Loading...
SCC Item 1. South Central Water Treatment Plant Project UpdatesOtsego Council Work Session Meeting July 26 1 South Central Water Treatment GMP Award & AE2S Amendment Presented by: Advanced Engineering and Environmental Services, LLC (AE2S) July 2026 Summary of Topics •System Wide Treatment Review •Project Scope •Site Plan Review •CMAR Process Review •CMAR Guaranteed Maximum Price (GMP) •AE2S Amendment •Project Cost Summary •Timeline/Schedule 1 2 SCC Item 1. Otsego Council Work Session Meeting July 26 2 Systemwide Treatment Planning Long-Term Systemwide Map Locations for future treatment at Wellhouse 1, Wellhouse 2, and NCWT not yet determined 3 4 Otsego Council Work Session Meeting July 26 3 SCWT Project Scope FACILITY TREATMENT STORAGE DISTRIBUTION SITE & SYSTEMSRECLAMATION •Treatment area •Administrative space •Maintenancegarage New 2,700 gpm groundwater treatment facility with expansion capacity to 4,500 gpm •Four (4) operational filters •Infrastructurefor two (2) additionalfilters •Chemical feed systems •750,000 gallon finished ground storage reservoir (clearwell) •High services pumps and wetwell •Bulkwater fillstation •Water Tower 4 control vault •Backwash holding tanks and recovery / reclamation systems •Site utilities, stormwater management, lift station, roads, and site restoration •HVAC, mechanical, electrical systems, instrumentation, and backup generator DISTRIBUTION Process Flow Diagram FILTERS (4)HMOFLUORIDECORROSION INHIBITORBACKWASH RECLAIM TANKS CHLORINECHLORINECHLORINECLEARWELL EXPANSION CLEARWELL AND HIGH SERVICE PUMPING OTSEGO SOUTH CENTRAL WATER TREATMENT PROCESS WATER SUPPLY WELLS CLEAN, SAFE WATER FOR OUR COMMUNITY PROCESSES WITHIN TREATMENT BUILDING AVAILABLE CLEARWELL EXPANSION PHASE 2 FILTERS (2) 5 6 Otsego Council Work Session Meeting July 26 4 Site Plan McAllister Ave NELandscaping/Screening Plan PINUS SYLVESTRIS SCOTCH PINE (30’-60’ MATURE) CELTIS OCCIDENTALI COMMON HACKBERRY (40’-60’ MATURE) GLEDITSIA TRIACANTHOS HONEY LOCUST (30’-70’ MATURE) SYRINGA PEKINENSIS 'SUNDAK' COPPER CURLS PEKING LILAC (20’-25’ MATURE) Screening on north side of site covered by City’s site seeding contractor at end of project 7 8 Otsego Council Work Session Meeting July 26 5 CMAR Process Construction Manager at Risk (CMAR) Rice Lake Construction Group Phase 1 Pre-Construction •CMAR collaborates with Owner and Engineer •Reviews design and schedule •Develops cost model for estimated costs •Owners approves GMP •CMAR proceeds with construction •CMAR assumes cost risk above GMP Agreement between Owner and CMAR for pre-construction services Phase 2 GMP Development •CMAR solicits competitive bids for individual work packages •Reviews bids/costs with Owner and Engineer •Establishes a Guaranteed Maximum Price (GMP) Phase 3 Construction Agreement amended to include a Guaranteed Maximum Price (GMP) What is a GMP? Cost of Work The actual cost to build the project Including Owner allowances, labor, materials, equipment, subcontractors, permits, and temporary facilities Construction Support Costs Project-specific management & support costs Typ. % of the Cost of Work CMAR Contingency Controlled by CMAR Covers construction means, methods, and execution risks % of Support Costs + Cost of Work Owner Contingency Controlled by City Covers unforeseen conditions, scope changes, and owner-directed changes % of Support Costs + Cost of Work CMAR Fee CMAR’s overhead and profit Covers business expenses, management, and earnings for taking on the project Fixed % applied to everything Guaranteed Maximum Price (GMP): •The maximum amount the Owner will pay for the defined scope of work, with the CMAR responsible for delivering the project within that established cost. ANY UNUSED CONTINGENCY IS RETURNED TO THE OWNER AT THE END OF THE PROJECT + CMAR FEE Guaranteed Maximum Price Negotiated w/ Owner Reviewedw/ Owner Negotiated w/ Owner Owner Determined EstablishedDuring CMAR Award 9 10 Otsego Council Work Session Meeting July 26 6 Establishing Cost of Work CMAR completed a pre-qualification process with prospective bidders Approved bidders were sent bid package Bids were received on June 30 and reviewed with AE2S and City on July 6 Items that were further reviewed by CMAR and Engineer •No bids received for floor hatches •No bids received for HVAC controls •Joint Sealant low bidder was over 50% lower than other bidders •Alternative manufacturers were included in bids •Bidders included a potential deduct for eliminating waterproofing admin and garage footings •Electrical bidders included price for additional breaker panel required by utility GMP Breakdown South Central Water Treatment Project GMP Breakdown CostItem $ 2,183,704DIV 01 - Construction Support Costs $ 331,000DIV 01 - Owner DirectedAllowances $ 26,265,106DIV 02 thru 46 - Cost of Work $ 863,394CMAR Construction Contingency (3%) $ 575,596Owner Construction Contingency (2%) $ 1,595,766CMAR Fee (6%) $ 31,814,567 Total Guaranteed Maximum Price July 15, 2026: Reviewed GMP with Public Works Subcommittee 11 12 Otsego Council Work Session Meeting July 26 7 AE2S – SCWT Construction Services Amendment South Central Water Treatment $ 2,388,800SCWT Construction Services – Phase $ 1,329,700Phase 060: Construction Administration $ 942,500Phase 061: Construction Observation $ 116,600Phase 070: Post-Construction $ 638,300SCWT I&C Programming -Phase $ 423,300Phase 080: Instrumentation and Controls (I&C) - SCWT $ 215,000Phase 081: Telemetry and Existing Sites Controls Modifications $ 3,027,100Total Engineering Services Amendment 1 South Central Wellfield Phase 1B •Amendment for future well construction services will be required after completing design and bidding •Design and bidding is included in original agreement and is expected to occur in Spring 2027 SCWT - Total Project Cost Summary $ 31,862,207CMAR Total $ 47,640CMAR Design Services $ 31,814,567Guaranteed Maximum Price (GMP) $ 5,370,268Soft Costs (Planning/Design Costs) $ 3,930,700AE2S Engineering Design/Bidding & Construction Services Costs $ 638,300Programming and I&C $ 31,650HAA (survey, staking, CMAR process, wetland delineation, as-builts, etc.) $ 37,618Geotech Investigation $ 75,000Special Inspections (est.) $ 60,000 Security and IT Equipment (est.) $ 50,000Site Seeding and Landscaping (est.) $ 312,000City Procured I&C Items (est.) $ 125,000Furnishings (est.) $ 50,000Utilities (est.) $ 40,000Building Permit (est.) $ 20,000Other – (misc/legal/admin) (est.) $ 37,232,475Total Project Cost SCWT 2026 CIP Amount: $35.8M Total Project Cost (2026 and beyond): $ 35,900,202 Expended thru 2025 -$1,332,273 13 14 Otsego Council Work Session Meeting July 26 8 Additional Cost Considerations Power and control equipment, & increased generator size for on-site wells Process piping and instrumentation for on-site wells Inclusion of Phase 2 filters construction with Phase 1 Modifications to Water Tower 4 entrance drive Water Tower 4 valve vault for level control Reduced clearwell size Schedule 2026 2027 2028 2029 July 27, 2026 15 16 Otsego Council Work Session Meeting July 26 9 QUESTIONS? Otsego South Central Water Treatment 17