Dais papers-Endeavor 6400 Queens Ave NE_Civil & LA_05-13-2026PLOTTED:COMM. NO.DRAWING NO.----190656400 QUEENS AVE.13605 1st Avenue N. #100Plymouth, MN 55441 | ae-mn.comP 763.412.4000 | F 763.412.4090Anderson Engineering of Minnesota, LLCDRAWING TITLECHECKED BY:DRAWN:DESIGNED:BJFJPDBJFAPRIL 20, 2026REVISION LOGDESCRIPTION OF REVISIONSNO.DATE6400 QUEENS AVENUEOTSEGO, MN 55330ENDEAVORINVESTMENTS XII, LLCPRELIMINARY PLANSPRINT NAME:SIGNATURE:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATEOF MINNESOTA.DATE:LICENSE NO.BRIAN J. FIELD, PE572244/20/2026PRELIMINARY PLATFORJACOBS PLAT SECOND ADDITION6400 QUEENS AVENUEOTSEGO, MN 55330NSITE LOCATIONHIGHWAY 10HIGHWAY 101
65TH ST NEQUEENS AVE NE OWNER/DEVELOPERENDEAVOR INVESTMENTS XII, LLC200 SOUTHDALE CENTERMINNEAPOLIS, MN 55435ATTN: EVAN MATTSON(651)-343-1118ENGINEER/SURVEYORANDERSON ENGINEERING OF MN13605 1ST AVE NORTH, SUITE 100PLYMOUTH, MN 55441ATTN: BRIAN J. FIELD763-412-4035GOPHER STATE ONE CALLCALL 48 HOURS BEFORE DIGGING811 OR 1-800-252-1166NSITE VICINITY1SITE VICINITY MAPSCALE: 1" = 2000'2SITE LOCATION MAPSCALE: 1" = 500'PRINT NAME:SIGNATURE:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WASAPPROVED BY ME ON BEHALF OF THE CITY OF OTSEGO.DATE:MISSISSIPPI RIVERHIGHWAY 101RICE LAKE02000'4000'0500'1000'COVER SHEETG1SHEET INDEXSHEETNUMBERSHEET TITLEG1COVER SHEETC1PRELIMINARY PLATC2DEMOLITION PLANC3OVERALL SITE PLANC4GRADING PLANC5UTILITY PLANC6EROSION & SEDIMENT CONTROL PLANC7SWPPP - PAGE 1C8SWPPP - PAGE 2C9CIVIL DETAILS - 1C10CIVIL DETAILS - 2C11CIVIL DETAILS - 3L1PLANTING PLANL2PLANTING NOTESL3PLANTING DETAILS1. THE HORIZONTAL DATUM AND BEARINGS ARE BASEDON THE WRIGHT COUNTY COORDINATE SYSTEM NAD83(2011)2. A. THE VERTICAL DATUM IS NAVD 88. THE SITE BENCH MARK IS THE TOP NUT OF THE HYDRANTLOCATED 112 FEET NORTHWESTERLY OF THESOUTHWESTERLY PROPERTY CORNER (DEPICTEDHEREON). ELEVATION = 942.50 FEET B. THE ABOVE TOP NUT HYDRANT RELATES TO CITYASBUILT DATA IN NGVD 29 AND HAS THE LISTEDELEVATION OF 942.25 FEET ON SHEET 24 OF QUEENS AVE NE CONSTRUCTION PLANS AND DATED: 10-22-07 RECORD PLAN
PROPERTY LINE
PROPERTY LINE
PROPERTY LINEPLOTTED:COMM. NO.
DRAWING NO.
----19065
6400 QUEENS AVE.
1 3 6 0 5 1 s t A v e n u e N . #1 0 0
P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m
P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0
A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C
DRAWING TITLE
CHECKED BY:DRAWN:DESIGNED:
BJFJPDBJF
APRIL 20, 2026
REVISION LOG
DESCRIPTION OF REVISIONSNO.DATE
6400 QUEENS AVENUE
OTSEGO, MN 55330
ENDEAVOR
INVESTMENTS XII, LLC
PRELIMINARY PLANS
PRINT NAME:
SIGNATURE:
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE
OF MINNESOTA.
DATE:LICENSE NO.
BRIAN J. FIELD, PE
572244/20/2026
N
0 100'200'
PRELIMINARY
PLAT
C1
65TH ST NE
QUEENS AVE NELEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
ADJACENT PROPERTY
BUILDING SETBACKS
PARKING SETBACK
DRAINAGE AND UTILITY
EASEMENT
40' WETLAND SETBACK
PROPOSED CONCRETE C&G
PROPOSED RETAINING WALL
PROPOSED TOTAL OUTDOOR
STORAGE AREA (10.04 ACRES)
PROPOSED ASPHALT
PAVEMENT
SITE DATA
EXISTING CONDITIONS
EXISTING LEGAL DESCRIPTION: SECT-35 TWP-121 RANGE-023 JACOBS PLAT LOT 001 BLOCK 001 THE NORTH HALF
OF THE SOUTHEAST QUARTER OF SECTION 35, TOWNSHIP 121, RANGE 23, WRIGHT COUNTY, MINNESOTA.
PID: 118374001010
FULL LOT AREA: 78.5 ACRES
EXISTING ZONING: I-1 INDUSTRIAL
EXISTING PARKING REQUIRED
WAREHOUSE (99%): 396,000 SF x 1 STALL/1,000 SF = 396 STALLS
OFFICE (1%): 4,000 SF x 1 STALL/200 SF = 20 STALLS
TOTAL = 416 STALLS
EXISTING PARKING PROVIDED
CAR PARKING = 120 STALLS
HANDICAP STALLS (VAN)= 6 STALLS
SEMI-TRAILER PARKING = 52 STALLS
PROPOSED CONDITIONS
PROPOSED LEGAL DESCRIPTION:
PROPOSED ZONING: I-1 INDUSTRIAL
SETBACKS
FRONT YARD = 65 FT FROM CENTERLINE, 30 FT FROM ROW
SIDE YARD = 30 FT
REAR YARD = 20 FT
MAXIMUM SITE COVERAGE
BUILDING AND STRUCTURE: FIFTY PERCENT (50%)
IMPERVIOUS SURFACES: EIGHTY FIVE PERCENT (85%)
OUTDOOR STORAGE: THIRTY PERCENT (30%)
PARKING REQUIRED (FUTURE BUILDING ADDITION)
WAREHOUSE (99%): 198,000 SF x 1 STALL/1,000 SF = 198 STALLS
OFFICE (1%): 2,185 SF x 1 STALL/200 SF = 11 STALLS
TOTAL = 209 STALLS
PARKING PROVIDED (FUTURE BUILDING ADDITION)
CAR PARKING = 43 STALLS
HANDICAP STALLS (VAN)= 2 STALLS
SEMI-TRAILER PARKING = 0 STALLS
6400 QUEENS AVENUE
(EXISTING BUILDING)
401,544 SF
FFE = 923.0
FUTURE ADDITION
200,185 SF
FFE = 923.0
EXISTING TRAILER
PARKING
EXISTING EMPLOYEE
PARKING LOT
FUTURE PAVEMENT
EXTENTS
DELINEATED
WETLAND (TYP)
DELINEATED
WETLAND
(TYP)50'DEDICATIONTO CITYPARKING
SETBACK
EXISTING PROPERTY
BOUNDARY
55.0FUTURE
RETAINING WALL
TOTAL FUTURE
OUTDOOR STORAGE
PARKING
SETBACK
BUILDING
SETBACK
BUILDING
SETBACK
20.0
15.0
EXISTING
PROPERTY
BOUNDARY
FUTURE D&U EASEMENT
EPHEMERAL STREAM
EX. POND P-1
EXISTING
RETAINING WALL FUTURE RETAINING WALL
EXISTING PROPERTY
BOUNDARY
PROPOSED SITE COVERAGE: LOT 1 = 38.65 ACRES OUTLOT A = 39.85 ACRES
EXISTING BUILDING AND FUTURE ADDITION: 14.12 ACRES = THIRTY SEVEN PERCENT (37%)
IMPERVIOUS SURFACES: 28.21 ACRES = SEVENTY ONE PERCENT (73%)
OUTDOOR STORAGE: 10.04 ACRES = TWENTY SIX PERCENT (26%)
WETLAND #4
100-YR HWL = 910.13
WETLAND #5
100-YR HWL = 919.98
WETLAND #6
100-YR HWL = 888.78
WETLAND #8
100-YR HWL = 903.40
WETLAND #7
100-YR HWL = 914.08
D&U EASEMENT
D&U EASEMENT
40' WETLAND
SETBACK (TYP.)
WETLAND #9
(NO STORAGE)
PROPOSED PROPERTY
BOUNDARY
30.0
BUILDING SETBACK
POND P-2
EXPANSION
FUTURE VEHICLE
PARKING
EX. POND P-2
T
O
T
A
L
F
U
T
U
R
E
O
U
T
D
O
O
R
S
T
O
R
A
G
E
350.0572.0277.0
EXISTING
D&U EASEMENT
PROPOSED
SCREENING FENCE
A400
PLOTTED:COMM. NO.
DRAWING NO.
----19065
6400 QUEENS AVE.
1 3 6 0 5 1 s t A v e n u e N . #1 0 0
P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m
P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0
A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C
DRAWING TITLE
CHECKED BY:DRAWN:DESIGNED:
BJFJPDBJF
APRIL 20, 2026
REVISION LOG
DESCRIPTION OF REVISIONSNO.DATE
6400 QUEENS AVENUE
OTSEGO, MN 55330
ENDEAVOR
INVESTMENTS XII, LLC
PRELIMINARY PLANS
PRINT NAME:
SIGNATURE:
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE
OF MINNESOTA.
DATE:LICENSE NO.
BRIAN J. FIELD, PE
572244/20/2026
0 60'120'
N
DEMOLITION PLAN
C2
65TH ST NE
6400 QUEENS AVENUE
(401,544 SF)
FFE = 923.0
LOADING DOCK = 919.0
POND P-1
POND P-2
DELINEATED
WETLAND
(TYP.)
WETLAND 8
WETLAND 7
WETLAND 4
WETLAND 5
EOF FOR WETLAND 4
KEYNOTES
REMOVE EXISTING ASPHALT PAVEMENT.
REMOVE EXISTING GRAVEL ROAD - 65TH ST. NE
EXPANDED EXISTING POND P2 & FILTRATION
BENCH AREA
REMOVE & REPLACE EXISTING HYDRANTS
PROTECT EXISTING STOOPS (TYP.)
PROTECT EXISTING STORM SEWER
STRUCTURE (TYP.)
PROTECT EXISTING RETAINING WALL
1
2
3
4
5
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
EXISTING WATERMAIN
EXISTING SANITARY SEWER
EXISTING STORM SEWER
EXISTING FENCE
REMOVE EXISTING ASPHALT
PAVEMENT
REMOVE EXISTING GRAVEL
ROAD
3
3
CONSTRUCTION
LIMITS
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
2
1
1
5
5
5
5
5
4
4
6
6
6
6 6
6
6
7
7
RELOCATE EXISTING
TRASH ENCLOSURE
REMOVE EXISTING WALL
PROPERTY LINE
PROPERTY LINE
PROPERTY LINECO CO
CO
CO
CO
PLOTTED:COMM. NO.
DRAWING NO.
----19065
6400 QUEENS AVE.
1 3 6 0 5 1 s t A v e n u e N . #1 0 0
P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m
P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0
A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C
DRAWING TITLE
CHECKED BY:DRAWN:DESIGNED:
BJFJPDBJF
APRIL 20, 2026
REVISION LOG
DESCRIPTION OF REVISIONSNO.DATE
6400 QUEENS AVENUE
OTSEGO, MN 55330
ENDEAVOR
INVESTMENTS XII, LLC
PRELIMINARY PLANS
PRINT NAME:
SIGNATURE:
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE
OF MINNESOTA.
DATE:LICENSE NO.
BRIAN J. FIELD, PE
572244/20/2026
N
OVERALL SITE
PLAN
C3
65TH ST NE
QUEENS AVE NELEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
ADJACENT PROPERTY
BUILDING SETBACKS
PARKING SETBACK
DRAINAGE AND UTILITY
EASEMENT
40' WETLAND SETBACK
PROPOSED FENCE
PROPOSED CONCRETE C&G
PROPOSED BITUMINOUS
PAVEMENT
6400 QUEENS AVENUE
(EXISTING BUILDING)
401,544 SF
FFE = 923.0
EXISTING TRAILER
PARKING
EXISTING EMPLOYEE
PARKING LOT
DELINEATED
WETLAND (TYP)
DELINEATED
WETLAND
(TYP)
EXISTING PROPERTY
BOUNDARY
EPHEMERAL STREAM
EX. POND P-1
EX. POND P-2
EXISTING
RETAINING WALL
WETLAND #4
WETLAND #5
WETLAND #6
WETLAND #8
WETLAND #7
D&U EASEMENT
D&U EASEMENT
40' WETLAND
SETBACK (TYP.)
WETLAND #9
0 100'200'
PROPOSED B612
CONCRETE CURB
& GUTTER
PROPOSED
PROPERTY
BOUNDARY
375.0'763.3'PROPOSED PROPERTY
BOUNDARY
EXISTING OUTDOOR
STORAGE AREA
(2.73 AC.)
POND P-2 EXPANSION
NWL = 906.00
100-YR HWL = 910.13
BOT = 900.00
D&U EASEMENT
PROPOSED OUTDOOR
STORAGE AREA
NEW STORAGE AREA = 7.38 AC.
EX. STORAGE = 2.73 AC.
TOTAL = 10.11 AC.
OUTLOT A
(ADDITIONAL LAND)
= 39.85 ACRES
LOT 1 = 38.65 ACRES
EXISTING 6FT
COMPOSITE BOARD
SCREENING FENCE
PROPOSED CHAIN LINK
SECURITY & SCREENING FENCE
EXISTING PROPERTY
BOUNDARY
81.1'
198.5'R50.0R50.0
EXISTING EDGE
OF GRAVEL
PROPOSED 65TH ST ROAD
CONSTRUCTION &
IMPROVEMENTS
46'
B-B
114
C11
TAPER GRAVEL TO
MATCH EXISTING
PROPOSED
SECURITY GATE
PROPOSED
SECURITY GATE
REMOVE EXISTING DOORS. WIDEN
OPENING FOR NEW OVERHEAD DOORS
REMOVE EXISTING DOORS. WIDEN
OPENING FOR NEW OVERHEAD DOORS
NEW OVERHEAD
DOORS
PROPOSED 6FT
SCREENING FENCE
A400 922920918916919
921
91
7
917917
919
921 917916 91190990790 6
9 1 0
9 1 2
9 1 5916
9 0 8
2.0%
2.0%5.0%5.0%9169
1
6
916916913916
918
91691691491591691791791391591
5
RIDGE LINE (FG. 917.8)12
:
1
4:11.5%
CBMH-7
R. 915.1
CB-8
R. 915.1
CBMH-9
R. 916.1
CBMH-6
R. 915.1
CBMH-5
R. 915.1
CBMH-4
R. 915.1
STMH-3
R. 914.50
STMH-2
R. 915.50
1.2%1.2%1.2%1.2%1.2%1.2%1.2%1.2%1.2%PROPERTY LINE
PROPERTY LINE
FES-1
I. 906.0
9009059059109059009
1
1
9109029
0
3
9079129109069099
0
8
3:1
4:1
4:1
4:1
3:1
914
CB-10
R. 916.1 PROPERTY LINE916CO CO
CO
CO
CO
930
925
920
915925
9 2 0920918
920
918
922
911
912
920
925
920
917
927
EX CBMH-103
R 917.18
EX STMH-401
R 916.88
EX CBMH-105
R 916.74
EX CBMH-104
R 916.71
EX CBMH-407
R 915.81
EX CBMH-403
R 915.63
EX CB-405
R 915.35 EX CBMH-402
R 915.32
EX CBMH-404
R 915.32
EX STMH-109
R 914.51
EX STMH-110
R 921.00
EX FES-111
INV 906.00
EX FES-302
INV 924.15
EX OCS-501
R 914.20
EX FES-504
INV 907.48
EX FES-602
INV 906.00
EX FES-601
INV 903.00
EX FES-702
INV 903.00
EX FES-903
INV 912.00
EX FES-905
INV 911.00
EX FES-409
INV 909.80
EX FES-408
INV 911.00
EX LIFT STATION
R 920.85
EX STMH-600
R 914.00
EX OCS-701
R 910.50
EX STMH-902
R 918.64
EX CBMH-106
R 916.14
EX STMH-502
R 916.19
EX STMH-503
R 912.54
EX CB-401A
R 916.00
EX STMH-107
R 916.1
EX STMH-108
R 915.25
EX FES-700
INV 902.00
EX FES-904
INV 912.00
ME/TC 917.3±
ME/FL 916.8±
ME/FL 916.2±
ME/TC 916.7±
TC 917.6
FL 917.1
TC 916.6
FL 916.1
TC 916.6
FL 916.1
TC 916.6
FL 916.1
TC 916.6
FL 916.1
TC 916.5
FL 916.0
TC 917.3
FL 916.8
TC 917.3
FL 916.8
FL 917.1
TC 917.6
TC 917.6
FL 917.1
FFE 923.0
FFE 923.0
FFE 923.0
FFE 923.0
FFE 923.02%2%PLOTTED:COMM. NO.
DRAWING NO.
----19065
6400 QUEENS AVE.
1 3 6 0 5 1 s t A v e n u e N . #1 0 0
P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m
P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0
A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C
DRAWING TITLE
CHECKED BY:DRAWN:DESIGNED:
BJFJPDBJF
APRIL 20, 2026
REVISION LOG
DESCRIPTION OF REVISIONSNO.DATE
6400 QUEENS AVENUE
OTSEGO, MN 55330
ENDEAVOR
INVESTMENTS XII, LLC
PRELIMINARY PLANS
PRINT NAME:
SIGNATURE:
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE
OF MINNESOTA.
DATE:LICENSE NO.
BRIAN J. FIELD, PE
572244/20/2026
0 60'120'
N
GRADING PLAN
C4
LEGEND
PROPERTY LIMITS
EXISTING RIGHT OF WAY
BUILDING SETBACK
PARKING SETBACK
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED MAJOR CONTOUR
40' WETLAND SETBACK
20' DRAINAGE & UTILITY
EASEMENT
DELINEATED WETLAND
PROPOSED CONCRETE C&G
PROPOSED STORM SEWER
STRUCTURE
PROPOSED BITUMINOUS
PAVEMENT
DRAINAGE ARROW
966
965
916
915
65TH ST NE
6400 QUEENS AVENUE
(401,544 SF)
FFE = 923.0
LOADING DOCK = 919.0
POND P-1
NWL = 911.0
2-YR HWL = 912.17
10-YR HWL = 912.72
100-YR HWL = 914.19
POND P-2
NWL = 906.0
2-YR HWL = 907.53
10-YR HWL = 908.63
100-YR HWL = 910.13
BOT = 900.00
DELINEATED
WETLAND
(TYP.)
WETLAND 8
100-YR HWL = 903.40
WETLAND 7
100-YR HWL = 914.08
WETLAND 4
100-YR HWL = 910.13
WETLAND 5
100-YR HWL = 919.98
EXISTING WALL
EOF FOR WETLAND 4
ELEV = 910.50
BUILDING SETBACK
PARKING SETBACK
EXISTING RIGHT OF WAY
EXISTING 6FT COMPOSITE
BOARD FENCE
D&U EASEMENT
PROTECT & MAINTAIN
EXISTING P-2 EOF
ELEV = 910.50
TOP OF BERM = 905.50
SPOT ELEVATION KEY
MATCH EXISTING GRADE
HIGH POINT ELEVATION
RIM ELEVATION
TOP OF CURB ELEVATION
FLOW LINE ELEVATION
ME/±
HP
R
TC
FL
EDGE OF EXISTING GRAVEL
EOF = 915.6
PG 915.6
PG 915.6
EOF = 915.6
EXPANDED
FILTRATION BENCH
BOT = 904.00
CONSTRUCTION LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
NEW AT-GRADE
OVERHEAD DOOR
NEW AT-GRADE
OVERHEAD DOOR
MODIFIED
OVERHEAD DOOR
MODIFIED OVERHEAD DOOR.
WIDEN EXISTING RAMP & EXTEND
CONCRETE APRON AS NEEDED
PROPOSED 6FT FENCE
ON TOP OF SCREENING BERM
PROPOSED 6FT FENCE
ON TOP OF SCREENING BERM
TOP OF BERM = 931.5
TOP OF BERM = 922.5
A400
CBMH-9
R. 916.1
I. 912.22 (12" IN)
I. 912.22 (18" OUT)
CBMH-8
R. 915.1
I. 911.13 (18" IN)
I. 911.13 (24" OUT)
170 LF
24" HDPE ST
@ 0.4%
200 LF - 36" HDPE ST @ 0.44%200 LF - 36" HDPE ST @ 0.44%
118 LF - 36" RCP
ST @ 0.44%
STMH-2
R. 915.50
I. 906.56 (36" IN)
I. 906.56 (36" OUT)
STMH-3
R. 914.50
I. 907.44 (36" IN)
I. 907.44 (36" OUT)
CBMH-7
R. 915.1
I. 910.45 (24" IN)
I. 910.45 (30" OUT)
CBMH-6
R. 915.1
I. 909.77 (30" IN)
I. 909.77 (30" OUT)
CBMH-5
R. 915.1
I. 909.09 (30" IN)
I. 909.09 (36" OUT)
170 LF
30" HDPE ST
@ 0.4%
170 LF
30" HDPE ST
@ 0.4%
CBMH-4
R. 915.1
I. 908.42 (36" IN)
I. 908.32 (36" OUT)
165 LF
36" HDPE ST
@ 0.4%
PROPERTY LINE
PROPERTY LINE
FES-1
I. 906.0 (36")
CB-10
R. 916.1
I. 913.1 (12" OUT)272 LF - 18"
H
D
P
E
S
T
@ 0.4
%
220 LF - 12" HDPE ST @ 0.4%PROPERTY LINECO CO
CO
CO
CO
STMH-107
R. 916.1
I. 908.42 (36")
I. 908.42 (36")
(LOWER EX. RIM & INSTALL
NEW R-3067-V CASTING)
STMH-108
R. 915.25
I. 907.80 (36")
I. 907.80 (36")
(INSTALL NEW
R-3067-V CASTING)
EX CBMH-103
R 917.18
EX STMH-401
RIM 916.88
I. 912.04(18" OUT)
I. 912.24(15" IN)
I. 912.24(16" IN)
EX CBMH-105
R 916.74
EX CBMH-104
R 916.71
EX CBMH-407
R 915.81
EX CBMH-403
R 915.63
EX CB-405
R 915.35
EX CBMH-402
R 915.32
EX CBMH-404
R 915.32
EX STMH-109
R 914.51
EX FES-111
INV 906.00
EX FES-302
INV 924.15
EX OCS-501
RIM 914.20
I. 908.96(18" OUT)
I. 908.96(18" IN)
I. 909.00(4" IN)
EX FES-601
INV 903.00
EX FES-702
INV 903.00
EX FES-903
INV 912.00
EX FES-904
INV 912.00
EX FES-905
INV 911.00
EX FES-409
INV 909.80
EX FES-408
INV 911.00
EX LIFT STATION
R 920.85
EX STMH-600
R 914.00
EX OCS-701
RIM 910.50
I. 906.00(18" IN)
I. 903.50(18" OUT)
I. 904.00(4" IN)
EX STMH-902
R 918.64
EX CB-401A
RIM 916.00
I. 912.55(15" OUT)
EX STMH-502
RIM 916.19
I. 908.53(18" IN)
I. 908.53(18" OUT)
EX STMH-503
RIM 912.54
I. 907.59(18" IN)
I. 907.59(18" OUT)
EX CBMH-106
RIM 916.14
I. 908.88(36" IN)
I. 908.88(36" OUT)
EX FES-504
INV 907.48 EX FES-602
INV 906.00
EX FES-700
INV 902.00
EX 200 LF -36" HDPE @ 0.31%EX 148 LF -36" HDPE @ 0.31%
EX 200 LF -
36" HDPE
@ 0.31%EX 200 LF -36" HDPE @ 0.31%EX 127 LF -
36" RCP
@ 0.44%
EX STMH-110
R 921.00
EX FES-500
INV 907.00
EX 312 LF -18" RCP @ 0.30%
PLOTTED:COMM. NO.
DRAWING NO.
----19065
6400 QUEENS AVE.
1 3 6 0 5 1 s t A v e n u e N . #1 0 0
P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m
P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0
A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C
DRAWING TITLE
CHECKED BY:DRAWN:DESIGNED:
BJFJPDBJF
APRIL 20, 2026
REVISION LOG
DESCRIPTION OF REVISIONSNO.DATE
6400 QUEENS AVENUE
OTSEGO, MN 55330
ENDEAVOR
INVESTMENTS XII, LLC
PRELIMINARY PLANS
PRINT NAME:
SIGNATURE:
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE
OF MINNESOTA.
DATE:LICENSE NO.
BRIAN J. FIELD, PE
572244/20/2026
0 60'120'
N
UTILITY PLAN
C5
LEGEND
PROPERTY LIMITS
40' WETLAND SETBACK
20' DRAINAGE & UTILITY
EASEMENT
DELINEATED WETLAND
EXISTING WATERMAIN
EXISTING STORM SEWER
EXISTING SANITARY SEWER
PROPOSED STORM SEWER
PROPOSED STORM SEWER
STRUCTURE
FES W/ CABLE CONCRETE
65TH ST NE
6400 QUEENS AVENUE
(401,544 SF)
FFE = 923.0
LOADING DOCK = 919.0
POND P-1
NWL = 911.0
2-YR HWL = 912.17
10-YR HWL = 912.72
100-YR HWL = 914.19
EXPANDED POND P-2
NWL = 906.0
2-YR HWL = 907.53
10-YR HWL = 908.63
100-YR HWL = 910.13 DELINEATED
WETLAND
(TYP.)
WETLAND 8
100-YR HWL = 903.40
WETLAND 7
100-YR HWL = 914.08
WETLAND 4
100-YR HWL = 910.13
WETLAND 5
100-YR HWL = 919.98
BUILDING SETBACK
PARKING SETBACK
EXISTING RIGHT OF WAY
1.SEE STORM SEWER STRUCTURE SCHEDULE ON SHEET C10.
2.ALL CONSTRUCTION SHALL COMPLY WITH 2025 EDITION OF MNDOT STANDARD CONSTRUCTION SPECIFICATIONS
(INCLUDING SUPPLEMENTS), AS APPLICABLE. ALL CONSTRUCTION SHALL COMPLY WITH STATE, COUNTY, AND CITY
PERMIT REQUIREMENTS.
3.CONTRACTOR SHALL VERIFY ALL UNDERGROUND UTILITIES IN THE AREA OF CONSTRUCTION, PRIOR TO BEGINNING
THE WORK.
4.THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL HORIZONTAL AND VERTICAL CONTROLS.
5.CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS PRIOR TO CONSTRUCTION.
6.THE CONTRACTOR SHALL OBTAIN ALL NECESSARY CONSTRUCTION PERMITS REQUIRED TO PERFORM ALL THE
WORK. THE CONTRACTOR SHALL POST ALL BONDS, PAY ALL FEES, PROVIDE PROOF OF INSURANCE, AND PROVIDE
ANY NECESSARY TRAFFIC CONTROL FOR THE WORK.
7.PROTECT EXISTING UTILITIES UNLESS OTHERWISE NOTED.
8.SUBSTITUTIONS FROM INFO. SHOWN HEREON SHALL BE REVIEWED AND APPROVED BY THE ENGINEER OF RECORD.
SHEET NOTES
RE-INSTALL NEW
HYDRANT WITH
TRAFFIC BOLLARDS
CONSTRUCTION LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
A400 922920918916919
921
91
7
917917
919
921 917916 91190990790 6
9 1 0
9 1 2
9 1 5916
9 0 89169
1
6
916916913916
918
91691691491591691791791391591
5
PROPERTY LINE
PROPERTY LINE
9009059059109059009
1
1
9109029
0
3
9079129109069099
0
8
914
PROPERTY LINE916CO CO
CO
CO
CO
930
925
920
915925
9 2 0920918
920
918
922
911
912
920
925
920
917
927
PLOTTED:COMM. NO.
DRAWING NO.
----19065
6400 QUEENS AVE.
1 3 6 0 5 1 s t A v e n u e N . #1 0 0
P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m
P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0
A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C
DRAWING TITLE
CHECKED BY:DRAWN:DESIGNED:
BJFJPDBJF
APRIL 20, 2026
REVISION LOG
DESCRIPTION OF REVISIONSNO.DATE
6400 QUEENS AVENUE
OTSEGO, MN 55330
ENDEAVOR
INVESTMENTS XII, LLC
PRELIMINARY PLANS
PRINT NAME:
SIGNATURE:
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE
OF MINNESOTA.
DATE:LICENSE NO.
BRIAN J. FIELD, PE
572244/20/2026
0 60'120'
N
EROSION &
SEDIMENT
CONTROL PLAN
C6
LEGEND
PROPERTY LIMITS
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED MAJOR CONTOUR
DELINEATED WETLAND
DRAINAGE ARROW
PROPOSED CONCRETE C&G
SILT FENCE
INLET SEDIMENT PROTECTION
ROCK CONSTRUCTION
ENTRANCE
TEMPORARY SEED & EROSION
CONTROL BALANKETS
966
965
916
915
65TH ST NE
6400 QUEENS AVENUE
(401,544 SF)
FFE = 923.0
LOADING DOCK = 919.0
POND P-1
EXPANDED
POND P-2
DELINEATED
WETLAND
(TYP.)
WETLAND 8
WETLAND 7
WETLAND 4
WETLAND 5
EOF FOR WETLAND 4
KEYNOTES
CONCRETE CABLE MAT
INLET PROTECTION (TYP.)
ROCK CONSTRUCTION ENTRANCE
SINGLE ROW SILT FENCE
DOUBLE ROW SILT FENCE
1
2
3
4
5
1
2
2
2
2
4
4
5
5
3
PROJECT DESCRIPTION/LOCATION
THE SITE IS LOCATED IN THE CITY OF OTSEGO IN WRIGHT COUNTY BOUNDED ON THE WEST BY
QUEENS AVE NE, SINGLE FAMILY HOMES TO THE SOUTH, CROPLAND TO THE EAST, AND 65TH ST
NE TO THE NORTH. THE PROPOSED SITE ENCOMPASSES 78.50 ACRES.
THE PLANNED SCOPE OF THE PROJECT INCLUDES:
·ASPHALT PAVEMENT EXPANSION TO THE EAST FOR NEW OUTDOOR STORAGE.
·THE INSTALLATION OF EROSION CONTROL MEASURES AS REQUIRED FOR THE MASS
GRADING OF THE SITE FOR THE CONSTRUCTION OF THE OUTDOOR STORAGE LOT.
·GRADING AS REQUIRED FOR THE NEW OUTDOOR STORAGE AND EXPANDED POND P-2.
·INSTALLATION OF STORM SEWER.
·PLACEMENT OF CONCRETE AS REQUIRED TO ESTABLISH CURB & GUTTER THROUGHOUT
THE SITE.
RECEIVING WATERS
THESE WATERS ARE LOCATED WITHIN ON MILE (AERIAL RADIUS) OF THE PROJECT LIMITS AND
RECEIVE RUNOFF FROM THE PROJECT SITE. DUE TO THE PROXIMITY OF THE RECEIVING
WATERS, THE BMPS DESCRIBED IN APPENDIX A OF THE NPDES PERMIT MAY APPLY TO ALL
AREAS OF THE SITE.
DUE TO THE PROXIMITY OF THE CROW AND MISSISSIPPI RIVERS, THE FOLLOWING WILL BE
IMPLEMENTED ACCORDING TO THE MPCA REQUIREMENTS FOR DISCHARGING INTO IMPAIRED
AND/OR SPECIAL WATERS:
1.23.9: PERMITTEES MUST IMMEDIATELY INITIATE STABILIZATION OF EXPOSED SOIL AREAS, AS
DESCRIBED IN ITEM 8.4, AND COMPLETE THE STABILIZATION WITHIN SEVEN (7) CALENDAR
DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE TEMPORARILY OR
PERMANENTLY CEASES.
2.23.10: PERMITTEES MUST PROVIDE A TEMPORARY SEDIMENT BASIN AS DESCRIBED IN
SECTION 14 FOR COMMON DRAINAGE LOCATIONS THAT SERVE AN AREA WITH FIVE (5) OR
MORE ACRES DISTURBED AT ONE TIME.
3.23.10: PERMITTEES MUST INCLUDE AN UNDISTURBED BUFFER ZONE OF NOT LESS THAN 100
LINEAR FEET FROM A SPECIAL WATER (NOT INCLUDING TRIBUTARIES) AND MUST MAINTAIN
THIS BUFFER ZONE AT ALL TIMES, BOTH DURING CONSTRUCTION AND AS A PERMANENT
FEATURE POST CONSTRUCTION, EXCEPT WHERE A WATER CROSSING OR OTHER
ENCROACHMENT IS NECESSARY TO COMPLETE THE PROJECT. PERMITTEES MUST FULLY
DOCUMENT THE CIRCUMSTANCE AND REASONS THE BUFFER ENCROACHMENT IS
NECESSARY IN THE SWPPP AND INCLUDE RESTORATION ACTIVITIES. THIS PERMIT ALLOWS
REPLACEMENT OF EXISTING IMPERVIOUS SURFACE WITHIN THE BUFFER. PERMITTEES MUST
MINIMIZE ALL POTENTIAL WATER QUALITY, SCENIC AND OTHER ENVIRONMENTAL IMPACTS
OF THESE EXCEPTIONS BY THE USE OF ADDITIONAL OR REDUNDANT BMPS AND MUST
DOCUMENT THIS IN THE SWPPP FOR THE PROJECT.
SOIL TYPES
PER ONLINE WEB SOIL SURVEY INFORMATION, SOIL TYPES TYPICALLY FOUND ON THIS PROJECT
RANGE FROM B TO D, WITH LESTER AND ANGUS LOAMS MAKING UP THE MAJORITY OF THE SITE.
OTHER LOAMS, ANGUS-CORDOVA COMPLEX'S AND CORDOVA CLAYS MAKE UP THE THE
REMAINDER OF THE SITE.
LONG TERM MAINTENANCE AND OPERATION
ENDEAVOR DEVELOPMENT HAS ENTERED INTO A MAINTENANCE AGREEMENT WITH THE CITY OF
OTSEGO THAT IDENTIFIES THE AGENCY THAT IS RESPONSIBLE FOR ONGOING MAINTENANCE,
AND HOW RESPONSIBILITY WILL BE TRANSFERRED TO OTHER AGENTS OR IF IT WILL BE
PRIVATELY MAINTAINED.
PROJECT PERSONNEL AND TRAINING
THIS SWPPP WAS PREPARED BY PERSONNEL THAT ARE VERIFIED IN THE DESIGN OF
CONSTRUCTION SWPPP. COPIES OF THE CERTIFICATIONS ARE ON FILE WITH THE ENGINEER.
PROVIDE A CERTIFIED EROSION CONTROL SUPERVISOR IN GOOD STANDING WHO IS
KNOWLEDGEABLE AND EXPERIENCED IN THE APPLICATION OF EROSION PREVENTION AND
SEDIMENT CONTROL BEST MANAGEMENT PRACTICES. THE EROSION CONTROL SUPERVISOR
WILL WORK WITH THE PROJECT ENGINEER / SWPPP DESIGNER TO OVERSEE THE
IMPLEMENTATION OF THE SWPPP AND THE INSTALLATION, INSPECTION, AND MAINTENANCE OF
THE EROSION PREVENTION AND SEDIMENT CONTROL BMPS BEFORE, DURING, AND AFTER
CONSTRUCTION UNTIL THE NOTICE OF TERMINATION (NOT) HAS BEEN FILED WITH THE MPCA.
PROVIDE PROOF OF CERTIFICATION AT THE RECONSTRUCTION MEETING. WORK WILL NOT BE
ALLOWED TO COMMENCE UNTIL PROOF OF CERTIFICATION HAS BEEN PROVIDED TO THE
PROJECT ENGINEER.
PROVIDE AT LEAST ONE CERTIFIED INSTALLER FOR EACH CONTRACTOR OR SUBCONTRACTOR
THAT INSTALLS THE PRODUCTS LISTED IN SPECIFICATION SECTION 2573.3.A.2 CERTIFIED
INSTALLERS. PROVIDE PROOF OF CERTIFICATION AT THE RECONSTRUCTION MEETING. WORK
WILL NOT BE ALLOWED TO COMMENCE UNTIL PROOF OF CERTIFICATION HAS BEEN PROVIDED TO
THE PROJECT ENGINEER.
CHAIN OF RESPONSIBILITY
THE OWNER AND CONTRACTOR ARE CO-PERMITTEES FOR THE NATIONAL POLLUTANT
DISCHARGE ELIMINATION SYSTEM (NPDES) CONSTRUCTION PERMIT. THE CONTRACTOR IS
RESPONSIBLE TO COMPLY WITH ALL ASPECTS OF THE NPDES CONSTRUCTION PERMIT AT ALL
TIMES UNTIL THE NOTICE OF TERMINATION (NOT) HAS BEEN FILED WITH THE MPCA THE
CONTRACTOR WILL DEVELOP A CHAIN OF COMMAND WITH ALL OPERATORS ON THE SITE TO
ENSURE THAT THE SWPPP WILL BE IMPLEMENTED AND STAY IN EFFECT UNTIL THE
CONSTRUCTION PROJECT IS COMPLETE, THE ENTIRE SITE HAS UNDERGONE FINAL
STABILIZATION, AND A NOTICE OF TERMINATION (NOT) HAS BEEN SUBMITTED TO THE MPCA.
PROJECT CONTACTS
THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION OF THE SWPPP AND INSTALLATION,
INSPECTION, AND MAINTENANCE OF THE EROSION PREVENTION AND SEDIMENT CONTROL BMPS
BEFORE, DURING, AND AFTER CONSTRUCTION UNTIL THE NOTICE OF TERMINATION (NOT) HAS
BEEN FILED.
*CERTIFIED FOR DESIGN OF CONSTRUCTION SWPPP BY UNIVERSITY OF MINNESOTA, EXPIRES
5/31/28
MPCA DUTY OFFICER 24 HOUR EMERGENCY NOTIFICATION:
651-649-5451 OR 800-422-0798
SITE INSPECTION AND MAINTENANCE
CONTRACTOR SHALL PROVIDE NAME, CONTACT INFO, AND TRAINING DOCUMENTATION FOR THE
PERSON RESPONSIBLE FOR SWPPP IMPLEMENTATION AND INSPECTION/MAINTENANCE OF BMPS.
INSPECT THE ENTIRE CONSTRUCTION SITE A MINIMUM OF ONCE EVERY SEVEN DAYS DURING
ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5
INCHES WITHIN A 24 HOUR TIME FRAME. INSPECT ALL TEMPORARY AND PERMANENT WATER
QUALITY MANAGEMENT, EROSION PREVENTION AND SEDIMENT CONTROL BMPS UNTIL THE SITE
HAS UNDERGONE FINAL STABILIZATION AND THE N.O.T. HAS BEEN SUBMITTED. INSPECT
SURFACE WATER INCLUDING DRAINAGE DITCHES FOR SIGNS OF EROSION AND SEDIMENT
DEPOSITION. INSPECT CONSTRUCTION SITE VEHICLE EXIT LOCATIONS FOR EVIDENCE OF
TRACKING ONTO PAVED SURFACES. INSPECT SURROUNDING PROPERTIES FOR EVIDENCE OF
OFF SITE SEDIMENT ACCUMULATION.
RECORD ALL INSPECTIONS AND MAINTENANCE ACTIVITIES IN WRITING WITHIN 24 HOURS. SUBMIT
INSPECTION REPORTS IN A FORMAT THAT IS ACCEPTABLE TO THE PROJECT ENGINEER.
FOR PROJECTS THAT DISCHARGE TO PROHIBITED WATERS, CONDUCT ROUTINE SITE
INSPECTIONS AT A MINIMUM OF ONCE EVERY 72 HOURS (3 DAYS).
INCLUDE THE FOLLOWING IN THE RECORDS OF EACH INSPECTION AND MAINTENANCE ACTIVITY:
A.DATE AND TIME OF INSPECTIONS
B.NAME OF PERSONS CONDUCTING INSPECTIONS
C.FINDINGS OF INSPECTIONS, INCLUDING RECOMMENDATIONS FOR CORRECTIVE ACTIONS
D.CORRECTIVE ACTION TAKEN, INCLUDING DATES, TIMES, AND PARTY COMPLETING
MAINTENANCE ACTIVITIES
E.DATE AND AMOUNT OF ALL RAINFALL EVENTS GREATER THAN 0.5 INCH IN 24 HOURS
F.DOCUMENTS AND CHANGES MADE TO THE SWPPP
REPLACE, REPAIR OR SUPPLEMENT ALL NONFUNCTIONAL BMPS BY IN THE TIME PROVIDED
BELOW:
A.REPAIR, REPLACE, OR SUPPLEMENT PERIMETER CONTROL DEVICES WHEN IT BECOMES
NONFUNCTIONAL OR SEDIMENT REACHES 12 THE HEIGHT OF THE DEVICE. COMPLETE
REPAIRS BY
B.THE END OF THE NEXT BUSINESS DAY FOLLOWING DISCOVERY.
C.REPAIR OR REPLACE INLET PROTECTION DEVICES WHEN THEY BECOME NONFUNCTIONAL
OR SEDIMENT REACHES 12 THE HEIGHT AND/OR DEPTH OF THE DEVICE. COMPLETE
REPAIRS BY THE END OF THE NEXT BUSINESS DAY FOLLOWING DISCOVER.
D.DRAIN AND REMOVE SEDIMENT FROM TEMPORARY AND PERMANENT SEDIMENT BASINS
ONCE THE SEDIMENT HAS REACHED 12 THE STORAGE VOLUME. COMPLETE WORK WITHIN
72 HOURS OF DISCOVERY.
E.REMOVE ALL DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATER INCLUDING
DRAINAGE WAYS, CATCH BASINS, AND OTHER DRAINAGE SYSTEMS. RESTABILIZED ANY
AREAS THAT ARE DISTURBED BY SEDIMENT REMOVAL OPERATION. SEDIMENT REMOVAL
AND STABILIZATION MUST BE COMPLETED WITHIN 7 DAYS OF DISCOVERY. PREPARE AND
SUBMIT A SITE MANAGEMENT PLAN FOR WORKING IN SURFACE WATERS.
F.REMOVE TRACKED SEDIMENT FROM PAVED SURFACES BOTH ON AND OFF SITE WITHIN 24
HOURS OF DISCOVERY. STREET SWEEPING MAY HAVE TO OCCUR MORE OFTEN TO
MINIMIZE OFF SITE IMPACTS. LIGHTLY WET THE PAVEMENT PRIOR TO SWEEPING
G.MAINTAIN ALL BMPS UNTIL WORK HAS BEEN COMPLETED, SITE HAS GONE UNDER FINAL
STABILIZATION, AND THE NOTICE OF TERMINATION (NOT) HAS BEEN SUBMITTED TO THE
MPCA.
AREA SUMMARY
SPECIAL SITE NOTES
IF SITE REQUIRES PERMANENT STORMWATER MANAGEMENT HYDROLOGIC AND WATER QUALITY
MODELING DATA IS AVAILABLE UPON REQUEST.
THE SWPPP COORDINATOR MUST BE AVAILABLE FOR AN ONSITE INSPECTION WITHIN 72 HOURS
UPON REQUEST BY THE MPCA AND SHALL BE RESPONSIBLE FOR THE FOLLOWING:
·SUBMIT THE NPDES PERMIT APPLICATION AND COMPLY WITH ALL REQUIREMENTS
·IMPLEMENT THE SWPPP.
·OVERSEE INSTALLATION AND MAINTENANCE PRACTICES AND REPAIRS IDENTIFIED IN THE
SWPPP.
·IMPLEMENT AND OVERSEE EMPLOYEE TRAINING AND RECORD IN OR WITH THE SWPPP.
·CONDUCT OR PROVIDE FOR INSPECTION AND MONITORING ACTIVITIES AND MAINTAIN
LOGS AS PERMIT REQUIRES.
·IDENTIFY OTHER POTENTIAL POLLUTANT SOURCES NOT LISTED IN THE SWPPP AND ADD
THEM.
·IDENTIFY ANY DEFICIENCIES IN THE SWPPP AND CORRECT THEM.
·ENSURE THAT CHANGES TO CONSTRUCTION PLANS ARE ADDRESSED IN THE SWPPP.
·FILE THE NOTICE OF TERMINATION UPON PROJECT COMPLETION.
AFTER THE NOTICE OF TERMINATION HAS BEEN FILED, THE OWNER SHALL BE RESPONSIBLE FOR
ASSIGNING RESPONSIBILITY FOR PERMANENT MAINTENANCE MEASURES.
PERMITS
THE FOLLOWING PERMITS APPLY TO THIS PROJECT:
NOTE: IF THE 25' BUFFERS ARE MAINTAINED FORM THE WETLANDS, ADDITIONAL PERMITS WILL
NOT BE REQUIRED.
LOCATION OF SWPPP REQUIREMENTS
THE REQUIRED SWPPP ELEMENTS MAY BE LOCATED IN MANY PLACES
WITHIN THE PLAN SET.
SWPPP AMENDMENTS
A QUALIFIED INDIVIDUAL MUST COMPLETE ALL SWPPP CHANGES. CHANGES INVOLVING THE USE
OF A LESS STRINGENT BMP MUST INCLUDE A JUSTIFICATION DESCRIBING HOW THE
REPLACEMENT BMP IS EFFECTIVE FOR THE SITE CHARACTERISTICS.
PERMITTEES MUST AMEND THE SWPPP TO INCLUDE ADDITIONAL OR MODIFIED BMPS AS
NECESSARY TO CORRECT PROBLEMS IDENTIFIED OF ADDRESS SITUATIONS WHENEVER THERE
IS A CHANGE IN DESIGN, CONSTRUCTION OPERATION, MAINTENANCE, WEATHER, OR SEASONAL
CONDITIONS HAVING A SIGNIFICANT EFFECT ON THE DISCHARGE OF POLLUTANTS TO SURFACE
WATERS OR GROUNDWATER.
PERMITTEES MUST AMEND THE SWPPP TO INCLUDE ADDITIONAL OR MODIFIED BMPS AS
NECESSARY TO CORRECT PROBLEMS IDENTIFIED OR ADDRESS SITUATIONS WHENEVER
INSPECTIONS OR INVESTIGATIONS BY THE SITE OWNER OR OPERATOR, USEPA OR MPCA
OFFICIALS INDICATE THE SWPPP IS NOT EFFECTIVE IN ELIMINATING OR SIGNIFICANTLY
MINIMIZING THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR GROUNDWATER OR THE
DISCHARGES ARE CAUSING WATER QUALITY STANDARD EXCEEDANCE OR THE SWPPP IS NOT
CONSISTENT WITH THE OBJECTIVES OF A USEPA APPROVED TMDL.
STORM WATER POLLUTION PREVENTION PLAN NARRATIVE - PAGE 1 OF 2
PROJECT
SITE
1-MILE RADIUS
AROUND PROJECT
RICE LAKE
CROW RIVER
CONTACT INFORMATION
ORGANIZATION CONTACT NAME PHONE
ENDEAVOR DEVELOPMENT EVAN MATTSON 651-343-1118
ANDERSON ENGINEERING (SWPPP DESIGN)JACOB DOBIAS*763-412-4000
ACREAGE SUMMARY
AREA ACRES
PROPERTY 78.50
DISTURBED 18.86
IMP. PRE-CONSTRUCTION 16.70
IMP. POST-CONSTRUCTION 27.45
NEW IMP.10.75
PERVIOUS AT COMPLETION 51.05
AGENCY TYPE OF PERMIT PERMIT # AND DATES
MINNESOTA POLLUTION
CONTROL AGENCY (MPCA)
NPDES CONSTRUCTION
PERMIT
CITY OF OTSEGO GRADING PERMIT
CITY OF OTSEGO BUILDING PERMIT
CITY OF OTSEGO WETLAND PERMIT
WATERS WITHIN 1 MILE RADIUS
NAME OF WATER
BODY
TYPE (LAKE,
RIVER,
WETLAND,
DITCH, ETC)
APPENDIX A
SPECIAL WATER
(YES OR NO)
IMPAIRED
WATER WITHIN 1
MILE OF
PROJECT SITE
(YES OR NO)
APPROVED
TMDL
RECEIVING
WATERS
(YES OR NO)
MISSISSIPPI RIVER RIVER YES NO YES NO
CROW RIVER RIVER NO YES YES NO
RICE LAKE LAKE NO NO NO NO
MISSISSIPPI
RIVERMi
s
s
i
s
s
i
p
p
i
River
PLOTTED:COMM. NO.
DRAWING NO.
----19065
6400 QUEENS AVE.
1 3 6 0 5 1 s t A v e n u e N . #1 0 0
P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m
P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0
A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C
DRAWING TITLE
CHECKED BY:DRAWN:DESIGNED:
BJFJPDBJF
APRIL 20, 2026
REVISION LOG
DESCRIPTION OF REVISIONSNO.DATE
6400 QUEENS AVENUE
OTSEGO, MN 55330
ENDEAVOR
INVESTMENTS XII, LLC
PRELIMINARY PLANS
PRINT NAME:
SIGNATURE:
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE
OF MINNESOTA.
DATE:LICENSE NO.
BRIAN J. FIELD, PE
572244/20/2026
SWPPP - PAGE 1
C7
STABILIZATION TIME FRAMES
ALL AREAS DISTURBED BY CONSTRUCTION WILL RECEIVE SEED OR SOD ACCORDING TO THE
PLANS AND SPECIFICATIONS AND WITHIN THE SPECIFIED VEGETATIVE TIME SCHEDULE. FINAL
STABILIZATION WILL OCCUR WHEN THE SITE HAS A UNIFORM VEGETATIVE COVER WITH A
DENSITY OF 70% OVER THE ENTIRE DISTURBED AREA COMPARED TO EXISTING CONDITIONS. ALL
TEMPORARY SYNTHETIC EROSION PREVENTION AND SEDIMENT CONTROL BMPS MUST BE
REMOVED AS PART OF THE SITE FINAL STABILIZATION. ALL SEDIMENT MUST BE CLEANED OUT OF
CONVEYANCES AND TEMPORARY SEDIMENTATION BASINS IF APPLICABLE.
1.INITIATE INLET STABILIZATION IMMEDIATELY WHEN CONSTRUCTION HAS TEMPORARILY OR
PERMANENTLY CEASED ON ANY PORTION OF THE SITE. COMPLETE STABILIZATION WITHIN
THE TIME FRAME LISTED. IN MANY INSTANCES THIS WILL REQUIRE STABILIZATION TO OCCUR
MORE THAN ONCE DURING THE COURSE OF THE PROJECT. TEMPORARY SOIL STOCKPILES
WITHOUT SIGNIFICANT CLAY OR SILT AND STOCKPILED AND CONSTRUCTED ROAD BASE ARE
NOT APPROPRIATE AND THEREFORE EXEMPT FROM THE STABILIZATION REQUIREMENT.
2.APPLICATION OF MULCH, HYDROMULCH, TACKIFIER AND POLYACRYLAMIDE ARE NOT
ACCEPTABLE STABILIZATION METHODS IN THESE AREAS.
3.STABILIZE ALL AREAS OF THE SITE PRIOR TO THE ONSET OF WINTER, ANY WORK STILL BEING
PERFORMED WILL BE SNOW MULCHED, SEEDED, AND BLANKETED WITHIN THE TIME FRAMES
IN THE NPDES PERMIT.
4.TOPSOIL BERMS MUST BE STABILIZED IN ORDER TO BE CONSIDERED PERIMETER CONTROL
BMPS. USE RAPID STABILIZATION METHOD 2, 3, OR 4 AS DIRECTED BY THE ENGINEER. THE
SEED MIX USED IN THE RAPID STABILIZATION MAY BE SUBSTITUTED AS FOLLOWS:
A.SINGLE YEAR CONSTRUCTION BETWEEN MAY 1 - AUGUST 1, SEED WITH SEED
MIXTURE 21.111
B.SINGLE YEAR CONSTRUCTION BETWEEN AUGUST 1 AND OCTOBER 31, SEED WITH
SEED MIXTURE 21-112
C.MULTI YEAR CONSTRUCTION 22-111
5.KEEP DITCHES AND EXPOSED SOILS IN AN EVEN ROUGH GRADED CONDITION IN ORDER TO
BE ABLE TO APPLY EROSION CONTROL MULCHES, HYDROMULCHES AND BLANKETS.
GENERAL SWPPP NOTES FOR CONSTRUCTION ACTIVITY
1.CONTRACTOR SHALL AMEND THE SWPPP AND DOCUMENT ANY AND ALL CHANGES TO THE
SWPPP AND ASSOCIATED PLAN SHEETS WITHIN 7 DAYS UPON IMPLEMENTATION. STORE THE
SWPPP AND ALL AMENDMENTS ON SITE AT ALL TIMES.
2.PREPARE AND SUBMIT A SITE MANAGEMENT PLAN FOR THE ENGINEER'S ACCEPTANCE FOR
CONCRETE MANAGEMENT, CONCRETE SLURRY APPLICATION AREAS, WORK IN AND NEAR
AREAS OF ENVIRONMENTAL SENSITIVITY, AREAS IDENTIFIED IN THE PLANS AS "SITE
MANAGEMENT PLAN AREA", ANY WORK THAT WILL REQUIRE DEWATERING, AND AS
REQUESTED BY THE ENGINEER. SUBMIT ALL SITE MANAGEMENT PLANS TO THE ENGINEER IN
WRITING. ALLOW ALL MINIMUM OF 7 DAYS FOR THE ENGINEER TO REVIEW AND ACCEPT SITE
MANAGEMENT PLAN SUBMITTALS. WORK WILL NOT BE ALLOWED TO COMMENCE IF A SITE
MANAGEMENT PLAN IS REQUIRED UNTIL ACCEPTANCE HAS BEEN GRANTED BY THE
ENGINEER. THERE WILL BE NO EXTRA TIME ADDED TO THE CONTRACT DUE TO THE
UNTIMELY SUBMITTAL.
3.IT IS THE DESIGNER'S INTENT THAT THE CONTRACTOR BUILD PONDS AND INSTALL EROSION
CONTROL BMPS BEFORE PUTTING THEM INTO ACTIVE SERVICE TO THE MAXIMUM EXTENT
PRACTICABLE.
4.BURNING OF ANY MATERIAL IS NOT ALLOWED WITHIN PROJECT BOUNDARY.
5.DO NOT DISTURB AREAS OUTSIDE OF THE CONSTRUCTION LIMITS. DELINEATE AREAS NOT
TO BE DISTURBED PRIOR TO STARTING GROUND DISTURBING ACTIVITIES. IF IT BECOMES
NECESSARY TO DISTURBED AREAS OUTSIDE OF THE CONSTRUCTION LIMITS OBTAIN
WRITTEN PERMISSION FROM THE PROJECT ENGINEER PRIOR TO PROCEEDING. PRESERVE
ALL NATURAL BUFFERS SHOWN ON THE PLANS.
6.ROUT STORMWATER AROUND UNSTABILIZED AREAS OF THE SITE WHENEVER FEASIBLE.
PROVIDE EROSION CONTROL AND VELOCITY DISSIPATION DEVICES AS NEEDED TO KEEP
CHANNELS FROM ERODING AND TO PREVENT NUISANCE CONDITIONS AT THE OUTLET.
7.DIRECT DISCHARGES FROM BMPS TO VEGETATED AREA WHENEVER FEASIBLE. PROVIDE
VELOCITY DISSIPATION DEVICES AS NEEDED TO PREVENT EROSION.
8.THE EROSION PREVENTION AND SEDIMENT CONTROL BMPS SHALL BE PLACED AS
NECESSARY TO MINIMIZE EROSION FROM DISTURBED SURFACES AND TO CAPTURE
SEDIMENT ON SITE. ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO
COMMENCEMENT OF ANY REMOVAL WORK AND/OR GROUND DISTURBING ACTIVITIES
COMMENCE.
9.ESTABLISH SEDIMENT CONTROL DEVICES ON ALL DOWN GRADIENT PERIMETERS AND UP
GRADIENT OF ANY BUFFER ZONES BEFORE AND UP GRADIENT LAND DISTURBING ACTIVITIES
BEGIN. MAINTAIN SEDIMENT CONTROL DEVICES UNTIL CONSTRUCTION IS COMPLETE AND
THE SITE IS STABILIZED.
10.LOCATE PERIMETER CONTROL ON THE CONTOUR TO CAPTURE OVERLAND, LOW-VELOCITY
SHEET FLOWS DOWN GRADIENT OF ALL EXPOSED SOILS AND PRIOR TO DISCHARGING TO
SURFACE WATERS. PLACE J-HOOKS AT A MAXIMUM OF 100 FOOT INTERVALS.
11.PROVIDE PERIMETER CONTROL AROUND ALL STOCKPILES. PLACE BMP A MINIMUM 5 FEET
FROM THE TOE OF SLOPE WHERE FEASIBLE. DO NOT PLACE STOCKPILES IN NATURAL
BUFFER AREAS, SURFACE WATERS OR STORMWATER CONVEYANCES.
12.FLOATING SILT CURTAIN IS ALLOWED AS PERIMETER CONTROL FOR IN WATER WORK ONLY.
INSTALL THE FLOATING SILT CURTAIN AS CLOSE TO SHORE AS POSSIBLE. PLACE PERIMETER
CONTROL BMP ON LAND IMMEDIATELY AFTER THE IN WATER WORK IS COMPLETED.
13.DITCH CHECKS WILL BE PLACED AS INDICATED ON THE PLANS DURING ALL PHASES OF
CONSTRUCTION.
14.PLACE CONSTRUCTION EXITS, AS NECESSARY, TO PREVENT TRACKING OF SEDIMENT ONTO
PAVED SURFACES BOTH ON AND OFF THE PROJECT SITE. PROVIDE CONSTRUCTION EXITS
OF SUFFICIENT SIZE TO PREVENT TRACK OUT. MAINTAIN CONSTRUCTION EXITS WHEN
EVIDENCE OF TRACKING IS DISCOVERED. REGULAR STREET SWEEPING IS NOT AN
ACCEPTABLE ALTERNATIVE TO PROPER CONSTRUCTION EXIT INSTALLATION AND
MAINTENANCE. CONSTRICTION EXITS ARE INCIDENTAL.
15.DISCHARGE TURBID OR SEDIMENT LADEN WATER TO TEMPORARY SEDIMENT BASINS
WHENEVER FEASIBLE. IN THE EVENT THAT IT IS NOT FEASIBLE TO DISCHARGE THE
SEDIMENT LADEN WATER TO A TEMPORARY SEDIMENT BASIN, THE WATER MUST BE
TREATED SO THAT IT DOES NOT CAUSE A NUISANCE CONDITION IN THE RECEIVING WATERS
OR TO DOWNSTREAM LANDOWNERS. CLEAN OUT ALL PERMANENT STORMWATER BASINS
REGARDLESS OF WHETHER USED AS TEMPORARY SEDIMENT BASINS OR TEMPORARY
SEDIMENT TRAPS TO THE DESIGN CAPACITY AFTER ALL UP GRADIENT LAND DISTURBING
ACTIVITY IS COMPLETED.
16.PROVIDE SCOUR PROTECTION AT ANY OUTFALL OF DEWATERING ACTIVITIES.
17.PROVIDE STABILIZATION IN ANY TRENCHES CUT FOR DEWATERING OR SITE DRAINING
PURPOSES.
POLLUTION PREVENTION
1.PROVIDE A SPILL KIT AT EACH WORK LOCATION ON THE SITE.
2.STORE ALL BUILDING MATERIALS THAT HAVE THE POTENTIAL TO LEACH POLLUTANTS,
PESTICIDES, HERBICIDES, INSECTICIDES. FERTILIZERS, TREATMENT CHEMICALS, AND
LANDSCAPE MATERIALS UNDER COVER WITH SECONDARY CONTAINMENT.
3.PROVIDE A SECURE STORAGE AREA WITH RESTRICTED ACCESS FOR ALL HAZARDOUS
MATERIALS AND TOXIC WASTE. RETURN ALL HAZARDOUS MATERIALS AND TOXIC WASTE TO
THE DESIGNATED STORAGE AREA AT THE END OF THE BUSINESS DAY UNLESS INFEASIBLE.
STORE ALL HAZARDOUS MATERIALS AND TOXIC WASTE (INCLUDING BUT NOT LIMITED TO OIL,
DIESEL FUEL, GASOLINE, HYDRAULIC FLUIDS, PAINT, PETROLEUM BASED PRODUCTS, WOOD
PRESERVATIVES, ADDITIVES, CURING COMPOUNDS, AND ACIDS) IN SEALED CONTAINERS
WITH SECONDARY CONTAINMENT. CLEAN UP SPILLS IMMEDIATELY.
4.STORE, COLLECT AND DISPOSE OF ALL SOLID WASTE.
5.POSITION ALL PORTABLE TOILETS SO THAT THEY ARE SECURE AND CANNOT BE TIPPED OR
KNOCKED OVER. PROPERLY DISPOSE OF ALL SANITARY WASTE.
6.FUEL AND MAINTAIN VEHICLES IN A DESIGNATED CONTAINED AREA WHENEVER FEASIBLE.
USE DRIP PANS OR ABSORBENT MATERIALS TO PREVENT SPILLS OR LEAKED CHEMICALS
FORM DISCHARGING TO SURFACE WATER OR STORMWATER CONVEYANCES. PROVIDE A
SPILL KIT AT EACH LOCATION THAT VEHICLES AND EQUIPMENT ARE FUELED OR MAINTAINED
AT.
7.LIMIT VEHICLE AND EQUIPMENT WASHING TO A DEFINED AREA OF THE SITE. CONTAIN
RUNOFF FROM THE WASHING AREA TO A TEMPORARY SEDIMENT BASIN OR OTHER
EFFECTIVE CONTROL. PROPERLY DISPOSE OF ALL WASTE GENERATED BY VEHICLE AND
EQUIPMENT WASHING. ENGINE DEGREASING IS NOT ALLOWED ON THE SITE.
8.PROVIDE EFFECTIVE CONTAINMENT FOR ALL LIQUID AND SOLID WASTES GENERATED BY
WASHOUT OF CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND
OTHER CONSTRUCTION MATERIALS. LIQUID AND SOLID WASHOUT WASTES MUST NOT
CONTACT THE GROUND. DESIGN THE CONTAINMENT SO THAT IT DOES NOT RESULT IN
RUNOFF FROM THE WASHOUT OPERATIONS OR CONTAINMENT AREA.
9.CREATE AND FOLLOW A WRITTEN DISPOSAL PLAN FOR ALL WASTE MATERIALS. INCLUDE IN
THE PLAN HOW THE MATERIAL WILL BE DISPOSED OF AND THE LOCATION OF THE DISPOSAL
SITE. SUBMIT PLAN TO THE ENGINEER.
10.USE METHODS AND OPERATIONAL PROCEDURES THAT PREVENT DISCHARGE OR
PLACEMENT OF BITUMINOUS GRINDINGS, CUTTING, MILLINGS, AND OTHER BITUMINOUS
WASTES FROM AREAS OF EXISTING OR FUTURE VEGETATED SOILS AND FROM ALL WATER
CONVEYANCE SYSTEMS, INCLUDING INLETS, DITCHES AND CURB FLOW LINES.
11.USE METHODS AND OPERATIONAL PROCEDURES THAT PREVENT CONCRETE DUST,
PARTICLES, CONCRETE WASH OUT, AND OTHER CONCRETE WASTES FROM LEAVING SITE,
DEPOSITING IN EXISTING OR FUTURE VEGETATED AREAS, AND FROM ENTERING
STORMWATER CONVEYANCE SYSTEMS, INCLUDING INLETS, DITCHES AND CURB FLOW LINES.
USE METHODS AND OPERATIONAL PROCEDURES THAT PREVENT SAW CUT SLURRY AND
PLANING WASTE FROM LEAVING SITE AND FROM ENTERING STORMWATER CONVEYANCE
SYSTEMS INCLUDING DITCHES AND CULVERTS.
RECORD RETENTION
THE SWPPP, ALL CHANGES TO IT AND INSPECTION AND MAINTENANCE RECORDS MUST BE KEPT
ON-SITE DURING CONSTRUCTION. THE OWNER MUST RETAIN A COPY OF THE SWPPP ALONG
WITH THE FOLLOWING RECORDS FOR THREE (3) YEARS AFTER SUBMITTAL OF THE NOTICE OF
TERMINATION (NOT).
1.ANY OTHER PERMITS REQUIRED FOR THE PROJECT.
2.RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING CONSTRUCTION
3.ALL PERMANENT OPERATIONS AND MAINTENANCE AGREEMENT THAT HAVE BEEN
IMPLEMENTED INCLUDING ALL RIGHT OF WAY, CONTRACTS, COVENANTS AND OTHER
BINDING REQUIREMENTS REGARDING PERPETUAL MAINTENANCE; AND
4.ALL REQUIRED CALCULATIONS FOR DESIGN OF THE TEMPORARY AND PERMANENT
STORMWATER MANAGEMENT SYSTEMS.
SWPPP SCHEDULE OF INSTALLATION & MAINTENANCE
DESCRIPTION OF PERMANENT STORMWATER TREATMENT SYSTEMS
[IF APPLICABLE, DESCRIBE PERMANENT STORMWATER TREATMENT SYSTEM]
CALCULATIONS FOR TEMPORARY & PERMANENT STORMWATER TREATMENT
SYSTEMS
[INCLUDE CALCULATIONS FOR TEMPORARY / PERMANENT STORMWATER SYSTEM]
ESTIMATED BMPS QUANTITIES
STORM WATER POLLUTION PREVENTION PLAN NARRATIVE - PAGE 2 OR 2
AREA TIME FRAME NOTES
LAST 200 LINEAL FEET OF DRAINAGE
DITCH OR SWALE
WITHIN 24 HOURS OF CONNECTION TO
SURFACE WATER OR PROPERTY EDGE 1, 2, 3
REMAINING PORTIONS OF DRAINAGE
DITCH OR SWALE 7 DAYS 1, 3
PIPE AND CULVERT OUTLETS 24 HOURS
STOCKPILES 7 DAYS 1
ITEM INSTALLATION INSPECTION &
MAINTENANCE REMOVAL
SILT FENCE PRIOR TO COMMENCEMENT OF
EARTHWORK OPERATIONS.
INSPECT & MAINT. AFTER EACH
RUN-OFF EVENT. REMOVE
SEDIMENTS AS REQUIRED.
AFTER TRIBUTARY DRAINAGE
AREA IS RESTORED.
ROCK CONST.
ENTRANCE
PRIOR TO COMMENCEMENT OF
EARTHWORK OPERATIONS.
INSPECT REGULARLY. MAINTAIN
AS NEEDED.PRIOR TO PAVING.
OUTLET SKIMMER
STRUCTURE AFTER POND GRADING IS
COMPLETED.
INSPECT REGULARLY. MAINTAIN
AS NEEDED.PERMANENT.
RIP-RAP &
FILTER
UPON COMPLETION OF POND
GRADING, CONC. SWALE CONST.
AND OUTLET INSTALLATION.
INSPECT & MAINTAIN AT LEAST
ANNUALLY AND AFTER HEAVY
RAINFALL EVENT.
PERMANENT.
DETENTION POND DURING EARTHWORK
OPERATIONS.
AFTER HEAVY RAINFALL EVENTS.
REMOVE SEDIMENTS AS NEEDED.PERMANENT.
SEED & MULCH AFTER POND GRADING IS
COMPLETED.
INSPECT & MAINTAIN AFTER HEAVY
RAINS. REPLACE WASH-OUT
AREAS IMMEDIATELY
NO REMOVAL NECESSARY.
INLET PROTECTION UPON INLET CONSTRUCTING WHEN 1/3 CAPACITY OF BMP IS
REACHED
AFTER TRIBUTARY AREAS
ARE FULLY RESTORED
BMP ORIGINAL ESTIMATE MODIFICATION DATE
ENERGY DISSIPATER
TEMP. DIVERSION DIKES
ROCK CHECK DAMS
TEMP SEEDING
PERMANENT SEEDING
PERMANENT SODDING
MULCHES (SPECIFY TYPES)
CAT 3 EROSION CONTROL BLANKET
SOIL TACKIFIERS
SILT FENCING
EROSION CONTROL MATS
STORM DRAIN INLET PROTECTION
TEMPORARY OR PERMANENT
SEDIMENTATION BASINS
CONSTRUCTION ENTRANCE
DEWATERING (TREATMENT LOCATION,
SCHEMATIC, & SAMPLING PLAN REQUIRED
CONCRETE TRUCK WASHOUT
BIOROLL DITCH CHECKS
PLOTTED:COMM. NO.
DRAWING NO.
----19065
6400 QUEENS AVE.
1 3 6 0 5 1 s t A v e n u e N . #1 0 0
P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m
P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0
A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C
DRAWING TITLE
CHECKED BY:DRAWN:DESIGNED:
BJFJPDBJF
APRIL 20, 2026
REVISION LOG
DESCRIPTION OF REVISIONSNO.DATE
6400 QUEENS AVENUE
OTSEGO, MN 55330
ENDEAVOR
INVESTMENTS XII, LLC
PRELIMINARY PLANS
PRINT NAME:
SIGNATURE:
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE
OF MINNESOTA.
DATE:LICENSE NO.
BRIAN J. FIELD, PE
572244/20/2026
SWPPP - PAGE 2
C8
PLOTTED:COMM. NO.
DRAWING NO.
----19065
6400 QUEENS AVE.
1 3 6 0 5 1 s t A v e n u e N . #1 0 0
P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m
P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0
A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C
DRAWING TITLE
CHECKED BY:DRAWN:DESIGNED:
BJFJPDBJF
APRIL 20, 2026
REVISION LOG
DESCRIPTION OF REVISIONSNO.DATE
6400 QUEENS AVENUE
OTSEGO, MN 55330
ENDEAVOR
INVESTMENTS XII, LLC
PRELIMINARY PLANS
PRINT NAME:
SIGNATURE:
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE
OF MINNESOTA.
DATE:LICENSE NO.
BRIAN J. FIELD, PE
572244/20/2026
CIVIL DETAILS - 1
C9
PLOTTED:COMM. NO.
DRAWING NO.
----19065
6400 QUEENS AVE.
1 3 6 0 5 1 s t A v e n u e N . #1 0 0
P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m
P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0
A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C
DRAWING TITLE
CHECKED BY:DRAWN:DESIGNED:
BJFJPDBJF
APRIL 20, 2026
REVISION LOG
DESCRIPTION OF REVISIONSNO.DATE
6400 QUEENS AVENUE
OTSEGO, MN 55330
ENDEAVOR
INVESTMENTS XII, LLC
PRELIMINARY PLANS
PRINT NAME:
SIGNATURE:
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE
OF MINNESOTA.
DATE:LICENSE NO.
BRIAN J. FIELD, PE
572244/20/2026
CIVIL DETAILS - 2
C10
STORM STRUCTURE SCHEDULE
STRUCTURE
NUMBER SIZE
CASTING (NEENAH
OR APPROVED
EQUAL)
FES-1 36"RCP
STMH-2 48" ROUND R-1642-D, SOLID,
"STORM"
STMH-3 48" ROUND R-1642-D, SOLID,
"STORM"
CBMH-4 48" ROUND R-3067-V
CBMH-5 48" ROUND R-3067-V
CBMH-6 48" ROUND R-3067-V
CBMH-7 48" ROUND R-3067-V
CBMH-8 48" ROUND R-3067-V
CBMH-9 48" ROUND R-3067-V
CB-10 2'X3'R-3067-V
SCALE:2 BITUMINOUS (HEAVY) PAVEMENT SECTION
N.T.S.
NOTE: VERIFY PAVEMENT SECTION DESIGN AND SUBGRADE REQUIREMENTS WITH
GEOTECHNICAL REPORT AND RECOMMENDATIONS PRIOR TO CONSTRUCTION.
6"
3" MIN.
2" MNDOT 2360 SPWEA240B
BITUMINOUS WEAR (MIN.)
2" MNDOT 2360 SPWEB230B
BITUMINOUS NON-WEAR (MIN.)
8" MNDOT 3138 CLASS 5
AGGREGATE BASE (MIN.)
TIP OUT GUTTER
WHERE PAVEMENT
SLOPES AWAY
MNDOT 2531 TYPE B612
CONCRETE CURB &
GUTTER
MNDOT 2357 TACK COAT
MIN.
APPROVED SUBGRADE
COMPACTED 98%
6" DIA. STEEL PIPE
(PAINTED YELLOW) FILL W/
CONCRETE, CROWN TOP 1"
4'-0"
3'-6"
6"
12" x 12" x 48" CONC. FTG.
SURFACE VARIES
SCALE:3 PIPE BOLLARD
N.T.S.
SCALE:1 STORM SEWER STRUCTURE SCHEDULE
N.T.S.
PLOTTED:COMM. NO.
DRAWING NO.
----19065
6400 QUEENS AVE.
1 3 6 0 5 1 s t A v e n u e N . #1 0 0
P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m
P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0
A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C
DRAWING TITLE
CHECKED BY:DRAWN:DESIGNED:
BJFJPDBJF
APRIL 20, 2026
REVISION LOG
DESCRIPTION OF REVISIONSNO.DATE
6400 QUEENS AVENUE
OTSEGO, MN 55330
ENDEAVOR
INVESTMENTS XII, LLC
PRELIMINARY PLANS
PRINT NAME:
SIGNATURE:
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE
OF MINNESOTA.
DATE:LICENSE NO.
BRIAN J. FIELD, PE
572244/20/2026
CIVIL DETAILS - 3
C11
NOTE:
1.FILTER MIX B:
- 70 TO 85% CONSTRUCTION SAND (ASTM C-33 WASHED)
- 15 TO 30% ORGANIC MATTER (MNDOT GRADE 2 COMPOST)
1 POND FILTRATION BASIN DETAIL (POND P2)
NTS
BOTTOM OF FILTRATION BASIN = 904.00
TOP OF BERM = 912.20
4
1
12" FILTER MIX B (SEE NOTE 1)
4
1
4
1
4" PVC DRAINTILE
INV. = 904.00
CORE-DRILL IN FIELD
TOP OF BERM = 912.20
EOF = 910.50
TOP OF WEIR = 908.00
18" RCP INV = 903.50
38 LF 1
8
"
R
C
P
@
1
0
.
7
3
%
SKIMMER = 910.50
WATERQUALITY VOLUMENWL = 906.00
EX. OCS-701
10.0' (TYP)
905.00
6" DIA. ORIFICE = 906.00 (NWL)
INVERT = 902.00
INVERT = 906.00
BOTTOM OF POND = 900.00
TOP OF SAND = 905.00
4" PERF. PVC
WITH FILTER SOCK
922920918916919
921
91
7
917917
919
921 917916 91190990790 6
9 1 0
9 1 2
9 1 5916
9 0 89169
1
6
916916913916
918
91691691491591691791791391591
5
PROPERTY LINE
PROPERTY LINE
9009059059109059009
1
1
9109029
0
3
9079129109069099
0
8
914
PROPERTY LINE916CO CO
CO
CO
CO
930
925
920
915925
9 2 0920918
920
918
922
911
912
920
925
920
917
927
6
Gd
6
Gi
3
Gd
3
Gi
16
Pb
31
Pb
5
Gd
5
Gi
9
Pb
PLOTTED:COMM. NO.
DRAWING NO.
----19065
6400 QUEENS AVE.
1 3 6 0 5 1 s t A v e n u e N . #1 0 0
P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m
P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0
A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C
DRAWING TITLE
CHECKED BY:DRAWN:DESIGNED:
CCBJSBJS
APRIL 20, 2026
REVISION LOG
DESCRIPTION OF REVISIONSNO.DATE
6400 QUEENS AVENUE
OTSEGO, MN 55330
ENDEAVOR
INVESTMENTS XII, LLC
PRELIMINARY PLANS
PRINT NAME:
SIGNATURE:
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED LANDSCAPE
ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA.
DATE:LICENSE NO.
CURT CLAEYS, PLA
456135/15/2026
PLANTING PLAN
L1
65TH ST NE
QUEENS AVE NE6400 QUEENS AVENUE
(EXISTING BUILDING)
DELINEATED
WETLAND (TYP)
DELINEATED
WETLAND
(TYP)
EXISTING PROPERTY
BOUNDARY
EPHEMERAL STREAM
EX. POND P-1
EX. POND P-2
WETLAND #4
WETLAND #5
WETLAND #6
WETLAND #8
WETLAND #7
WETLAND #9
EXISTING OUTDOOR
STORAGE AREA
PROPOSED OUTDOOR
STORAGE AREA
EXISTING 6FT
COMPOSITE BOARD
SCREENING FENCE
EXISTING EDGE
OF GRAVEL
SCALE:1 PLANTING PLAN - OVERALL - TREES & GROUNDCOVER
1" = 100'
0 100'200'
N
PROPERTY LINE
CONSTRUCTION LIMITS
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED MAJOR CONTOUR
NATIVE AREA SEED
MnDOT MIX: SOUTHERN
TALLGRASS ROADSIDE (STR)
WET AREA SEED
MnDOT MIX: WET DITCH (WD)
FILTRATION BED FILTER MIX,
SEE CIVIL
966
965
1.TEMPORARY IRRIGATION NOTES ON SHEET L2.
2.TOPSOIL AND SEEDING NOTES ON SHEET L2.
3.EXISTING SIGNIFICANT TREES SHALL BE PROTECTED IF IMPACTS FROM
CONSTRUCTION ARE IMMINENT. TREE PROTECTION DETAIL ON SHEET L3.
4.SEE CIVIL SHEETS FOR GRADING, UTILITY, AND FILTRATION BENCH DETAILS.
SHEET NOTES:PLANTING PLAN LEGEND
NATIVE SEED AREA
WET SEED AREA
WET POND,
SEE CIVIL
FILTRATION BENCH,
SEE CIVIL
WET SEED AREA
(WHERE GRADE
IS RESTORED
BELOW FES)
NOTE: REQUIREMENTS APPLICABLE TO THIS SITE (I-1 ZONING) ARE LISTED BELOW
LANDSCAPE CODE REQUIREMENTS:
NATIVE SEED ALONG IMPROVED ROAD
REQUIREMENT PROPOSED
DESIGN:
ALL AREAS WITHIN THE PROPERTY LINES (OR BEYOND, IF SIDE
GRADING EXTENDS BEYOND) SHALL BE TREATED. ALL EXTERIOR
AREAS NOT PAVED OR DESIGNATED AS DRIVES, PARKING OR
STORAGE, MUST BE PLANTED INTO ORNAMENTAL VEGETATION
(LAWNS, GROUND COVERS OR SHRUBS) UNLESS OTHERWISE
APPROVED BY THE ZONING ADMINISTRATOR.
ALL DISTURBED AREAS NOT PAVED WILL BE SEEDED WITH
NATIVE MIXES.
PLANT SPACING & SIZING:
PLANT MATERIAL CENTERS SHALL NOT BE LOCATED CLOSER
THAN THREE FEET (3') FROM THE FENCE LINE OR PROPERTY LINE.
PROPOSED DECIDUOUS TREE CENTERS ARE LOCATED FIVE
FEET (5') FROM THE PROPERTY LINE.
SHADE TREES (B&B) SHALL BE A MIN. OF 2" DBH.PROPOSED DECIDUOUS TREES ARE 2" DBH.
SCREENING:
OPEN AND OUTDOOR STORAGE AREA IS LANDSCAPED, FENCED,
AND SCREENED FROM VIEW OF NEIGHBORING USES AND
ABUTTING R DISTRICTS.SCREENING REQUIREMENTS WILL BE MET BY THE
COMBINATION OF PROPOSED EARTHEN BERMS, COMPOSITE
FENCING, AND TREE SCREENING PLANTINGS.STORAGE IS LANDSCAPED AND SCREENED FROM VIEW FROM THE
PUBLIC RIGHT-OF-WAY.
PLANT MATERIAL CENTERS SHALL NOT BE LOCATED CLOSER
THAN THREE FEET (3') FROM THE FENCE LINE OR PROPERTY LINE,
AND SHALL NOT CONFLICT WITH PUBLIC PLANTINGS, SIDEWALKS,
TRAILS, ETC.ROWS OF EVERGREEN TREES INTENDED FOR SCREENING
ARE SPACED FIFTEEN FEET (15') APART AND STAGGERED.
DECIDUOUS TREES INTENDED FOR SCREENING ARE SPACED
FOURTY FEET (40') APART. ALL SCREENING PLANTS ARE
LOCATED MORE THAN THREE FEET (3') FROM FENCE LINES
AND PROPERTY LINES.
LANDSCAPE SCREEN PLANT MATERIAL SHALL BE PLANTED IN TWO
(2) OR MORE ROWS. PLANTINGS SHALL BE STAGGERED IN ROWS
UNLESS OTHERWISE APPROVED BY THE ZONING ADMINISTRATOR.
DECIDUOUS TREES INTENDED FOR SCREENING SHALL BE
PLANTED NOT MORE THAN FORTY FEET (40') APART. EVERGREEN
TREES INTENDED FOR SCREENING SHALL BE PLANTED NOT MORE
THAN FIFTEEN FEET (15') APART.
TREE PRESERVATION:
PRIOR TO THE ISSUANCE OF BUILDING PERMITS FOR ALL NEW
AND/OR EXPANDED MULTIPLE-FAMILY RESIDENTIAL, COMMERCIAL,
INDUSTRIAL AND INSTITUTIONAL USES, A TREE PRESERVATION
PLAN SHALL BE SUBMITTED. THE PLAN AND ITS IMPLEMENTATION
SHALL BE IN ACCORDANCE WITH THE CITY'S ADOPTED TREE
PRESERVATION GUIDELINES AND REQUIREMENTS AS OUTLINED IN
THE SUBDIVISION ORDINANCE, AS MAY BE AMENDED, AND SHALL
BE SUBJECT TO REVIEW AND APPROVAL OF THE CITY ENGINEER
AND ZONING ADMINISTRATOR. THE ZONING ADMINISTRATOR MAY
EXEMPT AN APPLICANT FROM THE SUBMISSION OF A TREE
PRESERVATION PLAN UPON DEMONSTRATION THAT A TREE
PRESERVATION PLAN IS NOT CONSIDERED RELEVANT TO THE
SITE IN QUESTION.
NO SIGNIFICANT TREES ARE ANTICIPATED TO BE IMPACTED
BY CONSTRUCTION ACTIVITIES. ONE EXISTING TREE (~2"
DBH) EXISTS NEAR THE EDGE OF THE LIMITS OF
DISTURBANCE. TREE PROTECTION MEASURES WILL BE
TAKEN TO REDUCE IMPACT TO EXISTING TREE.
EXISTING TREES TO REMAIN TO
EXTENTS POSSIBLE, SEE TREE
PROTECTION DETAIL 3/L3.
TRANSPLANT EXISTING TREES WITHIN LIMITS
OF DISTURBANCE TO FINISHED GRADE
NATIVE SEED AREA
SYMBOL CODE QTY COMMON / BOTANICAL NAME CONT.SIZE
DECIDUOUS TREES
Gi 14 SKYLINE® HONEY LOCUST
GLEDITSIA TRIACANTHOS INERMIS 'SKYCOLE'B&B 2" CAL.
Gd 14 KENTUCKY COFFEETREE
GYMNOCLADUS DIOICUS 'ESPRESSO'B&B 2" CAL.
EVERGREEN TREES
Pb 56 BLACK HILLS SPRUCE
PICEA GLAUCA DENSATA B&B 4` HT.
PLANT SCHEDULE
PROPOSED 6FT COMPOSITE
BOARD SCREENING FENCE
(DETAIL PROVIDED BY OWNER)
PLOTTED:COMM. NO.
DRAWING NO.
----19065
6400 QUEENS AVE.
1 3 6 0 5 1 s t A v e n u e N . #1 0 0
P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m
P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0
A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C
DRAWING TITLE
CHECKED BY:DRAWN:DESIGNED:
CCBJSBJS
APRIL 20, 2026
REVISION LOG
DESCRIPTION OF REVISIONSNO.DATE
6400 QUEENS AVENUE
OTSEGO, MN 55330
ENDEAVOR
INVESTMENTS XII, LLC
PRELIMINARY PLANS
PRINT NAME:
SIGNATURE:
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED LANDSCAPE
ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA.
DATE:LICENSE NO.
CURT CLAEYS, PLA
456135/15/2026
PLANTING
NOTES
L2
1.THE REQUIRED WORK SHALL CONSIST OF CONTINUOUSLY CONDUCTING OPERATIONS AND MAINTENANCE FOR A
WARRANTY PERIOD ESTABLISHED FOR 1 YEAR AFTER THE INSTALLATION HAS BEEN ACCEPTANCE BY THE OWNER. THE
WORK INCLUDES:
1.1.ESTABLISHMENT OF BALLED AND BURLAPPED AND CONTAINER PLANT MATERIAL AND SEEDED AREAS
1.1.1.INCLUDING PEST CONTROL, FERTILIZING AND FUNGICIDAL TREATMENTS
1.2.REGULAR WATERING SCHEDULINGS FOR ALL PLANT MATERIAL AND SEEDING
1.3.TEMPORARY IRRIGATION SYSTEM OPERATION AND MAINTENANCE
1.4.REMOVAL OF ALL WEEDS WITHIN THE PROJECT AREA BY METHODS AGREED BY THE OWNER (POST/PRE HERBICIDE
TREATMENT, HAND OR MECHANICAL REMOVAL)
1.5.MAINTENANCE OF MISCELLANEOUS ITEMS (EROSION CONTROL PRODUCTS, REPAIRS FROM EROSION)
2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ON-SITE REVIEW MEETINGS WITH THE OWNER DURING THE PLANT
ESTABLISHMENT PERIOD TO IDENTIFY OPERATIONS AND MAINTENANCE TO BE EXECUTED MONTHLY.
3.PLANT MATERIAL DEEMED TO BE REPLACED AT THE END OF PLANT ESTABLISHMENT PERIOD SHALL BE EXECUTED WITHIN
2 WEEKS (14 DAYS) PRESENTING LESS THE FOLLOWING SURVIVORSHIP:
3.1.BALLED AND BURLAPPED PLANT MATERIAL: 75%
3.2.SEEDED AREAS: 90% (<10% BARE SOIL)
4.REPLACEMENT PLANTS, SEED SHALL BE OF THE SAME SPECIES AND SIZE AS ORIGINALLY SPECIFIED ON THE DRAWINGS,
UNLESS THE OWNER DETERMINES THAT SUBSTITUTIONS OF ANOTHER SPECIES OR SIZE SHALL BE MADE.
PLANT ESTABLISHMENT NOTES
1.LANDSCAPE CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO SUBMITTING A BID TO BECOME COMPLETELY
FAMILIAR WITH SITE CONDITIONS.
2.ALL ROUGH AND FINISH GRADING TO BE DONE BY OTHERS.
3.NO PLANTING SHALL BE INSTALLED UNTIL ALL GRADING, BUILDING, CONSTRUCTION, UTILITY WORK & IRRIGATION (IF
APPLICABLE) HAS BEEN COMPLETED IN THE AREAS TO BE PLANTED.
4.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY ALL UNDERGROUND CABLES, CONDUITS, WIRES, ETC., ON
THE PROPERTY.
5.IF THERE IS A DISCREPANCY BETWEEN THE NUMBER OF PLANTS SHOWN ON THE PLAN AND THE NUMBER OF PLANTS
SHOWN IN THE PLANT LIST, THE NUMBER OF PLANTS SHOWN ON THE PLAN WILL TAKE PRECEDENCE.
6.ALL PROPOSED PLANT MATERIAL SHALL BE LOCATED CAREFULLY AS SHOWN ON THE PLAN. IF THE CONTRACTOR
BELIEVES AN ERROR HAS BEEN MADE REGARDING SPACING OR LOCATION OF THE PLANT MATERIAL INDICATED ON THE
PLAN, NOTIFY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.
7.THE CONTRACTOR IS RESPONSIBLE FOR COMPLETE MAINTENANCE OF THE PLANT MATERIAL (WATERING, SPRAYING,
FERTILIZING, MOWING, ETC.) UNTIL THE WORK HAS BEEN ACCEPTED, BY THE OWNER.
8.THE CONTRACTOR IS RESPONSIBLE FOR ALL REPAIRS TO PROPERTY DAMAGE FROM PLANTING OPERATIONS AT NO COST
TO THE OWNER.
9.ALL NEWLY PLANTED PLANT MATERIAL SHALL BE GUARANTEED THROUGH ONE CALENDAR YEAR STARTING FROM THE
DATE OF ACCEPTANCE ESTABLISHED BY THE OWNER.
10.THE CONTRACTOR SHALL MEET WITH THE OWNER OR OWNERS REPRESENTATIVE ON SITE WHEN THEY FEEL THE PROJECT
IS COMPLETE ACCORDING TO THE CONTRACT DOCUMENTS. IF ALL WORK IS SATISFACTORY AND COMPLETE ACCORDING
TO THE CONDITIONS OF THE CONTRACT DOCUMENTS, THEN THE OWNER MUST DECLARE THE PROJECT COMPLETE. THIS
DECLARATION WILL CONSTITUTE AS THE BEGINNING OF THE ONE (1) YEAR WARRANTEE PERIOD FOR ALL PLANT MATERIAL.
THE OWNER SHALL PROVIDE A LETTER WITH SIGNATURE STATING THE DATE OF ACCEPTANCE.
11.WIND BURN OR OTHERWISE DAMAGED PLANT MATERIAL WILL NOT BE ACCEPTED.
12.CONTRACTOR CAN SUBSTITUTE MACHINE MOVED MATERIAL USING APPROPRIATE SIZE TREE SPADE FOR B & B WITH
OWNER APPROVAL.
13.THE PRACTICE OF STAKING SHOULD NOT ALLOW NAILS, SCREWS, WIRES, ETC. TO PENETRATE THE OUTER SURFACE OF
THE TREES.
14.THE CONTRACTOR WILL BE RESPONSIBLE FOR THE REMOVAL OF ALL TREE STAKES, GUYS, STRAPS AND TRUNK
PROTECTION MEASURES FOLLOWING THE COMPLETION OF THE WARRANTEE PERIOD OR AS DIRECTED BY THE OWNER.
15.LANDSCAPE CONTRACTOR IS REQUIRED TO PROVIDE THE OWNER WITH MAINTENANCE INFORMATION DURING THE
GUARANTEE PERIOD RELATING TO WATERING, FERTILIZING, PRUNING, PEST CONTROL, AND RELATED ITEMS. THIS WILL BE
PREPARED AND DELIVERED TO THE OWNER AFTER PROVISIONAL INSPECTION APPROVAL HAS BEEN GIVEN BY THE OWNER
AND/OR LANDSCAPE ARCHITECT.
16.INSTALL CORRUGATED PLASTIC TREE GUARDS, WHITE IN COLOR, WITH THE SIZE OF TUBE 1" DIA. (MIN.) LARGER THAN THE
CALIPER OF THE TREE TO BE PROTECTED.
17.3" DEPTH SHREDDED HARDWOOD MULCH SHALL BE INSTALLED UNDER ALL TREES.
18.CALIPER OF TREES UP TO AND INCLUDING 4" SHALL BE MEASURED AT 6" ABOVE GROUND LEVEL, AND 12" ABOVE GROUND
LEVEL FOR LARGER SIZES.
19.FOR BALLED & BURLAP PLANT MATERIAL, REMOVE THE TOP HALF OF THE BURLAP FROM THE ROOT BALL. WIRE CAGES,
STRAPS, ETC. SHALL BE REMOVED FROM THE TOP HALF OF THE ROOTBALL BEFORE INSTALLATION.
20.LANDSCAPE CONTRACTOR SHALL PROVIDE AND INSTALL NURSERY GROWN PLANT MATERIAL CONFORMING TO THE
REQUIREMENTS AND RECOMMENDATIONS OF THE LATEST EDITION OF ANSI Z60.1 STANDARDS UNLESS OTHERWISE NOTED
IN THE PLANS OR SPECIFICATIONS.
GENERAL LANDSCAPE NOTES
1.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL NECESSARY WATERINGS TO KEEP ALL NATIVE SEEDED
AREAS GROWING IN A HEALTHY CONDITION FOR THE EXTENTS OF ONE (1) YEAR AFTER INSTALLATION AND APPROVAL BY
OWNER. ANY SEEDED AREAS THAT DIE OR SHOW FATIGUE DUE TO INSUFFICIENT CARE WITHIN ONE (1) YEAR AFTER
INSTALLATION SHALL BE OVERSEEDED BY THE CONTRACTOR AT NO ADDITIONAL COSTS TO THE OWNER. OVERSEEDING, IF
APPLICABLE, SHALL BE THE SAME MIX AND RATE AS ORIGINALLY INSTALLED.
2.A WATERING SCHEDULE FOR THE SEEDED AREAS FOR THE LENGTH OF THE ONE (1) YEAR AFTER THE INSTALLATION SHALL
BE SUBMITTED WITH BID.
3.THE WATER SOURCE FOR WATERING OF THE SEEDED AREAS SHALL BE PROVIDED BY THE CONTRACTOR. SUBMIT A
DEDUCT ITEM IN BID FOR OWNER PROVIDED WATER SOURCE.
4.B&B TREES SHALL RECEIVE A WATERING BAG FOR THE LENGTH OF ONE (1) YEAR AFTER INSTALLATION AND BE FILLED
EVERY WEEK DURING THE GROWING SEASON. WATERING BAG SHALL BE TREEGATOR (OR APPROVED EQUAL). INSTALL
ACCORDING TO MANUFACTURERS RECOMMENDATIONS.
TEMPORARY IRRIGATION NOTES
PLOTTED:COMM. NO.
DRAWING NO.
----19065
6400 QUEENS AVE.
1 3 6 0 5 1 s t A v e n u e N . #1 0 0
P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m
P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0
A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C
DRAWING TITLE
CHECKED BY:DRAWN:DESIGNED:
CCBJSBJS
APRIL 20, 2026
REVISION LOG
DESCRIPTION OF REVISIONSNO.DATE
6400 QUEENS AVENUE
OTSEGO, MN 55330
ENDEAVOR
INVESTMENTS XII, LLC
PRELIMINARY PLANS
PRINT NAME:
SIGNATURE:
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED LANDSCAPE
ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA.
DATE:LICENSE NO.
CURT CLAEYS, PLA
456135/15/2026
PLANTING
DETAILS
L3
3 TREE PROTECTION DETAIL
NTS 4'-0"EQ EQ
ZONE A:
DIA=1/2X
ZONE B:
DIA=X
ZONE C:
DIA=2X
PLAN VIEW
ELEVATION VIEW"DRIPLINE"FENCING/ROOT PROTECTION
6' HIGH CHAIN LINK FENCING SHALL BE
PROVIDED AND MAINTANED AT THE DRIPLINE
OF EACH TREE OR AROUND A GROUP OF
TREES AT THE DRIPLINE OF OUTSIDE TREES.
THE ENGINEER'S APPROVAL IS REQUIRED
FOR USE/ACCESS WITHIN ZONE B.
PERMISSION FOR USE/ACCESS REQUIRES
SURFACE PROTECTION FOR ALL UNFENCED,
UNPAVED SURFACES WITHIN ZONE B AT ALL
TIMES.
* SURFACE PROTECTION MEASURES
1. MULCH LAYER, @ 6"-8"DEPTH
2. 3/4" PLYWOOD
3. STEEL PLATES
X
TRENCHING / EXCAVATION
ZONE A (CRITICAL ROOT ZONE)
[DEFINED AS DRIPLINE DIAMETER MULTIPLIED BY 0.5]
1.NO DISTURBANCE ALLOWED WITHOUT
SITE-SPECIFIC INSPECTION AND APPROVAL OF
METHODS TO MINIMIZE ROOT DAMAGE
2.SEVERANCE OF ROOTS LARGER THAN 2 INCHES
IN DIAMETER REQUIRES AN ENGINEER'S
APPROVAL
3.TUNNELLING REQUIRED TO INSTALL LINES 3
FEET BELOW GRADE OR DEEPER
ZONE B (DRIPLINE (DEFINE))
[MAXIMUM WIDTH OF BRANCH EXTENSION ON TREE]
1.OPERATION OF HEAVY EQUIPMENT AND/OR
STOCKPILING OF MATERIALS SUBJECT TO
(SPECIFY INDIVIDUAL) APPROVAL
2.SURFACE PROTECTION MEASURES REQUIRED
TRENCHING ALLOWED AS FOLLOWS:
- EXCAVATION BY HAND OR WITH HAND-DRIVEN
TRENCHER MAY BE REQUIRED
- LIMIT TRENCH WIDTH. DO NOT DISTURB ZONE A
(CRITICAL ROOT ZONE) MAINTAIN 2/3 OR MORE
OF ZONE B (DRIPLINE) IN UNDISTURBED
CONDITION
3.TUNNELLING MAY BE REQUIRED FOR TRENCHES
DEEPER THAN 3 FOOT
4.USE OF PNEUMATIC AIR WAND AND EXCAVATION
MAY BE CONSIDERED WHERE THE TRENCH
DEPTH DOES NOT EXCEED 4 FEET
ZONE C (ABSORBING ROOT ZONE)
[DEFINED AS DRIPLINE DIAMETER MULTIPLIED BY 2.0]
1.OPERATION OF HEAVY EQUIPMENT AND OR
STOCKPILING OF MATERIALS SUBJECT TO
(SPECIFY INDIVIDUAL) APPROVAL
2.SURFACE PROTECTION MEASURES MAY BE
REQUIRED AND IS TO BE DETERMINED BY
(SPECIFY INDIVIDUAL)
TRENCHING WITH HEAVY EQUIPMENT ALLOWED
AS FOLLOWS:
- MINIMIZE TRENCH WIDTH
- MAINTAIN 2/3 OR MORE OF ZONE C IN
UNDISTURBED CONDITION
- OR AS SPECIFIED BY (SPECIFY INDIVIDUAL)"DRIPLINE"NOTE:
-3" DP. WOOD MULCH SHALL BE USED IN ALL LANDSCAPE PLANTINGS
AREAS AND UNDER TREES ISOLATED FROM PLANTING AREAS UNLESS
IDENTIFIED OTHERWISE.
PLAN VIEW
NOT TO SCALE
3X ROOTBALL DIA.
3x ROOT
BALL DIA.12"-18"NOTE:
-3" DP. WOOD MULCH SHALL BE USED IN ALL LANDSCAPE
PLANTINGS AREAS AND UNDER TREES ISOLATED FROM
PLANTING AREAS UNLESS IDENTIFIED OTHERWISE.
-MULTI-STEM TREES SHALL NOT RECEIVE STAKING.
THEY SHALL CONFORM TO ALL OTHER DECIDUOUS
TREE PLANTING REQUIREMENTS.
PLAN VIEW
NOT TO SCALE
3X ROOTBALL DIA.
1 DECIDUOUS TREE PLANTING (ON SLOPE) DETAIL
NTS
FINISHED GRADE
3" DEPTH WOOD MULCH
SINGLE STRAIGHT LEADER
CENTER TREE IN HOLE, UPRIGHT
AFTER EXPOSING TREE ROOT FLAIR, PLANT SO
ROOT FLAIR IS ADJACENT TO FINISH GRADE
(3) TREE AUGUR STEEL ANCHORS. SECURE TO
TREE WITH ANTI-CHAFFING MATERIAL. ALLOW
FOR MOVEMENT OF TREE (EQUALLY SPACED).
WOOD MULCH
(3) TREE AUGUR STEEL
ANCHORS. SECURE TO TREE
WITH ANTI-CHAFFING
MATERIAL. ALLOW FOR
MOVEMENT OF TREE
(EQUALLY SPACED).MULCH TO BE HELD BACK 3" FROM
BASE OF ALL PLANT MATERIAL
ORIGIN
A
L
S
L
O
P
E
ORIGIN
A
L
S
L
O
P
E
UNDISTURBED OR COMPACTED SOIL
PLANTING SOIL
MOUND MIN. 12"
REMOVE BURLAP, TWINE, ROPE AND
WIRE FROM ROOTBALL
6' MIN. DIA. EARTH SAUCER
3" HEIGHT TAMPED WATER BASIN AT
EDGE OF EARTH SAUCER
FERTILIZER PLANT TAB
ORIGIN
A
L
S
L
O
P
E
CENTER TREE IN HOLE, UPRIGHT
SINGLE STRAIGHT LEADER
TREE TIE SECURED TO STAKE. SECURE TO
TREE WITH ANTI-CHAFFING MATERIAL.
ALLOW FOR MOVEMENT OF TREE.
WRAP TREE WITH TREE WRAPPING
MATERIAL AS SPECIFIED TO 1ST BRANCH
(3) TREE STAKES DRIVEN A MIN. 2'
BELOW GRADE (EQUALLY SPACED)
3" DEPTH WOOD MULCH
PLANTING SOIL
MOUND MIN. 12"
AFTER EXPOSING TREE ROOT
FLAIR, PLANT SO ROOT FLAIR IS
ADJACENT TO FINISH GRADE
TREE TIE SECURED TO
STAKE. SECURE TO TREE
WITH ANTI-CHAFFING
MATERIAL. ALLOW FOR
MOVEMENT OF TREE.
(3) TREE STAKES DRIVEN A MIN. 2'
BELOW GRADE (EQUALLY SPACED)
WOOD MULCH
FERTILIZER PLANT TAB
MULCH SHALL BE HELD BACK 3"
FROM BASE OF ALL PLANT MATERIAL
6' MIN. DIA. EARTH SAUCER
3" HEIGHT TAMPED WATER BASIN AT
EDGE OF EARTH SAUCER
FINISHED GRADE
REMOVE BURLAP, TWINE, ROPE AND
WIRE FROM ROOTBALL
UNDISTURBED OR COMPACTED SOIL
FERTILIZER PLANT TAB
ORIGIN
A
L
S
L
O
P
E
TREEGATOR WATERING BAG (OR APPROVED EQUAL)
TREEGATOR WATERING BAG (OR APPROVED EQUAL)
FERTILIZER PLANT TAB
2 CONIFEROUS TREE PLANTING (ON SLOPE) DETAIL
NTS