Master Plan Phase 1-June 2025Prairie Park Master Plan
Phase 1-Options
Parks and Recreation Commission
June 2025
1
Option 1: Park Building
2
Significant Cost Savings
Achieves the main goal of restrooms/changing area
More favorable for maintenance operations
More favorable for scheduling
Less potential for issues
Option 2: Restrooms/Concessions/Open Air Seating
3
Precedent Images: Orono Park (Elk River)
4
Precedent Images: Andrews Park (Champlin)
5
Nature based equipment or traditional equipment?
6
Ballfield Complex
7
Parking lot resurface and expansion
8
Miscellaneous work:
Common excavation and general grading
Concrete Plazas
Resurface existing trails
Stormwater allowance
Veterans Memorial- relocated and upgraded
Drinking Fountain
Landscaping
New irrigation Pavillion and Splash Pad
New Trees
9
Thoughts?
10
Thank you!