Loading...
Master Plan Phase 1-June 2025Prairie Park Master Plan Phase 1-Options Parks and Recreation Commission June 2025 1 Option 1: Park Building 2 Significant Cost Savings Achieves the main goal of restrooms/changing area More favorable for maintenance operations More favorable for scheduling Less potential for issues Option 2: Restrooms/Concessions/Open Air Seating 3 Precedent Images: Orono Park (Elk River) 4 Precedent Images: Andrews Park (Champlin) 5 Nature based equipment or traditional equipment? 6 Ballfield Complex 7 Parking lot resurface and expansion 8 Miscellaneous work: Common excavation and general grading Concrete Plazas Resurface existing trails Stormwater allowance Veterans Memorial- relocated and upgraded Drinking Fountain Landscaping New irrigation Pavillion and Splash Pad New Trees 9 Thoughts? 10 Thank you! 11