Loading...
Item 3.4 Well House No. 3-Water Treatment Plant3601 Thurston Avenue Anoka, MN 55303 763.231.5840 TPC@PlanningCo.com 1 PLANNING REPORT TO: Otsego Planning Commission FROM: D. Daniel Licht REPORT DATE: 1 April 2026 RE: Otsego – Utilities; Well House #3 – Water Treatment Plant TPC FILE: 101.01 BACKGROUND The City of Otsego is proposing to construct a Well House and Water Treatment Plant on Lot 1, Block 2, Dara Glen. The construction of the utility facility involves rezoning the subject property from I-2, General Industrial District to INS, Institutional District reflecting the proposed City utility use of the property and consideration of a Condition Use Permit for a government utility building within the INS District. A public hearing to consider the applications has been noticed for the Planning Commission meeting on 6 April 2026 2024 at 7:00PM. Exhibits: Site Location Map Building Elevations dated February 2026 First Floor Plan dated February 2026 Existing Conditions and Demolition Plan dated February 26, 2026 Site Plan dated February 26, 2026 Overall Utility Plan dated February 26, 2026 Grading Plan dated February 26, 2026 Erosion Control and Sediment Plan dated February 26, 2026 SWPPP dated February 26, 2026 (2 sheets) ANALYSIS Comprehensive Plan. The Comprehensive Plan establishes that water utilities are to be provided for the purposes of accommodating anticipated growth with a compact, urban form with staged expansion polices to manage development, provide for a balance of residential use types, and increase commercial and industrial development. The City has adopted a Water Item 3.4 2 System Management Plan to facilitate long-range development of utility infrastructure to meet the service needs of existing and future users. The addition of water treatment facilities for the water system is being undertaken to improve water quality for all users. The Well House #3 – Water Treatment Plan project is an essential service necessary to implement the policies of the Comprehensive Plan in accordance with the Water System Master Plan. Zoning. The lot is zoned I-2, General Industrial District. The zoning of the property was established on 24 September 2007 with platting of Dara Glen concurrent with approvals for Kaleidoscope Charter School to the west. The I-2 District zoning reflects the guidance of the Comprehensive Plan for development of the subject property for industrial land uses. The City proposes to rezone the property to INS, Institutional District reflecting the proposed use of the property for City utilities. City utilities are allowed as a conditional use within both the I-2 and INS District. Requirements for allowance within the INS District is as provided for by Section 11-90-6.G of the Zoning Ordinance requiring approval of a Conditional Use Permit in accordance with Section 11-4-4 of the Zoning Ordinance. The Planning Commission and City Council must take into consideration the possible effects of the Zoning Map amendment and Conditional Use Permit with their judgment based upon (but not limited to) the criteria outlined in Section 11-3-2.F and Section 11-4-2.F of the Zoning Ordinance: 1. The proposed action's consistency with the specific policies and provisions of the Otsego Comprehensive Plan. Comment: The 2023 Comprehensive Plan establish that costs incurred for the provision of City services shall be financed by those who receive such service. This is implemented by reducing the risk of payment for the provision of the utility systems by non-users through utility phasing, identification of potential water revenue sources, establishment of realistic growth expectations, and adoption of a Capital Improvement Plan. The improvement of Well House #3 – Water Treatment Plant is consistent with the Comprehensive Plan, Water System Master Plan and Capital Improvement Plan. 2. The proposed use's compatibility with present and future land uses of the area. Comment: The subject property is guided for industrial use. There is an undeveloped industrial lot to the north and undeveloped parcel guided for Office uses to the east of the subject site. Kaleidoscope Charter School is located west of the subject property across Kalland Avenue, which has an underlying guidance for industrial use. The Kittredge Crossings subdivision is located to the south of the subject site and is separated by increased setback and proposed/existing stormwater basins and wetlands. The proposed. The proposed Well House #3 – Water Treatment Plant will not affect surrounding properties. 3 3. The proposed use's conformity with all performance standards contained within the Zoning Ordinance and other provisions of the City Code. Comment: The proposed municipal well will comply with the applicable requirements of the Zoning Ordinance and City Code. 4. Traffic generation of the proposed use in relation to capabilities of streets serving the property. Comment: The proposed use will not generate any traffic beyond service trips by Utilities Department staff, which is within the capacity of Kalland Avenue as a local industrial street. 5. The proposed use can be accommodated by existing public services and facilities and will not overburden the City's service capacity. Comment: The City has planned for development of the Well House #3 – Water Treatment Plant to provide service capacity in accordance with the Comprehensive Plan, Water System Master Plan, and Capital Improvement Plan. Structure. The proposed 5,900 square foot structure encompasses piping equipment and chemical storage for treatment of raw water drawn from Well House #3 located to the east at Lachman Avenue and 77th Street. The finished treated water is then pumped from the Well House #3 – Water Treatment Plant to the water towers for storage. Section 11-17-4.D.2 of the Zoning Ordinance requires institutional uses have exterior finishes of masonry or precast concrete panels having a surface treatment over a minimum of 65 percent of any elevation facing a public street and use of masonry materials, precast concrete, fiber cement, or other architectural paneling for 90 percent of the other elevations. The proposed structure uses precast concrete panels with a combination of limestone block and exposed aggregate finish. There is a horizontal metal panel surrounding the upper section of the structure above the interior piping area, and metal roof. The proposed exterior finish of the proposed building complies with the requirements of the Zoning Ordinance. Buildings within the INS District are limited to a maximum height of three stories or 40 feet. The proposed structure is one story and measures 24 feet to the midpoint of the pitched roof section. The height of the proposed structure complies with the limits established by the Zoning Ordinance. 4 Lot Requirements. Section 11-90-7.A.1 of the Zoning Ordinance requires uses within the INS District to have a minimum lot area of five acres unless reduced by Conditional Use Permit. There is no minimum lot width requirement within the INS District. The subject property is 2.5 acres in area. Allowance of the proposed use of the property for City utility purposes through approval of a Conditional Use Permit will be subject to compliance with applicable setback requirements. Setbacks. Section 11-90-7.B of the Zoning Ordinance requires that the utility structures be subject to the setback requirements shown in the table below. The proposed building complies with the setback requirements applicable within the INS District, indicating that the area of the lot is suitable for the proposed use. Front North East South Required 30ft. 50ft. 50ft. 50ft. Proposed 85ft. 75ft. 65ft. 277ft. Access. The utility facility is to be accessed from a single driveway off of Kalland Avenue. Kalland Avenue is constructed as a local industrial street. The proposed access is to be constructed with a concrete apron that is 30 feet wide. Section 11-21-6.C.2 of the Zoning Ordinance establishes that a street access for non-residential uses is limited to 24 feet in width unless approved by the City Engineer to allow for adequate turning movements. The interior drive aisle provide access to service doors on the west and south elevations of the proposed structure. The interior drive aisles are to be surfaced with asphalt include perimeter concrete curb as required by Sections 11-21-7.C and 11-21-7.D of the Zoning Ordinance. There are no designated parking spaces within the subject property, which will not be a staffed facility. There is sufficient space within the interior drive aisles for Utilities Department Staff monitoring the facility or performing maintenance to park without interfering with traffic on Kalland Avenue. The drive aisles are also designed to accommodate truck maneuvers within the site so as not to require backing off of or onto Kalland Avenue. The design and construction specifications for access and off-street parking areas are subject to review and approval of the City Engineer. Exterior Lighting. The submitted plans detail two exterior light fixtures at the service doors on the west elevation of the proposed building. The light fixtures must have a 90 degree horizontal cut-off to cast light at the ground, not towards Kalland Avenue. All exterior lighting is subject to review and approval of the Zoning Administrator. 5 Waste Storage. The site and building plans do not show a location for waste storage. If exterior storage is intended, plans for construction of an enclosure are to be submitted with application for a building permit for review by the Zoning Administrator for compliance with requirements of Section 11-18-4.C of the Zoning Ordinance. Grading. Plans for grading, drainage, and erosion control for development the subject property have been prepared. The side development includes a stormwater basin for management of stormwater runoff created by the impervious surfaces within the lot. No landscaping of the subject property is proposed beyond seeding for erosion control. A more detailed plan for low maintenance, low water natural plantings should be considered with input from the Zoning Administrator. All stormwater management issues are subject to review and approval of the City Engineer. Utilities. The utility facility is to be connected to the water system for import of raw water and export of finished water. The facility is also to be connected to the sewer system for waste disposal. All utility plans are to be subject to review and approval of the City Engineer. RECOMMENDATION Our office recommends approval of a Zoning Map amendment and Conditional Use Permit for development of Well House #3 – Water Treatment Plant. POSSIBLE ACTION Motion to recommend approval of a Zoning Map amendment and Conditional Use Permit for Well House #3 – Water Treatment Plant, subject to the following conditions: 1. Once approved, no changes, modifications or alterations shall be made to any plan detail, standard, or specifications for Well House #3 – Water Treatment Plant without prior submission of a plan modification request to the Zoning Administrator for review and approval. 2. The design and construction specifications for access and off-street parking areas shall be subject to review and approval of the City Engineer. 3. All exterior lighting shall be subject to review and approval of the Zoning Administrator. 4. Any exterior storage of waste containers shall comply with requirements of Section 11- 18-4.C of the Zoning Ordinance, subject to review and approval of the Zoning Administrator. 5. All stormwater management issues shall be subject to review and approval of the City Engineer. 6 6. All utility plans shall be subject to review and approval of the City Engineer. c. Adam Flaherty, City Administrator/Finance Director Audra Etzel, City Clerk Ron Wagner, City Engineer Kurt Neidermeier, Utility Operations Manager David Kendall, City Attorney Site Location Map Well House #3 - Water Treatment Plant 1,234 ft Overview Legend Highways Interstate State Highway US Highway Roads City/Township Limits c t Parcels Torrens Site Location Map Well House #3 - Water Treatment Plant 1,234 ft Overview Legend Highways Interstate State Highway US Highway Roads City/Township Limits c t Parcels Torrens 72:/2: 0$,1/(9(/ $$**%%&&$BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB72:+,*+ ()()()()()()()()()()()()()()()           31/%31/%31/%31/%31/%63$1'5(/31/%31/%31/%31/%31/%31/%()$  72:/2: 0$,1/(9(/ $BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB72:+,*+ ()()()()()()()()()()()()          31/$31/$31/$31/$31/$31/$31/$31/%31/%31/'()72:/2: 0$,1/(9(/ $$**%%&&$BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB72:+,*+ ()()()()()()()()()()()()()          31/%31/%31/$31/$31/$31/$31/$31/$31/$31/(()72:/2: 0$,1/(9(/ $BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB72:+,*+ ()()()()()()()()()()()()          31/%31/%31/%31/%31/%31/%31/%31/%31/%31/%()*5((1%$<2)),&(3,1(675((768,7(*5((1%$<:,6&216,13+21(67$786352-(&77,7/(352-(&712'$7($/7352-(&712 ,6* 6+((7'(6,*1$725 6+((712&/,(176+((77,7/(35(3$5('%<&+(&.('%<$33529('%<$GYDQFHG(QJLQHHULQJDQG(QYLURQPHQWDO6HUYLFHV//&ZZZDHVFRP&HUWLILFDWLRQRI,QGLYLGXDO3URMHFW'HVLJQ'LVFLSOLQHV$UH,QFOXGHG2Q7KHLU,QGLYLGXDO'UDZLQJV5HVSHFWLYHO\$XWRGHVN'RFV2WVHJR:+:73$UFK5UYW30$)&$)&&-($%8,/',1*(/(9$7,216276(*20,11(627$&,7<2)276(*2276(*2:(//+286(12:$7(575($70(173/$17)25%,'',1*)(%58$5<:73$:(67(/(9$7,21$1257+(/(9$7,21$($67(/(9$7,21$6287+(/(9$7,21(;7(5,25),1,6+6&+('8/(0$5. 0$7(5,$/7<3( 0$18)$&785(5 02'(/6,=( &2/25 &200(176() 0(7$/3$1(/6,',1* /8; /8;/$39*5229( &<35(66 60227+3$1(/86('21:$//$1'9(17('3$1(/86('2162)),7() 0(7$/3$1(/75,0 0%&, '(6,*1(56(5,(6)/87(' /,*+76721(() 35(&$67&21&5(7(3$1(/ :(//6 (;326('$**5(*$7( $8() 35(&$67&21&5(7(5(9($/ :(//6 '((3;:,'(5(9($/ $8 5(9($/672%($7 2&$/,*1:,7+35(&$67-2,176() 35(&$67 :(//6 +;:&+,6(/('/,0(6721(%/2&.$&6+$ )250/,1(56&2776<67(0() )$6&,$0(7$/3$1(/ 0%&, /,*+76721(() 3$5$3(7&23,1* 0%&, /,*+76721(() 67$1',1*6($00(7$/3$1(/522) 0%&, 683(5/2. &+$5&2$/*5$<() *877(56<67(0 0%&, &+$5&2$/*5$<() '2:163287 0%&, /,*+76721(() 276(*2/2*25()(5(1&(63(&                    .(<127(/(*(1' .12&.2873$1(/ :,'7+; +(,*+76<0 '$7( '(6&5,37,21 $335I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA.ALYSSA F. CAMPBELL 49026DATE LIC. NO02/25/2026 77777777&2'('$7$3/$1.(<.%(;,7),5((;7,1*8,6+(5)5217$*(',67$1&(.12;%2;)((*5(66:,'7+,1&+(6(*5(662&&83$17&$3$&,7<2&&83$1766(59('(*5(663$7+),5('(3$570(17&211(&7,21+285),5(:$//:$///(*(1'1(:&216758&7,21*(1(5$/&2'('$7$352-(&7180%(5±276(*2:+:73±276(*201&2'('$7$±35(/,0,1$5<25),1$/±%8,/',1*&2'(%8,/',1*0,11(627$%8,/',1*&2'( %$6('21,17(51$7,21$/%8,/',1*&2'( ),5(0,11(627$),5(&2'(3/80%,1*0,11(627$3/80%,1*&2'(0(&+$1,&$/0,11(627$0(&+$1,&$/&2'((/(&75,&$/1$7,21$/(/(&75,&$/&2'((1(5*<0,11(627$(1(5*<&2'($&&(66,%,/,7<0,11(627$$&&(66,%,/,7<&2'(2&&83$1&<&/$66,),&$7,21$1'86(++$=$5'286*528362&&83$1&<82&&83$1&<63(&,$/'(7$,/('5(48,5(0(176%$6('212&&83$1&<$1'86(+$=$5'2860$7(5,$/6+$=$5'2860$7(5,$/60$7(5,$/66725('‡)/825,'( +)6 ‡48$17,7,(6*$//217$1.‡&/$66,),&$7,21&25526,9(72;,&‡0$;,080$//2:$%/(48$17,7<*$//216‡+02 721.$=25% ‡48$17,7,(6*$//217$1.‡&/$66,),&$7,2172;,&‡0$;,080$//2:$%/(48$17,7<*$//216‡&+/25,1( 62',80+<32&+/25,7( ‡48$17,7,(6  *$//217$1.  *$//217$1.‡&/$66,),&$7,21&25526,9(‡0$;,080$//2:$%/(48$17,7<*$//21663,//&21752/'5$,1$*($1'6(&21'$5<&217$,10(175(48,5('/$%(/,1*$1'6,*1$*(2)0$7(5,$/65(48,5('  ),5(3527(&7,216<67(06‡3$57,$//<635,1./(5('0,;('86($1'2&&83$1&<‡6(3$5$7('2&&83$1&,(6&216758&7,217<3(‡7<3(9%‡35,0$5<6758&785$/)5$0(+2856‡(;7(5,25%($5,1*:$//6+2856‡,17(5,25%($5,1*:$//6+2856‡(;7(5,25121%($5,1*:$//6+2856‡,17(5,25121%($5,1*:$//6+2856‡)/225&216758&7,21+2856‡522)&216758&7,21+2856,17(5,25),1,6+(6)2&&62&&‡(;,7(1&/2685($1'(;,73$66$*(:$<&/$66%&/$66%‡52206$1'(1&/26('63$&(6&/$66&&/$66&522)6<67(0‡&/$66&'(7(&7,21$1'&21752/6<67(06‡),5($/$506<67(01275(48,5('‡(0(5*(1&<92,&($/$506<671275(48,5('‡),5((;7,1*8,6+(565(48,5('‡$0,1,080$7/2:2502'(5$7(+$=$5'2&&83$1&<‡$0,1,080$7+,*++$=$5'2862&&83$1&<‡)2270$;,080',67$1&(72$),5((;7,1*8,6+(5‡602.(&21752/6<67(01275(48,5('‡602.(+($75(029$/6<67(01275(48,5('%8,/',1*+(,*+7‡$//2:$%/(+(,*+76725,(6)((7‡$&78$/+(,*+76725,(6¶)((7%8,/',1*$5($‡%$6,&$//2:$%/($5($6)‡$5($)$&725,1&5($6('8(72)5217$*(‡727$/$&78$/$5($6)5$7,22)$&78$/$5($',9,'('%<$//2:$%/($5($$//2:$%/( $//2:$%/( $&78$/ $&78$/ 8 + 6802)5$7,2   2&&83$17/2$'‡6725$*($5($6)2&&83$176 ‡,1'8675,$/352&(66$5($6)2&&83$176 (*5(666,=,1*‡27+(5&20321(176,1&+(62&&83$17(*5(66:,'7+‡'225,1&+(60,1,080‡6((3/$1)25(*5(66:,'7+3529,'('75$9(/',67$1&(6‡'($'(1'&255,'25)((70$;,080‡&200213$7+2)(*5(6675$9(/',67$1&()((70$;,080‡(;,7$&&(6675$9(/',67$1&()((70$;,0803$1,&+$5':$5((;,7),5(+$5':$5(‡5(48,5('$7+,*++$=$5'2&&83$1&,(6‡5(48,5('$7(/(&75,&$/5220:,7+(48,30(175$7('$03(5(625025(3/80%,1*),;785(63529,'('‡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cale in Feet0File: C:\Users\gprior\DC\ACCDocs\AE2S\05409-2023-008 Otsego WH3 WTP\Project Files\01-Civil\Plan Sheets\EX-COND.dwgPlotted: By: Graham Prior Date: Wednesday, February 25, 2026File: C:\Users\gprior\DC\ACCDocs\AE2S\05409-2023-008 Otsego WH3 WTP\Project Files\01-Civil\Plan Sheets\EX-COND.dwgPROJECT TITLE:PROJECT NO:DATE:ALT. PROJECT NO:SHEET DESIGNATOR: SHEET NO:CLIENT:SHEET TITLE:PREPARED BY:CHECKED BY:APPROVED BY:SYMDATEAPPRSTATUS:Certification of Individual Project Design Disciplines AreIncluded On Their Individual Drawings, RespectivelyAdvanced Engineering and Environmental Services, LLC www.ae2s.comOTSEGO WELLHOUSE NO. 3 WATER TREATMENT PLANTEXISTING CONDITIONS AND DEMOLITION PLANCITY OF OTSEGOOTSEGO, MINNESOTAP05409-2023-008C24002FEBRUARY 2026WTPC100GPDLDLFOR BIDDINGEXISTING NOTESSANITARY MANHOLERIM: 954.55INV (W): 936.05INV (N,S): 935.65SANITARY MANHOLERIM: 952.42INV (N,S): 934.628" PVC - SANITARY6" PVC - SANITARY SEWER SERVICEAPPROXIMATE PIPE INV: 936.31 (CONTRACTOR TO FIELDVERIFY)10" DIP - WATERMAIN6" DIP - WATER SERVICE (CONTRACTOR TO FIELDVERIFY DEPTH)123456EXISTING LEGENDPROPERTY LINEEDGE OF ICE (02/03/2025)GAS LINESTORM SEWERRIGHT OF WAYHYDRANTWATER VALVELIGHT POLEKALLAND AVETRANSFORMER / ELECTRICAL BOXCONCRETE PAVEMENTBITUMINOUS PAVEMENTWATERMAINSANITARY SEWERSTORM SEWER - CATCH BASINSTORM SEWER - FLARED END SECTIONSANITARY MANHOLE1233DEMOLITION NOTESREMOVE CURB AND GUTTERREMOVE BITUMINOUS PAVEMENT (FULL DEPTH)12189.80'TREETREE LINEUNDERGROUND ELECTRICUNDERGROUND ELECTRICEXISTING WETLAND100 YR ELEVATION = 949.0TOP OF ICE ELEVATION = 947.25(02/03/2025)EXISTING WET PONDPOND BOTTOM = 942.00NWL = 947.94TOP OF ICE ELEVATION = 948.05(02/03/2025)45APPROXIMATE WETLAND DELINEATION12223.51'39.17'3.00'WELL 12 (BY OTHERS)CAPPED 8" DIPHYDRANT (BY OTHERS)WETLAND DELINEATIONTRUNCATED DOMESPROPERTY CORNERSGENERAL NOTES1.PROPERTY CORNERS ARE SHOWN FOR REFERENCE.CONTRACTOR TO ESTABLISH CONTROL POINTS FORTHE PROJECT.2. SAWCUT FULL DEPTH PAVEMENT ON ALL REMOVALLIMITS.3. CONTRACTOR TO MAINTAIN ACCESS TO ADJACENTSCHOOL ENTRANCES THROUGHOUT WORK REQUIREDON KALLAND AVENUE.6 ჀჀჀ ჀWW48.00'146.71'16.40'5.12'R25.0 0'82.67'78.67'4.00'39.00'67.34'R25.00'R25.00'R25.00'7.78'R25.00'30.00'34.33'20.00'23.51'39.17'89.75'3.00'4.00'2.00'15.00'SSHTRON0Scale in Feet25File: C:\Users\gprior\DC\ACCDocs\AE2S\05409-2023-008 Otsego WH3 WTP\Project Files\01-Civil\Plan Sheets\CS-SITE.dwgPlotted: By: Graham Prior Date: Wednesday, February 25, 2026File: C:\Users\gprior\DC\ACCDocs\AE2S\05409-2023-008 Otsego WH3 WTP\Project Files\01-Civil\Plan Sheets\CS-SITE.dwgPROJECT TITLE:PROJECT NO:DATE:ALT. PROJECT NO:SHEET DESIGNATOR: SHEET NO:CLIENT:SHEET TITLE:PREPARED BY:CHECKED BY:APPROVED BY:SYMDATEAPPRSTATUS:Certification of Individual Project Design Disciplines AreIncluded On Their Individual Drawings, RespectivelyAdvanced Engineering and Environmental Services, LLC www.ae2s.comOTSEGO WELLHOUSE NO. 3 WATER TREATMENT PLANTSITE PLANCITY OF OTSEGOOTSEGO, MINNESOTAP05409-2023-008C24002FEBRUARY 2026WTPC101GPDLDLFOR BIDDINGKALLAND AVEWH3 WTPWELL 12 (BY OTHERS)GENERAL NOTES1.RADIUS DIMENSIONS SHOWN ARE FROM THE EDGE OFPAVEMENT.2.DIMENSIONS AT CURB AND GUTTER ARE FROM BACK OFCURB.3.CONTRACTOR TO MAINTAIN ACCESS TO ADJACENTSCHOOL ENTRANCES THROUGHOUT WORK REQUIREDON KALLAND AVENUE.CONSTRUCTION NOTESBITUMINOUS PAVEMENT (HEAVY DUTY) - SEE DETAIL1 ,C705SURMOUNTABLE CURB AND GUTTER - SEE CITY OFOTSEGO STANDARD PLATE 704, SHEET C704CONCRETE DRIVEWAY ENTRANCE - SEE DETAIL 4,SHEET C707CONCRETE SIDEWALK - SEE DETAIL 3, C705CONCRETE GENERATOR PAD - SEE ELECTRICAL ANDSTRUCTURAL6' TALL CHAINLINK FENCE - SEE DETAIL 1, C7078' WIDE SWING GATE - SEE DETAIL 1, C708BITUMINOUS PAVEMENT (KALLAND AVE) - SEE DETAIL 2,C705BOLLARD - SEE DETAIL 4, C705CONCRETE SPLASH BLOCK - SEE DETAIL 4, C706. SEEARCHITECTURAL FOR ROOF DRAIN LOCATIONS.OVERFLOW STRUCTURE - SEE OVERFLOW PLAN ANDPROFILE SHEET C203 AND STRUCTURALB618 CURB AND GUTTER - SEE MNDOT DETAIL 7100H,SHEET C704STRUCTURAL CONCRETE - SEE STRUCTURAL123456789101112131443225678899STORM PONDFILTRATION BENCHDRAINAGE SWALE210101112131313 :WWჀჀჀ Ⴠ958.0958.0958.0958.0957.9957.9957.8957.9955.8955.2955.4956.7956.8957.8957.8949.0947.0-1.49%-2.17%-1.34%-2.08%-4.33%957.5951.0953.0953.0951.0953.0955.0946.0956.0951.0958.0957.6958.0957.9959.0957.0955.0953.0951.0954.0952.0957.9956.1953.0-2.35%-7.41%955.0952.0952.0953.0953.00953.095395395399539955953.09535333951.0HTRON0Scale in Feet25File: C:\Users\gprior\DC\ACCDocs\AE2S\05409-2023-008 Otsego WH3 WTP\Project Files\01-Civil\Plan Sheets\CS-GRAD.dwgPlotted: By: Graham Prior Date: Wednesday, February 25, 2026File: C:\Users\gprior\DC\ACCDocs\AE2S\05409-2023-008 Otsego WH3 WTP\Project Files\01-Civil\Plan Sheets\CS-GRAD.dwgPROJECT TITLE:PROJECT NO:DATE:ALT. PROJECT NO:SHEET DESIGNATOR: SHEET NO:CLIENT:SHEET TITLE:PREPARED BY:CHECKED BY:APPROVED BY:SYMDATEAPPRSTATUS:Certification of Individual Project Design Disciplines AreIncluded On Their Individual Drawings, RespectivelyAdvanced Engineering and Environmental Services, LLC www.ae2s.comOTSEGO WELLHOUSE NO. 3 WATER TREATMENT PLANTGRADING PLANCITY OF OTSEGOOTSEGO, MINNESOTAP05409-2023-008C24002FEBRUARY 2026WTPC102GPDLDLFOR BIDDINGWH3 WTPFFE: 958.00'GENERAL NOTES1.ALL SPOT ELEVATIONS AT CURB LOCATIONS ARE AT THETOP BACK OF CURB.2.CONTRACTOR TO RESTORE ALL DISTURBED AREASWITH MINIMUM 6" TOPSOIL AND TEMPORARY SEEDING.THE OWNER WILL PLACE PERMANENT SEED AFTERCONSTRUCTION IS COMPLETED. CONTRACTOR TOCOORDINATE WITH THE OWNER WHEN DISTURBEDAREAS ARE READY FOR FINAL SEEDING.12" RCP6" PVC6" PVCCONSTRUCTION NOTESEMERGENCY OVERFLOW - SEE DETAIL 2, SHEET C707.STORM PONDNWL: 950.5WATER QUALITY VOLUME ELEVATION: 951.0100-YR HWL:951.7LOWEST INVERT ELEVATION: 952.0FILTRATION BENCHTOP OF SAND: 950.5WATER QUALITY VOLUME ELEVATION: 951.0100-YR HWL: 951.7123122235 :WWჀჀჀ ჀSS:WWWWWWWWCOHTRON0Scale in Feet25File: C:\Users\gprior\DC\ACCDocs\AE2S\05409-2023-008 Otsego WH3 WTP\Project Files\01-Civil\Plan Sheets\CS-UTILITES.dwgPlotted: By: Graham Prior Date: Wednesday, February 25, 2026File: C:\Users\gprior\DC\ACCDocs\AE2S\05409-2023-008 Otsego WH3 WTP\Project Files\01-Civil\Plan Sheets\CS-UTILITES.dwgPROJECT TITLE:PROJECT NO:DATE:ALT. PROJECT NO:SHEET DESIGNATOR: SHEET NO:CLIENT:SHEET TITLE:PREPARED BY:CHECKED BY:APPROVED BY:SYMDATEAPPRSTATUS:Certification of Individual Project Design Disciplines AreIncluded On Their Individual Drawings, RespectivelyAdvanced Engineering and Environmental Services, LLC www.ae2s.comOTSEGO WELLHOUSE NO. 3 WATER TREATMENT PLANTOVERALL UTILITY PLANCITY OF OTSEGOOTSEGO, MINNESOTAP05409-2023-008C24002FEBRUARY 2026WTPC103GPDLDLFOR BIDDINGKALLAND AVECONSTRUCTION NOTESFINISHED WATER - SEE PLAN AND PROFILE SHEET C201RAW WATER - SEE PLAN AND PROFILE SHEET C202OVERFLOW - SEE PLAN AND PROFILE SHEET C203SANITARY SEWER - SEE PLAN AND PROFILE SHEET C204STORM SEWER - SEE PLAN AND PROFILE SHEET C205STORM SEWER - SEE PLAN AND PROFILE SHEET C206FINISHED WATER - SEE PLAN AND PROFILE SHEET C207DRAINTILE - SEE PLAN AND PROFILE SHEET C205DRAINTILE - SEE PLAN AND PROFILE SHEET C206123456789112234455666748899 :WWჀჀ Ⴠ66)66)66)66)66)66)66)66)66)66)66)66)66)66)66)66)66)66)66)66)66) 66)66) 66)HTRON30Scale in Feet0File: C:\Users\gprior\DC\ACCDocs\AE2S\05409-2023-008 Otsego WH3 WTP\Project Files\01-Civil\Plan Sheets\CS-EROS.dwgPlotted: By: Graham Prior Date: Wednesday, February 25, 2026File: C:\Users\gprior\DC\ACCDocs\AE2S\05409-2023-008 Otsego WH3 WTP\Project Files\01-Civil\Plan Sheets\CS-EROS.dwgPROJECT TITLE:PROJECT NO:DATE:ALT. PROJECT NO:SHEET DESIGNATOR: SHEET NO:CLIENT:SHEET TITLE:PREPARED BY:CHECKED BY:APPROVED BY:SYMDATEAPPRSTATUS:Certification of Individual Project Design Disciplines AreIncluded On Their Individual Drawings, RespectivelyAdvanced Engineering and Environmental Services, LLC www.ae2s.comOTSEGO WELLHOUSE NO. 3 WATER TREATMENT PLANTEROSION AND SEDIMENT CONTROL PLANCITY OF OTSEGOOTSEGO, MINNESOTAP05409-2023-008C24002FEBRUARY 2026WTPC104GPDLDLFOR BIDDINGEXISTING WETLAND100 YR ELEVATION = 949.0TOP OF ICE ELEVATION = 947.25(02/03/2025)EXISTING WET PONDPOND BOTTOM = 942.00NWL = 947.94TOP OF ICE ELEVATION = 948.05(02/03/2025)CONSTRUCTION NOTESDROP INLET PROTECTION - SEE CITY OF OTSEGOSTANDARD PLATE 507, SHEET C704. CONTRACTORSHALL INSTALL INLET PROTECTION ON ALL NEW CATCHBASIN INLETSCONSTRUCTION ENTRANCE - SEE CITY OF OTSEGOSTANDARD PLATE 505, SHEET C704SILT FENCE - SEE CITY OF OTSEGO STANDARD PLATE501, SHEET C704PROPOSED CONCRETE WASHOUT LOCATION - INSTALLIN ACCORDANCE WITH MINNESOTA POLLUTIONCONTROL AGENCY (MPCA)123433111DOUBLE SILT FENCE AROUND POND AREAS235.01'50' (MIN)4GENERAL NOTES1.CONTRACTOR TO USE TEMPORARY SEEDING (MNDOTMIX 21-111) ON ALL DISTURBED SOIL IF CONSTRUCTIONACTIVITY HAS STOPPED FOR A PERIOD NO LATER THAN14 CALENDAR DAYS AFTER ACTIVITY HAS CEASED INACCORDANCE WITH THE SWPPP.2. CONTRACTOR SHALL INSTALL J-HOOKS AT INTERVALSNOT EXCEEDING 100' ON ALL SILT FENCE RUNNING ATAN ANGLE OF 30° OR GREATER TO THE CONTOURS.3.CONTRACTOR SHALL INSTALL INLET PROTECTION ONALL NEW CATCH BASINS INLETS AND OUTLETPROTECTION ON ALL NEW FLARED END SECTIONS UNTILESTABLISHMENT IS MET IN ACCORDANCE WITH THESWPPP. File: C:\Users\gprior\DC\ACCDocs\AE2S\05409-2023-008 Otsego WH3 WTP\Project Files\01-Civil\Plan Sheets\CS-SWPPP.dwgPlotted: By: Graham Prior Date: Wednesday, February 25, 2026File: C:\Users\gprior\DC\ACCDocs\AE2S\05409-2023-008 Otsego WH3 WTP\Project Files\01-Civil\Plan Sheets\CS-SWPPP.dwgPROJECT TITLE:PROJECT NO:DATE:ALT. PROJECT NO:SHEET DESIGNATOR: SHEET NO:CLIENT:SHEET TITLE:PREPARED BY:CHECKED BY:APPROVED BY:SYMDATEAPPRSTATUS:Certification of Individual Project Design Disciplines AreIncluded On Their Individual Drawings, RespectivelyAdvanced Engineering and Environmental Services, LLC www.ae2s.comOTSEGO WELLHOUSE NO. 3 WATER TREATMENT PLANTSWPPPCITY OF OTSEGOOTSEGO, MINNESOTAP05409-2023-008C24002FEBRUARY 2026WTPC105LLDLDLFOR BIDDINGKNOWLEDGEABLE PERSON/CHAIN OF RESPONSIBILITYTHE CONTRACTOR SHALL IDENTIFY A PERSON KNOWLEDGEABLE AND EXPERIENCED IN THE APPLICATION OF EROSIONPREVENTION AND SEDIMENT CONTROL BMPS WHO WILL OVERSEE THE IMPLEMENTATION OF THE SWPPP, INCLUDING:INSTALLATION, INSPECTION AND MAINTENANCE OF THE EROSION PREVENTION AND SEDIMENT CONTROL BMPS. THEGENERAL CONTRACTOR SHALL ATTACH CONTACT INFORMATION TO THE SWPPP PRIOR TO THE START OF ANYCONSTRUCTION ACTIVITY.THE CONTRACTOR SHALL ESTABLISH A CHAIN OF RESPONSIBILITY FOR ALL CONTRACTORS AND SUB-CONTRACTORS ONSITE TO ENSURE THE SWPPP IS BEING PROPERLY IMPLEMENTED AND MAINTAINED. THE CONTRACTOR SHALL PROVIDETHE CHAIN OF RESPONSIBILITY TO THE OWNER AND ATTACH TO THE SWPPP PRIOR TO ANY CONSTRUCTION ACTIVITY.SWPPP SUMMARY/OVERVIEW:THIS STORM WATER POLLUTION PREVENTION PLAN (SWPPP) HAS BEEN DEVELOPED TO ADDRESS THE REQUIREMENTS OFNPDES PERMIT MN R100001, PART III, SUBPART A. THIS SWPPP INCLUDES A COMBINATION OF NARRATIVE AND PLANSHEETS THAT DESCRIBE THE TEMPORARY AND PERMANENT STORM WATER MANAGEMENT PLAN FOR THE PROJECT. THECONTRACTOR IS RESPONSIBLE FOR AMENDING THE SWPPP WHENEVER THERE IS A CHANGE IN DESIGN, CONSTRUCTION,OPERATION, OR MAINTENANCE WHICH HAS POTENTIAL FOR DISCHARGE OF POLLUTANTS TO WATERS OF THE STATE.CONTRACTOR:CONTACT:PHONE:EMAIL:STORM WATER POLLUTION PREVENTION PLAN (SWPPP)CONTACTS:PROJECT INFORMATION:TRAINING DOCUMENTATION:THE CONTRACTOR (OPERATOR) SHALL ADD TO THE SWPPP TRAINING RECORDS FOR THE FOLLOWING PERSONNEL:-INDIVIDUALS OVERSEEING THE IMPLEMENTATION OF, REVISING, AND AMENDING THE SWPPP-INDIVIDUALS PERFORMING INSPECTIONS-INDIVIDUALS PERFORMING OR SUPERVISING THE INSTALLATION, MAINTENANCE AND REPAIR OF BMPSTRAINING MUST RELATE TO THE INDIVIDUAL'S JOB DUTIES AND RESPONSIBILITIES AND SHALL INCLUDE:1) DATES OF TRAINING2) NAME OF INSTRUCTORS3) CONTENT AND HOURS OF TRAININGTHE CONTRACTOR SHALL ENSURE THAT THE INDIVIDUALS ARE TRAINED BY LOCAL, STATE, FEDERAL AGENCIES,PROFESSIONAL ORGANIZATIONS, OR OTHER ENTITIES WITH EXPERTISE IN EROSION PREVENTION, SEDIMENT CONTROL,PERIMETER CONTROL, PERMANENT STORMWATER MANAGEMENT AND THE MINNESOTA NPDES/SDS CONSTRUCTIONSTORMWATER PERMIT.PROJECT SUMMARY:GENERAL SWPPP RESPONSIBILITIES:THE CONTRACTOR SHALL KEEP THE SWPPP, INCLUDING ALL AMENDMENTS AND INSPECTION AND MAINTENANCERECORDS ON SITE DURING CONSTRUCTION.THE SWPPP WILL BE AMENDED AS NEEDED AND/OR AS REQUIRED BY PROVISIONS OF THE PERMIT. AMENDMENTS WILL BEAPPROVED BY BOTH THE OWNER AND CONTRACTOR AND WILL BE ATTACHED OR OTHERWISE INCLUDED WITH THESWPPP DOCUMENTS. THE SWPPP AMENDMENTS SHALL BE INITIATED, FACILITATED, AND PROCESSED BY THECONTRACTOR. THE SWPPP AND AMENDMENTS SHALL BE KEPT ON SITE BY THE CONTRACTOR WHENEVERCONSTRUCTION ACTIVITY IS IN PROGRESS.THE CONTRACTOR SHALL DOCUMENT AMENDMENTS TO THE SWPPP AS A RESULT OF INSPECTION(S) WITHIN 7 DAYS.BOTH THE OWNER AND CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER TERMINATION AND/OR TRANSFER OFTHE PERMIT.THE FOLLOWING DOCUMENTS ARE CONSIDERED PART OF THE SWPPP: - EXISTING CONDITIONS, TRAFFIC AND EROSION CONTROL PLAN SHEETS - PLAN AND PROFILE SHEETS - CONSTRUCTION DETAILS - SWPPP NOTE PLAN SHEETS - PROJECT SPECIFICATIONS - PROJECT BID FORMPERMANENT STORMWATER MANAGEMENT SYSTEM:THE PROJECT WILL CREATE MORE THAN 1 ACRE OF NEW IMPERVIOUS AREA THEREFORE PERMANENT STORMWATERMANAGEMENT IS REQUIRED. BMPS HAVE BEEN DESIGNED TO TREAT THE NECESSARY WATER QUALITY VOLUME.CALCULATIONS DEMONSTRATING COMPLIANCE WITH THE NPDES PERMIT ARE AVAILABLE AT AE2S.ID NAME TYPESPECIAL WATER CLASSIFICATIONTMDLN/A N/A N/A N/A N/ATOTAL PROJECT AREA:2.49 ACTOTAL DISTURBED AREA: 1.49 ACPRE-CONSTRUCTION IMPERVIOUS AREA: 0 ACPOST-CONSTRUCTION IMPERVIOUS AREA: 0.50 ACIMPERVIOUS AREA ADDED: 0.50 ACLOCATION:Otsego, MinnesotaLATITUDE/LONGITUDE::45.2605, 93.6690, 0.0000PROJECT DESCRIPTION:Otsego WH3 WTPSOIL DISTURBING ACTIVITIES:Excavation, grading, utilities relocation, erosion control and vegetation establishmentOWNER:City of OtsegoCONTACT:Kurt Neidermeier - Utility ManagerADDRESS:13400 90th St NE, Otsego, MN 55330PHONE: 763-441-4414EMAIL:kneidermeier@otsegomn.govENGINEER:Advanced Engineering and Environmental Services, LLC (AE2S)CONTACT:Dan Landrus, PEPHONE:763-463-5036EMAIL:dan.landrus@ae2s.comPROJECT NO.: P05355-2023-002PREPARER/DESIGNER OF SWPPP: Lucas LaMooreEMPLOYER: AE2STRAINING AND DATE OBTAINED:DESIGN OF CONSTRUCTION SWPPP (EXPIRES 2029)NAME OF INSTRUCTOR(S):DR. JOHN CHAPMANDOES THE PROJECT DISCHARGE TO A CALCAREOUS FEN: NoIS THE PROJECT LOCATED IN A KARST AREA:NoRECEIVING WATER(S) WITHIN ONE MILE FROM PROJECT BOUNDARIES:(http://pca-gis02.pca.state.mn.us/CSW/index.html) File: C:\Users\gprior\DC\ACCDocs\AE2S\05409-2023-008 Otsego WH3 WTP\Project Files\01-Civil\Plan Sheets\CS-SWPPP.dwgPlotted: By: Graham Prior Date: Wednesday, February 25, 2026File: C:\Users\gprior\DC\ACCDocs\AE2S\05409-2023-008 Otsego WH3 WTP\Project Files\01-Civil\Plan Sheets\CS-SWPPP.dwgPROJECT TITLE:PROJECT NO:DATE:ALT. PROJECT NO:SHEET DESIGNATOR: SHEET NO:CLIENT:SHEET TITLE:PREPARED BY:CHECKED BY:APPROVED BY:SYMDATEAPPRSTATUS:Certification of Individual Project Design Disciplines AreIncluded On Their Individual Drawings, RespectivelyAdvanced Engineering and Environmental Services, LLC www.ae2s.comOTSEGO WELLHOUSE NO. 3 WATER TREATMENT PLANTSWPPPCITY OF OTSEGOOTSEGO, MINNESOTAP05409-2023-008C24002FEBRUARY 2026WTPC106LLDLDLFOR BIDDINGLONG TERM OPERATION AND MAINTENANCE:THE CITY WILL BE RESPONSIBLE FOR LONG-TERM OPERATION AND MAINTENANCE OF ALL PERMANENT BMPS ON THE PROJECT.TEMPORARY SEDIMENT BASINS:THE CONTRACTOR MAY USE A TEMPORARY SEDIMENT BASIN DURING THE PROJECT.TEMPORARY SEDIMENT BASIN OUTLETS SHALL BE CONSTRUCTED TO PREVENT SHORT-CIRCUITING AND PREVENT THE DISCHARGEOF FLOATING DEBRIS.BASINS MUST HAVE THE ABILITY TO ALLOW COMPLETE DRAWDOWN, INCLUDE A STABILIZED EMERGENCY OVERFLOW, WITHDRAWWATER FROM THE SURFACE, AND PROVIDE ENERGY DISSIPATION AT THE OUTLET.TEMPORARY SEDIMENT BASINS SHALL BE PROVIDED WITH ENERGY DISSIPATION AT ANY BASIN OUTLET TO PREVENT SOILEROSION.SEDIMENT BASINS MUST BE SITUATED OUTSIDE OF SURFACE WATERS AND ANY BUFFER ZONES, AND MUST BE DESIGNED TOAVOID THE DRAINING OF WATER FROM WETLANDS.TEMPORARY SEDIMENT BASINS SHALL BE CONSTRUCTED AND MADE OPERATIONAL CONCURRENT OR PRIOR TO SOILDISTURBANCE THAT IS UPGRADIENT AND CONTRIBUTES RUNOFF TO THE BASIN.EROSION PREVENTION MEASURES AND TIMING:THE CONTRACTOR IS RESPONSIBLE FOR ALL EROSION PREVENTION MEASURES FOR THE PROJECT.EROSION PREVENTION MEASURES SHOWN ON PLANS ARE THE ABSOLUTE MINIMUM REQUIREMENTS. THE CONTRACTOR SHALLIMPLEMENT ADDITIONAL EROSION PREVENTION MEASURES AS NECESSARY TO PROPERLY MANAGE THE PROJECT AREA.THE CONTRACTOR SHALL PLAN AND IMPLEMENT APPROPRIATE CONSTRUCTION PRACTICES AND CONSTRUCTION PHASING TOMINIMIZE EROSION AND RETAIN VEGETATION WHENEVER POSSIBLE.THE CONTRACTOR SHALL DELINEATE AREAS NOT TO BE DISTURBED AND/OR TO BE PROTECTED WITH FLAGS, STAKES, SIGNS, SILTFENCE, OR OTHER MEANS NECESSARY TO PROTECT THESE AREAS BEFORE CONSTRUCTION BEGINS ON THE SITE.THE CONTRACTOR SHALL STABILIZE OF ALL EXPOSED SOILS IMMEDIATELY TO LIMIT SOIL EROSION. IN NO CASE SHALL ANYEXPOSED AREAS, INCLUDING STOCK PILES, HAVE EXPOSED SOILS FOR MORE THAN 7 DAYS WITHOUT PROVIDING TEMPORARY ORPERMANENT STABILIZATION.DRAINAGE PATHS, DITCHES, AND/OR SWALES SHALL HAVE TEMPORARY OR PERMANENT STABILIZATION WITHIN 24 HOURS OFCONNECTING TO A SURFACE WATER OR 24 HOURS AFTER CONSTRUCTION ACTIVITY IN THE DITCH/SWALE HAS TEMPORARILY ORPERMANENTLY CEASED.THE CONTRACTOR SHALL IMPLEMENT STORMWATER CONVEYANCE CHANNELS WHEN APPROPRIATE TO ROUTE WATER AROUNDUNSTABILIZED AREAS ON SITE TO REDUCE EROSION.THE CONTRACTOR SHALL IMPLEMENT EROSION CONTROL BMPS AND VELOCITY DISSIPATION DEVICES ALONG CONSTRUCTEDSTORMWATER CONVEYANCE CHANNELS AND OUTLETS.THE CONTRACTOR SHALL STABILIZE TEMPORARY AND/OR PERMANENT DRAINAGE DITCHES OR SWALES WITHIN 200 LINEAL FEETFROM PROPERTY EDGE, OR DISCHARGE POINT(S) WITHIN 24 HOURS AFTER CONNECTING TO A SURFACE WATER OR PROPERTYEDGE.TEMPORARY OR PERMANENT DITCHES OR SWALES USED AS A SEDIMENT CONTAINMENT SYSTEM DURING CONSTRUCTION MUSTBE STABILIZED WITHIN 24 HOURS AFTER NO LONGER BEING USED AS A SEDIMENT CONTAINMENT SYSTEM.THE CONTRACTOR SHALL NOT UTILIZE HYDROMULCH, TACKIFIER, POLYACRYLAMIDE OR SIMILIAR EROSION PREVENTIONPRACTICES AS A FORM OF STABILIZATION FOR TEMPORARY OR PERMANENT DRAINAGE DITCHES OR SWALES.THE CONTRACTOR SHALL ENSURE PIPE OUTLETS HAVE TEMPORARY OR PERMANENT ENERGY DISSIPATION WITH IN 24 HOURS OFCONNECTION TO A SURFACE WATER.THE CONTRACTOR SHALL DIRECT DISCHARGES FROM BMPS TO VEGETATED AREAS TO INCREASE SEDIMENT REMOVAL ANDMAXIMIZE STORMWATER INFILTRATION. VELOCITY DISSIPATION DEVICES MUST BE USED TO PREVENT EROSION WHEN DIRECTINGSTORMWATER TO VEGETATED AREAS.SEDIMENT CONTROL MEASURES AND TIMING:THE CONTRACTOR IS RESPONSIBLE FOR ALL SEDIMENT CONTROL MEASURES FOR THE PROJECT.SEDIMENT CONTROL MEASURES SHOWN ON PLANS ARE THE ABSOLUTE MINIMUM REQUIREMENTS. THE CONTRACTOR SHALLIMPLEMENT ADDITIONAL SEDIMENT CONTROL MEASURES AS NECESSARY TO PROPERLY MANAGE THE PROJECT AREA.THE CONTRACTOR SHALL ENSURE SEDIMENT CONTROL MEASURES ARE ESTABLISHED ON ALL DOWN GRADIENT PERIMETERS BEFOREANY UPGRADIENT LAND DISTURBING ACTIVITIES BEGIN. THESE MEASURES SHALL REMAIN IN PLACE UNTIL FINAL STABILIZATION HASBEEN ESTABLISHED.THE CONTRACTOR SHALL ENSURE THERE ARE NO UNBROKEN SLOPE LENGTHS GREATER THAN 75 FEET ON SLOPES 3:1 OR STEEPER.THE CONTRACTOR SHALL ENSURE SEDIMENT CONTROL PRACTICES REMOVED OR ADJUSTED FOR SHORT-TERM ACTIVITIES BERE-INSTALLED IMMEDIATELY AFTER THE SHORT-TERM ACTIVITY HAS BEEN COMPLETED. SEDIMENT CONTROL PRACTICES MUST BEREINSTALLED BEFORE THE NEXT PRECIPITATION EVENT EVEN IF THE SHORT-TERM ACTIVITY IS NOT COMPLETE.THE CONTRACTOR SHALL ENSURE STORM DRAIN INLETS AND CULVERT INLETS ARE PROTECTED BY APPROPRIATE BMPS DURINGCONSTRUCTION UNTIL ALL SOURCES WITH POTENTIAL FOR DISCHARGING TO THE INLET HAS BEEN STABILIZED. INLET AND CULVERTPROTECTION SHALL CONFORM TO THE 2020 MNDOT SPECIFICATIONS 2573.THE CONTRACTOR SHALL ENSURE STOCK PILES ARE PROVIDED WITH AN EFFECTIVE SEDIMENT PERIMETER CONTROL PRIOR TO THEINITIATION OF STOCKPILLING AND STOCK PILES SHALL NOT BE PLACED IN ANY TYPE OF SURFACE WATER OR NATURAL BUFFER.THE CONTRACTOR SHALL INSTALL PERIMETER CONTROL AROUND ALL STAGING AREAS, BORROW PITS, AND AREAS CONSIDEREDENVIRONMENTALLY SENSITIVE.THE CONTRACTOR SHALL ENSURE VEHICLE TRACKING BE MINIMIZED WITH EFFECTIVE BMPS. WHERE THE BMPS FAIL TO PREVENTSEDIMENT FROM TRACKING ONTO STREETS THE CONTRACTOR SHALL CONDUCT STREET SWEEPING TO REMOVE ALL TRACKEDSEDIMENT.THE CONTRACTOR SHALL IMPLEMENT CONSTRUCTION PRACTICES TO MINIMIZE SOIL COMPACTION.SEDIMENT CONTROL BMP SUMMARY:SEE EROSION CONTROL PLANS AND BID FORM FOR TYPE, LOCATION, AND QUANTITY OF SEDIMENT CONTROL BMPS.EROSION PREVENTION BMP SUMMARY:SEE EROSION AND SEDIMENT CONTROL PLAN SHEETS AND BID FORM FOR TYPE, LOCATION, AND QUANTITY OF EROSION PREVENTIONBMPS.DEWATERING AND BASIN DRAINING ACTIVITIES:THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL DEWATERING AND SURFACE DRAINAGE REGULATIONS. DISCHARGEDIRECTLY INTO A SURFACE WATER IS NOT ALLOWED WITHOUT PRETREATING PRIOR TO DISCHARGEWATER FROM DEWATERING ACTIVITIES SHALL DISCHARGE TO A SEDIMENT CONTROL DESIGNED TO PREVENT DISCHARGES WITHVISIBLE TURBIDITY.DISCHARGE THAT CONTAINS OIL OR GREASE MUST BE TREATED WITH AN OIL-WATER SEPARATOR OR SUITABLE FILTRATION DEVICEPRIOR TO DISCHARGE.DISCHARGE POINTS SHALL BE PROTECTED FROM EROSION AND SCOUR.DISCHARGE WATER SHALL BE DISPERSED OVER AN ACCEPTED ENERGY DISSIPATION MEASURE.WATER FROM DEWATERING SHALL BE DISCHARGED IN A MANNER THAN DOES NOT CAUSE NUISANCE CONDITIONS, EROSION, ORINUNDATION OF WETLANDS.INSPECTION AND MAINTENANCE:ALL INSPECTIONS, MAINTENANCE, REPAIRS, REPLACEMENTS, AND REMOVAL OF BMPS ARE INCIDENTAL TO THE EROSION CONTROL BID ITEMS.THE CONTRACTOR IS RESPONSIBLE FOR COMPLETING SITE INSPECTIONS, AND BMP MAINTENANCE TO ENSURE COMPLIANCE WITH THE PERMIT REQUIREMENTS.THE CONTRACTOR SHALL INSPECT THE CONSTRUCTION SITE ONCE EVERY 7 DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN0.5 INCHES IN 24 HOURS.THE CONTRACTOR SHALL DOCUMENT A WRITTEN SUMMARY OF ALL INSPECTIONS AND MAINTENANCE ACTIVITIES CONDUCTED WITHIN 24 HOURS OF OCCURRENCE. RECORDS OFEACH ACTIVITY SHALL INCLUDE THE FOLLOWING:-DATE AND TIME OF INSPECTIONS-NAME OF PERSON(S) CONDUCTING INSPECTION-FINDINGS AND RECOMMENDATIONS FOR CORRECTIVE ACTIONS IF NECESSARY-CORRECTIVE ACTIONS TAKEN-DATE AND AMOUNT OF RAINFALL EVENTS-POINTS OF DISCHARGE OBSERVED DURING INSPECTION AND DESCRIPTION OF THE DISCHARGE-AMENDMENTS MADE TO THE SWPPP-PHOTOGRAPHS OF ALL DEWATERING ACTIVITIES-DOCUMENTATION OF NUISANCE CONDITIONSTHE CONTRACTOR SHALL SUBMIT A COPY OF THE WRITTEN INSPECTIONS TO THE ENGINEER AND OWNER ON A MONTHLY BASIS. IF MONTHLY INSPECTION REPORTS ARE NOTSUBMITTED, MONTHLY PAYMENTS MAY BE HELD.THE CONTRACTOR SHALL KEEP THE SWPPP, ALL INSPECTION REPORTS, AND AMENDMENTS ONSITE.THE CONTRACTOR SHALL DESIGNATE A SPECIFIC ONSITE LOCATION TO KEEP THE RECORDSTHE CONTRACTOR IS RESPONSIBLE FOR THE OPERATION AND MAINTENANCE OF TEMPORARY AND PERMANENT WATER QUALITY BMP'S, AS WELL AS EROSION AND SEDIMENTCONTROL BMP'S.THE CONTRACTOR SHALL INSPECT EROSION PREVENTION AND SEDIMENTATION CONTROL BMPS TO ENSURE INTEGRITY AND EFFECTIVENESS. ALL NONFUNCTIONAL BMPS SHALL BEREPAIRED, REPLACED, OR SUPPLEMENTED WITH FUNCTIONAL BMPS WITHIN 24 HOURS OF FINDING. THE CONTRACTOR SHALL INVESTIGATE AND COMPLY WITH THE FOLLOWINGINSPECTION AND MAINTENANCE REQUIREMENTS:PERIMETER CONTROL DEVICES, INCLUDING SILT FENCE, SHALL BE REPAIRED OR REPLACED WHEN THEY BECOME NONFUNCTIONAL OR THE SEDIMENT REACHES 1/3 OF THE DEVICEHEIGHT. THESE REPAIRS SHALL BE MADE WITHIN 24 HOURS OF DISCOVERY.TEMPORARY AND PERMANENT SEDIMENT BASINS SHALL BE DRAINED AND THE SEDIMENT REMOVED WHEN THE DEPTH OF SEDIMENT COLLECTED IN THE BASIN REACHES 12 THESTORAGE VOLUME. DRAINAGE AND REMOVAL MUST BE COMPLETED WITHIN 72 HOURS OF DISCOVERY.SURFACE WATERS, INCLUDING DRAINAGE DITCHES AND CONVEYANCE SYSTEMS, MUST BE INSPECTED FOR EVIDENCE OF EROSION AND SEDIMENT DEPOSITION. THE CONTRACTORSHALL REMOVE ALL DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATERS, INCLUDING DRAINAGEWAYS, CATCH BASINS, AND OTHER DRAINAGE SYSTEMS. THE CONTRACTORSHALL RE-STABLIZE THE AREAS WHERE SEDIMENT REMOVAL RESULTS IN EXPOSED SOIL. REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN 7 DAYS OF DISCOVERY, UNLESSPRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL CONSTRAINTS. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING ALL LOCAL, REGIONAL, STATE AND FEDERAL AUTHORITIESAND OBTAIN ANY APPLICABLE PERMITS, PRIOR TO CONDUCTING ANY WORK IN SURFACE WATERS.CONSTRUCTION SITE VEHICLE EXIT LOCATIONS SHALL BE INSPECTED DAILY FOR EVIDENCE OF SEDIMENT TRACKING ONTO PAVED SURFACES. TRACKED SEDIMENT MUST BEREMOVED FROM ALL PAVED SURFACES WITHIN 24 HOURS OF DISCOVERY.IF SEDIMENT ESCAPES THE CONSTRUCTION SITE, OFF-SITE ACCUMULATIONS OF SEDIMENT MUST BE REMOVED IN A MANOR AND AT A FREQUENCY SUFFICIENT TO MINIMIZE OFF-SITEIMPACTS.POLLUTION PREVENTION MANAGEMENT MEASURES:THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL POLLUTION PREVENTION MANAGEMENT MEASURES.ALL POLLUTION PREVENTION MEASURES ARE CONSIDERED INCIDENTAL TO THE MOBILIZATION BID ITEM, UNLESS OTHERWISE NOTED.THE CONTRACTOR IS RESPONSIBLE FOR INFORMING ALL VISITORS AND/OR PERSONNEL ON-SITE OF THE POLLUTION PREVENTION MANAGEMENT MEASURESTHE CONTRACTOR IS RESPONSIBLE FOR THE PROPER DISPOSAL, IN COMPLIANCE WITH MPCA DISPOSAL REQUIREMENTS, OF ALL HAZARDOUS MATERIALS, SOLID WASTE, ANDPRODUCTS ON-SITE.THE CONTRACTOR SHALL ENSURE CONSTRUCTION MATERIALS THAT HAVE THE POTENTIAL TO LEACH POLLUTANTS ARE KEPT UNDER COVER TO PREVENT THE DISCHARGE OFPOLLUTANTS.THE CONTRACTOR SHALL ENSURE PESTICIDES, HERBICIDES, INSECTICIDES, FERTILIZERS, TREATMENT CHEMICALS, AND LANDSCAPE MATERIALS ARE COVERED TO PREVENT THEDISCHARGE OF POLLUTANTS.THE CONTRACTOR SHALL ENSURE HAZARDOUS MATERIALS AND TOXIC WASTE IS PROPERLY STORED IN SEALED CONTAINERS TO PREVENT SPILLS, LEAKS, OR OTHER DISCHARGE.STORAGE AND DISPOSAL OF HAZARDOUS WASTE OR HAZARDOUS MATERIALS MUST BE IN COMPLIANCE WITH MINN. R. CH. 7045 INCLUDING SECONDARY CONTAINMENT ASAPPLICABLE.THE CONTRACTOR SHALL ENSURE ASPHALT SUBSTANCES USED ON-SITE ARE APPLIED IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.THE CONTRACTOR SHALL ENSURE PAINT CONTAINERS AND CURING COMPOUNDS BE TIGHTLY SEALED AND STORED WHEN NOT REQUIRED FOR USE. EXCESS PAINT AND/OR CURINGCOMPOUNDS SHALL NOT BE DISCHARGED INTO THE STORM SEWER SYSTEM AND SHALL BE PROPERLY DISPOSED OF ACCORDING TO MANUFACTURE'S INSTRUCTION.THE CONTRACTOR SHALL ENSURE SOLID WASTE BE STORED, COLLECTED AND DISPOSED OF PROPERLY IN COMPLIANCE WITH MINN. R. CH. 7035.THE CONTRACTOR SHALL ENSURE PORTABLE TOILETS ARE POSITIONED SO THAT THEY ARE SECURE AND WILL NOT BE TIPPED OR KNOCKED OVER. SANITARY WASTE MUST BEDISPOSED OF PROPERLY IN ACCORDANCE WITH MINN. R, CH. 7041.THE CONTRACTOR SHALL MONITOR ALL VEHICLES ON-SITE FOR LEAKS AND RECEIVE REGULAR PREVENTION MAINTENANCE TO REDUCE THE CHANCE OF LEEKAGE.EXTERNAL WASHING OF TRUCKS AND OTHER CONSTRUCTION VEHICLES AND ENGINE DEGREASING ARE PROHIBITED AT THE CONSTRUCTION SITE.THE CONTRACTOR SHALL ENSURE NO WASHOUT WASTE CONTACTS THE GROUND AND BE PROPERLY DISPOSED OF IN COMPLIANCE WITH MPCA RULES.THE CONTRACTOR SHALL INCLUDE SPILL KITS WITH ALL FUELING SOURCES AND MAINTENANCE ACTIVITIES. SECONDARY CONTAINMENT MEASURES SHALL BE INSTALLED ANDMAINTAINED BY THE CONTRACTOR.THE CONTRACTOR SHALL ENSURE SPILLS ARE CONTAINED AND CLEANED UP IMMEDIATELY UPON DISCOVERY. SPILLS LARGE ENOUGH TO REACH THE STORM WATER CONVEYANCESYSTEM SHALL BE REPORTED TO THE MINNESOTA DUTY OFFICER AT 1.800.422.0798.FINAL STABILIZATION:THE CONTRACTOR IS RESPONSIBLE FOR ENSURING FINAL STABILIZATION OF THE ENTIRE SITE. FINAL STABILIZATION INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING:ALL SOIL DISTURBING ACTIVITIES HAVE BEEN COMPLETED.ALL EXPOSED SOILS HAVE BEEN UNIFORMLY STABILIZED WITH AT LEAST 70% VEGETATION COVERAGE.ALL DRAINAGE DITCHES, BASINS, AND ALL STORM WATER CONVEYANCE SYSTEMS HAVE BEEN CLEARED OF SEDIMENT AND STABILIZED WITH PERMANENT COVER.ALL TEMPORARY BMPS HAVE BEEN REMOVED AND PROPERLY DISPOSED OF.FINAL STABILIZATION SHALL BE PERFORMED IN ACCORDANCE WITH MNDOT 2020 SPECIFICATION 2575