2026
PRAIRIE PARK MASTER PLAN IMPLEMENTATION
TRAIL RENEWAL PROJECTS
Based on Trail Ratings (ongoing)
COMMUNITY CENTER FEASIBILITY STUDY
PARK RENOVATIONS AS THEY REACH 20 YEAR+ THRESHOLD
PARK LAND(S) ACQUISITION
2ND COMMUNITY PARK
COMMUNITY GARDEN ADDITION
Future Project Considerations