RES 2026-30 Approving a Final Plat for Tanglewood 3rd AdditionCITY OF OTSEGO
COUNTY OF WRIGHT
STATE OF MINNESOTA
RESOLUTION NO: 2026-30
APPROVING A FINAL PLAT FOR
TANGLEWOOD 3RD ADDITION
WHEREAS, Tamarack Land — Lannon, LLC (the `owner") is proposing the final plat of Tanglewood 3d Addition; and
WHEREAS, the legal description of the subject property is attached as Exhibit A; and
WHEREAS, the Property is within the West Sewer District and guided for future Low Density Residential land uses by the 2023
Comprehensive Plan; and
WHEREAS, the Property is zoned R-5, Residential Single and Two Family District; and
WHEREAS, the City Council approved a preliminary plat and Planned Unit Development — Conditional Use Permit for
Tanglewood on 25 March 2024; and
WHEREAS, the proposed final plat consists of 65 single family lots, two outlots, and public right-of-way; and
WHEREAS, applications for final plat approval are processed in accordance with the provisions of Section 10-3-3 of the
Subdivision Ordinance; and
WHEREAS, the City Council considered the application at its meeting on 13 April 2026.
WHEREAS, the Request for Council Action prepared by the City Planner, The Planning Company LLC, is incorporated herein.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OTSEGO, MINNESOTA THAT: the final plat of
Tanglewood 3rd Addition is approved subject to the following conditions:
1. The applicant shall execute a development contract as drafted by the City Attorney and subject to approval of the
City Council.
2. All of the lots within the final plat shall comply with the following setback requirements:
Local
Interior
Interior
Wetland
Street
Side
Rear
Buffer
25ft. house
7ft.
20ft.
20ft.
30ft. garage
3. All street construction plans shall be subject to review and approval by the City Engineer.
4. Street lighting shall be installed within the final plat in accordance with Title 8, Chapter 8 of the City Code with
payment of charges as established in accordance with the City Fee Schedule, subject to review and approval of
the City Engineer.
5. All street names shall be subject to review and approval of the City Engineer.
01
6. Landscaping as required by Section 11-19-2.13.1 of the Zoning Ordinance shall be installed by the builder at the
time of construction.
7. All easements shall be subject to review and approval of the City Engineer.
8. All grading, drainage, and erosion control plans shall be subject to review and approval by the City Engineer.
9. Outlot A and Outlot B shall be conveyed to the City for stormwater management purposes by warranty deed, free
and clear of any and all encumbrances.
10. The developer shall pay a Stormwater Impact Fee as required for Otsego Creek in accordance with the City Fee
Schedule.
11. All utility plans shall be subject to review and approval of the City Engineer.
12. The applicant shall pay applicable utility availability charges upon approval of the final plat; the builder shall pay
utility connection charges at the time a building permit is issued for each lot based on the current fee in effect at
that time.
13. The developer shall satisfy park dedication requirements as a per lot cash fee in lieu of land in accordance with
the City Fee Schedule, less credits for trail and boardwalk improvements constructed by them within Outlot A as
determined by the City Engineer.
14. The development contract shall be executed and the final plat recorded within 100 days of City Council approval
as required by Section 10-5-3.B.8 of the Subdivision Ordinance.
(The remainder of this page intentionally blank)
ADOPTED by the Otsego City Council this 131h day of April, 2026.
MOTION BY: Dunlap
SECONDED BY: Goede
IN FAVOR: Stockamp, Dunlap, Goede, Lund, and Tanner
OPPOSED: none
CITY OF OTSEGO
Jessica L. Stockamp, May r
ATTEST:
Audra Etzel, City Clerk
EXHIBIT A
LEGAL DESCRIPTION
Outlot A, Tanglewood 2nd Addition, Wright County, Minnesota