Loading...
Item 3.4 Wellhouse 4 Treatment Improvements Project Pay Application 18 Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Utilities Utility Manager Neidermeier April 13, 2026 PRESENTER(s) REVIEWED BY: ITEM #: Consent AE2S Engineer Hanson City Administrator/Finance Director Flaherty 3.4 – Pay Application for Wellhouse 4 Treatment STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City Staff is recommending City Council approval of Pay Application #18 to Market & Johnson. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: The amounts requested in Pay Application No. 18 are consistent with the progress of work completed to date. The current request totals $276,274.53, reflecting 96.2% of the contract value completed or stored to date. The remaining balance to finish, including retainage, is $725,824.56. In accordance with Minnesota Statute, the City is withholding 5% retainage on completed work, which totals $329,138.71 for this pay application. During this period, no change orders were approved. Current changes represent a cumulative net change to a 2.04% increase in overall project bid cost. A 5.0% contingency is included in the approved project budget and financing package. SUPPORTING DOCUMENTS ATTACHED: • Pay Application #18 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to approve Pay Application #18 in the amount of $276,274.53 to Market & Johnson for work completed on the Wellhouse 4 Treatment Improvements project. BUDGET INFORMATION FUNDING: BUDGETED: Fund 601 – Drinking Water Utility Yes From 1. 2. 3. 4. 5. a.X b.X c. 6. 7. 8. 9. Contractor's Application for Payment Application No.:18 3416 City of Otsego Market & Johnson AE2S Otsego Wellhouse No. 4 Treatment Improvements Owner's Project No.: Engineer's Project No.: Contractor's Project No.: Application Period: Contract: Owner: Contractor: Engineer: Project: By: Title: Date: By: Title: 6,253,635.30$ Date: Signature:Date: Contractor's Certification Balance to finish, including retainage (Line 3 - Line 4, plus 5c) Approved by Owner The undersigned Contractor certifies, to the best of its knowledge, the following: (1) All previous progress payments received from Owner on account of Work done under the Contract have been applied on account to discharge Contractor's legitimate obligations incurred in connection with the Work covered by prior Applications for Payment; (2) Title to all Work, materials and equipment incorporated in said Work, or otherwise listed in or covered by this Application for Payment, will pass to Owner at time of payment free and clear of all liens, security interests, and encumbrances (except such as are covered by a bond acceptable to Owner indemnifying Owner against any such liens, security interest, or encumbrances); and (3) All the Work covered by this Application for Payment is in accordance with the Contract Documents and is not defective. Recommended by Engineer 3/1/2026 3/31/2026 Application Date:4/1/2026 Approved by Funding Agency By: Title: Date: By: Title: Date: to Original Contract Price $ 6,582,774.01 725,824.56$ Total Work completed and materials stored to date (Sum of Column G Lump Sum Total and Column J Unit Price Total) Retainage Work Completed Stored Materials Total Retainage (Line 5.a + Line 5.b) Amount eligible to date (Line 4 - Line 5.c) Less previous payments (Line 6 from prior application) Amount due this application 329,138.71$ -$ 276,274.53$ 5% 5% 5,977,360.77$ 6,840,000.00$ 139,459.86$ 6,979,459.86$ 6,582,774.01$ P05409-2020-010 Current Contract Price (Line 1 + Line 2) Contractor: 329,138.71$ Net change by Change Orders All labor & materials to complete construction of expansion & treatment system improvements EJCDC C-620 Contractor's Application for Payment (c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. RYAN HANSON, PE Progress Estimate - Lump Sum Work B C D Materials Presently Total Completed Balance to Finish Stored (not in C or D) and Stored to Date (B - F) (C + D + E) 02 41 19 30,853.00 30,853.00 30,853.00 100% - 03 20 01 67,068.00 67,068.00 67,068.00 100% - 03 20 02 93,399.00 93,399.00 93,399.00 100% - 03 30 00 1,092,954.00 1,092,954.00 1,092,954.00 100% - 04 20 00 144,000.00 144,000.00 144,000.00 100% - 05 10 01 17,075.00 17,075.00 17,075.00 100% - 05 10 02 7,400.00 7,400.00 7,400.00 100% - 06 10 00 63,733.00 63,733.00 63,733.00 100% - 07 10 00 7,000.00 7,000.00 7,000.00 100% - 07 21 00 13,999.00 13,999.00 13,999.00 100% - 07 27 00 6,200.00 6,200.00 6,200.00 100% - 07 30 00 132,100.00 132,100.00 132,100.00 100% - 07 46 00 9,056.00 - 9,056.00 9,056.00 100% - 07 50 00 53,200.00 53,200.00 53,200.00 100% - 07 90 00 8,808.00 - - 8,808.00 08 10 00 105,354.00 102,298.44 2,002.02 104,300.46 99% 1,053.54 09 21 16 37,802.00 37,802.00 37,802.00 100% - 09 67 00 24,780.00 9,792.00 9,792.00 40% 14,988.00 09 90 00 108,300.00 59,444.00 27,568.00 87,012.00 80% 21,288.00 10 14 00 3,172.00 - - 3,172.00 10 40 00 1,327.00 - - 1,327.00 21 00 00 5,000.00 - - 5,000.00 22 00 00 22 00 00 18,250.00 18,250.00 18,250.00 100% - 22 00 00 5,850.00 5,850.00 5,850.00 100% - 22 00 00 27,350.00 7,100.00 10,450.00 17,550.00 64% 9,800.00 22 00 00 22,815.00 6,015.00 7,230.00 13,245.00 58% 9,570.00 22 00 00 22,485.00 8,845.00 4,870.00 13,715.00 61% 8,770.00 23 00 00 23 00 00 187,650.00 179,710.00 7,940.00 187,650.00 100% - 23 00 00 25,255.00 6,620.00 6,480.00 13,100.00 52% 12,155.00 26 00 00 26 00 00 82,000.00 65,500.00 9,500.00 75,000.00 91% 7,000.00 26 00 00 120,750.00 120,750.00 120,750.00 100% - 26 00 00 11,040.00 11,040.00 11,040.00 100% - 26 00 00 126,000.00 118,000.00 8,000.00 126,000.00 100% - 26 00 00 89,700.00 89,700.00 89,700.00 100% - 26 00 00 18,500.00 8,500.00 10,000.00 18,500.00 100% - 26 00 00 36,000.00 23,000.00 10,500.00 33,500.00 93% 2,500.00 26 00 00 55,400.00 31,600.00 23,800.00 55,400.00 100% - 26 00 00 165,000.00 91,300.00 63,250.00 154,550.00 94% 10,450.00 26 00 00 57,510.00 36,000.00 15,000.00 51,000.00 89% 6,510.00 26 00 00 40,000.00 40,000.00 40,000.00 100% - 26 00 00 15,000.00 11,500.00 3,500.00 15,000.00 100% - 26 00 00 3,000.00 - - 3,000.00 26 00 00 1,100.00 - - 1,100.00 28 00 00 70,000.00 - - 70,000.00 Project: Otsego Wellhouse No. 4 Water Treatment Improvements Specification Section No.Description Scheduled Value ($) From Previous Application (C+D) Application Period: 3/1/2026 - 3/31/2026 Spare Parts Start-up O&Ms Singles and Roofing Tiles Insulation Structural Steel Install Application Number:18 Application Date: 4/1/2026 This Period Doors Frames & Hardware Plumbing Above Grade Material Concrete Reinforcing Material Gypsum Board Assemblies Fluid Applied Flooring Siding Air Barriers Membrane Roofing Selective Demolition Concrete Reinforcing Labor Cast In Place Concrete Unit Masonry Work Completed E F A Structural Steel Supply Controls and Motor Controls Wiring Labor Controls and Motor Controls Wiring Material Electronic Safety and Security Allowance Gear and Controls Submittals Branch Power and lighting Wiring Building Works Painting & Coating Signage Safety Specialties Fire Protection Electrical Power Distrubution Wiring Labor Power Distrubution Wiring Material Plumbing Below Grade Labor Dampproofing and Waterproofing Joint Sealants General Electrical Conditions Power Distribution Gear Lighting Fixtures Generator Equipment Control Station and Instrumentation Contractor's Application Plumbing HVAC HVAC Material HVAC Labor Plumbing Below Grade Material Plumbing Above Grade Labor Plumbing & Hydronic Pipe Insulation Material and Labor G % (F / B) 31 00 00 31 00 00 53,800.00 53,800.00 53,800.00 100% - 31 00 00 30,000.00 30,000.00 30,000.00 100% - 31 00 00 10,000.00 10,000.00 10,000.00 100% - 31 00 00 294,000.00 265,400.00 265,400.00 90% 28,600.00 31 00 00 175,000.00 175,000.00 175,000.00 100% - 32 12 16 24,010.00 6,962.90 6,962.90 29% 17,047.10 32 16 00 35,922.00 30,533.70 30,533.70 85% 5,388.30 40 10 00 40 10 00 423,595.00 423,594.90 0.10 423,595.00 100% - 40 10 00 188,720.00 169,647.00 15,073.00 184,720.00 98% 4,000.00 40 10 00 65,275.00 65,275.00 65,275.00 100% - 40 10 00 12,450.00 6,870.00 5,580.00 12,450.00 100% - 40 10 00 4,850.00 2,230.00 2,620.00 4,850.00 100% - 40 10 00 8,350.00 - 8,350.00 8,350.00 100% - 40 10 00 14,875.00 4,934.00 8,240.00 13,174.00 89% 1,701.00 43 00 00 43 25 00 67,109.00 67,109.00 67,109.00 100% - 43 32 76 150,325.00 150,325.00 150,325.00 100% - 46 33 20 59,056.25 59,056.25 59,056.25 100% - 46 33 40 75,162.50 75,162.50 75,162.50 100% - 46 33 80 85,900.00 85,900.00 85,900.00 100% - 46 61 21 37,581.25 37,581.25 37,581.25 100% - 46 61 21 859,000.00 773,100.00 773,100.00 90% 85,900.00 91 10 00 6,937.00 6,937.00 6,937.00 100% - 91 20 00 31,545.00 31,545.00 31,545.00 100% - 91 30 00 46,000.00 46,000.00 46,000.00 100% - 91 40 00 40,000.00 9,515.06 9,515.06 24% 30,484.94 91 50 00 787,278.00 740,041.32 21,485.00 761,526.32 97% 25,751.68 91 60 00 20,024.00 18,855.80 1,168.20 20,024.00 100% - 98 00 01 40,872.65 40,872.65 40,872.65 100% 0.00 98 00 02 6,090.13 - 6,090.13 6,090.13 100% - 98 00 03 6,546.03 6,546.03 6,546.03 100% - 98 00 04 (4,802.27) (4,802.27) (4,802.27) 100% - 98 00 05 (5,086.14) (5,086.14) (5,086.14) 100% - 98 00 06 41,262.85 38,200.00 3,062.85 41,262.85 100% - 98 00 07 (917.68) (917.68) (917.68) 100% - 98 00 08 26,783.27 26,783.27 26,783.27 100% - 98 00 09 (9,788.08) (9,788.08) (9,788.08) 100% - 98 00 10 (5,266.14) (5,266.14) (5,266.14) 100% - 98 00 11 3,982.69 3,982.69 3,982.69 100% - 98 00 12 2,359.56 2,359.56 2,359.56 100% - 98 00 13 2,312.56 2,312.56 2,312.56 100% - 98 00 14 18,914.39 18,914.39 18,914.39 100% - 98 00 15 3,817.67 3,817.67 3,817.67 100% - 98 00 16 3,432.64 3,432.64 3,432.64 100% 3,432.64 98 00 17 2,183.57 2,183.57 2,183.57 100% 3,432.64 98 00 18 (937.85) (937.85) (937.85) 100% 2,183.57 98 00 19 4,978.72 4,978.72 4,978.72 100% (937.85) 98 00 20 2,721.29 1,400.00 1,400.00 51% 4,978.72 - 2,721.29 6,979,459.86 6,291,958.71 290,815.30 - 6,582,774.01 94% 396,685.85 COR#021 RFP #14, RFI #28 Roofing Hardware Process Pipe Chemical Pipe Labor Liquid Chemical Storage Tanks and Scales Mobilization Earthwork Process Piping COR#014R1 Reusing Existing SSMH 103 COR#016 Filter-to-Waste Valve Removal COR#013R1 Modifications to Aubmersible Pumps & Accessories Process Pipe Chemical Pipe Material Earthwork Utilities Process Pipe Support Material COR#010 Addition of a Lintel at Door 110 COR#007 Upsizing Blower Pipe Intake from 4" to 6" Piping COR#015R1 Floor Assembly and Roof Layout Modifications Totals COR#008 - RFP#05 - Modifications to Valves and Piping Site Concrete Chlorine Gas Feed Equipment Builders Risk Insurance Process Pipe Material Process Pipe Labor and Misc. Pressure Filter Airwash Blower Pressure Filters COR#023 Masonry Wall Height Discrepancy COR#024 Additional Layer of 2x12 Blocking at Top of CMU COR#025 Concrete Section Removal from BWT Sump Pits COR#026 Excavation Vapor Barrier an Insulation per Response to RFI #42 COR#027 Additional Fluid Applied Flooring Scope COR#012 - Backwash Tank Water Stop Removal per RFI #19 COR#011R1 Flowable Fill Below South Addition Footings Demoliton Erosion Control Chemical Feed System Accessories Submersible Liquid Pumps Water and Wastewater Equipment Process Valves COR#009 - RFP#08 - Grout Sloping at Reclaim Tank COR#002 - RFQ#02 - Abandoned Sanitary Fill and Plug COR#003 - Add Temporary Overland Bypass Piping for Utility Work. COR#001R1 - Modify the Distribution Piping and add a 12” Watermain Connection Contractors Insurance Building Permit General Conditions Cold Weather Protection Performance and Payment Bonds Chemical Feed System Pumps COR#005R1 - RFQ#03 - Switching to Chemical Feed Pumps Process Pipe Support Labor Asphalt Paving