Item 3.1 Zachman Meadows 2nd Addition3601 Thurston Avenue Anoka, MN 55303 763.231.5840 TPC@PlanningCo.com 1 PLANNING REPORT TO: Otsego Planning Commission FROM: D.Daniel Licht REPORT DATE: 10 June 2026 ACTION DATE: 3 July 2026 RE: Otsego – Zachman Meadows 2nd Addition; Preliminary Plat TPC FILE: 101.02 BACKGROUND Boyd-Dollansky, LLC proposes to subdivide PID 118-800-262302 as a second phase of the Zachman Meadows residential plat. The subject property is 12.12 acres located north of 70th Street and east of Kadler Avenue. The proposed development consists of 43 single family lots. The proposed subdivision requires applications for a Zoning Map amendment, a PUD Development Stage Plan, and a preliminary plat. The applications are subject to review by the Planning Commission and approval of the City Council. A public hearing to consider the zoning and subdivision applications has been noticed for the Planning Commission meeting on 15 June 2026. Exhibits: §Property location map §Applicant Narrative dated 4 May 2026 §Civil plans dated 2 June 2026 (19 sheets) §Floodplain Mitigation Map dated 4 May 2026 §PUD, Planned Unit Development District ordinance Item 3.1 2 ANALYSIS Zoning. The subject property is zoned A-1, Agriculture Rural Service District. The proposed subdivision requires consideration of a Zoning Map amendment to rezone the subject property to PUD, Planned Unit Development District. The PUD District is to be based upon the uses and standards established for the residential Zachman Meadows preliminary plat by Ordinance 2024-05 adopted 22 April 2024. The Zoning Map amendment is to be considered based upon, but not limited to, the criteria established by Section 11-3-2.F of the Zoning Ordinance, respectively: 1. The proposed action's consistency with the specific policies and provisions of the Otsego Comprehensive Plan. Comment: The proposed development is consistent with the 2023 Comprehensive Plan, including the following policies: § Cluster land complementary uses and activities into functionally related sub-units of the community as determined by physical barriers, homogeneous land use characteristics, and service area boundaries. § Accomplish transitions between different land uses in an orderly manner so as not to create negative impacts on adjoining developments; changes in types of land use shall occur either at mid- block points, so that similar uses front on the same street, or at borders of areas separated by physical barriers. § Recognize the need to develop a variety of twin homes, townhouses, and multiple family dwellings to supplement conventional single family homes giving due consideration to local market demands and desired community character. 2. The proposed use's compatibility with present and future land uses of the area. Comment: The proposed development continues the land use pattern from Kittredge Crossings west through Windsong to Kadler Avenue with density increasing toward Kadler Avenue. The proposed residential uses are separated from existing and planned industrial uses to the north and west by wetland areas and Kadler Avenue, respectively, to provide necessary transition. 3 3. The proposed use's conformity with all performance standards contained within the Zoning Ordinance and other provisions of the City Code. Comment: The proposed development will comply with the requirements of the Zoning Ordinance, Subdivision Ordinance, and City Code including those provisions established as part of the PUD District. 4. Traffic generation of the proposed use in relation to capabilities of streets serving the property. Comment: The property is accessed by existing Minor Arterial and Commercial/Industrial Collector streets that have capacity to accommodate the traffic generated by the proposed development. 5. The proposed use can be accommodated by existing public services and facilities and will not overburden the City's service capacity. Comment: The proposed development is located within the West Sewer District and includes land uses consistent with the Future Land Use Plan. The City has adequate capacity to serve the proposed development. EAW. An Environmental Assessment Worksheet was prepared in accordance with Minnesota Rules 4410.4300 to evaluate the potential environmental effects of the initial Zachman Meadows and Condo Suites Otsego development; the subject property was included in this environmental review. The EAW document was noticed on 11 March 2025 and published by the Environmental Quality Board (EQB) and distributed to stakeholders and agencies identified by the EQB on 18 March 2025. At its meeting on 28 April 2025, the City Council adopted Findings of Fact, Conclusions, and Response to Comments and determined that the development did not have the potential for significant environmental effects, and that preparation of an Environmental Impact Statement was not required. Kadler Avenue. The property abuts Kadler Avenue, which the 2023 Transportation Plan designates as a Commercial/Industrial Collector Street. The Transportation Plan further identifies Kadler Avenue as a future Minor Arterial and possible Wright County roadway between 70th Street (future CSAH 38) and 95th Street (CSAH 39). The City has required dedication of 75 feet for one-half the right-of-way from developments abutting Kadler Avenue to allow for future expansion of the roadway consistent with Minor Arterial standards. The preliminary plat illustrates dedication of 75 feet wide right-of-way for the east half of Kadler Avenue abutting the subject site. One access is proposed to Kadler Avenue at the northwest corner of the preliminary plat. The proposed access aligns with the north driveway access to the Dakota Supply Group lot on the west side of Kadler Avenue to avoid conflicts with turning vehicles. Section 10-8-5.B.4.c of the Subdivision Ordinance requires a minimum of 500 feet between local street intersections to 4 Kadler Avenue based on its designated functional classification. The proposed access from the preliminary plat to Kadler Avenue is 1,050 feet from Kittredge Parkway to the south and 950 feet from future 77th Street to the north. The proposed access spacing complies with the provisions of the Subdivision Ordinance. Local Streets. Lots are to be accessed via local public streets internal to the preliminary plat with connections at Kadler Avenue, Kaeding Avenue, and Kagen Avenue. The local streets are designed with 60 foot rights-of-way as required by Section 10-8-5.B.1 of the Subdivision Ordinance and a 28 foot wide street section with a sidewalk on one side, as outlined by the Engineering Manual. There are no cul-de-sac streets within the proposed preliminary plat. Street names will be assigned by City staff in accordance with the Wright County grid system and Section 10-8-5.B.13 of the Subdivision Ordinance. Section 8-8-4 of the City Code specifies installation of street lighting for new subdivisions at the corners of intersecting streets and midblock locations for blocks longer than 900 feet. Street lighting is to be shown on the utility plan. All street design and construction plans and signs are subject to review and approval of the City Engineer. Blocks. Section 10-8-3.A of the Subdivision Ordinance establishes that blocks within a subdivision are to be a minimum of 300 feet and not more than 1,200 feet in length. The three blocks within the preliminary plat comply with the minimum and maximum length requirements established by the Subdivision Ordinance. Lot Requirements. The Zachman Meadows PUD District allows for single family lots having a minimum average area of 5,000 square feet and minimum width of 40 feet based on single family villa style homes. The average lot area within the preliminary plat is 6,717 square feet and all the proposed single family lots are at least 40 feet wide with additional width for corner lots to meet setback requirements from the street abutting the side lot line. The preliminary plat complies with the minimum lot requirements of the Zachman Meadows PUD District. Setbacks. The table below outlines minimum setbacks required for the preliminary plat by the Zachman Meadows PUD District: Kadler Avenue Local ROW Side Rear Required 65ft. House 25ft. Garage 30ft. 7ft. 20ft. Proposed 30ft. 25ft. Interior 7ft. Corner 15ft. Block 2: 15ft. Other: 20ft. 5 The rear yard setback from Kadler Avenue required by the PUD District is reduced from 65 feet to 30 feet based on the difference in right-of-way dedication for a Commercial/Industrial Collector Street versus that required for a potential future Minor Arterial/County Road. Because there is no established timeline for whether Kadler Avenue will be upgraded to a Minor Arterial, the effective setback between the homes and the existing street would be the same as if a 65 foot setback were required. Landscaping. Section 11-19-2.B.2 of the Zoning Ordinance requires that two shade trees be provided for each lot, one of which must be in the front yard, at the time of house construction. The front yard trees are required to be planted outside of public right-of-way. Section 11-19-3.B requires that lots abutting collector and arterial streets provide a landscape buffer yard. The submitted landscape plan includes the buffer yard plantings with the required size and number of plants and appropriate plant types for the lots within Block 3 subject to the buffer yard landscape requirement. Stormwater Management. The developer has submitted grading, drainage, and erosion control plans for development of the preliminary plat. Portions of the property are within the 100-Year Floodplain. The grading plan addresses filling areas of the floodplain and provides mitigation for additional flood storage. The developer has also submitted a wetland delineation for the proposed preliminary plat. Wetlands to be preserved are required by Section 11-16-5.F of the Zoning Ordinance to be protected by a 20 foot buffer with the wetland and wetland buffer platted within an outlot deeded to the City. All grading, drainage, wetland impacts, and erosion control issues are subject to review and approval of the City Engineer. Utilities. The subject property is within the West Sewer District with sewer and water utilities available at the south line of the preliminary plat. The developer has submitted plans for extension of sewer and water utilities to serve the proposed lots within the preliminary plat. The sewer extension includes additional depth and/or capacity necessary to function as a trunk facility serving areas west of Kadler Avenue. The developer will receive credit for the cost of the trunk portion of the sewer improvements against Sewer Availability Charges. All utility plans and trunk credits are subject to review and approval of the City Engineer. Easements. Section 10-18-12.A of the Subdivision Ordinance requires 10 foot drainage and utility easements at the perimeter of all lots (overlying side lot lines), as well as over any stormwater management facilities, wetlands, and wetland buffers not platted within outlots deeded to the City. The preliminary plat provides for dedication of required easements, which are to be subject to review and approval of the City Engineer. Outlots. The preliminary plat includes Outlot A, which overlays that portion of a creek, floodplain, wetlands, and wetland buffers within the subject property. The stormwater basin at the rear of the lots within Block 1 should also be platted in an outlot to be deeded to the City for stormwater management purposes in accordance with Section 10-8-12.D of the Subdivision Ordinance. 6 Park Dedication. Section 10-8-15.A of the Subdivision Ordinance requires subdividers to dedicate a reasonable portion of the buildable land within a proposed preliminary plat for public use as parks or open space. The City may also choose to accept an equivalent amount in cash for part or all the land required to be dedicated. The subject property is within the service area for Kittredge Park to the east. The Future Parks and Trails Map identifies a future Greenway corridor adjacent to the creek along the north line of the subject property. Due to the limited depth of the subject property between the Zachman Meadows plat and the creek, there is not sufficient space to accommodate the Greenway corridor on the south side of the creek. The needed area for the Greenway corridor will have to be acquired from the property to the north. City staff has discussed the possibility that the developer could acquire and dedicate a drainage and utility easement, as well as a trail easement for the Greenway corridor, over the creek, floodplain, wetlands, and wetland buffers on the parcel to the north with the trail easement being credited for park dedication. This matter is still under discussion between City staff and the developer and will need to be determined prior to final plat approval. If dedication of land in the form of drainage and utility and trail easements is not agreed upon, payment of a cash fee in lieu of land for each single family lot will be required based on the fee in effect at the time the development contract is executed. Development Contract. Section 10-10-4.A of the Subdivision Ordinance requires execution of a Development Contract with final plat approval to provide for completion of public improvements, establishment of required securities, and payment of applicable fees related to the subdivision of the subject property. Development fees required to be paid based on the fee schedule in effect at the time the development contract is executed include, but are not limited to, the following: • Water Availability Charge • Sewer Availability Charge (less trunk credits) • Otsego Creek Stormwater Impact Fee • Park fee in lieu of land dedication Payment of Utility Connection Fees is due at the time a building permit is issued for each lot in accordance with Title 6, Section 1 of the City Code. The City Attorney will draft a PUD Agreement and Development Contract addressing the subdivision improvements for approval by the City Council concurrent with the final plat. 7 RECOMMENDATION The proposed Zachman Meadows 2nd Addition PUD Development Stage Plan and preliminary plat are consistent with the goals and policies of the 2023 Comprehensive Plan. The proposal also complies with the requirements of the Zachman Meadows PUD District, the Zoning Ordinance, and the Subdivision Ordinance. Accordingly, City staff recommends approval of the applications subject to the conditions outlined below. POSSIBLE ACTIONS Motion to recommend approval of a Zoning Map amendment rezoning the subject property to PUD District and approval of a PUD Development Stage Plan and preliminary plat of Zachman Meadows 2nd Addition, subject to the following conditions: 1. Approval of the preliminary plat shall not guarantee access to sanitary sewer service. The City shall only allocate sanitary sewer capacity to approved final plats with signed development contracts to assure the City of timely development. 2. All right-of-way dedication, street design and construction plans, sidewalks, street lighting and street names shall be subject to review and approval of the City Engineer. 3. All lots within the preliminary plat shall comply with the following setbacks: Kadler Avenue Local ROW Side Rear Proposed 30ft. 25ft. Interior 7ft. Corner 15ft. Block 2: 15ft. Other: 20ft. 4. Two shade trees shall be planted upon each lot by the builder, one of which shall be in the front yard. 5. Residential buffer yard landscaping shall be planted by the developer within Block 3 as required by the Zoning Ordinance, subject to review and approval of the Zoning Administrator. 6. All grading, drainage, floodplain, wetland, and erosion control issues shall be subject to review and approval of the City Engineer. 7. A Stormwater Impact Fee for Otsego Creek shall be paid by the developer in accordance with the fee in effect upon execution of the development contract. 8. All utility plans shall be subject to review and approval of the City Engineer. 9. Utility Availability Charges shall be paid by the developer in accordance with the fee in effect upon execution of the development contract. 8 10. Utility Connection Fees shall be paid by the developer at the time a building permit is issued for each lot in accordance with the City Code and fee schedule in effect. 11. All drainage and utility easements shall be subject to review and approval of the City Engineer. 12. The preliminary plat shall be revised to encompass the stormwater basin within an outlot to be designated as Outlot B, subject to review and approval of the City Engineer. 13. Outlot A and Outlot B shall be deeded to the City for stormwater management purposes. 14. Park dedication requirements shall be satisfied as payment of a cash fee in lieu of land in accordance with the fee in effect upon execution of the development contract, unless an agreement is reached to dedicate land subject to approval of the City Council. 15. A PUD Agreement and Development Contract as drafted by the City Attorney and approved by the City Council shall be executed by the developer. 16. The final plat shall be recorded within one year of City Council approval unless an extension is approved by the City Council. c. Adam Flaherty, City Administrator/Finance Director Audra Etzel, City Clerk Ron Wagner, City Engineer David Kendall, City Attorney Property Location Map Zachman Meadows 2nd Addition 1,051 ft Overview Legend Highways Interstate State Highway US Highway Roads City/Township Limits c t Parcels Torrens Narrative Zachman Meadows 2nd Addition Prepared for: Boyd Dollansky, LLC May 4, 2026 SUBMITTED TO City of Otsego Planning Department 13400 90th Street NE Otsego, MN 55330 PREPARED BY Landform Professional Services, LLC 105 5th Ave S, Suite 513 Minneapolis, MN 55401 Landform®, SensiblyGreen® and Site to Finish® are registered service marks of Landform Professional Services, LLC TABLE OF CONTENTS Introduction .................................................................................................................................................. 1 Development Plan ......................................................................................................................................... 1 Summary ....................................................................................................................................................... 2 Contact Information ...................................................................................................................................... 2 Zachman Meadows 2nd Addition, Otsego, MN May 4, 2026 BDL23001 1 Introduction On behalf of Boyd Dollansky, LLC, Landform is pleased to submit this application for a Rezoning and Preliminary Plat for a property at PID #118800262302. The proposed development includes single-family homes that expand off the first mixed use addition to the south. This 12.12-acres site is a follow up to the EAW that was completed in April of 2025 for the entire Zachman Meadows development. We are excited about the improvements proposed for this site. Development Plan Rezoning We intend to develop the site as part of the existing PUD to the south and would need to have the parcel rezoned to PUD to match the standards for the 1st addition. The PUD zoning would match the southern site which is guided the same for residential. This would be an The requested rezoning to PUD complies with the standards in Section 11-3-2(F) of the Zoning Ordinance as follows: 1. The proposed action's consistency with the specific policies and provisions of the City Comprehensive Plan. The PUD would be consistent with the underlying land use and the specific policies and provisions of the City’s Comprehensive Plan. 2. The proposed use's compatibility with present and future land uses of the area. The uses would be consistent with the land uses in the 2023 Comprehensive Plan. The Low-Medium Density land use on the property allows development of single family homes that will transition from the existing homes on the east to the industrial development on the west side of Kadler Avenue as anticipated in the Comprehensive Plan. 3. The proposed use's conformity with all performance standards contained within this title and other provisions of this Code. The development will comply with all performance standards contained in the Zoning Ordinance except where specific flexibility has been granted by the existing PUD to the south. 4. Traffic generation of the proposed use in relation to capabilities of streets serving the property. The property is bounded by Kadler Avenue on the west (a future major collector) and 70th Street NE on the south (a future major arterial). These streets will accommodate the traffic anticipated by this development. 5. The proposed use can be accommodated by existing public services and facilities and will not overburden the City's service capacity. The proposed use can be accommodated by existing public services and facilities and will not overburden the City’s service capacity. The property is in the sewered district and services are stubbed to the property. The existing PUD zone includes base zoning districts Residential-Medium Density District (R-6), Residential-High Density District (R-7) and General Industrial District (I-2) in accordance with the future land use guidance in the Zachman Meadows 2nd Addition, Otsego, MN May 4, 2026 BDL23001 2 Comprehensive Plan. The PUD standards would allow for a 5,000 sq. ft. minimum lot size average in the single family villa lots similar to those found directly to the east. We are requesting approval of the following residential setbacks in the PUD: Front = 25 feet Front, corner = 15 feet Rear, adjacent to Kadler = 30 feet Side = 7 feet Rear = 20 feet Rear = 15 feet (Block 2) The site will comply with the landscaping standards in Chapter 19 of the Zoning Ordinance and the building standards in Chapter 17 of the Zoning Ordinance. Preliminary Plat The preliminary plat shows 43 single family lots that build off the temporary cul-de-sacs of both Kagen Avenue and Kaeding Lane. The roads will connect as the “new“ section of 75th Street that will have an additional access onto Kadler Ave that matches with the industrial drive access across from it. The single-family lots have sizes ranging from 4,577 sq. ft. to 9,881 sq. ft. with an average of 6,717 sq. ft. for the entire addition. The development meets the standards found in the Zoning Ordinance except for the flexibility that is allowed in the existing PUD that this would be included in if rezoned. Summary We respectfully request approval of the rezoning and preliminary plat at the June 1st Planning Commission and June 8th City Council. Contact Information This document was prepared by: Zeke Peters, AICP Landform 105 South Fifth Avenue, Suite 513 Minneapolis, MN 55401 Any additional questions regarding this application can be directed to Eric Luth at eluth@landform.net or 612.638.0261. PROJECT NO. FILE NAME LANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY From Site to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net DEVELOPER MUNICIPALITY 2025PRELIMI N A R Y NOT FO R CONST R U C TI O N Preliminary Plat & Final Plat Submittal Preliminary Plat Submittal ETL ETL 02 JUN 2025 04 MAY 2026 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. License No:Date:xx/xx/2025 Eric T. Luth, PE 50475 CRAIG DOLLANSKY TEL: (612) 309-9563 EMAIL: BOYDDOLLANSKY@GMAIL.COM OTSEGO, MINNESOTA BDL001-003 C0.1 CIVIL & LANDSCAPE TITLE SHEET C001BDL001-003.DWG ZACHMAN MEADOWS 2ND ADDITION OTSEGO, MINNESOTA NORTHNO SCALE AREA LOCATION MAP SHEETS ISSUED BY DATE COMPOST/BIO LOG D Angle &And @ At 100 YR.100 Year Flood Elevation A.B.Anchor Bolt A.D.Area Drain A/C Air Conditioning Unit ADD.Addendum ADDL.Additional ADJ.Adjacent / Adjust AHU Air Handling Unit ALT.Alternate ALUM.Aluminum ANOD.Anodized APPROX.Approximate ARCH Architect / Architectural AUTO.Automatic AVG.Average B.C.Back of Curb B/W Bottom of Wall BFE Basement Floor Elevation BIT Bituminous (Asphaltic) BLDG Building BM Benchmark BSMT.Basement C.F.Cubic Feet C.F.S.Cubic Feet Per Second C.G.Corner Guard C.J.Control Joint C.L.Centerline C.M.U.Concrete Masonry Unit C.O.Cleanout C.O.E.U.S. Army Corps Of Engineers C.Y.Cubic Yards CB Catch Basin CBMH Catch Basin Manhole CEM.Cement CIP Cast Iron Pipe CMP Corrugated Metal Pipe CONC.Concrete (Portland) CONN.Connection CONST.Construction CONT.Continuous CONTR.Contractor COP.Copper CU.Cubic D.S.Down Spout DEG.Degree DEMO.Demolition / Demolish DEPT.Department DET.Detail DIA.Diameter DIAG.Diagonal DIM.Dimension DIP Ductile Iron Pipe DN Down DWG.Drawing E.East E.J.Expansion Joint E.O.Emergency Overflow E.O.S.Emergency Overflow Swale E.W.Each Way EA.Each EL.Elevation ELEC.Electrical ELEV.Elevation EMER.Emergency ENGR.Engineer ENTR.Entrance EQ.Equal EQUIP.Equipment EQUIV.Equivalent EXIST.Existing EXP.Expansion F & I Furnish and Install F.B.O.Furnished by Others F.C.Face of Curb F.D.Floor Drain F.D.C.Fire Department Connection F.V.Field Verify FB Full Basement FBWO Full Basement Walk Out FBLO Full Basement Look Out FDN.Foundation FES Flared End Section FFE Finished Floor Elevation FLR.Floor FT. OR (')Foot FUT.Future G.B.Grade Break G.C.General Contractor GAL.Gallon GALV.Galvanized GFE Garage Floor Elevation GL.Glass GR.Grade H.Height H.P.High Point HDPEP High Density Polyethylene Pipe HGT.Height HORIZ.Horizontal HVAC Heating, Ventilation, Air Conditioning HYD Hydrant I.D.Inside Dimension OR Identification I.E. or IE Invert Elevation IN. OR (")Inches INFO.Information INL.Inlet Elevation INSUL.Insulation INV.Invert Elevation JT.Joint L.F.Linear Feet L.P.Low Point / Liquid Petroleum LB.Pound LGU Local Government Unit LB.Pound LB.Longitudinal LT.Light / Lighting MAINT.Maintenance MAS.Masonry MATL.Material MAX.Maximum MECH Mechanical MED.Medium MFR.Manufacturer MH Manhole MIN.Minimum / Minute MISC.Miscellaneous MNDOT Minnesota Department Of Transportation MOD.Module / Modular MUL.Mullion N.North N.I.C.Not In Contract NO. OR #Number NOM Nominal NTS Not to Scale NWE Normal Water Elevation NWL Normal Water Level O.F.On Center O.G.Outside Dimension O.H.Overhead Electric OH.Overhead OHWL Ordinary High Water Level OPNG.Opening ORIG.Original P.C.Point of Curvature P.I.Point of Intersection PIV Post Indicator Valve P.L. OR P/L Property Line P.O.B.Point of Beginning P.S.F.Pounds Per Square Foot P.S.I.Pounds Per Square Inch P.T.Point of Tangency P.V.C.Point of Vertical Curvature P.V.I.Point of Vertical Intersection P.V.T.Point of Vertical Tangency PE Polyethylene PED.Pedestal / Pedestrian PERF.Perforated PREP.Preparation PROJ.Project PROP.Proposed PVC Poly-Vinyl-Chloride (Piping) PVMT.Pavement QTR.Quarter QTY.Quantity R Radius RAD.Radius RE Rim Elevation (Casting) R.D.Roof Drain R.E.Remove Existing R.O.Rough Opening R.P.Radius Point RC Reinforced Concrete Pipe R.S.Rough Slab RSD Roof Storm Drain RE.Regarding REINF.Reinforced REQ'D Required REV.Revision / Revised RGU Regulatory Government Unit ROW OR R/W Right of Way S.South S.F.Square Feet SAN.Sanitary Sewer SECT.Section SE Split Entry /Side Exit SEWO Split Entry Walk Out /Side Exit Walk Out SHT.Sheet SIM.Similar SLNT.Sealant SPEC.Specification SQ.Square SSD Subsurface drain STMH Storm Sewer Manhole STD.Standard STRUCT.Structural SYM.Symmetrical T Thickness T/R Top of Rim T/W Top of Wall TEMP.Temporary THK.Thick / Thickness T.J.Tooled Joint TNH Top Nut Hydrant TYP.Typical U.N.O.Unless Noted Otherwise V.B.Vapor Barrier V.C.Vertical Curve V.I.F.Verify In Field VER.Verify VER.Vertical VEST.Vestibule W Width W.PT.Working Point W.W.F.Welded Wire Fabric W/With W/O Without WO Walk Out VER.Wetland WP Waterproof WETL.Weight YD.Yard YR.Year EROSION CONTROL BLANKET ABBREVIATIONS SILT FENCE SYMBOL DESCRIPTION REVISED AREA (THIS ISSUE) REVISION - ADDENDUM, BULLETIN, ETC. NOTE REFERENCE LARGE SHEET DETAIL COORDINATE POINT PARKING STALL COUNT DESCRIPTIONSYMBOL EROSION CONTROL SYMBOLS DRAWING SYMBOLS LEGAL DESCRIPTION BENCHMARK INLET PROTECTION C21 C7.31 12 2 Project Benchmark: MNDOT GSID Station #34925 Station Name: 8680 K Location: 2.0 miles northwest of Albertville, 1.3 miles northwest-along Interstate Highway 94 from the junction of Interstate Highway 94 and County Road 19 in Albertville, 179.4 feet east-southeast of milepost 200, 92.0 feet north-northeast of westbound Interstate Highway 94, at Interstate Highway 94 milepoint 200.0, 6.5 feet southwest of a fence, 6.6 feet south-southwest of a witness post. Elevation = 965.74 FEET (NGVD29) Site Benchmark: Type: Top Nut Hydrant Location = At the Southwest corner of the temporary cul-de-sac for Keading Ave NE. Elevation = 960.87 (NGVD29) That part of said Southwest Quarter of the Northwest Quarter of Section 26, Township 121, Range 24, Wright County, Minnesota lying southerly of the following described line: Commencing at the southwest corner of said Southwest Quarter of the Northwest Quarter; thence on an assumed bearing of North 00 degrees 50 minutes 36 seconds West, along the west line of said Southwest Quarter of the Northwest Quarter, for a distance of 462.17 feet to the Point of Beginning of the line to be described; thence South 85 degrees 19 minutes 35 seconds East a distance of 375.46 feet; thence North 78 degrees 03 minutes 21 seconds East a distance of 382.81 feet; thence South 67 degrees 06 minutes 51 seconds East a distance of 284.72 feet; thence South 48 degrees 37 minutes 24 seconds East a distance of 324.34 feet; thence South 66 degrees 03 minutes 13 seconds East a distance of 39.44 feet; thence North 88 degrees 28 minutes 35 seconds East a distance of 34.91 feet to a point on the east line of said Southwest Quarter of the Northwest Quarter, said point being distant 144.25 feet north of the southeast corner of said Southwest Quarter of the Northwest Quarter as measured along said east line and there terminating. 3 BOYD DOLLANSKY, LLC W7120 OAKDALE DRIVE BEAVER DAM, WISCONSIN, 53916 TEL 612-309-9563 EMAIL BOYDDOLLANSKY@GMAIL.COM CONTACT: CRAIG DOLLANSKY DESCRIPTIONSHEET NO. CIVIL & LANDSCAPE TITLE SHEET EXISTING CONDITIONS & REMOVALS PLAN PRELIMINARY PLAT & SITE PLAN GRADING, DRAINAGE & EROSION CONTROL PLAN GRADING, DRAINAGE & EROSION CONTROL DETAILS SWPPP SANITARY SEWER & WATERMAIN PLAN & PROFILE SANITARY SEWER & WATERMAIN PLAN & PROFILE STORM SEWER PLAN & PROFILE STORM SEWER PLAN & PROFILE STREETS PLAN & PROFILE STREETS PLAN & PROFILE CIVIL CONSTRUCTION DETAILS CIVIL CONSTRUCTION DETAILS CIVIL CONSTRUCTION DETAILS CIVIL CONSTRUCTION DETAILS CIVIL CONSTRUCTION DETAILS LANDSCAPE PLANTING PLAN LANDSCAPE DETAILS CIVIL / LANDSCAPE SHEET INDEX & REVISION MATRIX OWNER C0.1 C1.1 C2.1 C3.1 C3.2 C3.3 C4.1 C4.2 C5.1 C5.2 C6.1 C6.2 C7.1 C7.2 C7.3 C7.4 C7.5 L2.1 L7.1 LANDFORM 105 SOUTH FIFTH AVENUE, SUITE 513 MINNEAPOLIS, MN 55401 TEL 612-252-9070 CONTACT: ERIC LUTH PROJECT CONTACTS CIVIL ENGINEER LANDFORM 105 SOUTH FIFTH AVENUE, SUITE 513 MINNEAPOLIS, MN 55401 TEL 612-252-9070 CONTACT: JERROD GUSTAVUS LESAVAGE SURVEYOR LANDFORM 105 SOUTH FIFTH AVENUE, SUITE 513 MINNEAPOLIS, MN 55401 TEL 612-252-9070 CONTACT: JOHN ORTIZ LANDSCAPE ARCHITECT 06.02.2505.04.26X X X X X X X X X X X X X X X X X X UNDERGROUND FIBER OPTICFO MODULAR RETAINING WALL FIELDSTONE RETAINING WALL NEW CATV UNDERGROUND CABLE/TV EXISTING DESCRIPTION DESCRIPTION STORM SEWER WATERMAIN FORCE MAIN SANITARY SEWER-WASTE ROOF DRAIN SYSTEM GAS LINE-UNDERGROUND FIRE LINE (IF SEPARATE) FIRE DEPT. CONNECTION SOIL SUBDRAIN TELEPHONE-UNDERGROUND ELECTRIC-UNDERGROUND LAWN SPRINKLER SLEEVE BLDG. GAS TELE ELEC LSS C.O. MAJOR CONTOUR BUILDING SPOT ELEVATION 120 CONCRETE SLOPE DIRECTION CONCRETE CURB GUARD RAIL FENCING CONCRETE RETAINING WALL HEIGHT, TYPE POWER POLE LIGHT STANDARD EXIT LOCATION UNDERGROUND STRUCTURE EDGE OF PAVEMENT BOLLARD CANOPY / OVERHANG BIT. EDGE CATCH BASIN MANHOLE SYMBOLS LANDSCAPING GRAVEL FLAG POLE > >> POWERPOLE GUARD POST GAS METER TREES TRAFFIC SIGN WATER MAIN SANITARY SEWER LINE STORM SEWER LINE OVERHEAD ELECTRIC MAJOR CONTOUR SPOT ELEVATION CONCRETE BUILDING CANOPY / OVERHANG 120 12"STS 8"SAN FENCING CONCRETE CURB RETAINING WALL OE STORM MANHOLE WATER VALVE FIRE HYDRANT FLARED END SECTION CATCH BASIN 6"WTR XXHEIGHT, TYPE 1 NOTE NUMBER GUY WIRE IRON MONUMENT FOUND WATER SHUT-OFF VALVE l l MEASURED DISTANCE DISTANCE PER RECORDED PLAT UNDERGROUND TELEPHONEUT UNDERGROUND ELECTRICUE GAS LINEG PAVING BLOCK PAVING BLOCK SET 1/2" X 14" IRON PIPE TRANSFORMER TREE LINE MAILBOX SURVEY DISK (BENCHMARK) WSO BITUMINOUS SOIL BORING 123.45 %1.00 234.5 LIGHT POLE MINOR CONTOUR123MINOR CONTOUR123 GM ST SS SANITARY MANHOLE TNH MB B# PRELIMINARY PLAT MAY 4, 2026 I RIPRAP GATE VALVE HYD FES >>>> >>>> >> >> I FM RD FIRE OTSEGO, MN 94 KITTREDGE PKWY74TH ST NEKADLER AVE NE73RD ST NE 80TH ST NE 19 70TH STREETJALGER AVE19 19 70T H S T R E E T 70TH STREET SITE X X X X X X X X X X X X X X X X X X X XX ))))))))))))))94 RELEVANT SPECIFICATIONS AND ORDER OF PRECEDENCE If there is a conflict between or among any of the terms or provisions of the Contract Documents, the Contract Documents shall be generally construed as being complementary with one another with the intent of providing the highest quality to the CLIENT. However, if a conflict cannot be reconciled the ENGINEER shall be consulted and their written directions shall be followed. In general, unless otherwise directed in writing by the ENGINEER the following order of precedence shall apply from highest precedence (“1”) to lowest (“7”). 1.Agreement between OWNER and CONTRACTOR 2.City Standard Specifications and Detail Plates 3.MnDOT Specifications for Construction 4.City Engineers Association of Minnesota (CEAM) Specifications 5.Conditions of the Contract 6.Plans 7.Digital Model 8.Bid Proposal >>>I I 56.9 57.0 ???49.0 49.0 57.0 I I I I >>>>>>IIII >>>IIII >>>IIII IIIEOF EOF EOF 56.9 ???54.0 >>>I I I I I I >>>>>>I I I I I I >>>IIIEOF57.8 BTM NWL NWL BTM 100 YR-HWL 100 YR-HWLWETLAND 110'10'10'10'10'10'ALL OF OUTLOT A IS DRAINAGE AND UTILITY EASEMENT >>>>>>>>>>>>>>>>>>>>>>>>FMFMFMFMFMFMIIIICS CS CS CS EBX CS2" MAPLE T MH 13-1 RIM: 958.82 INL (W): 934.02 INV (W):946.42FMFMFM 75 33 III28' - 21" RCP @ 0.12% I HOUSEHOUSESS SSMH RE=970.13 INV=961.66 N IN INV=961.66 S OUT INV=961.66 E OUT WRIGHT COUNTY CIM AT THE SW CORNER OF THE SW 1/4 OF THE NW 1/4 OF SEC. 26, TWP. 121, R. 24 SS SSMH RE=966.20 INV=956.46 (S) INV=956.54 (W) ST ST SS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X XXXXXXXXXXXXXXXUESTRUCTURE - (61) INV: 945.09 STRUCTURE - (62) INV: 945.03 STRUCTURE - (63) INV: 944.50STRUCTURE - (64) INV: 944.47 13' - 24" HDPE Pipe @ 0.24% STRUCTURE - (65) INV: 939.76 STRUCTURE - (66) INV: 939.81 13' - 24" HDPE Pipe @ 0.40%XXXXXXXXT S85°19'35"E 375.46 N78°03'21"E 38 2 . 8 1 S67°0 6 ' 5 1 " E 2 8 4 . 7 2 S4 8 ° 3 7 ' 2 4 " E 3 2 4 . 3 4 S66°03'13"E 39.44 N88°28'35"E 34.91 PUBLIC RIGHT OF WAY EASEMENT PER DOC. NO. 040420933 75 33 SS SSMH RE=957.37 INV=936.60 (N) INV=936.60 (E) *FILLED W/WATER SS SSMH RE=954.23 INV=936.78 (N) INV=936.78 (S) *FILLED W/WATER W 953.6 STRUCTURE - (67) INV: 947.17 STRUCTURE - (68) INV: 947.63 97' - 36" RC P @ 0 . 4 7 % STRUCTURE - (69) INV: 942.93 STRUCTURE - (70) INV: 943.22 19' - 30" Concrete Pipe @ 1.56% Water Elevation = 946.5 (2025-05-21) NGVD29 T Public Road and Utility Easement per Doc. No. 53670168.5020.00 50.0020.00 75.009.63 10.00 90° 90° 90°90°193.5290°FPFPFPFPFPFP FP FPFP FPFPFPFP FP FP >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>ST CBMH 961.0 CB RE=961.09 ST HYD>>>>>>>>>>>>>>IIIIIIIIIIIIFPFPFPFPF P FP FP FP F P FPFP FP FPFPFPFPFPFPFP B-113 B-114 B-115 42 WETWET WETWETWE T WE T WET WET WET WET WET WET WET WET WET WETWETWETWET WETWETWET WET WET W E T WETWET WET WET WET WET WET WET W E T WE T WE T WET WETWETWETW E T WE T WET WETWET 30 30 30 30N00°50'36"W 462.17WEST LINE OF THE SW 1/4 OF THE NW 1/4S00°52'53"E 144.25EAST LINE OF THE SW 1/4 OF THE NW 1/4 SE CORNER OF THE SW 1/4 OF THE NW 1/4 S88°51'29"W 1060.29 TEMPORARY TURNAROUND EASEMENT TEMPORARY EASEMENT SSSSSTIIIIWater Elevation = 945.8 (2025-05-21) NGVD29 SOUTH LINE OF THE SW 1/4 OF THE NW 1/4 T N H T NH SITE BENCHMARK TOP NUT OF HYDRANT ELEV.=960.87 WIRE FENCE END ±0.5 FT W OF CORNER WIRE FENCE FITS CORNER EXISTING SANITARY SEWER PER ZACHMAN MEADOWS PLAN SET EXISTING SANITARY SEWER PER ZACHMAN MEADOWS PLANS EXISTING STORM PER 'ZACHMAN MEADOWS' PLAN SET STORM SEWER PER 'ZACHMAN MEADOWS' PLAN SET STORM PIPE AND STRUCTURES PER PLANS WATERMAIN PER 'ZACHMAN MEADOWS' PLAN SET WATERMAIN PER 'ZACHMAN MEADOWS' PLAN SET SAN16 RIM: 957.38 INV (S):947.49 INV (N):947.59 SAN17 RIM: 957.17 INV (S):934.57 INV (N):934.67 CB-101B RIM: 954.01 INV: 950.40 CBMH-101A RIM: 957.07 INV (W): 949.85 INV: 949.85 CBMH-101 RIM: 957.10 INV (W): 949.71 INV (S): 953.65 INV: 949.60 CBMH-301 RIM: 956.97 INV (E): 953.30 INV: 950.10 CB-302 RIM: 957.02 INV: 953.50 CBMH-201 RIM: 956.45 INV (W): 951.70 INV (S): 951.10 INV: 949.42 FES-200 INV: 949.00 FES-300 INV: 949.00FES-100 INV: 949.00 94 4 944944944 9 4 6 94 6 946 94 6 948 94 8 950 95 0 952 9 5 2 954 95 4 956 956958 960 962 964 966 946946946948948948 950950950 952 952 954 954 956 956 958 958 960 960 962 962 946 948 950 952 954 956 9589609629649 6 6 9589589609609629629 6 4 96 6 942944946948950952954956958960944946 948 950950 952 952952 952 954 954 954 954 956 956956956 958958 948 950 95 2 9 54 95 6 9 5 8 944 94 4 946 946 9489 4 8 9 5 0 950 9 5 2 952 95 4 954 956 956 958 950 952 954 956 958 950952 954 956 95 8 944 946 948 950 9 5 0 952 952 954 95 4 952 954 956 958 960 962 942 944946948 950 952 954 956 958 960 962 942944946948 950 952 954 952 954 956 958 958 960 962 960 962 9 5 8 958942944946948 950 952 954 956 958 950 952 954 956 958 942944946 948 950 952 954 956 95 8 944946 948 950 952 954 956 944946 948 950 952 954 956 958944946 948 950 952 954 956 958946 948 950 95 2 9 5 4 95 6 958 950952954956958 960948 950 952 9 5 4956 94 4 94 4 94 6 94 6 94 8 9 4 8 950952954946 948 950 952 954 950 952 9 5 4 95695896094 8 950 952 946 946 948 950 9469 4 8 948 950 952 954 956 95 8 946 948 95 0 95295495695896 0 96 2 96 4 96 6 9 6 8 9 7 0 9 7 2 9 6 6 968970 972 96896 8 958958960962964966968970950952 954 952 952 944 946 948 950 952 954 946 944944 946 94 4 94 4 9 4 6 948 948 948 948 9489 5 4 954 954 9 5 6 HHCABX CABX CABX CABX CABX CABX EBX EBX EBX CABX 10 10 10 6 6 6 10 12 12 12 12 11 9 7 8 10 4 PROJECT NO. FILE NAME LANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY From Site to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net DEVELOPER MUNICIPALITY 2025PRELIMI N A R Y NOT FO R CONST R U C TI O N Preliminary Plat & Final Plat Submittal Preliminary Plat Submittal ETL ETL 02 JUN 2025 04 MAY 2026 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. License No:Date:xx/xx/2025 Eric T. Luth, PE 50475 NORTH 0 50 100 CRAIG DOLLANSKY TEL: (612) 309-9563 EMAIL: BOYDDOLLANSKY@GMAIL.COM OTSEGO, MINNESOTA BDL001-003 C1.1 EXISTING CONDITIONS & REMOVALS PLAN C101BDL001-003.DWG PRELIMINARY PLAT MAY 4, 2026 WET Background information shown per Boundary Survey performed by Landform on 2024-03-19, LiDAR drone flight performed by Landform on 2024-03-21, photo drone flight performed by Landform on 2025-04-21, ZACHMAN MEADOWS Final Site Improvement Plans prepared by Landform and dated 2024-07-30, and additional field work dated 2024-10-30 and 2025-05-22 expressly for this project.; City of Otsego, Minnesota record drawings; and utility service providers. Landform offers no warranty, expressed or written, for information provided by others. Existing project conditions shall be verified prior to beginning construction. Errors, inconsistencies, or omissions discovered shall be reported to the engineer IMMEDIATELY. Parcel 118800262302 existing zoning: A-1 Agricultural-Rural Service Area 1. 2. EXISTING CONDITIONS :Pavement Removal :Soil BoringB-X 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. GENERAL NOTES LEGENDDEMOLITION AND CLEARING NOTES For construction staking and surveying services contact Landform at 612.252.9070. Wetland delineation completed by KLJ on February 11, 2025 1. 2. :Fence Removal :Wetland Obtain permits for demolition, clearing, and disposal prior to beginning. Contact utility service providers for field location of services 72 hours prior to beginning demolition and clearing. See Sheet C3.1 for erosion prevention and sediment control measures that must be in place prior to disturbances to site. Existing wetland to be disturbed and filled-in during construction. Dimensions shown for removal are approximate. Coordinate with new construction to ensure appropriate removal of existing facilities. Pavement sawcut. Remove concrete walks and curbing to the nearest existing joint beyond construction limits. Complete demolition with minimal disruption of traffic. Coordinate lane closures with the regulatory authority and provide advance notification to affected emergency response providers. Provide barricades, lights, signs, traffic control, and other measures necessary for protection and safety of the public and maintain throughout construction. Existing storm inlet to be relocated. Remove existing site features including, but not limited to, paved temporary cul-da-sac, curbing, and fencing within the construction limits unless noted otherwise. Coordinate removal, relocation, termination, and re-use of existing private and public utility services and appurtenances with the utility companies. Restore electric handholes, pullboxes, powerpoles, guylines, and structures disturbed by construction in accordance with utility owner requirements. Temporary easement to be abandoned. Haul demolition debris off-site to a facility approved by regulatory authorities for the handling of demolition debris, unless noted otherwise. >> > I LEGEND :Sanitary Sewer :Watermain :Storm Sewer :SawcutLEGAL DESCRIPTION That part of said Southwest Quarter of the Northwest Quarter of Section 26, Township 121, Range 24, Wright County, Minnesota lying southerly of the following described line: Commencing at the southwest corner of said Southwest Quarter of the Northwest Quarter; thence on an assumed bearing of North 00 degrees 50 minutes 36 seconds West, along the west line of said Southwest Quarter of the Northwest Quarter, for a distance of 462.17 feet to the Point of Beginning of the line to be described; thence South 85 degrees 19 minutes 35 seconds East a distance of 375.46 feet; thence North 78 degrees 03 minutes 21 seconds East a distance of 382.81 feet; thence South 67 degrees 06 minutes 51 seconds East a distance of 284.72 feet; thence South 48 degrees 37 minutes 24 seconds East a distance of 324.34 feet; thence South 66 degrees 03 minutes 13 seconds East a distance of 39.44 feet; thence North 88 degrees 28 minutes 35 seconds East a distance of 34.91 feet to a point on the east line of said Southwest Quarter of the Northwest Quarter, said point being distant 144.25 feet north of the southeast corner of said Southwest Quarter of the Northwest Quarter as measured along said east line and there terminating. FP :Existing Floodplain :Curb Removal EBX2" MAPLE T 75 33 HOUSEHOUSESS WRIGHT COUNTY CIM AT THE SW CORNER OF THE SW 1/4 OF THE NW 1/4 OF SEC. 26, TWP. 121, R. 24 SS ST ST SS XXXXXXXXXXXXXXXXXXXXXXX X X X X X X X XXXXXXXXXXXXXXXUEXXXXXXXXT S85°19'35"E 375.46 N78°03'21"E 38 2 . 8 1 S67°0 6 ' 5 1 " E 2 8 4 . 7 2 S4 8 ° 3 7 ' 2 4 " E 3 2 4 . 3 4 S66°03'13"E 39.44 N88°28'35"E 34.91 PUBLIC RIGHT OF WAY EASEMENT PER DOC. NO. 040420933 75 33 SS SS 953.6 Water Elevation = 946.5 (2025-05-21) NGVD29 T Public Road and Utility Easement per Doc. No. 53670168.5020.00 50.0020.00 75.009.63 10.00 90° 90° 90°90°193.5290°FPFPFPFPFPFP FP FPFP FPFPFPFP FP FP ST ST HYD FPFPFPFPF P FP FP FP FP FPFP FP FPFPFPFPFP B-113 B-114 B-115 42 WETWET WETWETWE T WE T WET WET WET WET WET WET WET WET WET WETWETWETWET WETWETWET WET WET W E T WETWET WET WET WET WET WET WET W E T WE T WE T WET WETWETWETW E T WE T WET WETWET 30 30 30 30N00°50'36"W 462.17WEST LINE OF THE SW 1/4 OF THE NW 1/4S00°52'53"E 144.25EAST LINE OF THE SW 1/4 OF THE NW 1/4 SE CORNER OF THE SW 1/4 OF THE NW 1/4 S88°51'29"W 1060.29 SSSSSTWater Elevation = 945.8 (2025-05-21) NGVD29 SOUTH LINE OF THE SW 1/4 OF THE NW 1/4 T N H T NH SITE BENCHMARK TOP NUT OF HYDRANT ELEV.=960.87 WIRE FENCE END ±0.5 FT W OF CORNER WIRE FENCE FITS CORNER HHCABX CABX CABX CABX CABX CABX EBX EBX EBX CABX BTM NWL NWL BTM 100 YR-HWL 100 YR-HWL 75TH ST R E E T N E KEADING AVENUE NE75' R.O.W. DEDICATION30' BUILDING SETBACKPOND 10P 100-YR HWL= 955.46 NWL = 949.00 OUT=949.00 BTM = 942.00 7 5 T H STREET NE BLOCK 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16BLOCK 3B L O C K 2 BLOCK 2 1 2 3 4 5 6 7 8 9 10 111213141516 171819 2021 1 2 3 4 5 6 OUTLOT A OUTLOT A OUTLOT A 9+11.87-0+14.03 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+5 0 8 + 0 0 8+509+00LP: 954.75 1+23.58 HP: 956.09 3+59.67 LP: 954.91 5+78.29 957.15955.42 954.82 955.16 955.79 955.92 955.31 954.97 955.61 9 5 6 . 2 9 957.06955.12 954.84 955.47 956.08 955.62 955.01 955.29 95 5 . 9 3 956.670+000+501+001+502+002+503+ 0 0 3+504+00 4+505+005+505+62.85 LP: 955.46 2+00.19 ???957.34956.59955.4695 6 . 0 1 956.65 959.71 957.19955.91955.71956.31 957.87??? WETLAND 2 WETLAND 2 POND 10P 100-YR HWL= 947.60 NWL = 944.50 OUT=944.50 BTM = 938.00100 YR-HWL 100 YR-HWL NWL BTM BTMNWL 10'10'10'10'10'10'ALL OF OUTLOT A IS DRAINAGE AND UTILITY EASEMENT 60'ROW28'B to BR90'R20' R1000' R 2 0 'R400'R650'R175'R30'R 3 0 ' R 9 0 ' 30'25'25'25'25'25'20'20'20' 15' 15 ' 20.02'25'SIDEWALK SIDEWALK WETLAND BUFFER WETLAND BUFFER WETLAND BUFFER R.O.W. DEDICATIONKADLER AVENUE NER.O.W. DEDICATION 28'B to B60'ROW 60' ROW 28' B to B 44' 44' 44' 4 4 ' 4 4 '44' 44' 44'44'44'44'44' 44' 44' 133.7 8.444.23 3 .5 53.844.044.044.044.024.020.144.046.8115.047.144.0114.9 114.7 114.9 116.7 120.4 55.417.944.048.9115.1 48.521.123.182.261.333.56.1111.8 115.1 70.2 44.2 35.0 35.0 34.7 34.9 35.5 38.0 45.6 45.6 45.6 156.9 11.8151.07.982.3107.5 9.3 144.4168.1180.1192.0200.944.0 44.0 44.0 6.9 44.1 52.352.352.352.3 208.1208.7206.35 1 .0 2 9 .7 1 5 .6 4 1.6 187.1198.1204.522.376.2 29.8 42.5 49.7 49.8 21.1 29.7 49.6 4 2.442.4 4 2 .4 4 2 .4 5 7 .3 4 4.727.712 1 .16.4 111.299.8108.4114.5114.9112.949.5 49.9 50.6 50.3 48.4 46.8 44.5 44.3 43.9 43.9 43.9 16.5 26.6 42.4 42.442.442.4 114.0118.2125.6125.5116.3101.3106.4111.462.9 36 . 9 33.8 64. 5 27. 3 42.9120.0132.8131.9124.539.2 39.3 39.2 3 9.2 94.8 107.7 3 9 . 2 39.232.97.7121.1 33.739. 1 3 5 . 218.042.322.5113.015'15'7.9Parcel Table Block_Lot 1_1 1_2 1_3 1_4 1_5 1_6 1_7 1_8 1_9 1_10 1_11 1_12 Area (S.F.) 5611 5028 8240 9454 8510 8610 8999 9071 9040 8905 8653 8186 Area (Acres) 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 Parcel Table Block_Lot 1_13 1_14 1_15 1_16 2_1 2_2 2_3 2_4 2_5 2_6 2_7 2_8 Area (S.F.) 7661 7135 8611 7780 6542 4705 5184 6847 6802 6055 5884 4790 Area (Acres) 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.2 0.2 0.1 0.1 0.1 Parcel Table Block_Lot 2_9 2_10 2_11 2_12 2_13 2_14 2_15 2_16 2_17 2_18 2_19 2_20 Area (S.F.) 4577 4798 5464 5808 5624 5335 5205 5227 5131 5105 4743 5207 Area (Acres) 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 Parcel Table Block_Lot 2_21 3_1 3_2 3_3 3_4 3_5 3_6 Outlot A ROW Proposed 75th Lane 75th Street Area (S.F.) 9881 7820 5210 5088 5047 5051 5394 132058 79529 Area (Acres) 0.2 0.2 0.1 0.1 0.1 0.1 0.1 3.0 1.8 PROJECT NO. FILE NAME LANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY From Site to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net DEVELOPER MUNICIPALITY 2025PRELIMI N A R Y NOT FO R CONST R U C TI O N Preliminary Plat & Final Plat Submittal Preliminary Plat Submittal ETL ETL 02 JUN 2025 04 MAY 2026 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. License No:Date:xx/xx/2025 Eric T. Luth, PE 50475 NORTH 0 50 100 CRAIG DOLLANSKY TEL: (612) 309-9563 EMAIL: BOYDDOLLANSKY@GMAIL.COM OTSEGO, MINNESOTA BDL001-003 C2.1 PRELIMINARY PLAT & SITE PLAN C201BDL001-003.DWG PRELIMINARY PLAT MAY 4, 2026 ARE SHOWN THUS: DRAINAGE AND UTILITY EASEMENTS Being 5 feet in width and adjoining lot lines, unless otherwise shown and 10 feet in width and adjoining right of way lines as shown on the plat. 10 (Not to Scale) 10 55 LEGAL DESCRIPTION That part of said Southwest Quarter of the Northwest Quarter of Section 26, Township 121, Range 24, Wright County, Minnesota lying southerly of the following described line: Commencing at the southwest corner of said Southwest Quarter of the Northwest Quarter; thence on an assumed bearing of North 00 degrees 50 minutes 36 seconds West, along the west line of said Southwest Quarter of the Northwest Quarter, for a distance of 462.17 feet to the Point of Beginning of the line to be described; thence South 85 degrees 19 minutes 35 seconds East a distance of 375.46 feet; thence North 78 degrees 03 minutes 21 seconds East a distance of 382.81 feet; thence South 67 degrees 06 minutes 51 seconds East a distance of 284.72 feet; thence South 48 degrees 37 minutes 24 seconds East a distance of 324.34 feet; thence South 66 degrees 03 minutes 13 seconds East a distance of 39.44 feet; thence North 88 degrees 28 minutes 35 seconds East a distance of 34.91 feet to a point on the east line of said Southwest Quarter of the Northwest Quarter, said point being distant 144.25 feet north of the southeast corner of said Southwest Quarter of the Northwest Quarter as measured along said east line and there terminating. Obtain all necessary permits for construction within, or use of, public right-of-way. The digital file, which can be obtained from the Engineer, shall be used for staking. Discrepancies between the drawings and the digital file shall be reported to the Engineer. Dimensions shown are to back of curb unless noted otherwise. 2. 3. 4. GENERAL NOTES SITE PLAN NOTES For construction staking and surveying services contact Landform at 612.252.9070.1. BENCHMARK LEGEND Proposed Easement Proposed Setback Property Line Underlying Parcel Line Interior Lot Line ZONING & SETBACK SUMMARY The Property is currently Zoned: A-1 Agricultural Rural Service Area Current Land Use: Rural Undeveloped Adjacent Properties Zoning: North: A-1 Agricultural Rural Service Area South: PUD Planned Unit Development East: A-1 Agricultural Rural Service Area West: I-2 General Industrial Proposed Zoning: PUD Planned Unit Development Building Setback Information is as follows: Front Yard = 25 ft. Rear = 20 ft. Rear Block(s) 2 = 15 ft. Rear Kadler = 30 ft. (65 ft. from typical City 80 ft. R.O.W.) Side = 7 ft. Corner Side Yard = 15 ft. R.O.W. Side Yard = 25 ft. Impervious Pervious Total 150,282 377,703 s.f s.f. s.f. Impervious Proposed: Total Pervious Existing: 527,985 0 527,985 s.f. s.f. s.f. 3.45 8.67 12.12 0.0 12.12 RESIDENTIAL AREA SUMMARY 100.0% 28.46% 71.54% 100.0% 0.0% 100.0% ac. ac. ac. ac. ac. ac. 527,985 12.12 Required Average Residential Lot Area for Zachman Meadows 2nd Addition = 5,000 SF Average Lot Area for Residential Lots on Zachman Meadows 2nd Addition = 6,717 SF Project Benchmark: MNDOT GSID Station #34925 Station Name: 8680 K Location: 2.0 miles northwest of Albertville, 1.3 miles northwest-along Interstate Highway 94 from the junction of Interstate Highway 94 and County Road 19 in Albertville, 179.4 feet east-southeast of milepost 200, 92.0 feet north-northeast of westbound Interstate Highway 94, at Interstate Highway 94 milepoint 200.0, 6.5 feet southwest of a fence, 6.6 feet south-southwest of a witness post. Elevation = 965.74 FEET (NGVD29) Site Benchmark: Type: Top Nut Hydrant Location = At the Southwest corner of the temporary cul-de-sac for Keading Ave NE. Elevation = 960.87 (NGVD29) RESIDENTIAL LOT AREA TABLE Lot Coverage Information is as follows: Minimum Lot Area = 5,000 SF Total Site Area = 527,985 SF = 12.12 Ac. Wetland and Wetland Buffer = 124,041 SF = 2.85 Ac. Net Developable = 403,944 SF = 9.27 Ac. >>>>>>>>>>>>>>>>>>>>>>>>FMFMFMFMFMFMIIIIEBX2" MAPLE T FMFM FM 75 33 HOUSEHOUSESS SS ST ST SS XXXXXXXXXXXXXXXX X X X X X X X XXXXXXXXXXXXXXXUEXT 33 75 33 SS SS 953.6 Water Elevation = 946.5 (2025-05-21) NGVD29 T FPFPFPFPFPFP FP FPFP FPFPFPFP FP FP >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>ST ST HYD>>>>>>>>>>>>>>FPFPFPFPF P FP FP FP FP FPFP FPFPFPFPFP B-113 B-114 B-115 42 WETWET WETWETWE T WE T WET WET WET WET WET WET WET WET WET WETWETWETWET WETWETWET WET WET W E T WETWET WET WET WET WET WET WET W E T WE T W E T WET WETWETWETW E T WE T WET WET30 30 30 30SSSSSTWater Elevation = 945.8 (2025-05-21) NGVD29 T N H T NH SITE BENCHMARK TOP NUT OF HYDRANT ELEV.=960.87 94 4 944944944 9 4 6 94 6 946 94 6 948 94 8 95 0 9 5 2 95 4 956946946946948948948 950950950 952 952 954 954 956 956 958 958 960 960 962 962 946 948 950 952 954 956 9589609629649 6 6 9589589609609629629 6 4 96 6 942944946948950952954956958960944946 948 950950 952 952952 952 954 954 954 954 956 956956956 958958 948 950 95 2 9 54 95 6 9 5 8 944 94 4 946 946 9489 4 8 9 5 0 950 9 5 2 952 95 4 954 956 956 958 950 952 954 956 958 950952 954 956 95 8 944 946 948 950 9 5 0 952 952 954 95 4 952 954 956 958 960 962 942 944946948 950 952 954 956 958 960 962 942944946948 950 952 954 952 954 956 958 958 960 962 960 962 9 5 8 958942944946948 950 952 954 956 958 950 952 954 956 958 942944946 948 950 952 954 956 95 8 944946 948 950 952 954 956 944946 948 950 952 954 956 958944946 948 950 952 954 956 958946 948 950 95 2 9 5 4 95 6 958 950952954956958 960948 950 952 9 5 4956 94 4 94 4 94 6 94 6 94 8 9 4 8 950952954946 948 950 952 954 950 952 9 5 4 95695896094 8 950 952 946 946 948 950 9469 4 8 948 950 952 954 956 95 8 946 948 95 0 95295495695896 0 96 2 96 4 96 6 9 6 8 9 7 0 9 7 2 9 6 6 968970 972 96896 8 958958960962964966968970950952 954 952 952 944 946 948 950 952 954 946 944944 946 94 4 94 4 9 4 6 948 948 948 948 9489 5 4 954 954 9 5 6 HHCABX CABX CABX CABX CABX CABX EBX EBX EBX CABX 5.2% 5.0% 5.1%((958.6))SOGTF 959.4GF 959.1((959.8)) SOG TF 960.6GF 960.3((958.6))SOGTF 959.4GF 959.1((958.9))SOGTF 959.7GF 959.4((959.5))SOGTF 960.3GF 960.04.4%>>>I I 56.9 57.0 ???49.0 49.0 57.0 ((958.9))SOGTF 959.7GF 959.4((959.4))SOGTF 960.2GF 959.9((960.7))SOGTF 961.5GF 961.2((959.7))SOGTF 960.5GF 960.2((958.7))SOGTF 959.5GF 959.2((959.2)) SOG TF 960.0GF 959.7 4.1%((958.7)) SOG TF 959.5GF 959.2 4.2%((958.2)) SOG TF 959.0GF 958.7 4.3%((957.9)) SOG TF 958.7GF 958.4 4.7%((959.4)) SOG TF 960.2GF 959.9 ((959.1)) SOG TF 959.9GF 959.6 ((958.8)) SOG TF 959.6GF 959.3 ((958.5)) SOG TF 959.3GF 959.0 ((958.2)) SOG TF 959.0GF 958.7 4.9%((958.0)) SOG TF 958.8GF 958.5 5.1%5.0% 5.0% 4.5% 4.7% 4.8% 4.7%I I I I >>>>>>IIII >>>IIII >>>IIII 5.0%5.1%5.1%5.2%IIIEOF EOF EOF 56.9 ???54.0 >>>I I I I I I >>>>>>I I I I I I >>>III57.8 BTM NWL NWL BTM 100 YR-HWL 100 YR-HWL 75TH ST R E E T N E KEADING AVENUE NE75' R.O.W. DEDICATION30' BUILDING SETBACK((958.9))SOGTF 959.4GF 959.15.1% 6.1% 2.2%7.6%6.4%5.2%3.9%2.6%3.0%4.4%5.6%6.9%6.9%5.8%3.6%POND 10P 100-YR HWL= 955.46 NWL = 949.00 OUT=949.00 BTM = 942.00 6.7% 5.6% 5.8% 5.6%5.4%5.6%5.7%5.7%5.5%5.4%5.5%5.6%5.5%5.7%5.5%5.4%5.5%5.8%5.6%5.8%5.8%5.4%2.8% 3.9% 5.1% 6.1% 5.4% 6.1%((958.4))SOGTF 958.9GF 958.6((957.1))SOGTF 957.6GF 957.3((956.8)) SOG TF 957.3GF 957.0 ((956.8)) SOG TF 957.3GF 957.0 ((956.8)) SOG TF 957.3GF 957.0 ((956.8)) SOG TF 957.3GF 957.0 ((956.8)) SOG TF 957.3GF 957.0 ((956.8)) SOG TF 957.3 GF 957.0 ((956.8)) SOG TF 957.3 GF 957.0 ((956.8)) SOG TF 957.3 GF 957.0 ((956.8)) SOG TF 957.3 GF 957.0 ((956.8)) SOG TF 957.3 GF 957.0 ((956.8)) SOG TF 957.3 GF 957.0 ((95 6 . 8 ) ) SO G TF 9 5 7 . 3 GF 9 5 7 . 0 ((959.0))SOGTF 959.5GF 959.2((958.5))SOGTF 959.0GF 958.7((958.3))SOGTF 958.8GF 958.5(( 9 5 8 . 0 ) )SOGT F 9 5 8 . 5GF 9 5 8 . 2 (( 9 5 7 . 7 ) ) S O G T F 9 5 8 . 2 G F 9 5 7 . 9 ((9 5 7 . 5 ) ) S O G TF 9 5 8 . 0 GF 9 5 7 . 7 ((95 7 . 3 ) ) SO G TF 9 5 7 . 8 GF 9 5 7 . 5 ((957.1) ) SOG TF 957. 6 GF 957. 3 ((956.8)) SOG TF 957.3 GF 957.0 ((956.5)) SOG TF 957.0 GF 956.7 ((956.4)) SOG TF 956.9 GF 956.6 ((956.7)) SOG TF 957.2 GF 956.9 ((956.9)) SOG TF 957.4 GF 957.1 ((957.2)) SOG TF 957.7 GF 957.4 ((957.4)) SOG TF 957.9 GF 957.6 ((957.5)) SOG TF 958.0 GF 957.7 ((957.4)) SOG TF 957.9 GF 957.6 ((957.2)) SOG TF 957.7 GF 957.4 ((956.9)) SOG TF 957.4 GF 957.1 ((956.7)) SOG TF 957.2 GF 956.9 ((956.4)) SOG TF 956.9 GF 956.6 ((956.4)) SOG TF 956.9 GF 956.6 7 5 T H STREET NE BLOCK 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16BLOCK 3B L O C K 2 BLOCK 2 1 2 3 4 5 6 7 8 9 10 111213141516 171819 2021 1 2 3 4 5 6 OUTLOT A OUTLOT A OUTLOT A ((957.3))SOGTF 957.8GF 957.5((957.3))SOGTF 957.8GF 957.5((957.7))SOGTF 958.2GF 957.9((958.1))SOGTF 958.6GF 958.3((958.5))SOGTF 959.0GF 958.7((958.9))SOGTF 959.4GF 959.157.5 57.0 56.6 56.4 56.453.0 53.8 54.7 55.5 56.4 57.5 55.055.355.555.856.056.356.356.155.855.655.355.255.455.755.956.156.456.656.9 57.1 57.5 55.5 55.6 56.9 57.5 55.055.255.555.856.256.356.055.755.455.455.756.6 57.6 55.4 958960962964966968958958 958958956956958960962956956954954956956956956954954956956 956 952 954 956 958 958958958 950 952 954 956 950 952 954 9 5 6 95 6 9 5 6 956956948 950 952 954 956 948 950 952 954 956 956956 956956938 938 940 940 942 942 944 944 946 946 948 950 952 954 956 948 950 952 954 956956956 948 950 952 954 956956956 948 950 952 954 956956956 948 950 952 954 956956956 9 4 8 95 0 9 5 2 9 5 4 95 6956956 9489509 5 2 9 5 4 956956 9 5 6 958 950952954956958958 9549569589569589 5 6 956 956 956956956 956956956 956 956 956 956956956 956 956 956956956 956 956 956956956 956 956 956956 956958 958958958 956956 956 9+11.87-0+14.03 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+5 0 8 + 0 0 8+509+00LP: 954.75 1+23.58 HP: 956.09 3+59.67 LP: 954.91 5+78.29 957.15955.42 954.82 955.16 955.79 955.92 955.31 954.97 955.61 9 5 6 . 2 9 957.06955.12 954.84 955.47 956.08 955.62 955.01 955.29 955 . 9 3 956.670+000+501+001+502+002+503+ 0 0 3+504+00 4+505+005+505+62.85 LP: 955.46 2+00.19 ???957.34956.59955.4695 6 . 0 1 956.65 959.71 957.19955.91955.71956.31 957.87???>>>>>>>>>>>>>>>>>>>>>>942 942 944 944 946 946 948 948 950 56.00 55.02 EOFEOFEOF48.250.256.4 50.048.2 48.4 48.950.250.048.846.846.548.652.050.949.946.950 . 3 48.149.351.4 5 1 . 9 50.0WETLAND 1WETLAND 2 WETLAND 2 POND 10P 100-YR HWL= 947.60 NWL = 944.50 OUT=944.50 BTM = 938.00 46.7 42.00 56.00 54.92 58.9 58.3 55.4 57.9 54.7 57.754.1 57.753.748.348.348.357.148.357.348.357.848.358.348.358.848.359.456.057.660.656.5 58.1 57.9 58.3 57.7 56.9 57.9 59.2 58.2 48.4 48.348.358.755.18 53.248.348.348.348.248.248.248.248.148.248.248.248.347.948.046.846 . 8 46.846.748.2100 YR-HWL 100 YR-HWL NWL BTM BTMNWL 10'10'10'10'10'10'ALL OF OUTLOT A IS DRAINAGE AND UTILITY EASEMENT 956956 C7.11 ROCK CONSTRUCTION ENTRANCE C7.11 ROCK CONSTRUCTION ENTRANCE C7.1 1 ROCK CONSTRUCTION ENTRANCE C7.13 DROP INLET PROTECTION C7.1 4 DROP INLET PROTECTION C7.1 3 DROP INLET PROTECTION ))))))))))))))))))))) )))))))))))))))))))) BIO-LOGS C7.12 SILT FENCE C7.13 DOUBLE SILT FENCE 13 13 13 1313 54.36 54.36 55.85 56.14 54.52 54.5256.29 PROJECT NO. FILE NAME LANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY From Site to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net DEVELOPER MUNICIPALITY 2025PRELIMI N A R Y NOT FO R CONST R U C TI O N Preliminary Plat & Final Plat Submittal Preliminary Plat Submittal ETL ETL 02 JUN 2025 04 MAY 2026 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. License No:Date:xx/xx/2025 Eric T. Luth, PE 50475 NORTH 0 50 100 CRAIG DOLLANSKY TEL: (612) 309-9563 EMAIL: BOYDDOLLANSKY@GMAIL.COM OTSEGO, MINNESOTA BDL001-003 C3.1 GRADING, DRAINAGE & EROSION CONTROL PLAN C301BDL001-003.DWG PRELIMINARY PLAT MAY 4, 2026Contact utility service providers for field location of services 72 hours prior to beginning grading. Reserved. Remove topsoil from grading areas and stockpile sufficient quantity for reuse. Materials may be mined from landscape areas for use on site and replaced with excess organic material with prior Owner approval. Remove surface and ground water from excavations. Provide initial lifts of stable foundation material if exposed soils are wet and unstable. Reserved. Refer to Structural Specifications for earthwork requirements for building pads. An Independent Testing Firm shall verify the removal of organic and unsuitable soils, soil correction, and compaction and provide periodic reports to the Owner. Place and compact fill using lift thicknesses matched to soil type and compaction equipment to obtain specified compaction throughout the lift. Compact cohesive soils in paved areas to 95% of maximum dry density, Standard Proctor (ASTM D698) except the top 3 feet which shall be compacted to 100%. Compact to 98% density where fill depth exceeds 10 feet. The soils shall be within 3% of optimum moisture content. In granular soils all portions of the embankment shall be compacted to not less than 95% of Modified Proctor Density (ASTM D1557). Reserved. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Install perimeter sediment controls prior to beginning work and maintain for duration of construction. Remove controls after areas contributing runoff are permanently stabilized and dispose of off site. Install inlet protection: Wimco RD or CG models as appropriate, or approved equal. Maintain protection until project is stabilized. Limit soil disturbance to the grading limits shown. Schedule operations to minimize length of exposure of disturbed areas. Management practices shown are the minimum requirement. Install and maintain additional controls as work proceeds to prevent erosion and control sediment carried by wind or water. Refer to SWPPP Notes on Sheet C3.3 for additional requirements. Excavate ponds early in the construction sequence. Remove sediment from ponds periodically and after areas contributing runoff are permanently stabilized. Contractor shall prevent sediment laden water from entering the reserved system until the site is completely stabilized. Stabilization must be started immediately to limit soil erosion when the construction activity in that portion of the site has temporarily or permanently ceased and will not resume for 14 calendar days. Seed, Sod, Mulch, Erosion Control Blanket, and Fertilizer shall meet the following Specifications, as modified. Seeded areas without erosion control blanket shall be disc mulched. EROSION CONTROL QUANTITES Item Specification Number Estimated Quantities Seed MNDOT 3876 MN Type 21-111 @ 100 lb./ac. - Temporary Erosion Control, May 1 - Jul 31 MN Type 21-112 @ 100 lb./ac. - Temporary Erosion Control, Aug 1 - Oct 31 1500 lbs. Mulch MNDOT 3882 (MNDOT Type 1 @ 2 ton/ac., Disc Anchored)30 ton E.C. Blanket MNDOT 3885 (MNDOT Type 3N)1,585 s.y. General MNDOT 2575 1.0 L.S. Placement See Landscape Sheets for permanent turf and landscape establishment. Scrape adjacent streets clean daily and sweep clean weekly. 12. 14. 15. 16. 17. 18. 19. 20. 21. 22. GRADING NOTES GENERAL NOTES LEGEND :Inlet Protection :Silt Fence :Grading Limits :Vehicle Tracking Pad ESTIMATED QUANTITY 9 ea. 3 ea. 4,787 LF. SYMBOL DESCRIPTION EROSION PREVENTION AND SEDIMENT CONTROL NOTES For construction staking and surveying services contact Landform at 612.252.9070.1. :Compost or Bio Log 4 ea.))))))))))))))13 NO SCALE TYPICAL LOT DETAIL1 NOTES: 1. GARAGE LOCATION INDICATED BY DRIVEWAY. :TOP OF FOUNDATION ELEVATION :FRONT GARAGE FLOOR ELEVATION MAIN STREET BLK 1 5 X 105.0 X 105.0 X 106.5 X106.5 DENOTES PROPOSED LOT CORNER ELEVATIONS DENOTES DRAINAGE & UTILITY EASEMENT SIDE YARD 5' DENOTES BUILDING SETBACKS DENOTES DRAINAGE FLOW 4.5%DENOTES DRIVEWAY SLOPE ((99.5)) SOG GF=100.0 BUILDING TYPES: SOG = SLAB ON GRADE :REAR ELEVATION TF=100.3 DENOTES DRAINAGE & UTILITY EASEMENT REAR YARD 10' KEY Residential Pads: :Proposed Wetland Buffer Averaging = 32,500 SF :20ft Wetland Buffer = 32,243 SF 55.0 :Pond line :Spot Elevation 55.0 :Existing Spot Elevation :Rip-Rap / Articulated Block per detail PROJECT NO. FILE NAME LANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY From Site to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net DEVELOPER MUNICIPALITY 2025PRELIMI N A R Y NOT FO R CONST R U C TI O N Preliminary Plat & Final Plat Submittal Preliminary Plat Submittal ETL ETL 02 JUN 2025 04 MAY 2026 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. License No:Date:xx/xx/2025 Eric T. Luth, PE 50475 CRAIG DOLLANSKY TEL: (612) 309-9563 EMAIL: BOYDDOLLANSKY@GMAIL.COM OTSEGO, MINNESOTA BDL001-003 C3.2 GRADING, DRAINAGE & EROSION CONTROL DETAILS C301BDL001-003.DWG PRELIMINARY PLAT MAY 4, 2026 1 1 1 1 1 1 25'VARIES - 35' TO 48' 1.5' HOLD DOWNGRADE 1.0' TOPSOIL MAX. 25'16'9' R/W 5' LC NO SCALE SLAB ON GRADE3 5' 0.5' 2% M I N 33% M A X 5' ANY AVAILABLE SOIL MATERIAL UNLESS OTHERWISE DIRECTED BY ENG. GARAGE FLOOR REFER TO PLANS ANY FILL MUST LIE ON SUITABLE BEARING SOIL. (BOTTOM MUST BE APPROVED BY SOILS ENGINEER.) STRUCTURAL COMPACTED FILL IF REQUIRED (TYP) ANY AVAILABLE SOIL MATERIAL UNLESS OTHERWISE DIRECTED BY ENG. (SOG) NO SCALE2POND EMERGENCY OVERFLOW 10' 20' 41 TOP OF BERM REFER TO PLAN E.O.F. ELEVATION REFER TO PLAN ENKAMAT 7020 EROSION PREVENTION MAT (OR EQUAL). INSTALL WITH GROUND STAPLES PER MANUFACTURER'S RECOMMENDATION. INSTALL MAT FROM CREST OF E.O.F. TO BOTTOM OF OVERFLOW SWALE. COVER WITH TOPSOIL, SEED, AND MULCH. NWL = XXX.XX 10' 4 1 MAX. 3 1 MAX. 10 1 NO SCALE POND BENCH1 5 - 7% 2% MIN. PROJECT NO. FILE NAME LANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY From Site to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net DEVELOPER MUNICIPALITY 2025PRELIMI N A R Y NOT FO R CONST R U C TI O N Preliminary Plat & Final Plat Submittal Preliminary Plat Submittal ETL ETL 02 JUN 2025 04 MAY 2026 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. License No:Date:xx/xx/2025 Eric T. Luth, PE 50475 CRAIG DOLLANSKY TEL: (612) 309-9563 EMAIL: BOYDDOLLANSKY@GMAIL.COM OTSEGO, MINNESOTA BDL001-003 C3.3 SWPPP C303BDL001-003.DWG PRELIMINARY PLAT MAY 4, 2026 STORMWATER POLLUTION PREVENTION MANAGEMENT MEASURES EROSION PREVENTION AND SEDIMENT CONTROL SITE EVALUATION / ASSESSMENT / PLANNING Operator must develop pollution prevention management measures, implement good housekeeping BMPs, must follow all applicable federal, state, and local building codes, Occupational Safety and Health Act (OSHA), and the general conditions and general requirements of the construction contract. The Operator shall minimize the exposure to stormwater of any of the products, material, or wastes stored on site that may wash downstream or contaminate stormwater. Building products that have the potential to leach pollutants must be under cover. Chemicals and landscape materials shall be under cover to prevent the discharge of pollutants. Operator to track progress of the following items on site maps: portable toilets, material storage areas, vehicle and equipment fueling and maintenance areas, concrete washouts, paint and stucco washouts, dumpsters or other trash and debris containers, spill kits, stockpiles, any other non-structural non-storm water management BMPs, any temporarily removed structural BMPs, any changes to the structural BMPs. Solid waste: collected sediment, asphalt and concrete millings, floating debris, paper, plastic, fabric, construction and demolition debris and other wastes must be disposed of properly and must comply with MPCA disposal requirements. Hazardous waste: oil, gasoline, paint and any hazardous substances must be properly stored in sealed containers to prevent spills, leaks or other discharge. Restricted access to storage areas must be provided to prevent vandalism. Storage and disposal of hazardous waste or materials must be in compliance with Minn. R. Ch. 7045 including secondary containment as applicable. Portable toilets must be positioned so that they are secure and will not be tipped or knocked over. Concrete and other washout waste: operator must provide effective containment for all liquid and solid wastes generated by washout operations. The liquid and solid wastes must not contact the ground, and the containment must be designed so that it does not result in runoff from the washout operations or areas. Liquid and solid wastes must be disposed of properly and in compliance with MPCA rules. A sign must be installed adjacent to each washout facility that requires site personnel to utilize the proper facilities for disposal of concrete and other washout wastes. External vehicle washing: external washing of trucks and other construction vehicles must be limited to a defined area of the site. Runoff must be contained and waste properly disposed of. No engine degreasing is allowed on site. Operator shall take reasonable steps to prevent the discharge of spilled or leaked chemicals, including fuel, from any area where they will be loaded or unloaded as detailed in the Permit. INSPECTIONS AND MAINTENANCE 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. See Grading, Drainage, Paving and Erosion Control sheets for the location and type of temporary erosion prevention and sediment control BMPs. See Grading and Drainage, Utility, and Landscape sheets for the location and type of permanent erosion prevention and sediment control BMPs. Minimize Disturbed Areas and Protect Natural Features and Soil Appropriate construction practices (e.g. construction phasing, vegetative buffer strips, horizontal slope grading) shall be used to minimize erosion. Areas not to be disturbed (buffers, etc.) shall be protected with construction or silt fence before work begins. Operator shall develop methods to minimize soil compaction outside of building pads, pavement areas and utility trenches and shall use tracked equipment wherever practicable. Topsoil shall be salvaged and reused to the extent practicable. Phase Construction Activity Operator must not disturb more land than can be effectively inspected and maintained. Sediment control practices shall be established on all down gradient perimeters before any upgradient land disturbing activities begin. These practices shall remain in place until final stabilization has been established in accordance with the Permit. The timing of the installation of sediment control practices may be adjusted to accommodate short-term activities such as clearing or grubbing, or passage of vehicles. Any short-term activity must be completed as quickly as possible and the sediment control practices shall be installed immediately after the activity is completed. However, sediment control practices shall be installed before the next precipitation event even if the activity is not complete. Control Stormwater Flowing onto and Through the Project The normal wetted perimeter of any temporary or permanent drainage ditch or swale that drains water from any portion of the construction site, or diverts water around the site, shall be stabilized within 200 lineal feet from the property edge, or from the point of discharge into any surface water. Stabilization of the last 200 lineal feet shall be completed within 24 hours after connecting to a surface water. Stabilization of the remaining portions of any temporary or permanent ditches or swales shall be complete within 14 days after connecting to a surface water and construction in that portion of the ditch has temporarily or permanently ceased. Temporary or permanent ditches or swales that are being used as a sediment containment system (with properly designed rock ditch checks, bio rolls, silt dikes etc.) do not need to be stabilized. These areas shall be stabilized within 24 hours after no longer being used as a sediment containment system. Stabilize Soils All exposed soil areas, including stockpiles, must be stabilized. Stabilization must be started immediately to limit soil erosion when the construction activity in that portion of the site has temporarily or permanently ceased and will not resume for 14 calendar days. Stabilization must be complete within 14 days of cessation of construction activity. Temporary soil stockpiles shall have silt fence or other effective sediment controls, and cannot be placed in surface waters, including storm water conveyances such as curb and gutter systems, or conduits and ditches unless there is a bypass in place for the storm water. Temporary stockpiles without significant silt, clay or organic components (e.g. clean aggregate stockpiles, demolition concrete stockpiles, sand stockpiles) and the constructed base components of roads, parking lots and similar surfaces, are exempt from this requirement. Perimeter sediment control measures must be in place prior to the placement of any stockpiles. Any erosion control netting shall be "wildlife friendly" and of a natural type that can decompose and shall have non-welded moveable joints. Any sediment control device made of soil must be stabilized within 24 hours. Protect Slopes Operator shall avoid work on slopes with a grade of 3:1 or greater when practicable. Grading on slopes with a grade of 3:1 or steeper will require techniques such as phasing and stabilization practices designed for steep slopes(e.g. slope draining and terracing). Protect Storm Drain Inlets All storm drain inlets shall be protected by appropriate BMPs during construction until all sources with potential for discharging to the inlet have been stabilized. Inlet protection may be temporarily removed if a specific safety concern has been identified. Provide Energy Dissipation at all Pipe Outlets within 24 Hours After connection to a surface water or permanent stormwater treatment system. Establish Perimeter Controls and Sediment Barriers Prior to disturbing soils on a project site, establish sediment control BMPs on all down-gradient perimeters and where site discharges to public waters. Retain Sediment On-site and Control Dewatering Practices Discharge shall not cause nuisance conditions, erosion in receiving channels, adversely affect receiving water or impact wetlands, or downstream properties. Discharge points shall be adequately protected from erosion and scour by accepted energy dissipation measures. Discharge water containing oil or grease shall be treated to remove oil or grease prior to discharge to surface waters. Refer to Permit requirements for temporary or permanent sediment basins. Discharge shall be photographed at the beginning of discharge and at least every 24 hours afterward, while discharge is occurring. If nuisance conditions result from dewatering, dewatering shall be stopped until nuisance condition can be remedied. Establish Stabilized Construction Exits Vehicle tracking pads shall be established as shown on the Grading, Drainage, Paving and Erosion Control sheet(s) to minimize tracking of sediment from the construction site onto adjacent streets. Dewatering and Basin Draining Permittees must discharge turbid or sediment-laden waters related to dewatering or basin draining to a temporary or permanent sediment basin. Discharges must not cause erosion or scour near the discharge points. Remove Sediment from Surface Waters All sediment deposits and deltas must be removed from surface waters, including drainage ways, catch basins, and other drainage systems, and the removal areas restabilized within seven (7) days. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Permittees must ensure that a trained person will inspect the entire construction site at least once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5-inches in 24 hours. Records of inspections shall include all maintenance activities and must be recorded within 24 hours of the inspection and retained with the SWPPP. Inspections shall include stabilized areas, erosion prevention and sediment control BMPs. Additionally, areas adjacent to the project shall be inspected. Surface waters on or adjacent to the site must be inspected for evidence of erosion or sediment deposition. Permittees must record all inspection and maintenance activities within 24 hours of being conducted as detailed in the Permit. Inspection Records content shall include: A.Date and time of inspections; B.Name of persons conduction inspections; C.Findings of inspections, including specific locations where corrective actions are needed; D.Corrective actions taken including dates, times, and the party taking the corrective action; E.Dates of all rainfall events greater than 1/2 inch in 24 hours (refer to Permit for measurement requirements); F.Any discovered discharge must be recorded, including photographs, descriptions of discharge (color, odor, settled or suspended solids, oil sheen, or other obvious indicators of pollution), and specific location of discharge location; G.Any amendments to the Permit as a result of inspections must be documented within seven calendar days as described in the Permit H.All photographs of dewatering activities and documentation of nuisance conditions resulting from dewatering. BMP Maintenance: A.Nonfunctional BMPs must be repaired or replaced by the end of the next business day after discovery unless a different time frame is indicated. B.Follow the designer's or manufacturer's recommended maintenance procedures for all BMPs. C.Remove sediment from BMPs when the depth of sediment has reached 1/2 the height of the BMP and properly dispose of sediment into controlled areas to prevent soil from returning to the BMP during subsequent rain events. D.Remove sediment from paved roadways within one calendar day of discovery. E.Remove sediment from around BMPs protecting storm drain inlets. F.Surface waters with evidence of sediment deposition must be stabilized and sediment removed within seven calendar days of discovery, or as stated by the Permit. G.Ensure that construction support activities, including borrow areas, waste areas, contractor work areas, and material storage areas and dedicated concrete and asphalt batch plants are cleaned and maintained. H.Replace damaged BMPs that no longer operate effectively. Add BMPs as needed during construction to minimize erosion and prevent sediment from leaving the site. Any basin that has the water quality volume reduced by half shall be drained and have the sediment removed within 72 hours of discovery. Any temporaty or permanent sediment basin that has the water quality volume reduced by half shall be drained and have the sediment removed within 72 hours of discovery. 1. 2. 3. 4. 5. 6. 7. 8. RECORD KEEPING / RECORD RETENTION The SWPPP (original or copies), including all changes to it, and inspections and maintenance records, shall be kept at the site during construction by the Owner / Operator who has operational control of that portion of the site. The SWPPP can be kept in either the field office or in an on site vehicle during normal working hours. All Owners(s) must keep the SWPPP, along with the following additional records, on file for three (3) years after submittal of the Notice of Termination (NOT). This does not include any records after submittal of the NOT. The following is a list of records that shall be kept at the project site available for inspectors to review: Copy of the SWPPP, with any modifications; Inspection and maintenance records; Permanent operation and maintenance agreements; Calculations for the design of temporary and permanent stormwater management systems; Any other permits required for the project; Records of all inspection and maintenance conducted during construction; and All permanent operation and maintenance agreements that have been implemented, including all right-of-way, contracts, covenants and other binding requirements regarding perpetual maintenance 1. 2. 3. LOG OF CHANGES TO THE SWPPP / AMENDMENTS The Owner / Operator(s) must amend the SWPPP within seven (7) days to include additional requirements, such as additional or modified BMPs, designs to correct problems identified during inspections, or address situations as detailed in the Permit. 1. FINAL STABILIZATION The Owner / Operator(s) must ensure final stabilization of the site. Final stabilization includes: A.Ensuring all areas have permanent cover. B.Vegetative areas must have perennial cover with a density of 70% of expected final growth. 1. POST CONSTRUCTION / PERMANENT BMPS See Grading and Drainage, Utility, and Landscape sheets for post construction and permanent stormwater BMPs.1. TERMINATION OF COVERAGE Owner / Operator(s) wishing to terminate coverage under the Permit must submit a Notice of Termination (NOT) to the MPCA. Compliance with the Permit is required until a NOT is submitted. Refer to the Permit for details. Conditions for submitting a NOT include: A.Site must have achieved final stabilization (refer to section above). B.The permanent stormwater treatment and conveyance systems must be clean and all accumulated sediment removed. C.All temporary synthetic erosion prevention and sediment control BMPs must be removed from the site and disposed of properly. D.Permit termination on individual lots occurs once building construction is complete, permanent or temporary erosion prevention and downgradient perimeter control is complete, the residence sells to the homeowner, and the permittee distributes the MPCA's "Homeowner Fact Sheet" to the homeowner. 1. The Operator shall have primary responsibility and significant authority for the development, implementation, maintenance, inspection and amendments to the approved SWPPP. Duties include but are not limited to:Ensuring full compliance with the SWPPP and the Permit Implementing all elements of the SWPPP, including but not limited to: Implementing prompt and effective erosion and sediment control measuresImplementing all non-storm water management, and good housekeeping BMPs ensuring that no materials other than Storm water are discharged in quantities, which will have an adverse effect on receiving waters or storm drain systems, etc.Conducting routine inspections and maintenance Ensuring elimination of all unauthorized discharges Coordinating to ensure all of the necessary corrections / repairs are made immediately, and that the project complies with the SWPPP, the Permit, and approved plans at all times. 1. SWPPP CONTACT AND TRAINING INFORMATION Owner: Boyd Dollansky, LLC attn: Craig Dollansky W7120 Oakdale Drive Beaver Dam, Wisconsin, 53916 Phone: 612-309-9563 Email Address: boyddollansky@gmail.com Operator: To Be Determined. Contact Owner until Contractor Is Selected. Long Term Maintenance And Operation: To Be Determined. Contact Owner until Contractor Is Selected. SWPPP Designer: John Ortiz, RLA Landform Professional Services 105 South Fifth Avenue, Suite 513 Minneapolis, MN 55401 612-252-9070 jortiz@landform.net Certification: U of MN, Design of Construction SWPPP, Exp. May 31, 2027 SWPPP Inspector / Manager: To Be Determined. Contact Owner until Contractor And SWPPP Inspector / Manager is selected. Certification: Exp. BMP Installation And Repair: To Be Determined. Contact Owner until BMP Installer And Maintainer is selected. Certification: , Exp. 1. 2. 3. 4. 5. 6. WATERS WITHIN ONE MILE OF SITE SCHEDULE OF BMP INSTALLATION AND CONSTRUCTION ACTIVITY Install perimeter sediment control BMPs prior to start of other site work. Refer to Grading, Drainage, Paving and Erosion Control sheet(s) for initial locations of BMPs. Construct temporary / permanent sedimentation basins prior to upland disturbance. Install perimeter sediment control BMPs around normal water levels within 48-hours of completion of basin grading. Stabilize outlets from temporary / permanent sedimentation basins within 24-hours of outlet construction. Perform work in phases to minimize disturbed area at any one time. Operator to develop phasing plan prior to start of work. Open work areas should be limited to those that can be managed and inspected within required time frames. Strip topsoil from areas to be disturbed and stockpile with perimeter sediment control BMPs. Provide stabilization if stockpile is left longer than 14 days. Rough grade site. Install utilities. Install small utilities (gas, electric, communications). Final grade pavement areas and compact subgrade. Lay down pavement aggregate and compact. Install curb and gutter. Backfill after a minimum of three days and provide a minimum of two rolls of sod at the back of curb. Construct site walks. Provide final stabilization. Remove temporary BMPs and dispose of properly. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. DESCRIPTION OF CONSTRUCTION ACTIVITY Construction activity includes erosion and sediment control BMPs installation, clearing and grubbing, site grading, utility installation, building construction, paving, and landscaping. 1. MN SPECIAL (PROHIBITED, RESTRICTED, OTHER) & IMPAIRED WATERS 1. NPDES PERMIT AND SWPPP COMPONENTS The current Minnesota Construction Stormwater General Permit (Permit) dated August 1, 2018 is referenced in this document as the Permit. The SWPPP includes the following components: Construction Documents prepared by LandformStormwater Management Plan prepared by Landform Maintenance Plan for permanent stormwater BMPs Geotechnical Report prepared by Independent Testing Technologies All components must be kept onsite, or electronically available onsite, by the Operator during regular work hours. The Operator shall contact Civil Engineer if they do not have all of the above documents. 1. TEMPORARY SEDIMENTATION BASIN(S) This project does not have more than ten (10) disturbed acres draining to a common location and the site does not drain to an impaired or special water, therefore a temporary sediment basin is not required. Refer to sheet(s) C3.1 and the Stormwater Management Plan for further information. Temporary sediment basins shall provide treatment to runoff before it leaves the construction site or enters surface waters. The contractor shall comply with the following requirements: A.Sedimentation basins must provide live storage of runoff resulting from the 2-year 24-hour rainfall event from each acre drained to the basin, with a minimum of 1,800 c.f./acre live storage volume. (Where no calculation has been performed, each basin shall provide at least 3,600 c.f./acre live storage.) Sedimentation basins must include a stabilized emergency overflow to prevent basin integrity failure. B.Discharge from temporary sedimentation basins will be withdrawn from the surface in order to minimize the discharge of pollutants. Discharge from basin draining shall not adversely affect the receiving water or downstream properties. Contractor will visually check to ensure adequate treatment has been obtained and that nuisance conditions will not result from the discharge. Any discharge observed to be occurring during the inspection shall be recorded, described, and photographed. If any proposed temporary BMPs are not working as intended refer to the "Stormwater Compliance Assistance Toolkit for Small Construction Operators", MPCA, 2017 for additional information. Operator shall contact the SWPPP Designer for additional requirements and information. 1. 2. 3. 4. 5. SITE INFORMATION Site location: Latitude: 45.258522, Longitude: -93.681474 Disturbed area = 8.32 ac. Pre-construction impervious area within disturbed area = 0.0 ac. Post-construction impervious area within disturbed area = 3.45 ac. Net change in impervious area within disturbed area = 3.45 ac. Type of stormwater management:Wet sedimentation Erosion prevention and sediment control quantities are on sheets C3.1 SURFACE WATER BUFFERS 50 foot buffers from Surface Waters have been maintained.1. There are no Special or Impaired Waters within one (1) mile of the site. 1 MILE KAGAN AVENUE NEBLOCK 1 2 4 15 ((958.6))SOGTF 959.4GF 959.1((959.8)) SOG TF 960.6GF 960.3SOGTF 959.4GF 959.1SOGTF 959.7GF 959.4SOGTF 960.3GF 960.01 KEADING AVENUE NE>>>I I 56.9 57.0 ???49.0 49.0 57.0 3 ((958.9))SOGTF 959.7GF 959.4((959.4))SOGTF 960.2GF 959.9((960.7))SOGTF 961.5GF 961.2((959.7))SOGTF 960.5GF 960.2((958.7))SOGTF 959.5GF 959.216 17 ((959.2)) SOG TF 960.0GF 959.7 ((958.7)) SOG TF 959.5GF 959.2 ((958.2)) SOG TF 959.0GF 958.7 ((957.9)) SOG TF 958.7GF 958.4 ((959.4)) SOG TF 960.2GF 959.9 ((959.1)) SOG TF 959.9GF 959.6 ((958.8)) SOG TF 959.6GF 959.3 ((958.5)) SOG TF 959.3GF 959.0 ((958.2)) SOG TF 959.0GF 958.7 ((958.0)) SOG TF 958.8GF 958.5 5 6 7 8 9 10 11 12 13 14 I I I I >>>>>>IIII >>>IIII >>>IIII IIIEOF EOF EOF 56.9 ??? >>>I I I I I I >>>>>>I I I I I I >>>III57.8 BTM NWL NWL BTM 100 YR-HWL 100 YR-HWL 75TH ST R E E T N E KEADING AVENUE NEPOND 10P 100-YR HWL= 955.46 NWL = 949.00 OUT=949.00 BTM = 942.00 TREET NE BLOCK 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 B L O C K 2 BLOCK 2 1 2 3 4 5 6 7 8 9 10 11 1213141516 171819 2021 OUTLOT A OUTLOT A OUTLOT A I I I I I I I I I I I I I I I I I I IIIIIIIIIIIIIII IIIIIIIIIII I I EOFEOFEOFWETLAND 1POND 10P 100-YR HWL= 947.60 NWL = 944.50 OUT=944.50 BTM = 938.00100 YR-HWL NWL 10'10'10'10'10'ALL OF OUTLOT A IS DRAINAGE AND UTILITY EASEMENT II>>> II>>> II>>> II>>> >>III>>>II>>>III>>>>III>>>>III>>>>III>>>>III>>>>III>>>>III>>>III>>>II>>>>III>>>>III>>>>III>>>>I I I>>>III>>>>III>>>>III>>>>II I >>>III>>>II>>>IIIIII>>> >>>IIII I I I I>>>I I I I>>>I I I I>>>I I II>>>I II>>III>>III>>III>>IIII>>>III>>III>>III>>>>III>>III>>III>>>>>>>> > > >>>>>>>>>>>>>>> >> >> >>>>> > > > > > >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Station=1+05.65 HYD 6" GV 18 LF 6" DIP H.B.O.E=956.2 10" DIP W.M. 10" DIP W.M. 10" DIP W.M . 1 0 " D I P W .M .IIIIII-0+14.030+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8 + 0 0 9+009+11.870+001+002+003 + 0 0 10' MIN SEPARATION 10' MIN SEPARATION CONNECT TO EXISTING WATERMAIN MH-138 MH-137 MH-141 MH-142 SAN17 >>>>>>>>>>>>>>>>>>>>>>CS CS CS2" MAPLE FM HOUSEHOUSEXXXXXXXXXXXXSTRUCTURE - (65) INV: 939.76 STRUCTURE - (66) INV: 939.81 13' - 24" HDPE Pipe @ 0.40% FP FPFP FP FP FP FP F P FPFPFPFPWETWETWETWETWET WET WET WET WET WET WET WET WETWETWET WET WET WET WET WET WET WE T WE T WE T WET WETWETWETW E T WE T SSSSIIIIWater Elevation = 945.8 (2025-05-21) NGVD29 TN H T NH SITE BENCHMARK TOP NUT OF HYDRANT ELEV.=960.87 EXISTING SANITARY SEWER PER ZACHMAN MEADOWS PLAN SET EXISTING SANITARY SEWER PER ZACHMAN MEADOWS PLANS EXISTING STORM PER 'ZACHMAN MEADOWS' PLAN SET STORM SEWER PER 'ZACHMAN MEADOWS' PLAN SET STORM PIPE AND STRUCTURES PER PLANS WATERMAIN PER 'ZACHMAN MEADOWS' PLAN SET WATERMAIN PER 'ZACHMAN MEADOWS' PLAN SET SAN16 RIM: 957.38 INV (S):947.49 INV (N):947.59 SAN17 RIM: 957.17 INV (S):934.57 INV (N):934.67 CBMH-101A RIM: 957.07 INV (W): 949.85 INV: 949.85 CBMH-101 RIM: 957.10 INV (W): 949.71 INV (S): 953.65 INV: 949.60 CBMH-301 RIM: 956.97 INV (E): 953.30 INV: 950.10 CB-302 RIM: 957.02 INV: 953.50 CBMH-201 RIM: 956.45 INV (W): 951.70 FES-200 INV: 949.00 FES-300 INV: 949.00 FES-100 INV: 949.00 HHCABX CABX CABX CABX CABX CABX EBX EBX EBX CABX San Serv: 0+07 INV=942.5 6' RISER San Serv: 2+69 INV=943.5 7' RISER San Serv: 2+29 INV=943.4 7' RISER San Serv: 1+79 INV=944.4 8' RISER San Serv: 1+24 INV=944.3 8' RISER San Serv: 0+70 INV=944.2 8' RISER San Serv: 2+67 INV=943.4 7' RISER San Serv: 2+15 INV=943.4 7' RISER San Serv: 1+74 INV=943.3 7' RISER San Serv: 1+36 INV=944.3 8' RISER San Serv: 0+93 INV=944.2 8' RISER San Serv: 0+53 INV=944.2 8' RISER San Serv: 3+33 INV=944.1 8' RISER San Serv: 2+79 INV=944.0 8' RISER San Serv: 2+24 INV=943.9 8' RISER San Serv: 1+77 INV=943.9 8' RISER San Serv: 1+53 INV=943.8 8' RISER San Serv: 1+10 INV=943.8 8' RISER San Serv: 0+34 INV=943.6 8' RISER San Serv: 3+33 INV=944.1 8' RISER San Serv: 2+93 INV=944.0 8' RISER San Serv: 2+52INV=944.0 8' RISER San Serv: 2+11INV=943.9 8' RISER San Serv: 1+67INV=943.8 8' RISER San Serv: 1+44INV=943.8 8' RISER San Serv: 1+00INV=943.7 8' RISER San Se r v : 0+60INV=94 3 . 7 8' RISE R San S e r v : 0+2 6INV = 9 4 3 . 6 8' RI S E R San Serv: 0+27 INV=945.4 10' RISER Sa n S e r v : 1+ 5 2 IN V = 9 4 5 . 6 10' R I S E R S a n S e r v : 1 + 1 8 IN V = 9 4 5 . 5 10 ' R I S E R Sa n S e r v : 0 + 85 INV = 9 4 5 .5 1 0 ' R ISER San Se r v :0+51INV=945 .410' R ISER San Serv: 0+18 INV=945.4 10' RISER CBOX: 957.9 CBOX: 956.4 CBOX: 956.1 CBOX: 955.9 CBOX: 955.9 CBOX: 956.1 CBOX: 956.3 CBOX: 956.5CBOX: 956.6CBOX: 956.4CBOX: 956.1CBOX: 955.9CBOX: 955.8 CBOX: 955.7 CBOX: 955.7 CBOX: 956.0 CBOX: 956.2 CBOX: 956.5 CBOX: 956.7 CBOX: 956.9 CBOX: 956.7 CBOX: 956.5 CBOX: 956.2 CBOX: 956.0 CBOX: 955.7 CBOX: 955.8 CBOX: 956.1 CBOX: 956.4 CBO X : 956. 6 CB O X : 95 6 . 8 C B O X : 9 5 7 . 0 CBOX:95 7 . 3 CBOX:957.6 CBOX: 957.8 930 935 940 945 950 955 960 965 970 930 935 940 945 950 955 960 965 970 -0+50 952.7955.420+00 953.1955.27953.1955.120+50 953.1954.97953.1954.821+00 953.0954.75953.0954.841+50 952.5955.00951.8955.162+00 951.0955.31950.9955.472+50 950.6955.63950.6955.793+00 950.7955.95951.2956.083+50 951.5956.06951.9955.924+00 951.9955.77951.4955.624+50 950.6955.47950.0955.315+00 948.9955.16950.2955.015+50 951.5954.92953.0954.976+00 954.8955.13955.6955.296+50 955.0955.45953.4955.617+00 951.9955.77950.8955.937+50 950.8956.10953.5956.298+00 957.9956.48957.8956.678+50 957.6956.86957.2957.069+00 9+50 154' - 15" PVC @ 0.15% 339' - 15" PVC @ 0.15% MH-141 RIM: 955.91 INL (W): 935.29 INV: 935.29 48" DIA R-1642 PER DETAIL C7.1/6 295' - 15" PVC @ 0.15% MH-137 RIM: 954.79 INL (W): 935.73 INV: 935.73 48" DIA R-1642 PER DETAIL C7.1/6 104' - 15" PVC @ 0.15% MH-138 RIM: 955.46 INL (N): 935.88 INL (S): 935.88 INV: 935.88 48" DIA R-1642 PER DETAIL C7.1/6 10" DIP CLASS 52 W.M. 10" DIP CLASS 52 W.M.10" DIP CLASS 52 W.M.10" DIP CLASS 52 W.M.10" DIP CLASS 52 W.M. 12"X10" TEE 10" GV 10" 11.25 BEND 10"X6" TEE 10" 22.5 BEND 10" 45 BEND 10" 11.25 BEND 10" GV FINISHED GROUND EXISTING GROUND7.5' MIN COVER 7.5' MIN COVER DEFLECT WATERMAIN 3' MIN SEPARATION HORIZONTAL SCALE: 1" = 50 FT VERTICAL SCALE: 1" = 5 FT 36" Concrete Pipe 947.95 15" RCP 950.25 15" RCP 950.85 EX 10" DIP CONNECT TO EXISTING WATERMAIN EXISTING SAN17 RIM: 957.17 INL (NW): 934.57 INV: 934.57 INV: 934.67 MH-165 ADJUST AND MODIFY EXISTING MANHOLE SAN17 RIM: 957.07 48" DIA R-1642 PER DETAIL C7.1/6 MH-142 RIM: 955.86 INL (W): 934.80 INV: 934.80 48" DIA R-1642 PER DETAIL C7.1/6 PROJECT NO. FILE NAME LANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY From Site to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net DEVELOPER MUNICIPALITY 2025PRELIMI N A R Y NOT FO R CONST R U C TI O N Preliminary Plat & Final Plat Submittal Preliminary Plat Submittal ETL ETL 02 JUN 2025 04 MAY 2026 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. License No:Date:xx/xx/2025 Eric T. Luth, PE 50475 NORTH 0 50 100 CRAIG DOLLANSKY TEL: (612) 309-9563 EMAIL: BOYDDOLLANSKY@GMAIL.COM OTSEGO, MINNESOTA BDL001-003 C4.1 SANITARY SEWER & WATERMAIN PLAN & PROFILE C400BDL001-003 (75TH LANE).DWG PRELIMINARY PLAT MAY 4, 2026 Pipe Materials Watermain DIP Class 52 (ANSI A21.51/AWWA C111) Water Service Copper Type K (ASTM B88) Public Sanitary Sewer PVC SDR 35 (ASTM: D3034) or DIP Class 50 (ANSI A-21.51) Sanitary Sewer Service PVC SDR 26 Storm Sewer RCP 12"-18" Class 5 (Mn/DOT 3236 and ASTM C443) RCP 21" Class 4 (Mn/DOT 3236 and ASTM C443) RCP 24"-48" Class 3 (Mn/DOT 3236 and ASTM C443) Drain Tile HDPE - Corrugated & Perforated (D3212 AND ASTM F477) Contact utility service providers for field location of services 72 hours prior to beginning. Contractor to field verify location and elevation of all utility points of connection prior to construction of any proposed utilities. Contractor to notify Engineer immediately if there is any discrepancy. Contractor to pothole all utility crossings prior to construction of new utilities to verify depths of existing lines. Contact Engineer immediately if any conflicts are discovered. Provide means and measures to protect adjacent property from damage during utility installation. Pipe lengths shown are from center of structure to center of structure or end of end section. Install tracer wire with all non-conductive utilities in accordance with City of Otsego standards. Connect to City utilities in accordance with City of Otsego standards. Contact Jason Coombe at 763.441.2593 for wet tap inspection. Maintain 7.5 feet of cover on water. Deflect water to maintain 18-inch minimum outside separation at sewer crossings. Center pipe lengths to provide greatest separation between joints. Contact Jason Coombe, City of Otsego Building Department, at 763.441.2593 for flushing and pressure test inspections. The water distribution system shall be disinfected per 10 State Standards. Catch basins in curb and gutter are sumped 2 inches below the gutter grade. Refer to Detail 11 on Sheet C7.3. Coordinate with private utilities to provide electric, natural gas, and communications services. See Site Lighting Plan for additional information. Compact cohesive soils in paved areas to 95% of maximum dry density, Standard Proctor (ASTM D698) except the top 3 feet which shall be compacted to 100%. Compact to 98% density where fill depth exceeds 10 feet. The soils shall be within 3% of optimum moisture content. In granular soils all portions of the embankment shall be compacted to not less than 95% of Modified Proctor Density (ASTM D1557). Adjust structures to final grade where disturbed. Comply with requirements of Utility. Meet requirements for traffic loading in paved areas. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. GENERAL NOTES UTILITY NOTES For construction staking and surveying services contact Landform at 612.252.9070.1. SERVICES KEY SERV: 1+00 950.1 1' RISER CBOX 960.2 SERVICE CALLOUT CURB STOP BOX CALLOUT STATIONING FROM DOWNSTREAM SAN MH SERVICE INVERT ELEVATION RISER HT (APPLICABLE IF SHOWN) GROUND ELEVATION AT TOP OF BOX I PROPOSED EXISTING >>ST SS I TN H LEGEND 55.0 CURB & GUTTER STORM SEWER SANITARY SEWER WATERMAIN SANITARY SERVICE WATER SERVICE PROPERTY LINE EASEMENT POND LINE CONCRETE SIDEWALK SPOT ELEVATION CURB & GUTTER STORM SEWER SANITARY SEWER WATERMAIN SANITARY SERVICE WATER SERVICE EASEMENT SPOT ELEVATION55.0 >> I I I I I >> I I I I I >> >>>> >> >> ((9 5 8 . 6 ) ) SO G TF 9 5 9 . 4 GF 9 5 9 . 1 ((9 5 8 . 6 ) ) SO G TF 9 5 9 . 4 GF 9 5 9 . 1 ((9 5 8 . 9 ) ) SO G TF 9 5 9 . 7 GF 9 5 9 . 4 SO G TF 9 6 0 . 3 GF 9 6 0 . 0 TF 9 6 1 . 0 GF 9 6 0 . 7 >>>II59.0>>I57.0???49.057.0((9 5 8 . 9 ) ) SO G TF 9 5 9 . 7 GF 9 5 9 . 4 SO G TF 9 6 0 . 2 GF 9 5 9 . 9 IIII>>>EOFEOF???54.0>>>IIIIII>>>>>>IIIIII>>>>>>II57.8KE A D I N G A V E N U E N E 75' R . O . W . D E D I C A T I O N 30' B U I L D I N G S E T B A C K 75TH STREET NEBLOCK 112345678BL O C K 3 18192021123456OUTLOT A>> >>IIIIIIIIIII I I I I I IIIIIIIIIIIIIEO F EO F EO F W E T L A N D 1 10'10'10'10'ALL OF OUTLOT A IS DRA I N A G E A N D UTIL I T Y E A S E M ENTII>>>II>>>II>>>II>>>>>>>III>>>>III>>>III>>>II>>>IIIIII>>>>>>IIIIIIII>>>IIII>>>IIII>>>IIII> > >III> >III> >III> >>>>>>>>>>>>>>>>>>>>>>>>>> > > > > > >>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>> >> >>>>>>>>>>FM FM FM FM FMSTST X X XXXXXUE XTSSMH RE=957.37 INV=936.60 (N) INV=936.60 (E) *FILLED W/WATER WWW953.6STRUCTURE - (67) INV: 947.1797' - 36" RCP @ 0.47 %Water Elevation = 946.5(2025-05-21) NGVD29T>>>>>> >> >> >> >> >>STCBMH 961.0 CB RE=961.09 HYD>> >> >> >>>>I I I I I I I I I FPFP FPFPFPFPFPWE T WETWETWETWETWETWETWETWETWETWETWETWETSTI I I TNHSITE BENCHMARK TOP NUT OF HYDRANT ELEV.=960.87 EXISTINGSANITARYSEWER PERZACHMANMEADOWSPLANSSTORM SEWER PER 'ZACHMANMEADOWS' PLAN SETWATERMAIN PER'ZACHMAN MEADOWS'PLAN SETSAN16 RIM: 957.38 INV (S):947.49 INV (N):947.59 CB-101B RIM: 954.01 INV: 950.40 CBMH-101A RIM: 957.07 INV (W): 949.85 INV: 949.85 CBMH-101 RIM: 957.10 INV (W): 949.71 INV (S): 953.65 INV: 949.60 FES-100 INV: 949.00 HHCABXCABXCABXEBXEBXCABX0+ 0 0 0+ 5 0 0+ 9 1 . 2 4>>>>>>I I I I -0+14.030+001+002+003+005+62.850+ 0 0 1+ 0 0 2+ 0 0 3+00 4+005+0010' MIN SEPARATION 12 " D I P W . M .12" DIP W.M.12" D I P W . M . MH-140 MH-138 MH-139 MH-162 MH-163 CONNECT TO EXISTING WATERMAIN 10' MIN SEPARATION CONNECT TO EXISTING SANITARY STUB Sa n S e r v : 1+ 6 5 IN V = 9 4 6 . 9 Sa n S e r v : 1+ 6 3 IN V = 9 4 6 . 8 Sa n S e r v : 1+ 1 9 IN V = 9 4 5 . 3 Sa n S e r v : 0+ 7 4 IN V = 9 4 2 . 5 Sa n S e r v : 1+ 2 1 IN V = 9 4 5 . 4 Sa n S e r v : 0+ 7 7 IN V = 9 4 2 . 7 Sa n S e r v : 0+ 3 3 IN V = 9 4 3 . 7 5' R I S E R Sa n S e r v : 0+ 1 1 IN V = 9 4 4 . 7 8' R I S E R Sa n S e r v : 0+ 3 4 IN V = 9 4 4 . 7 8' R I S E R CB O X : 95 8 . 2 CB O X : 95 7 . 7 CB O X : 95 6 . 9 CB O X : 95 8 . 2 CB O X : 95 7 . 8 CB O X : 95 7 . 3 CB O X : 95 7 . 0 CB O X : 95 6 . 8 CB O X : 957 . 4 930 935 940 945 950 955 960 965 970 930 935 940 945 950 955 960 965 970 -0+50 963.2957.340+00 962.6957.31960.6957.190+50 958.9956.93957.0956.591+00 955.7956.25954.7955.911+50 953.7955.58952.8955.462+00 952.6955.56952.8955.712+50 953.1955.86953.1956.013+00 953.0956.16952.6956.313+50 952.5956.46952.9956.654+00 953.8957.11954.4957.874+50 954.9958.88956.6959.715+00 960.4960.85+50 6+00 MH-140 RIM: 957.33 INV: 947.66 48" DIA R-1642 PER DETAIL C7.1/6 190' - 1 5 " P V C @ 6. 2 0 % MH-138 RIM: 955.46 INL (N): 935.88 INL (S): 935.88 INV: 935.88 48" DIA R-1642 PER DETAIL C7.1/6 93' - 15" PVC @ 0.15% 192' - 15" PVC @ 0.15% MH-162 RIM: 954.78 INL (N): 936.30 INV: 936.30 48" DIA R-1642 PER DETAIL C7.1/6 MH-139 RIM: 955.99 INL (W): 936.01 INV: 936.01 48" DIA R-1642 PER DETAIL C7.1/6 12" GV 12" GV 12" 45 BEND 12" 45 BEND 12"X10" TEE 12" GV 12" 11.25 BEND 12" 45 BEND 12" 45 BEND 12" 45 BEND CONNECT TO EXISTING WATERMAIN 12"X16" TEE EXISTING GROUND7.5' MIN COVER FINISHED GROUND 18' - 8" PVC @ 0.40% 15" RCP 951.96 HORIZONTAL SCALE: 1" = 50 FT VERTICAL SCALE: 1" = 5 FT CONNECT TO EXISTING WATERMAIN 12" DIP CLASS 52 W.M.12" DIP CLASS 52 W. M .75TH STREET NE1OUTLOT AIIIII IIII >>>III>>>>>>>>>FM FM FM FMST X X XXXXUE XTSSMH RE=957.37 INV=936.60 (N) INV=936.60 (E) *FILLED W/WATER SSMH RE=954.23 INV=936.78 (N) INV=936.78 (S) *FILLED W/WATER STRUCTURE - (67) INV: 947.17 STRUCTURE - (68) INV: 947.63 97' - 36" RCP @ 0.47%Water Elevation = 946.5(2025-05-21) NGVD29T>>>>>>>>>>>>CBMH 961.0 CB RE=961.09 STH YD>>>>> I I I I I I I I FPFPFPFPFPWETWETWETWET0+00 0+50 0+91.245+62.853+004+005+0012" DIP W.M.MH-162 MH-163 CONNECT TO EXISTING SANITARY STUB 10' MIN SEPARATION Sa n S e r v : 0+ 3 4 IN V = 9 4 4 . 7 8' R I S E R CB O X : 95 7 . 4 930 935 940 945 950 955 960 965 930 935 940 945 950 955 960 965 -0+25 953.0957.050+00 952.2952.10+50 951.61+00 1+25 MH-162 RIM: 954.78 INL (N): 936.30 INV: 936.30 48" DIA R-1642 PER DETAIL C7.1/6 71' - 15" PVC @ 0.15% MH-163 RIM: 951.46 INV: 936.40 48" DIA R-1642 PER DETAIL C7.1/6 HORIZONTAL SCALE: 1" = 50 FT VERTICAL SCALE: 1" = 5 FT EXISTING GROUND FINISHED GROUND PROJECT NO. FILE NAME LANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY From Site to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net DEVELOPER MUNICIPALITY 2025PRELIMI N A R Y NOT FO R CONST R U C TI O N Preliminary Plat & Final Plat Submittal Preliminary Plat Submittal ETL ETL 02 JUN 2025 04 MAY 2026 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. License No:Date:xx/xx/2025 Eric T. Luth, PE 50475 NORTH 0 50 100 CRAIG DOLLANSKY TEL: (612) 309-9563 EMAIL: BOYDDOLLANSKY@GMAIL.COM OTSEGO, MINNESOTA BDL001-003 C4.2 SANITARY SEWER & WATERMAIN PLAN & PROFILE C400BDL001-003 (KEADING AVE NE2).DWG PRELIMINARY PLAT MAY 4, 2026 Pipe Materials Watermain DIP Class 52 (ANSI A21.51/AWWA C111) Water Service Copper Type K (ASTM B88) Public Sanitary Sewer PVC SDR 35 (ASTM: D3034) or DIP Class 50 (ANSI A-21.51) Sanitary Sewer Service PVC SDR 26 Storm Sewer RCP 12"-18" Class 5 (Mn/DOT 3236 and ASTM C443) RCP 21" Class 4 (Mn/DOT 3236 and ASTM C443) RCP 24"-48" Class 3 (Mn/DOT 3236 and ASTM C443) Drain Tile HDPE - Corrugated & Perforated (D3212 AND ASTM F477) Contact utility service providers for field location of services 72 hours prior to beginning. Contractor to field verify location and elevation of all utility points of connection prior to construction of any proposed utilities. Contractor to notify Engineer immediately if there is any discrepancy. Contractor to pothole all utility crossings prior to construction of new utilities to verify depths of existing lines. Contact Engineer immediately if any conflicts are discovered. Provide means and measures to protect adjacent property from damage during utility installation. Pipe lengths shown are from center of structure to center of structure or end of end section. Install tracer wire with all non-conductive utilities in accordance with City of Otsego standards. Connect to City utilities in accordance with City of Otsego standards. Contact Jason Coombe at 763.441.2593 for wet tap inspection. Maintain 7.5 feet of cover on water. Deflect water to maintain 18-inch minimum outside separation at sewer crossings. Center pipe lengths to provide greatest separation between joints. Contact Jason Coombe, City of Otsego Building Department, at 763.441.2593 for flushing and pressure test inspections. The water distribution system shall be disinfected per 10 State Standards. Catch basins in curb and gutter are sumped 2 inches below the gutter grade. Refer to Detail 11 on Sheet C7.3. Coordinate with private utilities to provide electric, natural gas, and communications services. See Site Lighting Plan for additional information. Compact cohesive soils in paved areas to 95% of maximum dry density, Standard Proctor (ASTM D698) except the top 3 feet which shall be compacted to 100%. Compact to 98% density where fill depth exceeds 10 feet. The soils shall be within 3% of optimum moisture content. In granular soils all portions of the embankment shall be compacted to not less than 95% of Modified Proctor Density (ASTM D1557). Adjust structures to final grade where disturbed. Comply with requirements of Utility. Meet requirements for traffic loading in paved areas. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. GENERAL NOTES UTILITY NOTES For construction staking and surveying services contact Landform at 612.252.9070.1. SERVICES KEY SERV: 1+00 950.1 1' RISER CBOX 960.2 SERVICE CALLOUT CURB STOP BOX CALLOUT STATIONING FROM DOWNSTREAM SAN MH SERVICE INVERT ELEVATION RISER HT (APPLICABLE IF SHOWN) GROUND ELEVATION AT TOP OF BOX KEADING AVENUE NE SANITARY MH-162 TO MH-163 NORTH 0 50 100 >> I >>>> PROPOSED EXISTING >>>>ST SS I TN H LEGEND 55.0 CURB & GUTTER STORM SEWER SANITARY SEWER WATERMAIN SANITARY SERVICE WATER SERVICE PROPERTY LINE EASEMENT POND LINE CONCRETE SIDEWALK SPOT ELEVATION >> CURB & GUTTER STORM SEWER SANITARY SEWER WATERMAIN SANITARY SERVICE WATER SERVICE EASEMENT SPOT ELEVATION55.0 >> I I I I I >> I I I I I >>>I I 57.0 ???49.0 57.0 I I I I >>>EOF EOF???54.0 I57.8 KEADING AVENUE NE75' R.O.W. DEDICATION30' BUILDING SETBACKPOND 10P 100-YR HWL= 955.46 NWL = 949.00 7 5 T H STREET NE 1 2 3 4 5 6 7 BLOCK 3BLOCK 2 16 171819 2021 1 2 3 4 5 6 OUTLOT A IIIIIIIIIII IIIIIIIIIII I I II IIII EOFEOFEOFWETLAND 110'10'10'10'ALL OF OUTLOT A IS DRAINAGE AND UTILITY EASEMENT II>>> II>>> II>>> II>>>>>>>III>>>>I I I >>>>III>>>I I I >>>II >>>IIIIII>>> >>>IIII I I I I>>>I I I I>>>I I I I>>>I I I I>>>I I I>>III>>III>>>>>>>>>> > > > > > > >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>FMFMFMFMII75 33 II SS SSMH RE=970.13 INV=961.66 N IN INV=961.66 S OUT INV=961.66 E OUT SS SSMH RE=966.20 INV=956.46 (S) INV=956.54 (W) ST ST SS UET 33 75 33 SS INV=936.60 (N) INV=936.60 (E) *FILLED W/WATER FP >>>>>>>>>>>>>>>>>>>>>ST CBMH 961.0 CB RE=961.09 H YD >>>>>>>>IIIIIIIF P FP FP FP WET WE T WET WET WET WET WET WET WET WET WET WETSSSTTNH EXISTING SANITARY SEWER PER ZACHMAN MEADOWS PLANS STORM SEWER PER 'ZACHMAN MEADOWS' PLAN SET WATERMAIN PER 'ZACHMAN MEADOWS' PLAN SET CB-101B RIM: 954.01 INV: 950.40 CBMH-101A RIM: 957.07 INV (W): 949.85 INV: 949.85 CBMH-101 RIM: 957.10 INV (W): 949.71 INV (S): 953.65 INV: 949.60 FES-100 INV: 949.00 HHCABX CABXEBXI0+001+002+003+ 0 0 4+00 5+005+62.85 -0+14.030+00 1+00 2+00 3+00 CBMH-102 CBMH-103MH-104FES-105 MH-101 FES-100 CB-103A CB-102A 4" HDPE Perforated Drain Tile 4" HDPE Perforated Drain Tile 930 935 940 945 950 955 960 965 930 935 940 945 950 955 960 965 FES-100 INV: 949.00 38' - 27" RCP @ 1.0% MH-101 RIM=956.11 INV-IN (N)=949.40 INV-OUT (SE)=949.40 48" DIA BUILD=6.7' 122' - 27" RCP @ 0.9% CBMH-102 RIM=954.29 INV-IN (N)=950.50 INV-IN (E)=950.50 INV-OUT (S)=950.50 48" DIA W/ 3.0' SUMP BUILD=6.8' 140' - 15" RCP @ 0.6% MH-104 RIM=956.29 INV-IN (W)=952.10 INV-OUT (E)=952.10 48" DIA BUILD=4.2' 129' - 15" RCP @ 0.7% FES-105 INV: 953.00 27' - 15" RCP @ 2.6% HORIZONTAL SCALE: 1" = 50 FT VERTICAL SCALE: 1" = 5 FT EXISTING GROUND FINISHED GROUND 15" PVC Pipe 935.7015" PVC Pipe 935.91 12" DIP 10" DIP 49.0BTMNWLNWLBTM100 YR -HWL75TH STREET NEBLOCK 1456789101112131415BLOCK 2 7891011121314151617IIIIIIIIIIIII I I I I I I I WETLAND 1 100 YR -HWL>>>I I >>>I I I >>>>I I I >>>>I I I >>>>I I I >>>>I I I >>>>I I I >>>>I I I>>>III>>>>III>>>>III>>>>IIIIII> >III> >III>> IIII>>> III>> III>> III>> >>III >>III >>>>>>>>>>>>>>>>>>>>>> >> >>>> >>>>>> >> >> >>>>>>>>>>>>>>XXFPFPFPB-113B-114 WE T FES-200 INV: 949.00 FES-300 INV: 949.00 2 + 0 0 3+004+005+006+007+00FES-300 MH-302 MH-303 FES-200 CB-201 CBMH-202 CB-202A4" HDPE Pe r fo ra ted 4" HDPE Pe r fo ra tedDra in T i le4" HDPE Pe r fo ra tedDra in T i le 930 935 940 945 950 955 960 965 930 935 940 945 950 955 960 965 28' - 15" RCP @ 4.6%153' - 42" RCP @ 0.4% CB-201 RIM=954.48 INV-IN (N)=949.60 INV-OUT (S)=949.60 60" DIA BUILD=7.9' HORIZONTAL SCALE: 1" = 50 FT VERTICAL SCALE: 1" = 5 FT EXISTING GROUND FINISHED GROUND 15" PVC Pipe 935.04 10" DIP FES-200 INV: 949.00 PROJECT NO. FILE NAME LANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY From Site to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net DEVELOPER MUNICIPALITY 2025PRELIMI N A R Y NOT FO R CONST R U C TI O N Preliminary Plat & Final Plat Submittal Preliminary Plat Submittal ETL ETL 02 JUN 2025 04 MAY 2026 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. License No:Date:xx/xx/2025 Eric T. Luth, PE 50475 CRAIG DOLLANSKY TEL: (612) 309-9563 EMAIL: BOYDDOLLANSKY@GMAIL.COM OTSEGO, MINNESOTA BDL001-003 C5.1 STORM SEWER PLAN & PROFILE C500BDL001-003.DWG PRELIMINARY PLAT MAY 4, 2026 NORTH 0 50 100 NORTH 0 50 100 Pipe Materials Watermain DIP Class 52 (ANSI A21.51/AWWA C111) Water Service Copper Type K (ASTM B88) Public Sanitary Sewer PVC SDR 35 (ASTM: D3034) or DIP Class 50 (ANSI A-21.51) Sanitary Sewer Service PVC SDR 26 Storm Sewer RCP 12"-18" Class 5 (Mn/DOT 3236 and ASTM C443) RCP 21" Class 4 (Mn/DOT 3236 and ASTM C443) RCP 24"-48" Class 3 (Mn/DOT 3236 and ASTM C443) Drain Tile HDPE - Corrugated & Perforated (D3212 AND ASTM F477) Contact utility service providers for field location of services 72 hours prior to beginning. Contractor to field verify location and elevation of all utility points of connection prior to construction of any proposed utilities. Contractor to notify Engineer immediately if there is any discrepancy. Contractor to pothole all utility crossings prior to construction of new utilities to verify depths of existing lines. Contact Engineer immediately if any conflicts are discovered. Provide means and measures to protect adjacent property from damage during utility installation. Pipe lengths shown are from center of structure to center of structure or end of end section. Install tracer wire with all non-conductive utilities in accordance with City of Otsego standards. Connect to City utilities in accordance with City of Otsego standards. Contact Jason Coombe at 763.441.2593 for wet tap inspection. Maintain 7.5 feet of cover on water. Deflect water to maintain 18-inch minimum outside separation at sewer crossings. Center pipe lengths to provide greatest separation between joints. Contact Jason Coombe, City of Otsego Building Department, at 763.441.2593 for flushing and pressure test inspections. The water distribution system shall be disinfected per 10 State Standards. Catch basins in curb and gutter are sumped 2 inches below the gutter grade. Refer to Detail 11 on Sheet C7.3. Coordinate with private utilities to provide electric, natural gas, and communications services. See Site Lighting Plan for additional information. Compact cohesive soils in paved areas to 95% of maximum dry density, Standard Proctor (ASTM D698) except the top 3 feet which shall be compacted to 100%. Compact to 98% density where fill depth exceeds 10 feet. The soils shall be within 3% of optimum moisture content. In granular soils all portions of the embankment shall be compacted to not less than 95% of Modified Proctor Density (ASTM D1557). Adjust structures to final grade where disturbed. Comply with requirements of Utility. Meet requirements for traffic loading in paved areas. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. GENERAL NOTES UTILITY NOTES For construction staking and surveying services contact Landform at 612.252.9070.1. >> I >>>> PROPOSED EXISTING >>>>ST SS I TN H LEGEND 55.0 CURB & GUTTER STORM SEWER SANITARY SEWER WATERMAIN SANITARY SERVICE WATER SERVICE PROPERTY LINE EASEMENT POND LINE CONCRETE SIDEWALK SPOT ELEVATION >> CURB & GUTTER STORM SEWER SANITARY SEWER WATERMAIN SANITARY SERVICE WATER SERVICE EASEMENT SPOT ELEVATION55.0 >> I I I I I >> I I I I I STORM FES-100 TO FES-105 STORM FES-200 TO CB-202 930 935 940 945 950 955 960 965 930 935 940 945 950 955 960 965 31' - 36" Concrete Pipe @ 0.6% FES-300 INV: 946.00 PER DETAIL C7.4/10 39' - 12" Concrete Pipe @ -7.6% OCS-301 RIM=955.00 INV-IN (S)=949.00 INV-OUT (N)=949.00 60" DIA BUILD=6.0' 139' - 36" Concrete Pipe @ 0.7% MH-302 RIM=955.85 INV-IN (S)=948.00 INV-OUT (N)=948.00 60" DIA BUILD=7.9' MH-303 RIM=956.14 INV-IN (S)=947.80 INV-OUT (N)=947.80 60" DIA BUILD=8.3' 142' - 36" Concrete Pipe @ 2.0% FES-304 INV: 945.00 PER DETAIL C7.4/10 HORIZONTAL SCALE: 1" = 50 FT VERTICAL SCALE: 1" = 5 FT EXISTING GROUND FINISHED GROUND 15" PVC Pipe 935.34 10" DIP DEFLECT PIPE SEE SHEET C4.1BTMNWLNWLBTM100 YR -HWL100 YR -HWL75TH STREET NEKEADING A V E N U E N E BLOCK 12345678910111213BLOCK 2 9101112131415161718192021OUTLOT AIIIIIIIIII I I I I I I I I I I I I I I I I I IIIEOF EOF EOF WETLAND 1 100-YR HWL= 947 .60NWL = 944 .50OUT=944.50BTM = 938 .00100 YR -HWL 1 0 0 Y R - HW LNWL BTM BTMNWLI I>>>I I>>>>>>I I >>>I I I >>>>I I I >>>>I I I >>>>I I I >>>>I I I>>>III>>>>III>>>>III>>>>III>>>III>>>II>>>IIII I>>>I I I I I I >>>IIII> > >III>>III> >III> >III>> IIII>>> III>> III>> III>> >>III >>III>>>>>>>>>>>>>>> > >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>> >>>> >>>>>>>>>>>>>>>>>>>>>>XXXX XXXXFPFP FP FPFPFPFPFPFPB-113B-114WETW E T WETWE T W E T WE T WET WET WETWETWETWETWETWETWETFES-200 INV: 949.00 1+00 2+00-0+14.030+001+002 + 0 0 3+00 4+005+006+00CBMH-102 CBMH-103 MH-104 MH-101 FES-300 MH-302 MH-303 FES-304 FES-200 CB-201 CBMH-202 FES-100 CB-103A CB-102A CB-202A4" HDPE Pe r fo ra tedDra in T i le 4" HDPE Pe r fo ra tedDra in T i le 4" HDPE Pe r fo ra tedDra in T i le4" HDPE Pe r fo ra tedDra in T i le 2 3 4 5 BLOCK 2 18 19 2021 IIIIIII EOFEOFEOFWETLAND 1>>>I I >>>I I I >>>I I >>>II >I>I>I I I I>>>I I I>>>>>>>>>>>>>>>>>>>>>>>FP WET WET WET WET 1+00 2+00 CBMH-102 CBMH-103 MH-101 FES-100 CB-103A CB-102A 4" HDPE Perforated Drain Tile 4" HDPE Perforated Drain Tile 940 945 950 955 960 940 945 950 955 960 -0+25 953.4954.620+00 0+50 0+75 CB-102A RIM=954.28 INV-OUT (W)=950.60 2X3 BUILD=3.7 CBMH-102 RIM=954.29 INV-IN (N)=950.50 INV-IN (E)=950.50 INV-OUT (S)=950.50 48" DIA BUILD=6.8' 945 950 955 960 945 950 955 960 -0+25 952.6954.620+00 0+50 0+75 CB-103A RIM=954.28 INV-OUT (W)=951.30 2X3 BUILD=3.0 CBMH-103 RIM=954.28 INV-IN (W)=951.20 INV-IN (E)=951.20 INV-OUT (S)=951.20 48" DIA BUILD=3.1' 945 950 955 960 945 950 955 960 -0+25 951.5954.780+00 0+50 0+75 CB-202A RIM=954.44 INV-OUT (W)=951.00 2X3 BUILD=3.4 CBMH-202 RIM=954.44 INV-IN (E)=950.90 INV-OUT (S)=950.90 48" DIA BUILD=3.5' 75TH STR E E T N E 11 12 13 14 15 9101112 IIIIIIII>>>>III>>>>III>>>>III>>>>III>>>>IIIIII>>III>>>>III>>III>>>>>>>>>>>>>>>>>>XXXFP FP B-113 B-114 WET WET 5+00 6+00 FES-200 CB-201 CBMH-202 CB-202A 4" HDPE Perforated Drain Tile 4" HDPE Perforated Drain Tile 10111213 POND 10P 100-YR HWL= 947.60 NWL = 944.50 OUT=944.50 BTM = 938.00BTM XXXXXXXXXSTRUCTURE - (63) INV: 944.50STRUCTURE - (64) INV: 944.47 13' - 24" HDPE Pipe @ 0.24%FPFPFP FP B-115 WET WET W E T WETWET WET WET FES-404 FES-405 935 940 945 950 955 935 940 945 950 955 -0+25 946.9944.480+00 946.00+50 0+75 FES-404 INV: 944.50 42' - 24" Concrete Pipe @ 0.3% FES-405 INV: 944.38 PROJECT NO. FILE NAME LANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY From Site to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net DEVELOPER MUNICIPALITY 2025PRELIMI N A R Y NOT FO R CONST R U C TI O N Preliminary Plat & Final Plat Submittal Preliminary Plat Submittal ETL ETL 02 JUN 2025 04 MAY 2026 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. License No:Date:xx/xx/2025 Eric T. Luth, PE 50475 CRAIG DOLLANSKY TEL: (612) 309-9563 EMAIL: BOYDDOLLANSKY@GMAIL.COM OTSEGO, MINNESOTA BDL001-003 C5.2 STORM SEWER PLAN & PROFILE C500BDL001-003.DWG PRELIMINARY PLAT MAY 4, 2026 NORTH 0 50 100 Pipe Materials Watermain DIP Class 52 (ANSI A21.51/AWWA C111) Water Service Copper Type K (ASTM B88) Public Sanitary Sewer PVC SDR 35 (ASTM: D3034) or DIP Class 50 (ANSI A-21.51) Sanitary Sewer Service PVC SDR 26 Storm Sewer RCP 12"-18" Class 5 (Mn/DOT 3236 and ASTM C443) RCP 21" Class 4 (Mn/DOT 3236 and ASTM C443) RCP 24"-48" Class 3 (Mn/DOT 3236 and ASTM C443) Drain Tile HDPE - Corrugated & Perforated (D3212 AND ASTM F477) Contact utility service providers for field location of services 72 hours prior to beginning. Contractor to field verify location and elevation of all utility points of connection prior to construction of any proposed utilities. Contractor to notify Engineer immediately if there is any discrepancy. Contractor to pothole all utility crossings prior to construction of new utilities to verify depths of existing lines. Contact Engineer immediately if any conflicts are discovered. Provide means and measures to protect adjacent property from damage during utility installation. Pipe lengths shown are from center of structure to center of structure or end of end section. Install tracer wire with all non-conductive utilities in accordance with City of Otsego standards. 2. 3. 4. 5. 6. 7. 8. GENERAL NOTES UTILITY NOTES For construction staking and surveying services contact Landform at 612.252.9070.1. STORM FES-300 TO FES-304 >> I >>>> PROPOSED EXISTING >>>>ST SS I T NH LEGEND 55.0 CURB & GUTTER STORM SEWER SANITARY SEWER WATERMAIN SANITARY SERVICE WATER SERVICE PROPERTY LINE EASEMENT POND LINE CONCRETE SIDEWALK SPOT ELEVATION >> CURB & GUTTER STORM SEWER SANITARY SEWER WATERMAIN SANITARY SERVICE WATER SERVICE EASEMENT SPOT ELEVATION55.0 >> I I I I I >> I I I I I NORTH 0 50 100 Connect to City utilities in accordance with City of Otsego standards. Contact Jason Coombe at 763.441.2593 for wet tap inspection. Maintain 7.5 feet of cover on water. Deflect water to maintain 18-inch minimum outside separation at sewer crossings. Center pipe lengths to provide greatest separation between joints. Contact Jason Coombe, City of Otsego Building Department, at 763.441.2593 for flushing and pressure test inspections. The water distribution system shall be disinfected per 10 State Standards. Catch basins in curb and gutter are sumped 2 inches below the gutter grade. Refer to Detail 11 on Sheet C7.3. Coordinate with private utilities to provide electric, natural gas, and communications services. See Site Lighting Plan for additional information. Compact cohesive soils in paved areas to 95% of maximum dry density, Standard Proctor (ASTM D698) except the top 3 feet which shall be compacted to 100%. Compact to 98% density where fill depth exceeds 10 feet. The soils shall be within 3% of optimum moisture content. In granular soils all portions of the embankment shall be compacted to not less than 95% of Modified Proctor Density (ASTM D1557). Adjust structures to final grade where disturbed. Comply with requirements of Utility. Meet requirements for traffic loading in paved areas. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. STORM CB-102A TO CBMH-102 STORM CB-103A TO CBMH-103 STORM CB-202A TO CBMH-202 STORM FES-404 TO FES-405 FMFMFMFMCS CS2" MAPLE FM FM 33 HOUSEHOUSESS SS SS XXXXXXXXXXXXXXXXUEXXXXXXXT 33 33 FP FPFP FP FP >>>>> FP FP FP FP FPFP FP FPFPFPF P 42 WET WE T WET WET WET WET WET WET WET WET WET WETWETWET WET WET WET WET WET WET WE T WE T WE T WET WETWETWETW E T WE T WET WETWET 30 30 30 30SSSSSTTNHTNH SITE BENCHMARK TOP NUT OF HYDRANT ELEV.=960.87 WIRE FENCE END ±0.5 FT W OF CORNER WIRE FENCE FITS CORNER WATERMAIN PER 'ZACHMAN MEADOWS' PLAN SET WATERMAIN PER 'ZACHMAN MEADOWS' PLAN SET HHCABX CABX CABX CABX CABX CABX EBX EBX EBX CABX BTM NWL NWL BTM 100 YR-HWL 100 YR-HWL 75TH ST R E E T N E KEADING AVENUE NE75' R.O.W. DEDICATION30' BUILDING SETBACK7 5 T H STREET NE BLOCK 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16BLOCK 3B L O C K 2 BLOCK 2 1 2 3 4 5 6 7 8 9 10 111213141516 171819 2021 1 2 3 4 5 6 OUTLOT A OUTLOT A OUTLOT A 9+11.87-0+14.03 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+ 5 0 8 + 0 0 8+509+00LP: 954.75 1+23.58 HP: 956.09 3+59.67 LP: 954.91 5+78.29 957.15955.42 954.82 955.16 955.79 955.92 955.31 954.97 955.6 1 9 5 6 . 2 9 957.06955.12 954.84 955.47 956.08 955.62 955.01 955.29 955 . 9 3 956.670+000+501+001+502+002+503+ 0 0 3+504+00 4+505+00 LP: 955.46 2+00.19 957.34956.59955.469 5 6 . 0 1 956.65 959.71 957.19955.91955.71956.31 957.87 100 YR-HWL BTMNWL 10'10'10'10'10'10'ALL OF OUTLOT A IS DRAINAGE AND UTILITY EASEMENT 60'ROW28'B to BR90'R1000'R400'R650'R175'R30'R 3 0 ' R 9 0 '28'B to B60' ROW 60' ROW 28' B to B 935 940 945 950 955 960 965 970 975 935 940 945 950 955 960 965 970 975 -0+50 952.7955.420+00 953.1955.27953.1955.120+50 953.1954.97953.1954.821+00 953.0954.75953.0954.841+50 952.5955.00951.8955.162+00 951.0955.31950.9955.472+50 950.6955.63950.6955.793+00 950.7955.95951.2956.083+50 951.5956.06951.9955.924+00 951.9955.77951.4955.624+50 950.6955.47950.0955.315+00 948.9955.16950.2955.015+50 951.5954.92953.0954.976+00 954.8955.13955.6955.296+50 955.0955.45953.4955.617+00 951.9955.77950.8955.937+50 950.8956.10953.5956.298+00 957.9956.48957.8956.678+50 957.6956.86957.2957.069+00 9+50 LP STA: 1+23.58 LP ELEV: 954.75 PVI STA:1+24.28 PVI ELEV:954.68 K:40.51 AD: 1.23% LVC:50.00 BVCS: 0+99.28BVCE: 954.83EVCS: 1+49.28EVCE: 954.83LP STA: 5+78.29 LP ELEV: 954.91 PVI STA:5+79.05 PVI ELEV:954.84 K:40.15 AD: 1.25% LVC:50.00 BVCS: 5+54.05BVCE: 954.99EVCS: 6+04.05EVCE: 955.00LP STA: 7+50.00 LP ELEV: 955.93 PVI STA:7+75.00 PVI ELEV:956.09 K:389.90 AD: 0.13% LVC:50.00 BVCS: 7+50.00BVCE: 955.93EVCS: 8+00.00EVCE: 956.29HP STA: 3+59.67 HP ELEV: 956.09 PVI STA:3+59.05 PVI ELEV:956.16 K:40.39 AD: -1.24% LVC:50.00 BVCS: 3+34.05BVCE: 956.01EVCS: 3+84.05EVCE: 956.01GRADE BREAK STA = 0+00ELEV = 955.421GRADE BREAK STA = 9+11.87ELEV = 957.148-0.60%0.63%-0.60%0.64% 0.77% HORIZONTAL SCALE: 1" = 5 FT VERTICAL SCALE: 1" = 50FT EXISTING GROUND FINISHED GROUND PROJECT NO. FILE NAME LANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY From Site to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net DEVELOPER MUNICIPALITY 2025PRELIMI N A R Y NOT FO R CONST R U C TI O N Preliminary Plat & Final Plat Submittal Preliminary Plat Submittal ETL ETL 02 JUN 2025 04 MAY 2026 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. License No:Date:xx/xx/2025 Eric T. Luth, PE 50475 NORTH 0 50 100 CRAIG DOLLANSKY TEL: (612) 309-9563 EMAIL: BOYDDOLLANSKY@GMAIL.COM OTSEGO, MINNESOTA BDL001-003 C6.1 STREET PLAN & PROFILE C600BDL001-003 (75TH LANE).DWG PRELIMINARY PLAT MAY 4, 2026 75TH STREET NE >> PROPOSED EXISTING >>ST SS I TN H LEGEND GENERAL NOTES For construction staking and surveying services contact Landform at 612.252.9070. 55.0 Obtain all necessary permits for construction within, or use of, public right-of-way. The digital file, which can be obtained from the Engineer, shall be used for staking. Discrepancies between the drawings and the digital file shall be reported to the Engineer. The building footprint, as shown on these drawings, and the digital file, shall be compared to the structural drawings prior to staking. Dimensions shown are to back of curb. 2. 3. 4. SITE PLAN NOTES CURB & GUTTER STORM SEWER SANITARY SEWER WATERMAIN PROPERTY LINE EASEMENT POND LINE LIMITS OF DISTURBANCE CONCRETE SIDEWALK SPOT ELEVATION 1. CURB & GUTTER STORM SEWER SANITARY SEWER WATERMAIN EASEMENT SPOT ELEVATION55.0 I I I I 7533SSSSSTSTSSX X XXXXXXXXXXXUE XT337533SSSST>>>>>>>>>>>>>>>>>>>>STHYD>>>>>>>>>>>>FPFPFPFPFPFPFPFP42WETWETWETWETWETWETWE T WETWE T3030SSSTTNHSITE BENCHMARK TOP NUT OF HYDRANT ELEV.=960.87 HHCABXCABXCABXEBXEBXCABX57.0???49.057.0???54.057.8KEADING AVENUE NE 75' R.O.W. DEDICATION 30' BUILDING SETBACK 7 5TH STREET NE1234BLOCK 3 192021123456OUTLOT A-0+14.030+000+501+001+50LP: 954.75 1+23.58 955.42954.82955.12954.840+00 0+50 1+00 1+50 2+00 2+50 3+003+504+004+505+005+505+62.85LP: 955.46 2+00.19 ???957.34 956.59 955.46 956.01956.65959.71957.19 955.91 955.71 956.31957.87 ???10'10'10'10'ALL OF OUTLO T A I S D RA I N A G E A N D U T I L I T Y E AS E M E N T 0+00 0+50 0+91.24 R90 'R1000'R400'R30'R30'R90'28 'B t o B 6 0 'ROW 60'ROW28'B to BSEE INSERT B SEE INSERT A R20'R20'940 945 950 955 960 965 970 975 980 940 945 950 955 960 965 970 975 980 -0+50 963.2957.340+00 962.6957.31960.6957.190+50 958.9956.93957.0956.591+00 955.7956.25954.7955.911+50 953.7955.58952.8955.462+00 952.6955.56952.8955.712+50 953.1955.86953.1956.013+00 953.0956.16952.6956.313+50 952.5956.46952.9956.654+00 953.8957.11954.4957.874+50 954.9958.88956.6959.715+00 960.4960.85+50 6+00 LP STA: 2+00.19 LP ELEV: 955.46 PVI STA:1+90.47 PVI ELEV:955.35 K:25.46 AD: 1.96% LVC:50.00 BVCS: 1+65.47BVCE: 955.70EVCS: 2+15.47EVCE: 955.50LP STA: 3+86.52 LP ELEV: 956.53 PVI STA:4+24.02 PVI ELEV:956.76 K:20.95 AD: 3.58% LVC:75.00 BVCS: 3+86.52BVCE: 956.53EVCS: 4+61.52EVCE: 958.32HP STA: 0+25.00 HP ELEV: 957.31 PVI STA:0+50.00 PVI ELEV:957.27 K:41.11 AD: -1.22% LVC:50.00 BVCS: 0+25.00BVCE: 957.31EVCS: 0+75.00EVCE: 956.93HP STA: 4+97.55 HP ELEV: 959.64 PVI STA:4+82.55 PVI ELEV:959.20 K:23.97 AD: -1.25% LVC:30.00 BVCS: 4+67.55BVCE: 958.58EVCS: 4+97.55EVCE: 959.64GRADE BREAK STA = 0+00ELEV = 957.344GRADE BREAK STA = 5+22ELEV = 960.358-0.15% 2.93% -1.36%0.60% 4.18% EXISTING GROUND FINISHED GROUND HORIZONTAL SCALE: 1" = 5 FT VERTICAL SCALE: 1" = 50FT UE UE T33>>>>>>>>>> >>>> >>>>R30'R 3 0 ' KADLER AVENUE NE 75TH STREET NE59.08 58.98 59.12 59.16 60.21 61.30 5' WIDE CROSS GUTTER 60.61 59.1459.7460.0460.34 59.8460.44 C7.3 7 5.0' WIDE VALLEY VALLEY GUTTER R20'R2 0 '75TH STREET NEKEADING AVE NE 54.9 55.1 55.4 54.8 55.0 55.2 PROJECT NO. FILE NAME LANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY From Site to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net DEVELOPER MUNICIPALITY 2025PRELIMI N A R Y NOT FO R CONST R U C TI O N Preliminary Plat & Final Plat Submittal Preliminary Plat Submittal ETL ETL 02 JUN 2025 04 MAY 2026 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. License No:Date:xx/xx/2025 Eric T. Luth, PE 50475 NORTH 0 50 100 CRAIG DOLLANSKY TEL: (612) 309-9563 EMAIL: BOYDDOLLANSKY@GMAIL.COM OTSEGO, MINNESOTA BDL001-003 C6.2 STREET PLAN & PROFILE C600BDL001-003 (KEADING AVE NE2).DWG PRELIMINARY PLAT MAY 4, 2026 KEADING AVE NE >> PROPOSED EXISTING >>ST SS I TN H LEGEND GENERAL NOTES For construction staking and surveying services contact Landform at 612.252.9070. 55.0 Obtain all necessary permits for construction within, or use of, public right-of-way. The digital file, which can be obtained from the Engineer, shall be used for staking. Discrepancies between the drawings and the digital file shall be reported to the Engineer. The building footprint, as shown on these drawings, and the digital file, shall be compared to the structural drawings prior to staking. Dimensions shown are to back of curb. 2. 3. 4. SITE PLAN NOTES CURB & GUTTER STORM SEWER SANITARY SEWER WATERMAIN PROPERTY LINE EASEMENT POND LINE LIMITS OF DISTURBANCE CONCRETE SIDEWALK SPOT ELEVATION 1. CURB & GUTTER STORM SEWER SANITARY SEWER WATERMAIN EASEMENT SPOT ELEVATION55.0 INSERT A KADLER AVE NE & 75TH STREET NE INTERSECTION SURM CURB & GUTTER SURM TIPPED GUTTER B618 CURB & GUTTER INSERT B KEADING AVE NE & 75TH STREET NE INTERSECTION NORTH 0 20 40 PROJECT NO. FILE NAME LANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY From Site to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net DEVELOPER MUNICIPALITY 2025PRELIMI N A R Y NOT FO R CONST R U C TI O N Preliminary Plat & Final Plat Submittal Preliminary Plat Submittal ETL ETL 02 JUN 2025 04 MAY 2026 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. License No:Date:xx/xx/2025 Eric T. Luth, PE 50475 CRAIG DOLLANSKY TEL: (612) 309-9563 EMAIL: BOYDDOLLANSKY@GMAIL.COM OTSEGO, MINNESOTA BDL001-003 C7.1 CIVIL CONSTRUCTION DETAILS C701BDL001-003.DWG PRELIMINARY PLAT MAY 4, 2026 NO SCALE NO SCALE NO SCALE NO SCALE NO SCALE NO SCALE NO SCALE NO SCALE ROCK CONSTRUCTION ENTRANCE DROP INLET PROTECTION TYPICAL TREATMENT BASIN SANITARY SEWER STANDARD MANHOLE SANITARY MANHOLE FRAME AND CASTING PACER TRAFFIC FLANGE HYDRANTMANHOLE JOINT SEAL SILT FENCE INTERNAL CHIMNEY SEAL MANHOLE ADJUSTMENT RINGS NO SCALENO SCALE DEEP SANITARY MAIN SERVICE CONNECTION 1211109 865 421 NO SCALE7 FLOW 24" MIN. NOTES: 1.DIG A 6" TRENCH ALONG THE INTENDED FENCE LINE OR USE MACHINE SLICED ANCHOR. 2.WIRE MESH MUST BE EMBEDDED A MINIMUM OF 2" INTO THE GROUND AND NO MORE THAN 36" ABOVE THE GROUND SURFACE. 3.DRIVE ALL POSTS INTO THE GROUND AT THE BACK SIDE OF THE TRENCH. 4.LAYOUT WIRE MESH AND SILT FENCE ON THE UPHILL SIDE ALONG THE FENCE LINE, AND BACK FILL. STEEL T-POST 1.25 lbs/FT @ 6 FT O.C. MAX UV STABILIZED GEOTEXTILE 24"-36" HEIGHT MACHINE SLICED ANCHOR OR 6"X6" TAMPED EARTH BACKFILL UNDISTURBED SOIL WELDED STEEL PLATE6" MIN6" MIN 24" MIN.BACKFILL UV STABILIZED GEOTEXTILE 24"-36" HEIGHT WIRE MESH 6"x6" MAX., (14 MIN. GAUGE) - MIN. 2" EMBEDMENT INTO SOIL STEEL T-POST 1.25 LBS/FT @ 6' O.C. MAX. FLOW WELDED STEEL PLATE REGULAR SILT FENCE HEAVY-DUTY SILT FENCE NO SCALE3DOUBLE SILT FENCE PROJECT NO. FILE NAME LANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY From Site to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net DEVELOPER MUNICIPALITY 2025PRELIMI N A R Y NOT FO R CONST R U C TI O N Preliminary Plat & Final Plat Submittal Preliminary Plat Submittal ETL ETL 02 JUN 2025 04 MAY 2026 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. License No:Date:xx/xx/2025 Eric T. Luth, PE 50475 CRAIG DOLLANSKY TEL: (612) 309-9563 EMAIL: BOYDDOLLANSKY@GMAIL.COM OTSEGO, MINNESOTA BDL001-003 C7.2 CIVIL CONSTRUCTION DETAILS C701BDL001-003.DWG PRELIMINARY PLAT MAY 4, 2026 NO SCALE NO SCALE NO SCALE NO SCALE NO SCALE NO SCALE NO SCALE NO SCALE NO SCALE NO SCALE STORM SEWER STANDARD MANHOLE TYPICAL WATER TIGHT SEALS WATERMAIN CONCRETE BLOCKING CURB STOP COVER FOR DRIVEWAY INSTALLATION IRRIGATION SERVICE DETAILWATER SERVICE DETAIL WATER SERVICE DETAIL 2" HYDRANT AND VALVE INSTALLATION HYDRANT PLAN AND SECTION VIEW TYPICAL RESILIENT WEDGE VALVE AND BOX INSTALL NO SCALE WATERMAIN CONCRETE BLOCKING QUANTITIES3 11 12109 865 421 NO SCALE SHALLOW SANITARY MAIN SERVICE CONNECTION7 PROJECT NO. FILE NAME LANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY From Site to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net DEVELOPER MUNICIPALITY 2025PRELIMI N A R Y NOT FO R CONST R U C TI O N Preliminary Plat & Final Plat Submittal Preliminary Plat Submittal ETL ETL 02 JUN 2025 04 MAY 2026 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. License No:Date:xx/xx/2025 Eric T. Luth, PE 50475 CRAIG DOLLANSKY TEL: (612) 309-9563 EMAIL: BOYDDOLLANSKY@GMAIL.COM OTSEGO, MINNESOTA BDL001-003 C7.3 CIVIL CONSTRUCTION DETAILS C701BDL001-003.DWG PRELIMINARY PLAT MAY 4, 2026 NO SCALE NO SCALE NO SCALE NO SCALE NO SCALENO SCALE SURMOUNTABLE CURB & GUTTER NO SCALE NO SCALE CONCRETE CURB AND GUTTER NO SCALE ARTICULATED CONCRETE BLOCK MAT LAYOUT SKIMMER STRUCTURE WITH WEIR48 INCH DIAMETER SHALLOW DEPTH CATCH BASIN 2' X 3' CATCH BASIN CONCRETE CURB AND GUTTER PLATE STYLE GRATE 48" DIA. OUTLET STRUCTURE STANDARD STORM 48" MANHOLE - CATCH BASIN NO SCALE STANDARD STORM 60" MANHOLE - CATCH BASIN NO SCALENO SCALE LONGITUDINAL PERMEABLE AGGREGATE BASE (P.A.B) DRAIN11 1 109 8775 432 60" 12"Ø ORFICE 60"70" 72.15" 61.84" 60" 60" NO SCALE PROJECT NO. FILE NAME LANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY From Site to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net DEVELOPER MUNICIPALITY 2025PRELIMI N A R Y NOT FO R CONST R U C TI O N Preliminary Plat & Final Plat Submittal Preliminary Plat Submittal ETL ETL 02 JUN 2025 04 MAY 2026 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. License No:Date:xx/xx/2025 Eric T. Luth, PE 50475 CRAIG DOLLANSKY TEL: (612) 309-9563 EMAIL: BOYDDOLLANSKY@GMAIL.COM OTSEGO, MINNESOTA BDL001-003 C7.4 CIVIL CONSTRUCTION DETAILS C701BDL001-003.DWG PRELIMINARY PLAT MAY 4, 2026 NO SCALE PERMANENT BARRICADE NO SCALE NO SCALE NO SCALE NO SCALE NO SCALE LOCAL RESIDENTIAL URBAN STREET SECTION-9 TON URBAN MAIL BOX LOCATIONTYPICAL DRIVEWAY SECTIONS ALTERNATE 10"9" 6" 27"-36" 48"-54" 21"24" 78"-90" 60"-72" 42" 18" 15" 1 1/4"Ø 1 1/4"Ø 1 1/4"Ø 1"Ø 1"Ø 1"Ø 3/4"Ø 3/4"Ø PIPE SIZE H 12"3/4"Ø BARS 1"6" 7" 8" 1" 1" 4" 5" 6" 4" 3" 3/4" 3/4" 3/4" 5/8" 5/8" 2 1/2" `H' 5/8" BOLTS24" MAXNO SCALE FLARED END SECTION AND TRASH GUARD WITH RIP RAP4 32" TYP. PROVIDE TRASH GUARDS ON ALL INLETS/OUTLETS (MnDOT 5201B). PROVIDE 3 FASTENING CLIPS AND HOT DIP GALVANIZE AFTER FABRICATION USE MANUFACTURERS RECOMMENDED TIES AND BOLTS TIE LAST 3 PIPE JOINTS. USE 2 TIE BOLT FASTENERS PER JOINT. INSTALL AT 60d FROM TOP OR BOTTOM OF PIPE. FASTENING CLIP WELD COUPLER TO BOLT ISOMETRIC SECTION PIPE LENGTHS ON PLAN AND IN CALCULATIONS ARE TO THIS POINT FINISHED GRADE INVERT (SEE PLAN) HAND PLACED RIPRAP DEPTH PER TABLE FILTER FABRIC (MIRAFI 500 OR EQ.) EXTEND UNDER FES 3' COMPACTED SUBGRADE 12" FOR 27" DIA. PIPE AND SMALLER 18" FOR 30" DIA. PIPE AND LARGER TIE DETAIL 1' TYP 2' CLASS IId50= 6"CLASS IIId50= 9"CLASS IV d50= 9" DIA. OFROUNDPIPE (IN.) LENGTH(FT.)12" DEPTH RIPRAP(CU. YDS.) 18" DEPTH RIPRAP(CU. YDS.)24" DEPTH RIPRAP(CU. YDS.) 12151821242730364248 881010121214161820 2.82.93.94.25.55.87.39.210.912.9 4.14.45.96.38.38.710.913.816.319.4 5.55.87.88.411.011.614.518.321.725.8 RIPRAP AT RCP OUTLETS TABLE OF QUANTITIES TRASH GUARD SIZING CROSS GUTTER5 321 6 PROJECT NO. FILE NAME LANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY From Site to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net DEVELOPER MUNICIPALITY 2025PRELIMI N A R Y NOT FO R CONST R U C TI O N Preliminary Plat & Final Plat Submittal Preliminary Plat Submittal ETL ETL 02 JUN 2025 04 MAY 2026 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. License No:Date:xx/xx/2025 Eric T. Luth, PE 50475 CRAIG DOLLANSKY TEL: (612) 309-9563 EMAIL: BOYDDOLLANSKY@GMAIL.COM OTSEGO, MINNESOTA BDL001-003 C7.5 CIVIL CONSTRUCTION DETAILS C701BDL001-003.DWG PRELIMINARY PLAT MAY 4, 2026 NO SCALE PEDESTRIAN CURB RAMP DETAILS NO SCALE PEDESTRIAN CURB RAMP DETAILS NO SCALE PEDESTRIAN CURB RAMP DETAILS NO SCALE PEDESTRIAN CURB RAMP DETAILS43 21 >>>>>>>>>>>>>>>>>>>>>>>>FMFMFMFMFMFMIIIIEBX2" MAPLE T FMFM FM IIII HOUSEHOUSEXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X XXXXXXXXXXXXXXXUEXT 953.6 >>T FPFPFPFPFPFP FP FPFP FPFPFPFP FP FP >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>HYD>>>>>>>>>>>>>>IIIIIIIIIIIIFPFPFPFPF P FP FP FP FP FPFP FPFPFPFPFP 42 WETWET WETWETWE T WE T WET WET WET WET WET WET WET WET WET WETWETWETWET WETWETWET WET WET W E T WETWET WET WET WET WET WET WET W E T WE T W E T WET WETWETWETW E T WE T WET WETIIIIT N H T NH SITE BENCHMARK TOP NUT OF HYDRANT ELEV.=960.87 HHCABX CABX CABX CABX CABX CABX EBX EBX EBX CABX BTM NWL NWL BTM 100 YR-HWL 100 YR-HWL 75TH ST R E E T N E KEADING AVENUE NE7 5 T H STREET NE BLOCK 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16BLOCK 3B L O C K 2 BLOCK 2 1 2 3 4 5 6 7 8 9 10 111213141516 171819 2021 1 2 3 4 5 6 OUTLOT A OUTLOT A OUTLOT A >>>>>>>> > > > > > > >>>>>>>>>>>>>>>>>>>>>>>> > > > > > >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>I I I I I I I I I I I I I I I I I I IIIIIIIIIIIIIII IIIIIIIIIII I I II IIII EOFEOFEOFWETLAND 1100 YR-HWL 100 YR-HWL NWL BTM BTMNWL 10'10'10'10'10'10'ALL OF OUTLOT A IS DRAINAGE AND UTILITY EASEMENT II>>> II>>> II>>> II>>> >>III>>>II>>>III>>>>III>>>>III>>>>III>>>>III>>>>III>>>>III>>>III>>>II>>>>III>>>>III>>>>III>>>>I I I>>>III>>>>III>>>>II I >>>>II I >>>I I I >>>II >>>IIIIII>>> >>>IIII I I I I>>>I I I I>>>I I I I>>>I I I I>>>II I>>II I>>III>>III>>IIII>>>III>>III>>III>>>>III>>III>>III(11) PINI (10) PIDE (3) TABL (3) CEOC (3) QUAL (8) BEND (11) ACRU (10) CASP (11) ACGM (10) BEND (3) QUBI (7) QUAL (6) CASP (5) ACRU SYMBOL CODE QTY BOTANICAL / COMMON NAME MATURE SIZE PLANTING SIZE ROOT CONDITION DECIDUOUS TREES ACRU 19 Acer rubrum `Autumn Spire` / Autumn Spire Maple 50`H x 25`W 2.5" Cal.B & B ACGM 11 Acer saccharum `Green Mountain` TM / Green Mountain Sugar Maple 60`H x 40`W 2.5"Cal B & B BEND 18 Betula nigra `Dura Heat` / Dura Heat River Birch 35`H x 18`W 2.5"Cal B & B CASP 16 Catalpa speciosa / Northern Catalpa 60`H x 40`W 2.5"Cal B & B CEOC 6 Celtis occidentalis / Common Hackberry 50`H x 50`W 2.5"Cal B & B QUAL 10 Quercus alba / White Oak 70`H x 60`W 2.5"Cal B & B QUBI 3 Quercus bicolor / Swamp White Oak 55`H x 55`W 2.5"Cal B & B TABL 3 Tilia americana `Boulevard` / Boulevard Linden 60`H x 30`W 2.5" CAL.B & B EVERGREEN TREES PIDE 10 Picea glauca `Densata` / Black Hills Spruce 45`H x 20`W 8` HT B & B PINI 11 Pinus nigra / Austrian Black Pine 50`H x 30`W 10` HT.B & B PROJECT NO. FILE NAME LANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY From Site to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net DEVELOPER MUNICIPALITY 2025PRELIMI N A R Y NOT FO R CONST R U C TI O N Preliminary Plat & Final Plat Submittal Preliminary Plat Submittal ETL ETL 02 JUN 2025 04 MAY 2026 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Landscape Architect under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. John C. Ortiz License No:62761 Date:dd/mm/yyyy NORTH 0 50 100 CRAIG DOLLANSKY TEL: (612) 309-9563 EMAIL: BOYDDOLLANSKY@GMAIL.COM OTSEGO, MINNESOTA BDL001-003 L2.1 LANDSCAPE PLANTING PLAN L201BDL001-003.DWG PRELIMINARY PLAT MAY 4, 2026 GENERAL NOTES For construction staking and surveying services contact Landform at 612.252.9070. LEGEND Seed mix. MNDOT 33-261, Stormwater South and West. Seed at rate of 35 lbs/acre. With erosion control mat. Seed mix. BWSR Mid Diversity Mesic to Dry Buffer South and West. Seed at rate of 46.18 lbs/acre. With erosion control mat. Contact Utility Service providers for field location of services 72 hours prior to beginning. Coordinate installation with Contractors performing related work. Seed mixtures MNDOT 25-131 -Low Maintenance Turf and MNDOT 33-261-Stormwater South and West as defined in current MNDOT Seeding Manual. Native Seeds shall be of Minnesota origin and certified by the Minnesota Crop Improvement Association (MCIA). Provide verifying documentation to the Owner 30 days minimum prior to installation. Seed mixture BWSR-Mid Diversity Mesic to Dry Buffer South and West as defined in current BWSR Seeding Manual. Native Seeds shall be of Minnesota origin and certified by the Minnesota Crop Improvement Association (MCIA). Provide verifying documentation to the Owner 30 days minimum prior to installation. Plant material shall conform to the American Association of Nurserymen Standards and be of hardy stock, free from disease, infestation, damage, and disfiguration. All existing deciduous/coniferous trees are to be trimmed of dead wood and pruned to a natural uniform shape. Planting soil shall consist of 4 parts topsoil to 1 part peat humus, with 3 pounds of commercial fertilizer added per cubic yard. Spread a minimum of 4 inches of topsoil and sod all turf areas disturbed by Construction. Follow MNDOT Seeding Manual for planting instructions for establishment of native seed and provide coordination for required erosion prevention and sediment control. Reserved. Edge planting beds with 5-inch, 18" thick, black, commercial grade steel edging (Sur-Loc or approved equal) except where adjacent to curbing, walks or buildings. Place plants according to layout with proper nominal spacing. Quantities shown on this plan are totals for entire design. For discrepancy between the number of plants on the Schedule and the number shown on the Drawing, the Drawing shall govern. 2. 3. 6. 7. 8. 9. 10. 11. 12. 13. LANDSCAPE NOTES 4. 5. 1. OVERALL PLANT SCHEDULE See Details for depth of planting soil. Install 3-4 inch depth of triple-shredded hardwood mulch in Planting Bed Areas. Reserved. Install a 4-foot diameter triple-shredded hardwood mulch dish around trees not placed within a Shrub or Perennial Planting Bed. Edging is not required, unless noted otherwise. Install 2 to 3 inch (nominal size) grey trap rock to a depth of 4 inches in all planting beds unless noted otherwise. Landscape fabric shall be installed under all areas of rock mulch. Secure all edges and seams of fabric with 6-inch landscape staples. Erosion control blanket (MNDOT 3885). Category 3N, straw 2S, erosion control mat. Irrigation is required. Irrigation shall be designed by irrigation contractor. Contractor shall submit design plan and all shop drawings and system components to Landscape Architect for review, prior to purchase and installation. Contractor shall follow all applicable codes and obtain all necessary permits from local jurisdiction. All plant material shall have a 1-year warranty. The warranty shall begin after the last plant has been installed and the Landscape Architect has approved the installation. Landscape contractor is responsible for replacing any and all plant material that dies during the warranty period. Landscape contractor shall assume all costs to any replacements. All replacements shall be same species and sizes and equal or better vigor as original installation. 14. 15. 16. 17. 18. 20. 21. LANDSCAPE NOTES CONTINUED 19. PROJECT NO. FILE NAME LANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY From Site to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net DEVELOPER MUNICIPALITY 2025PRELIMI N A R Y NOT FO R CONST R U C TI O N Preliminary Plat & Final Plat Submittal Preliminary Plat Submittal ETL ETL 02 JUN 2025 04 MAY 2026 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Landscape Architect under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. John C. Ortiz License No:62761 Date:dd/mm/yyyy CRAIG DOLLANSKY TEL: (612) 309-9563 EMAIL: BOYDDOLLANSKY@GMAIL.COM OTSEGO, MINNESOTA BDL001-003 L7.1 LANDSCAPE DETAILS L7.1 LANDSCAPE DETAILS.DWG PRELIMINARY PLAT MAY 4, 2026 SUBGRADE AREA DUG/TILLED TO PROMOTE ROOT GROWTH 3-5 x DIA. OF SOIL BALL AREA DUG FOR PLANTING 2-3 x DIA. OF SOIL BALL SCARIFY BOTTOM AND SIDES OF HOLE PRIOR TO PLANTING CUT TOP OF WIRE BASKET 1/3 (MIN.) FROM TOP OF ROOTBALL. CUT TWINE FROM AROUND TOP 1/3 (MIN.) OF ROOTBALL. CUT AND ROLL BACK BURLAP 1/3 (MIN.) FROM TOP OF ROOTBALL. 2" X 2" X 24" WOOD STAKE SET AT ANGLE EXISTING SOIL LOOSENED PLANTING SOIL (SEE PLANS) EDGE CONDITION VARIES 1.INSPECT FOR ENCIRCLING ROOTS TO MITIGATE FUTURE STEM GIRDLING. REJECT ANY TREES THAT ARE SEVERELY AFFECTED. 2.TWO ALTERNATE METHODS OF TREE STAKING ARE ILLUSTRATED AND TO BE UTILIZED ONLY IF NECESSARY. 3.MAINTAIN TREES IN A PLUMB POSITION THROUGHOUT THE GUARANTEE PERIOD. SEE SPECIFICATIONS. FLAGGING: ONE (1) FLAG PER WIRE DOUBLE STRAND 14 GA. WIRE - 3' @ 120 DEGREE INTERVALS (TYP.) TREE SHALL BE PLANTED WITH ROOT FLARE EVEN WITH SOIL LINE OR FIRST MAJOR BRANCHING ROOT ONE (1) INCH BELOW SOIL LINE. IF ROOT FLARE IS NOT APPARENT IT MAY BE COVERED BY BURLAP OR SOIL. ADJUST PLANT AS NEEDED TO MAINTAIN APPROPRIATE DEPTH. 16" POLYPROPYLENE OR POLYETHYLENE (40 MIL, 1-1/2" WIDE STRAP TYP.) TREE WRAP TO FIRST BRANCH NOTES: 8' STEEL STAKE. PLACE WITHIN TWO (2) INCHES OF ROOT BALL. NO SCALE DECIDUOUS TREE PLANTINGVARIES PER SPECIES(SEE PLANS)24" MIN.FOUR (4") INCHES MAX.SHREDDED HARDWOOD MULCH (SEE PLANS) 1 TREE SHALL BE PLANTED WITH ROOT FLARE EVEN WITH SOIL LINE OR FIRST MAJOR BRANCHING ROOT ONE (1) INCH BELOW SOIL LINE. IF ROOT FLARE IS NOT APPARENT IT MAY BE COVERED BY BURLAP OR SOIL. ADJUST PLANT AS NEEDED TO MAINTAIN APPROPRIATE DEPTH.VARIESSCARIFY BOTTOM AND SIDES OF HOLE PRIOR TO PLANTING 2" X 2" X 24" WOOD STAKE SET AT ANGLE PLANTING SOIL (SEE PLANS) EDGE CONDITION VARIES (SEE PLANS) CUT TOP OF WIRE BASKET 1/3 (MIN) FROM TOP OF BALL. CUT TWINE FROM AROUND TOP 1/3 (MIN) OF ROOTBALL. CUT AND ROLL BACK BURLAP 1/3 (MIN) FROM TOP OF ROOTBALL. 16" POLYPROPYLENE OR POLYETHYLENE (40 MIL, 1-1/2" WIDE STRAP TYP.) FLAGGING: ONE (1) PER WIRE 1.INSPECT FOR ENCIRCLING ROOTS TO MITIGATE FUTURE STEM GIRDLING. REJECT ANY TREES THAT ARE SEVERELY AFFECTED. 2.TWO ALTERNATE METHODS OF TREE STAKING ARE ILLUSTRATED AND TO BE UTILIZED ONLY IF NECESSARY. 3.MAINTAIN TREES IN A PLUMB POSITION THROUGHOUT THE GUARANTEE PERIOD AS DEFINED ON PLANS AND/OR SPECIFICATIONS. NOTES: NO SCALE CONIFEROUS TREE PLANTING EXISTING SUBGRADE AREA DUG/TILLED TO PROMOTE ROOT GROWTH 3-5x DIA. OF SOIL BALL EXISTING SOIL LOOSENED FOUR (4") INCHES SHREDDED HARDWOOD MULCH. MAINTAIN A TWELVE (12") INCH DIAMETER RING AROUND BASE OF TRUNK, CLEAR OF MULCH. DOUBLE STRAND 14 GA. WIRE.24"12" DIA. DOUBLE STRAND 14 GA. WIRE. 8' STEEL STAKE. PLACE TWO (2) INCHES FROM ROOT BALL. 2 SCARIFY BOTTOM AND SIDES OF HOLE PRIOR TO PLANTING. PLACE PLANT WHERE SHOWN ON PLAN EXISTING SUBGRADE REFER TO LANDSCAPE PLAN(S) FOR GROUNDCOVER OUTSIDE SHRUB BED(S)FINISHED GRADE 1.IF ROOTS ARE PRESENT AROUND THE EDGES OF ROOTBALL, UNCOIL OR CUT AS MANY AS POSSIBLE WITHOUT DESTROYING SOIL MASS. 2.DIG PLANTING PIT NO DEEPER THAN HEIGHT OF ROOT BALL. NOTES: TOP OF ROOT MASS SHALL BE LEVEL WITH FINISHED GRADE PLANTING SOIL (SEE PLANS) NO SCALE SHRUB PLANTING DIG PLANTING PIT 3X WIDEST DIMENSION OF ROOT BALL ROOT BALL SITS ON EXISTING OR RECOMPACTED SUBGRADE. FOUR (4) INCH HIGH SOIL BERM CONSTRUCTED AROUND ENTIRE ROOT BALL. BERM SHALL BEGIN AT ROOT BALL EDGE. MULCH (SEE PLANS) EDGING (SEE PLANS) 3 IF ROOTS ARE PRESENT AROUND THE EDGES OF ROOTBALL, UNCOIL OR CUT AS MANY AS POSSIBLE WITHOUT DESTROYING SOIL MASS. NOTES: NO SCALE STEEP SLOPE PLANTING SCARIFY BOTTOM AND SIDES OF HOLE PRIOR TO PLANTING. EDGE CONDITION VARIES (SEE PLANS) EDGING (SEE PLANS) PLANTING SOIL (SEE PLANS) MULCH (SEE PLANS) ROUND-TOPPED SOIL BERM, 4" HIGH x 8" WIDE, ABOVE ROOT BALL SURFACE, CENTERED ON DOWNHILL SIDE FOR 240 DEGREES.FINISHED GRADE EXISTING SUBGRADE ORIGINAL GRADE SHALL PASS THROUGH POINT WHERE TRUNK MEETS TOP OF ROOT BALL. DIG PLANTING PIT 3X WIDTH OF ROOT BALL A PLAN SECTION A-A ROUND-TOPPED BERM ROOT BALL EDGE SLOPEA 5 INSTALL TREE PROTECTION DEVICES PRIOR TO START OF LAND DISTURBANCE. MAINTAIN UNTIL FINAL LANDSCAPE IS INSTALLED. 8' O.C.2.5' 4' (TYP) NO SCALE TREE PROTECTION4 DRIPLINEPOLYETHYLENE SAFETY NETTING, COLOR: ORANGE. THREE TIES PER POST.DRIPLINE6.5' STEEL T-POST, 1.25 lb/LF, POSITION AT DRIPLINE, SPACED EIGHT (8) FEET ON CENTER. 5" MULCH LAYER >>>>>>>>>>>>>>>>>>>>>>>>FMFMFMFMFMFMIIIICS CS CS CS EBX CS2" MAPLE T FMFM FM 75 33 288' - 8" PVC Pipe @ 1.15% 28' - 21" RCP @ 0.12%HOUSEHOUSESS SSMH RE=970.13 INV=961.66 N IN INV=961.66 S OUT INV=961.66 E OUT H Y D SS SS XXXXXXXXXXXXXXXXXXXX X X X X X X X XXXXXXXXXXXXXUEXXXXXXXXT 33 75 33 Water Elevation = 946.5 (2025-05-21) NGVD29 T FPFPFPFP FPFP FPFP FPFP FP FP >>>>>>FPFPFPFPF P FP FP FP F P FPFP FP FPFP FPFPFP B-113 B-114 B-115 42 WET WE T WET WET WET WET WET WET WET WET WET WETWETWETW E T WETWETWET WET WET W E T WETWET WET WET WET WET WET WET WE T WET WE T WET WETWETWETW E T WE T WET WETWET 30 30 3030 30SSSSSTWater Elevation = 945.8 (2025-05-21) NGVD29 TN HTNHTNH SITE BENCHMARK TOP NUT OF HYDRANT ELEV.=960.87 WIRE FENCE END ±0.5 FT W OF CORNER WIRE FENCE FITS CORNER EXISTING SANITARY SEWER PER ZACHMAN MEADOWS PLAN SET EXISTING SANITARY SEWER PER ZACHMAN MEADOWS PLANS WATERMAIN PER 'ZACHMAN MEADOWS' PLAN SET WATERMAIN PER 'ZACHMAN MEADOWS' PLAN SET SAN16 RIM: 957.38 INV (S):947.49 INV (N):947.59 SAN17 RIM: 957.17 INV (S):934.57 INV (N):934.67 FES-200 INV: 949.00 FES-300 INV: 949.00FES-100 INV: 949.00 94 4 944944944 9 4 6 94 6 946 94 6 948 94 8 950 95 0 952 9 5 2 954 9 5 4 956 956958 960 962 964 946946946948948948 950950950 952 952 954 954 956 956 958 958 960 960 962 962 946 948 950 952 954 956 9589609629649 6 6 9589589609609629629 6 4 96 6 942944946948950952954956958960944 946 948 950950 952 952952 952 954 954954 954 956 956956956 958958 948 950 95 2 954 95 6 9 5 8 944 9 4 4 946 946 9489 4 8 9 5 0 950 9 5 2 952 95 4 954 956 956 958 950 952 954 956 958 950952 954 956 95 8 944 946 948 950 9 5 0 952 952 954 9 5 4 952 954 956 958 960 962 942 944946948 950 952 954 956 958 960 962 942944946948 950 952 954 952 954 956 958 958 960 962 960 962 9 5 8 958942944946948 950 952 954 956 958 950 952 954 956 958 942944946 948 950 952 954 956 9 5 8 944946 948 950 952 954 956 944946 948 950 952 954 956 958944946 948 950 952 954 956 958946 948 950 9 5 2 9 5 4 956 958 950952954956958 960948 950 952 9 5 4956 94 4 94 4 94 6 94 6 94 8 9 4 8 950952954946 948 950 952 954 950 952 9 5 4 95695896094 8 950 952 946 946 948 950 9469 4 8 948 950 952 954 956 95 8 946 948 95 0 95295495695896 0 96896 8 95895896096296496696897095 0 952 954 952 952 944 946 948 950 952 954 946 944944 946 94 4 94 4 9 4 6 948 948 948 948 9489 5 4 954 954 9 5 6 HHCABX CABX CABX CABX CABX CABX EBX EBX EBX CABX 5.2% 5.0% 5.1%((958.6))SOGTF 959.4GF 959.1((959.8)) SOG TF 960.6GF 960.3((958.6))SOGTF 959.4GF 959.1((958.9))SOGTF 959.7GF 959.4((959.5))SOGTF 960.3GF 960.0GF 960.74.4%>>>I I 56.9 57.0 ???49.0 49.0 57.0 ((958.9))SOGTF 959.7GF 959.4((959.4))SOGTF 960.2GF 959.9((960.7))SOGTF 961.5GF 961.2((959.7))SOGTF 960.5GF 960.2((958.7))SOGTF 959.5GF 959.2((959.2)) SOG TF 960.0GF 959.7 4.1%((958.7)) SOG TF 959.5GF 959.2 4.2%((958.2)) SOG TF 959.0GF 958.7 4.3%((957.9)) SOG TF 958.7GF 958.4 4.7%((959.4)) SOG TF 960.2GF 959.9 ((959.1)) SOG TF 959.9GF 959.6 ((958.8)) SOG TF 959.6GF 959.3 ((958.5)) SOG TF 959.3GF 959.0 ((958.2)) SOG TF 959.0GF 958.7 4.9%((958.0)) SOG TF 958.8GF 958.5 5.1%5.0% 5.0% 4.5% 4.7% 4.8% 4.7%I I I I >>>>>>IIII >>>IIII >>>IIII I>5.0%5.1%5.1%5.2%>>>>>IIIIEOFEOF EOF EOF II56.9 ???54.0 >>>I I I I I I >>>>>>I I I I I I >>>I IIII>II>I>II>>I>IIII57.8 BTM NWL NWL BTM 100 YR-HWL 100 YR-HWL 75TH ST R E E T N E KEADING AVENUE NE((958.9))SOGTF 959.4GF 959.15.1% 6.1% 2.2%7.6%6.4%5.2%3.9%2.6%3.0%4.4%5.6%6.9%6.9%5.8%3.6%POND 10P 100-YR HWL= 955.00 NWL = 949.00 OUT=949.00 BTM = 942.00 6.7% 5.6% 5.8%5.6%5.4%5.6%5.7%5.7%5.5%5.4%5.5%5.6%5.5%5.7%5.5%5.4%5.5%5.8%5.6%5.8%5.8%5.4%2.8% 3.9% 5.1% 6.1% 5.4% 6.1%((958.4))SOGTF 958.9GF 958.6((957.1))SOGTF 957.6GF 957.3((956.8)) SOG TF 957.3GF 957.0 ((956.8)) SOG TF 957.3GF 957.0 ((956.8)) SOG TF 957.3GF 957.0 ((956.8)) SOG TF 957.3GF 957.0 ((956.8)) SOG TF 957.3GF 957.0 ((956.8)) SOG TF 957.3 GF 957.0 ((956.8)) SOG TF 957.3 GF 957.0 ((956.8)) SOG TF 957.3 GF 957.0 ((956.8)) SOG TF 957.3 GF 957.0 ((956.8)) SOG TF 957.3 GF 957.0 ((956.8)) SOG TF 957.3 GF 957.0 ((956 . 8 ) ) SO G TF 9 5 7 . 3 GF 9 5 7 . 0 ((959.0))SOGTF 959.5GF 959.2((958.5))SOGTF 959.0GF 958.7((958.3))SOGTF 958.8GF 958.5(( 9 5 8 . 0 ) )SOGTF 9 5 8 . 5GF 9 5 8 . 2 (( 9 5 7 . 7 ) ) S O G T F 9 5 8 . 2 G F 9 5 7 . 9 ((9 5 7 . 5 ) ) S O G TF 9 5 8 . 0 GF 9 5 7 . 7 ((95 7 . 3 ) ) SO G TF 9 5 7 . 8 GF 9 5 7 . 5 ((957.1) ) SOG TF 957. 6 GF 957 . 3 ((956.8)) SOG TF 957.3 GF 957.0 ((956.5)) SOG TF 957.0 GF 956.7 ((956.4)) SOG TF 956.9 GF 956.6 ((956.7)) SOG TF 957.2 GF 956.9 ((956.9)) SOG TF 957.4 GF 957.1 ((957.2)) SOG TF 957.7 GF 957.4 ((957.4)) SOG TF 957.9 GF 957.6 ((957.5)) SOG TF 958.0 GF 957.7 ((957.4)) SOG TF 957.9 GF 957.6 ((957.2)) SOG TF 957.7 GF 957.4 ((956.9)) SOG TF 957.4 GF 957.1 ((956.7)) SOG TF 957.2 GF 956.9 ((956.4)) SOG TF 956.9 GF 956.6 ((956.4)) SOG TF 956.9 GF 956.6 7 5 T H STREET NE BLOCK 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16BLOCK 3B L O C K 2 BLOCK 2 1 2 3 4 5 6 7 8 9 10 111213141516 171819 2021 1 2 3 4 5 6 OUTLOT A OUTLOT A OUTLOT A ((957.3))SOGTF 957.8GF 957.5((957.3))SOGTF 957.8GF 957.5((957.7))SOGTF 958.2GF 957.9((958.1))SOGTF 958.6GF 958.3((958.5))SOGTF 959.0GF 958.7((958.9))SOGTF 959.4GF 959.157.5 57.0 56.6 56.4 56.453.0 53.8 54.7 55.5 56.4 57.5 55.055.355.555.856.056.356.356.155.855.655.355.255.455.755.956.156.456.656.9 57.1 57.5 55.5 55.6 56.9 57.5 55.055.255.555.856.256.356.055.755.455.455.756.657.6 55.4 958960962964966968958958 958958956956958960962956956954954956956956956954954956956 956 952 954 956 958 958958958 950 952 954 956 950 952 954 9 5 6 95 6 9 5 6 956956948 950 952 954 956 948 950 952 954 956 956956956956938 938 940 940 942 942 944 944 946 946 948 950 952 954 956 948 950 952 954 956956956 948 950 952 954 956956956 948 950 952 954 956956956 948 950 952 954 956956956 9 4 8 9 5 0 95 2 9 5 4 9 5 6956956 9489509 5 2 9 5 4 956956 9 5 6 958 950952954956958958 9549569589569589 5 6 956 956 956956956 956956956 956 956 956 956956956 956 956 956 956956956 956 956 956956956 956 956 956956 956958 958958958 956956 956 >>>>>>>>>>>>>>>>>>>>>>942 942 944 944 946 946 948 948 950 56.00 55.02 EOFEOFEOF48.250.256.4 50.048.2 48.4 48.950.250.048.846.846.548.652.050.949.946.950 . 3 48.149.351.4 51 . 9 50.0 POND 10P 100-YR HWL= 947.26 NWL = 944.50 OUT=944.50 BTM = 938.00 46.7 42.00 56.00 54.92 58.9 56.2 58.3 55.4 57.9 54.7 57.754.1 57.758.753.758.448.358.148.357.848.357.657.357.148.357.348.357.848.358.348.358.848.359.456.057.660.656.5 58.1 57.9 58.3 57.7 56.9 57.9 59.2 58.2 48.4 48.348.358.755.18 53.248.348.348.348.248.248.248.248.148.248.248.248.347.948.046.846 .846.846.748.2100 YR-HWL 100 YR-HWL NWL BTM BTMNWL 10'10'10'10'10'10'ALL OF OUTLOT A IS DRAINAGE AND UTILITY EASEMENT ))))))) ))))))) ))))))) ))))))) 47.90 47.60 47.60 47.90 47.60 FLOODPLAIN IMPACT AREA C AREA=24,726 SF FLOODPLAIN IMPACT AREA A AREA=368 SF FLOODPLAIN IMPACT AREA B AREA=657 SF FLOODPLAIN MITIGATION AREA AREA=17,159 SF FP ELEV = 947.6FP ELEV = 947.9FP ELEV = 948.2PROJECT NO. FILE NAME LANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY From Site to Finish 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net DEVELOPER MUNICIPALITY 2025PRELIMI N A R Y NOT FO R CONST R U C TI O N Preliminary Plat & Final Plat Submittal Preliminary Plat Submittal ETL ETL 02 JUN 2025 04 MAY 2026 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. License No:Date:xx/xx/2025 Eric T. Luth, PE 50475 NORTH 0 50 100 CRAIG DOLLANSKY TEL: (612) 309-9563 EMAIL: BOYDDOLLANSKY@GMAIL.COM OTSEGO, MINNESOTA BDL001-003 EX-1 FLOODPLAIN MITIGATION MAP BDL23003 FLOODPLAIN EXHIBIT.DWG FLOODPLAIN MITIGATION MAP MAY 4, 2026 FLOODPLAIN CALCULATIONS LEGEND :FLOODPLAIN MITIGATION AREA :FLOODPLAIN IMPACT AREA SYMBOL DESCRIPTION TOTAL FLOODPLAIN IMPACT AREA = 25,752 SF TOTAL FLOODPLAIN FILL VOLUME = 490 CY TOTAL FLOODPLAIN MITIGATION VOLUME PROVIDED = 1,686 CY FP :FLOODPLAIN BOUNDARY FP ELEV =XXX.X :FLOODPLAIN WS ELEVATION 1 CITY OF OTSEGO COUNTY OF WRIGHT STATE OF MINNESOTA ORDINANCE NO: 2026-XX AN ORDINANCE AMENDING THE ZONING ORDINANCE OF THE CITY OF OTSEGO TO PROVIDE FOR A CHANGE IN ZONING CLASSIFICATION AND ESTABLISHED A PUD, PLANNED UNIT DEVELOPMENT DISTRICT FOR LAND INCLUDED WITHIN THE ZACHMAN MEADOWS SECOND ADDITION PLAT. THE CITY COUNCIL OF THE CITY OF OTSEGO DOES HEREBY ORDAIN: Section 1. Subject Property. The official Zoning Map of the Otsego Zoning Ordinance is hereby amended to change the zoning classification of the property legally as described by Exhibit A. Section 2. Zoning District. The property is hereby rezoned from an A-1, Agricultural Rural Service District designation to PUD, Planned Unit Development District subject to the terms and conditions set forth herein. Section 3. Allowed Uses. The allowed uses within the PUD District shall include the all permitted uses, permitted accessory uses, conditional uses, interim uses and uses allowed by administrative permit within the R-6 Medium Density Residential District shall be allowed upon the lots within Block 1 through 3 of the preliminary plat, subject to approval of a PUD Development Stage Plan in accordance with Chapter 36 of the Zoning Ordinance. Section 4. Lot Requirements. Lots within the PUD District shall be subject to the minimum lot area, lot width, and setback, and building coverage or impervious surface requirements applicable to the base zoning districts established by Section 3 of this Ordinance except as may be modified by approval of a PUD Development Stage Plan, and the following: A. Minimum Setback Requirements: Kadler Avenue Local ROW Side Rear 30ft. 25ft. Interior 7ft. Corner 15ft. Block 2: 15ft. Other: 20ft. Section 5. Construction Standards. The construction of structures within the PUD District shall conform to minimum requirements set forth by Chapter 17 of the Zoning Ordinance for the base zoning districts established by Section 3 of this Ordinance, except as may be modified by approval of a PUD Development Stage Plan. Section 6. Amendments. Modification of the allowed uses, performance standards, and lot requirements established by this PUD District or the inclusion of additional lands within this PUD District shall be processed in accordance with Chapter 3 of the Zoning Ordinance. 2 Section 7. Zoning Map. The Zoning Map of the City of Otsego shall not be republished to show the aforesaid rezoning, but the Zoning Administrator shall appropriately mark the Zoning Map on file at City Hall for the purpose of indicating the rezoning hereinabove provided for in this Ordinance, and all of the notations, references and other information shown thereon are hereby incorporated by reference and made part of this Ordinance. Section 8. Effective Date. This Ordinance shall become effective immediately upon its passage and publication according to Law. (Remainer of this page intentionally blank) 3 ADOPTED by the Otsego City Council this _____ day of _______, 2026. MOTION BY: SECONDED BY: IN FAVOR: OPPOSED: CITY OF OTSEGO __________________________________ Jessica L. Stockamp, Mayor ATTEST: __________________________________ Audra Etzel, City Clerk