Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Item 4.1 Lily Pond Park Renovation Project
Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Parks and Recreation Parks and Recreation Director Jacobs February 23, 2026 PRESENTER(s) REVIEWED BY: ITEM #: Parks and Recreation City Administrator/Finance Director Flaherty 4.1 – Lily Pond Park STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. X Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff are recommending the City Council authorize staff to proceed with Lily Pond Park Renovation project. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? Yes No BACKGROUND/JUSTIFICATION: Constructed in 2005 Lily Pond Park sits in the northwestern corner of the Otsego Parks system. The existing play equipment at Lily Pond Park has reached the end of its useful life and no longer meets current expectations for accessibility, safety, or play value. While the playground is the focus, the broader goal of this project is to make the necessary investments now, so Lily Pond Park does not require another major renovation for the next 20 years. Rather than replacing the playground alone and returning later to address parking, trails, and courts staff have taken a comprehensive approach to renovating the park all at once. This allows for a more competitive bid process, reduces future maintenance needs, and avoids multiple construction disruptions. Community Input Community feedback showed strong support for replacing the playground and improving accessibility throughout the park. Residents expressed interest in: • All new playground equipment • Adventure and climbing-style play • Accessible surfacing and inclusive features • A park that works well for a wide range of ages This input reinforced the need to replace aging play equipment with durable, modern improvements. Playground Improvements • New play areas for ages 2–5 and 5–12 • Modern, durable equipment focused on climbing, movement, balance, and swinging • Accessible surfacing and transfer points • Equipment that meets current safety and accessibility standards The playground design was developed in collaboration with Midwest Playscapes. Park-Wide Improvements • Removal and replacement of existing playground equipment • Parking lot milling, resurfacing, striping, and ADA upgrades • Trail resurfacing and edging • Basketball and tennis court improvements • New landscaping • Screened portable restroom enclosure An optional zip line feature is included as an alternate. If bids are under budget, the City Council could choose to include the alternate in this project at time of award. Cost: • Base project estimate: approximately $576,629 (CIP budget is $580,000) • Playground quote: $174,944.83 (budget was $175,000) • Optional zip line alternate: approximately $52,600 Project Schedule • February 23: Authorize bidding • March 18: Project bids opened • March 23: City Council consideration of bid award • May: Construction begins • Mid-August: Substantial completion This schedule allows the park to reopen before the end of the summer season. The Parks and Recreation Commission reviewed the Lily Pond Park Renovation plans at its January 20, 2026, meeting and recommended that the City Council consider approval. SUPPORTING DOCUMENTS ATTACHED: • Plans and Specifications • Quote – Midwest Playscapes • Lily Pond Park Presentation POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to approve the Lily Pond Park Renovation project plans and specifications and to authorize the bid process. Motion to accept the quote and authorize staff to procure the playground equipment from Midwest Playscapes in the amount of $174,944.83. BUDGET INFORMATION FUNDING: BUDGETED: Fund 205 – Parks Capital Equipment Yes 8'5'116'5'4'8'27'12'12'Sheet Number:12.12.2575% CD SETDESCRIPTIONKEYProject Number:Date:Drawn by:Checked By:CLIENT: PROJECT:Gabrielle Grinde, PLA (MN)Registration No.Date021-02002.24.26I hereby certify that this plan wasprepared by me or under my directsupervision and that I am a dulylicensed Landscape Architect under thelaws of the State of Minnesota.T100DATE504169990 101st St NE Otsego, MN 55362 LILYPOND PARK CITY OF OTSEGO 02.24.26HSGG, AB800 WASHINGTON AVE N. #207MINNEAPOLIS, MN 55401www.hkgi.com01.14.26100% REVIEW SET02.24.26BID SETLOCATION MAPOVERALL SITE WORKSHEET INDEXOWNER: CITY OF OTSEGOCITY CONSTRUCTION PROJECT MANAGER: NICK JACOBS 763-334-3170CITY ENGINEER (HAKANSON ANDERSON): RON WAGNER 763-852-0478LANDSCAPE ARCHITECT (HKGI): GABRIELLE GRINDE 608-852-33701.CONTRACTOR SHALL INSPECT THE SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS RELATINGTO THE NATURE AND SCOPE OF WORK.2.CONTRACTOR SHALL CONTACT GOPHER STATE ONE (811) FOR LOCATION OF UNDERGROUND WIRES,CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING.CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE IF DAMAGED DURING CONSTRUCTION AT NOADDITIONAL COST TO THE OWNER.3.CONTRACTOR SHALL BE RESPONSIBLE FOR HIRING A PRIVATE UTILITY LOCATOR TO COMPLETE THEPRIVATE UTILITY LOCATIONS.4.CONTRACTOR SHALL ASSURE COMPLIANCE WITH APPLICABLE CODES AND REGULATIONS GOVERNINGTHE WORK AND/OR MATERIALS SUPPLIED.5.CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS NEEDED RELATING TO THE NATURE AND SCOPE OFWORK.6.CONTRACTOR TO BE RESPONSIBLE FOR COORDINATING CONSTRUCTION STAKING WITH CITYENGINEER. OWNER WILL BE RESPONSIBLE FOR SPECIAL INSPECTION AND MATERIAL TESTING.7.CONTRACTOR SHALL COORDINATE ALL PHASES OF CONSTRUCTION AND RESTORATION WITH OTHERCONTRACTORS WORKING ON SITE.8.CONTRACTOR TO BE RESPONSIBLE FOR SECURING CONSTRUCTION SITE.9.A PEDESTRIAN DETOUR ROUTE SHALL BE SIGNED IF NEEDED FOR DURATION OF TRAIL CLOSURE.10.TREES TO REMAIN IN CONSTRUCTION AREA SHALL BE PROTECTED ACCORDING TO TREE PROTECTIONSPECIFICATION SECTION.11.LIMITS OF WORK SHOWN ON PLAN ARE ONLY APPROXIMATE AND MAY BE ADJUSTED IN FIELD BYLANDSCAPE ARCHITECT. WORK OUTSIDE OF THESE LIMITS WILL BE DONE AT CONTRACTOR'S EXPENSEUNLESS DIRECTED BY LANDSCAPE ARCHITECT OR OWNER IN WRITING.12.CONTRACTOR SHALL PREPARE AND SUBMIT AS-BUILT DRAWING(S) OF SITE IMPROVEMENTS UPONCOMPLETION OF CONSTRUCTION INSTALLATION AND PRIOR TO FINAL PROJECT ACCEPTANCE.13.REPAIR/REPLACE PAVEMENT, CURBING OR TURF DAMAGED BY CONSTRUCTION OPERATIONS ISINCIDENTAL. ALL CURB AND GUTTER SHOULD BE REPLACED TO CITY STANDARDS FOLLOWING CITYPAVEMENT AND CURB STANDARD SECTIONS, DETAILS, AND SPECIFICATIONS.14.PROTECT AND PRESERVE THE EXISTING IRRIGATION SYSTEM DURING CONSTRUCTION. IRRIGATIONREPAIR AND REPLACEMENT WILL BE PROVIDED UNDER A SEPARATE CONTRACT. THE CONTRACTORWILL COORDINATE WITH THE IRRIGATION CONTRACTOR AS NEEDED.GENERAL NOTEST100 TITLE SHEETC100EXISTING CONDITIONSC200REMOVALS PLANC300EROSION CONTROL AND GRADING PLANC400DETAILSL100LANDSCAPE LAYOUTL200PLANTING PLANL300LANDSCAPE DETAILSL301LANDSCAPE DETAILSL302LANDSCAPE DETAILSLILY POND PARK LOCATIONPARKING LOT IMPROVEMENTSWORK LIMITSSUMMARY OF WORKREPAVE EXISTING BITUMINOUSTRAIL LOOP101ST ST NEKADLER AVE NETENNIS COURTHALF-COURTBASKETBALLCOURTPLAYGROUND, BY OTHERSALTERNATE: ZIP LINETITLE SHEETTRAIL REMOVAL X X X XXXXXNSheet Number:12.12.2575% CD SETDESCRIPTIONKEYProject Number:Date:Drawn by:Checked By:CLIENT: PROJECT:OT733C100EXISTING CONDITIONSDATE9990 101st St NE Otsego, MN 55362 LILY POND PARK CITY OF OTSEGO 02.24.26MSBW800 WASHINGTON AVE N. #207MINNEAPOLIS, MN 55401www.hkgi.com01.15.26100% REVIEW SET02.24.26BID SET X X X XXXXX◦◦◦◦◦◦◦◦◦◦◦◦◦◦◦Sheet Number:12.12.2575% CD SETDESCRIPTIONKEYProject Number:Date:Drawn by:Checked By:CLIENT: PROJECT:OT733C200REMOVALS PLANDATE9990 101st St NE Otsego, MN 55362 LILY POND PARK CITY OF OTSEGO 02.24.26MSBW800 WASHINGTON AVE N. #207MINNEAPOLIS, MN 55401www.hkgi.com01.15.26100% REVIEW SET02.24.26BID SET◦◦◦◦ XXXXX X X X X XXXXXX ●●●●●●●●●●●●●●●●◦◦◦◦◦◦◦◦◦◦◦◦◦◦◦Sheet Number:12.12.2575% CD SETDESCRIPTIONKEYProject Number:Date:Drawn by:Checked By:CLIENT: PROJECT:OT733C300EROSION CONTROL ANDGRADING PLANDATE9990 101st St NE Otsego, MN 55362 LILY POND PARK CITY OF OTSEGO 02.24.26MSBW800 WASHINGTON AVE N. #207MINNEAPOLIS, MN 55401www.hkgi.com01.15.26100% REVIEW SET02.24.26BID SET●●◦◦◦◦ Sheet Number:12.12.2575% CD SETDESCRIPTIONKEYProject Number:Date:Drawn by:Checked By:CLIENT: PROJECT:OT733C400DETAILSDATE9990 101st St NE Otsego, MN 55362 LILY POND PARK CITY OF OTSEGO 02.24.26MSBW800 WASHINGTON AVE N. #207MINNEAPOLIS, MN 55401www.hkgi.com01.15.26100% REVIEW SET02.24.26BID SET RESTORATION AREA,RESTORE TO TURFPRE-FAB RESTROOMENCLOSURE (SEESPEC) ON 12'X12'CONCRETE PADHALF COURT BASKETBALLCOURT WITH STRIPING(A/L302)BASKETBALL HOOPSYSTEM, SEE SPECSTENNIS/ PICKLEBALLCOURT STRIPING(REF. A,B/L301)CONCRETE PATH,SEE CIVILCONCRETE PATH,SEE CIVIL8 FT TENNIS COURTENTRANCE/ EXIT(NO FENCE)ALTERNATE: ZIP LINE WITHENGINEERED WOOD FIBER,BY OTHERSPARKING LOTREPLACEMENT,SEE CIVILRESURFACE EXISTINGBITUMINOUS TRAILEXISTING SITE FURNISHINGS ONCONCRETE PADS (TO REMAIN,UNLESS NOTED OTHERWISE)NEW CONCRETE RAMP,SEE CIVIL8' BLACK CHAINLINKTENNIS COURT FENCE(REF. B/L300)18" CONCRETEMAINTENANCE EDGE(REF. A/L300)TENNIS NETTINGSYSTEM, SEE SPECSCRUSHED LIMESTONEWALK WITH STEEL EDGER(REF. B/L302), SEE SPECSRESTORATION AREA,RESTORE TO TURFRESTORATION AREA,RESTORE TO TURFUPDATED PLAYGROUNDWITH EWF AND PIPSURFACING, BY OTHERUPDATED PLANTING AREA8'EXISTING CURBING TO REMAINEXISTING STRUCTURETO REMAINBITUMINOUS COURTPAVEMENT, SEE CIVILBITUMINOUS COURTPAVEMENT, SEE CIVIL5'116'REMOVE ALL EXISTINGPLANTS, WEEDS, ANDMULCH. ADD 2" COMPOST,NEW PLANTS, AND MULCH.5'4'8'UPDATED PLAYGROUNDWITH EWF AND PIPSURFACING, BY OTHERSALTERNATE: STEEL EDGINGAROUND ZIPLINE27'EXISTING CONCRETETO REMAIN8 FT TENNIS COURTENTRANCE/ EXIT(NO FENCE)12'12'Sheet Number:12.12.2575% CD SETDESCRIPTIONKEYProject Number:Date:Drawn by:Checked By:CLIENT: PROJECT:Gabrielle Grinde, PLA (MN)Registration No.Date021-02002.24.26I hereby certify that this plan wasprepared by me or under my directsupervision and that I am a dulylicensed Landscape Architect under thelaws of the State of Minnesota.L100DATE504169990 101st St NE Otsego, MN 55362 LILYPOND PARK CITY OF OTSEGO 02.24.26HSGG, AB800 WASHINGTON AVE N. #207MINNEAPOLIS, MN 55401www.hkgi.com01.14.26100% REVIEW SET02.24.26BID SETLANDSCAPE LAYOUTNORTH0030'60'LEGEND:PROPOSED CONCRETEBITUMINOUS RESURFACINGPLAYGROUND SURFACING,BY OTHERSENGINEERED WOOD FIBER (EWF),BY OTHERSREMOVE AND REPAVE EXISTINGPARKING LOTNEW BITUMINOUS COURT(GREEN)NEW BITUMINOUS COURT (BLUE)EXISTING CONCRETEUPDATED PLANTING BEDREMOVED FEATURESRESTORED AREAWORK LIMITS (51) SB(72) AL MM(49) SB(70) AL MM(40) SB(56) AL MMREFER TO CIVIL FORSEEDING/RESTORATIONSYMBOLCODEQTYCOMMON / BOTANICAL NAMESIZECONTAINERPERENNIAL 1 GAL CONTPLANT SCHEDULESheet Number:12.12.2575% CD SETDESCRIPTIONKEYProject Number:Date:Drawn by:Checked By:CLIENT: PROJECT:Gabrielle Grinde, PLA (MN)Registration No.Date021-02002.24.26I hereby certify that this plan wasprepared by me or under my directsupervision and that I am a dulylicensed Landscape Architect under thelaws of the State of Minnesota.L200DATE504169990 101st St NE Otsego, MN 55362 LILYPOND PARK CITY OF OTSEGO 02.24.26HSGG, AB800 WASHINGTON AVE N. #207MINNEAPOLIS, MN 55401www.hkgi.com01.14.26100% REVIEW SET02.24.26BID SETPLANTING PLANNORTH0010'20' 8 FT BLACK CHAINLINK FENCEBL3001'48" MINIMUM 48" MIN. DEPTH 3A32 CONCRETE FOOTINGS (4000PSI) AT ALL END, CORNER, GATEPOSTS, AND AS SHOWN ON PLANS. SLEEVE ALL POSTS WITHIN CONCRETE LOCATIONSAND FILL VOIDS WITH POLYURETHANE JOINT SEALANT OR APPROVED EQUAL, SEESPECS. HOLD FTG TOP DOWN 6 INCHES FROM FINISH GRADE/PAVEMENT TOPTOP OF SURFACING/PAVEMENT - FINISH GRADESLEEVE ALL POSTS, SEE SPECS1 58" O.D. BOTTOM RAIL (TYP.)9 GAUGE WIRE TIES ALONG TOP, MIDDLE AND BOTTOM RAILS @ 12" O.C. (TYP.)1 58" O.D. MIDDLE RAIL (TYP.)TENSION BAR BANDS/CLIPS @ 12" O.C.TENSION BAR (TYP.)1.75" BLACK CHAINLINK FABRIC, SEE SPECS.END AND/OR CORNER POSTS 3". SEE SPECS.BALL CAP WITH SET SCREW OR SPOT WELDED (TYP.)2 1/2" O.D. LINE POSTS (TYP.)6' MIN 8'VARIES, REFERENCE PLAN ENLARGEMENT (A/L301)18" CONCRETE MAINTENANCE EDGEAL300SCALE: N.T.S.SLOPECHAINLINK FENCE FABRIC,ON FIELD SIDE, TYP.FOOTINGDRIVEN FENCE POST, JNT. TYP12" EXPANSION JOINT EVERY 30 FT. O.C.TIME OUT WITH CONTROL JT.CONTROL JOINT, CENTEREDEVERY POST & CENTERED BETWEEN POSTSCHAINLINK FENCE POST, SEE SPECSEDGE CONDITION VARIES, SEE PLAN4" THICK CONCRETE MAINTENANCE EDGE. EXPANSIONJOINTS EVERY POST & CENTERED BETWEEN POSTS.6" CLASS #5AT FENCE FTG LOCATIONS - HOLD FTG TOP DOWN 6" FROM FINISH GRADE3G52 CONCRETE FOOTINGS (4000PSI) AT ALL END, CORNER, GATE POSTS, ANDAS SHOWN ON PLANS. SLEEVE ALL POSTS WITHIN CONCRETE LOCATIONS ANDFILL VOIDS WITH POLYURETHANE JOINT SEALANT OR APPROVED EQUAL, SEESPECS. HOLD FTG TOP DOWN 6" FROM FINISH GRADE/PAVEMENT TOPCOMPACTED SUBGRADE TO95% MODIFIED PROCTOR DENSITYNOTES:1.SLEEVE ALL POSTS WITHINCONCRETE LOCATIONS AND FILLVOIDS WITH POLYURETHANE JOINTSEALANT OR APPROVED EQUAL.2.IMPREGNATED FELT EXPANSIONJOINT MATERIAL2.1.12" EXPANSION JOINT TOOCCUR 30' O.C. MAXIMUM ANDAT OTHER VERTICALOBSTRUCTIONS.3.MAINTENANCE EDGING TO RUNCONTINUOUSLY AROUND ALLPOSTS TO CREATE A UNIFORMEDGE. SEE PLANS FOR ALIGNMENT.R9"EXPANSION JOINT AROUND EVERY POST, TYP.6" MIN6" MIN4"4'-0" MIN.1"SPACING OF POSTS VARIES (REF. PLAN ENLARGEMENT)1'-6"3G52 CONCRETE FOOTINGS (4000PSI) AT ALL END, CORNER, GATE POSTS, AND AS SHOWN ON PLANS. SLEEVE ALL POSTSWITHIN CONCRETE LOCATIONS AND FILL VOIDS WITH POLYURETHANE JOINT SEALANT OR APPROVED EQUAL, SEE SPECS.HOLD FTG TOP DOWN 6" FROM FINISH GRADE/PAVEMENT TOPEXTEND CONCRETE PAST FENCE 9 INCHES4" THICK CONCRETE MAINTENANCE EDGE 3F52(4000PSI)1'SIDE VIEWPLAN VIEWSheet Number:12.12.2575% CD SETDESCRIPTIONKEYProject Number:Date:Drawn by:Checked By:CLIENT: PROJECT:Gabrielle Grinde, PLA (MN)Registration No.Date021-02002.24.26I hereby certify that this plan wasprepared by me or under my directsupervision and that I am a dulylicensed Landscape Architect under thelaws of the State of Minnesota.L300DATE504169990 101st St NE Otsego, MN 55362 LILYPOND PARK CITY OF OTSEGO 02.24.26HSGG, AB800 WASHINGTON AVE N. #207MINNEAPOLIS, MN 55401www.hkgi.com01.14.26100% REVIEW SET02.24.26BID SETLANDSCAPEDETAILS TENNIS COURT STRIPINGAL30136'27'4'-6"13'-6"3'18'21'78'42' NET O.C.60'120'12'12'21'7'-6" TYP.8'TYP.MEASURETO CENTEROF LINETENNIS COURT PLAYINGAREA TO BE BLUE,SURROUNDING COURT TOBE GREENSEE SPECSTENNIS LINESTO BE WHITEINCLUDE CENTERSTRAP ON NETBITUMINOUS PAVEMENT,SEE CIVIL8 FT BLACKCHAINLINK FENCE(REF. B/L300)18" CONCRETEMAINTENANCE EDGE(REF. A/L300)NET POSTS,SEE SPEC8'8' ENTRANCE(NO GATE)SEE PICKLEBALLSTRIPING DETAIL FORDIMENSIONS (B/L301)8' ENTRANCE(NO GATE)8'PICKLEBALL STRIPING ON TENNIS COURTBL30120'10'15'14'44'8'8'8'44'20'20'MEASURETO CENTEROF LINEPICKLEBALL LINES TOBE YELLOWMEASURE TOCENTER OF LINEPICKLEBALL LINESTO BE YELLOWBITUMINOUS PAVEMENT,SEE CIVILSEE TENNIS COURTSTRIPING DETAIL FORTENNIS LINE DIMENSIONS(A/L301)Sheet Number:12.12.2575% CD SETDESCRIPTIONKEYProject Number:Date:Drawn by:Checked By:CLIENT: PROJECT:Gabrielle Grinde, PLA (MN)Registration No.Date021-02002.24.26I hereby certify that this plan wasprepared by me or under my directsupervision and that I am a dulylicensed Landscape Architect under thelaws of the State of Minnesota.L301DATE504169990 101st St NE Otsego, MN 55362 LILYPOND PARK CITY OF OTSEGO 02.24.26HSGG, AB800 WASHINGTON AVE N. #207MINNEAPOLIS, MN 55401www.hkgi.com01.14.26100% REVIEW SET02.24.26BID SETLANDSCAPEDETAILS 50'X60' BASKETBALL COURT STRIPING LAYOUTSCALE: N.T.S.AL302BASKETBALL HOOP SYSTEM, SEE SPECBITUMINOUS COURT, SEE CIVILNOTES :1.ALLOW A MINIMUM OF 3' FROM SIDELINE TO EDGE OF PAVEMENT.2.PAINT STRIPING 2" THICK, DIMENSIONING TO CENTER OF LINES5'41'4'3'54'5'3'16'5'12'15'18'-9"6'1'-3"15'7'-3"6'16'5'BASKETBALL COURT PLAYINGAREA TO BE BLUE, SURROUNDINGAREA TO BE GREEN,SEE SPECS2' MIN.2'x2' BASKETBALL GOAL CONCRETE FOOTING(REF. E/L402)R6'R22'R5'5"CRUSHED LIMESTONE COMPACTED,CROWN IN CENTER.95% COMPACTED SUBGRADE (ASTM D1557)4'GEOTEXTILE FABRIC (TURN UP AT SIDES),INCIDENTAL TO GRADING14"X5" STEEL EDGER AT EDGECRUSHED AGGREGATE WALK WITH STEEL EDGERSCALE: N.T.S.BL302SALVAGED ROCK AGGREGATE6"WOOD MULCH, INCIDENTAL,REFER TO SPECSAPPLY 2 INCHES TESTED /APPROVED COMPOST AND 8"SALVAGED TOPSOIL,INCIDENTALUNCOMPACT/LOOSEN BASESOILS TO 12" DEPTHSEDGE CONDITION VARIES,SEE PLANSVARIES, SEE PLANSNOTES:1.REMOVE ALL EXISTING VEGETATION, WEEDS, AND MULCH.2.HAND LOOSEN ROOTS OF CONTAINERIZED MATERIAL, TYP.3.REFER TO LAYOUT SHEETS FOR EDGE CONDITION4.VERIFY A FREE-DRAINING SUBBASE EXISTS WITH PROJECT MANAGER PRIOR TO INSTALLING SOILS4.1.IF NOT, CONTRACTOR REQUIRED TO LOOSEN BASE MATERIALS. SEE SPECS3"1'1'1"SPACE AS SHOWN ON PLANSPLANTING BED RENOVATIONSSCALE: N.T.S.CL3024'-0"4'-0"CONTRACTOR TO BORE UNDERCROWN DRIPLINE OF TREEMAINTAIN FINISHED GRADE WITHTHE TREE PROTECTION FENCEUNLESS OTHERWISE INDICATEDON THE PLANSCONTRACTOR CAN EXCAVATEOPEN TRENCH OUTSIDE OFTHE DROWN DRIPLINETREE PROTECTION FENCE: HIGHDENSITY POLYETHYLENE FENCINGWITH 3.5" X 1.5" OPENINGS; COLOR:ORANGE; STEEL POSTS INSTALLEDAT 8' O.C.2' X 6' STEEL POSTS ORAPPROVED EQUALCROWN DRIPLINE OR OTHER LIMIT OF TREE PROTECTION AREA; SEE TREE PRESERVATION FENCING ON PLANS FOR ALIGNMENTADJACENT MATERIAL VARIES,REFER TO PLANSTREE PROTECTION FENCINGDL3022 FT DIAMETER BASKETBALL GOAL CONCRETE FOOTINGSCALE: N.T.S.EL302PLAN VIEW24" DIAMETER CONCRETE FOOTINGBASKETBALL POSTEXPANSION JOINT WITH SEALANTFOOTER PER MANUFACTURERSPECIFICATIONS. CONTRACTOR TOSUBMIT SHOP DRAWINGS PRIOR TOINSTALL.2'2'NOTE:48" MIN. FROST FOOTINGSheet Number:12.12.2575% CD SETDESCRIPTIONKEYProject Number:Date:Drawn by:Checked By:CLIENT: PROJECT:Gabrielle Grinde, PLA (MN)Registration No.Date021-02002.24.26I hereby certify that this plan wasprepared by me or under my directsupervision and that I am a dulylicensed Landscape Architect under thelaws of the State of Minnesota.L302DATE504169990 101st St NE Otsego, MN 55362 LILYPOND PARK CITY OF OTSEGO 02.24.26HSGG, AB800 WASHINGTON AVE N. #207MINNEAPOLIS, MN 55401www.hkgi.com01.14.26100% REVIEW SET02.24.26BID SETLANDSCAPEDETAILS PROPOSAL BY: Tim Solomonson | PLA(MN) | CPSI Project Manager | Architectural Liaison PREPARED FOR: City of Otsego, MN LILY POND PARK PLAYGROUND RENOVATION BASE PROJECT + ALTERNATES PROPOSAL JANUARY 6, 2026 Lily Pond Park Midwest Playscapes | Playground Renovation Proposal: JANUARY 6, 2026 To: Nick Jacobs – Parks Director – City of Otsego From: Tim Solomonson – Project Manager – Midwest Playscapes Mr. Jacobs, We are pleased to present our proposals for the City’s playground renovation at Lily Pond Park. Our proposal includes a base project quote that meets the City’s desire for a playground with a unitary surface network and meets the $175,000 budget requirements. Our proposal also includes two alternates options for a zipline, each in a distinct location. Midwest Playscapes is prepared to collaboratively review our proposal with the Parks & Recreation Commission to finalize equipment selections, colors, and layout if desired. With Gratitude. Sincerely, Tim Solomonson – Project Manager | PLA(MN) | CPSI January 6, 2026 COZYCOCOON QUATT R O SEESA W 7'-6" 2-Bay Swing TRANSFERSTATIONW/ STEP36"0,92M60"1,53M72"1,83M96"2,44M4707ZZCH4707ZZCH 4707ZZCH4707ZZCH4707ZZCH4707ZZCH4707ZZCH4707ZZCH TRANSFERSTATIONTRANSFERSTATIONF.P.F.P.243896"3150124"3150124"3759148"3759148"3759148"3759148"3455136"3455136"3455136"GEOCLIMBERZIG-ZAGSLIDEPOSTMOUNTDRUMVERTICLIMBERMIGHTYDESCENTSLIDETWISTEDCLIMBERCONVERGECLIMBERHORIZONTALLOOP LADDERW/ ACCESSLADDERLEGLIFTANYWHERESEAT(under slide)RIBBONCLIMBERPOSTMOUNTWHEELADASTAIRSADASTAIRS36"36"5690224"5690224"5690224"5690224"3455136"4674184"4674184"PLAYSOLEIL(Qty. 4)EXISTING METAL PICNIC SHELTER EX. PLANT BED EX.PLANTBED TRAN S F E R STATI O N W/ ST E P 36"0,92M 3150124" 3150124" 3150124" 3150124"223588" 223588" 223588" CLIMB I N G SQUA R E ACCE S S I B L E BELL PANE L POST MOU N T DRU M 36" (0, 9 2 M ) R I S E VERTI C A L ' S ' CRA W L T U B E 90° GLID E SLIDE TRANS F E R STATI O N W/ ST E P CLIMBI N G SQUAR E ACCES S I B L E BELL PANEL 36" (0, 9 2 M ) R I S E VERTIC A L ' S ' CRAWL TUBE 90° GLIDE SLIDE TWIST'N TURN EX. PLANT BED S-CU R V E BALA N C E BEA MFLOWERCLIMBER 626 SF CFH: 4FT 184SF CFH: 8FT 224SFCFH:8FT110SFCFH:8FT 370SF CFH: 8FT EXI S T I N G ME T A L PIC N I C SH E L T E R EX. PL A N T BE D EX.PLANTBED EX. PL A N T BE D BPaper SizeDESIGN OPTIONAGE GROUP:TOTAL AREA:PERIMETER:DATE:SCALE:PROJECT NO:FALL HEIGHT:*PLAYGROUND SUPERVISION REQUIREDDRAWN BY:ASTM F1487-CPSC #325AS-4685-LILY POND PARK12-23-25Tim Solomonson5300 SqFt.200 Ft.VARIES (MAX 7.5FT)2-1211140'5'30'10'1/16" = 1'-0"20'NORTHADD ALTERNATE 1:ADA ZOOMTRAX AREAADD ALTERNATE 2: ZIPLINE AREABASE PROJECT:2-12 PLAY AREANORTHLAYOUT REFERENCENORTH Project:Otsego - Lily Pond Park Sourcewell Info:Phone:763-334-3170 Contact:Nick Jacobs Playworld Systems: #010521-LTS-8 Fax: Ship To:Bill To: Email:njacobs@otsegomn.gov Customer Name / Contract #:Date:1/6/26 Shipping Contact: tims@midwestplayscapes.com Qty Design / Item Description Unit Price Total Border/Surfacing 90 TON Container Drain Aggregate (3-4" depth) + Tile 55.00$ 4,950.00$ 166 CY Engineered Wood Fiber 25.00$ 4,150.00$ 1145 SF Poured-in-place Safety Surface 19.17$ 21,949.65$ 1145 SF Poured-in-place Aggregate Base 4.69$ 5,370.05$ Play Equipment 1 350-2204 Challengers - Adventure Mountain (Ages 5-12)66,500.00$ 66,500.00$ 1 350-2231 Challengers (Ages 2-5) w/ Slide & Tunnel 18,000.00$ 18,000.00$ 1 ZZXX1361 Turf Twister 3,750.00$ 3,750.00$ 1 ZZXX0483 Cozy Cocoon 4,531.00$ 4,531.00$ 1 ZZXX0600 Quattro Seesaw 9,734.00$ 9,734.00$ 1 ZZXX0584 Sidewinder Cycle w/ Sidecar 4,034.00$ 4,034.00$ 1 ZZXX1362 Turn 'N Twist 1,288.00$ 1,288.00$ 1 ZZXX0479 Flower Climber 2,006.00$ 2,006.00$ 1 ZZXX1020 S-Curve Balance Beam 916.00$ 916.00$ 1 ZZXX0818 Single Post Swing 1,791.00$ 1,791.00$ 1 ZZXX00819 Single Post Swing Add a Bay 1,231.00$ 1,231.00$ 2 ZZXX0260 Belt Seats 187.00$ 374.00$ 1 ZZXX0892 Accessible Swing Seat 1,631.00$ 1,631.00$ 1 ZZXX0265 Tot Swing Seat 324.00$ 324.00$ Installation 24,963.65$ Sourcewell Discount (10%)(9,811.00)$ on non-sale items Subtotal $167,682.35 Freight 7,262.48$ Tax Exempt #________________________ * Please provide certificate Sales Tax Local Sales Tax Total 174,944.83$ Any Insurance requirements above $1,000,000 General Liability will be subject to a surcharge Name: ____________________________ Signed: ___________________________ Date: _____________________________ QUOTATION - BASE PROJECT UNLESS OTHERWISE NOTED, prices shown are material only. They DO NOT include: assembly, installation, border, safety surfacing, drain tile, geotextile fabric, removal of existing equipment, site preparation, excavation or site restoration, unloading of equipment, disposal of packaging material, storage of equipment, additional insurance and bonding would be extra, unless otherwise stated above. If playground equipment or materials are stored off site, customer is responsible for transporting equipment to job site. Prices firm for 30 days, subject to review thereafter. Our terms are net 30. A finance charge of 1.5% will be imposed on the outstanding balance unpaid for more than 30 days after the shipment of materials. Equipment shall be invoiced separately from other services and shall be payable in advance of those services and project completion. Retainage not accepted. Once customer has signed quotation, your order cannot be changed or canceled. Please allow 3to4 weeks for delivery after receipt of order. Standard manufacturing design, specification, and construction apply unless noted otherwise. Customer is responsible for the identification of all underground utilities. Area must be accessible to Bobcat and other equipment necessary for installation or additional fees will be charged. Freight quote is based on customer unloading equipment and checking in all equipment for any missing parts. If product is refused by customer upon delivery for any reason (unless damaged), without prior authorization from Midwest Playscapes, Inc., the customer agrees to pay 20% restocking fee plus freight charges. Price does not include prevailing wages, unless otherwise noted. If we can be of Other Assistance, please feel free to contact us. City to Perform Equipment and EWF Removals, Container Prep., and Restoration. Assumes Reuse of Existing Container Project:Otsego - Lily Pond Park Sourcewell Info:Phone:763-334-3170 Contact:Nick Jacobs Playworld Systems: #010521-LTS-8 Fax: Ship To:Bill To: Email:njacobs@otsegomn.gov Customer Name / Contract #:Date:1/6/26 Shipping Contact: tims@midwestplayscapes.com Qty Design / Item Description Unit Price Total Border/Surfacing 47 TON Container Drain Aggregate (3-4" depth) + Tile 55.00$ 2,585.00$ 84 CY Engineered Wood Fiber 25.00$ 2,100.00$ 87 LF Conc. Container Edger 42.00$ 3,654.00$ 48 CY Container Excavation 55.00$ 2,640.00$ 370 SF Poured-in-place Safety Surface 19.17$ 7,092.90$ 370 SF Poured-in-place Aggregate Base 4.69$ 1,735.30$ Play Equipment 1 ZZXX1138 Zoomtrax w/ Accessible Seat 14,725.00$ 14,725.00$ Installation 3,681.25$ Sourcewell Discount (10%)(1,472.50)$ on non-sale items Subtotal $36,740.95 Freight 2,800.00$ Tax Exempt #________________________ * Please provide certificate Sales Tax Local Sales Tax Total 39,540.95$ Any Insurance requirements above $1,000,000 General Liability will be subject to a surcharge Name: ____________________________ Signed: ___________________________ Date: _____________________________ QUOTATION - ADD ALTERNATE 1 City to Perform Equipment and EWF Removals, Container Prep., and Restoration. Assumes Reuse of Existing Container UNLESS OTHERWISE NOTED, prices shown are material only. They DO NOT include: assembly, installation, border, safety surfacing, drain tile, geotextile fabric, removal of existing equipment, site preparation, excavation or site restoration, unloading of equipment, disposal of packaging material, storage of equipment, additional insurance and bonding would be extra, unless otherwise stated above. If playground equipment or materials are stored off site, customer is responsible for transporting equipment to job site. Prices firm for 30 days, subject to review thereafter. Our terms are net 30. A finance charge of 1.5% will be imposed on the outstanding balance unpaid for more than 30 days after the shipment of materials. Equipment shall be invoiced separately from other services and shall be payable in advance of those services and project completion. Retainage not accepted. Once customer has signed quotation, your order cannot be changed or canceled. Please allow 3to4 weeks for delivery after receipt of order. Standard manufacturing design, specification, and construction apply unless noted otherwise. Customer is responsible for the identification of all underground utilities. Area must be accessible to Bobcat and other equipment necessary for installation or additional fees will be charged. Freight quote is based on customer unloading equipment and checking in all equipment for any missing parts. If product is refused by customer upon delivery for any reason (unless damaged), without prior authorization from Midwest Playscapes, Inc., the customer agrees to pay 20% restocking fee plus freight charges. Price does not include prevailing wages, unless otherwise noted. If we can be of Other Assistance, please feel free to contact us. Project:Otsego - Lily Pond Park Sourcewell Info:Phone:763-334-3170 Contact:Nick Jacobs Playworld Systems: #010521-LTS-8 Fax: Ship To:Bill To: Email:njacobs@otsegomn.gov Customer Name / Contract #:Date:1/6/26 Shipping Contact: tims@midwestplayscapes.com Qty Design / Item Description Unit Price Total Border/Surfacing 62 TON Container Drain Aggregate (3-4" depth) + Tile 55.00$ 3,410.00$ 112 CY Engineered Wood Fiber 25.00$ 2,800.00$ 140 CY Container Excavation 55.00$ 7,700.00$ Play Equipment 1 ZZXX1145 LiveWire Zip Line 26,117.00$ 26,117.00$ Installation 6,137.50$ Sourcewell Discount (10%)(2,611.70)$ on non-sale items Subtotal $43,552.80 Freight 2,250.00$ Tax Exempt #________________________ * Please provide certificate Sales Tax Local Sales Tax Total 45,802.80$ Any Insurance requirements above $1,000,000 General Liability will be subject to a surcharge Name: ____________________________ Signed: ___________________________ Date: _____________________________ QUOTATION - ADD ALTERNATE 2 Spade Edge Container (No Container Edger - Grass Lawn meets EWF) UNLESS OTHERWISE NOTED, prices shown are material only. They DO NOT include: assembly, installation, border, safety surfacing, drain tile, geotextile fabric, removal of existing equipment, site preparation, excavation or site restoration, unloading of equipment, disposal of packaging material, storage of equipment, additional insurance and bonding would be extra, unless otherwise stated above. If playground equipment or materials are stored off site, customer is responsible for transporting equipment to job site. Prices firm for 30 days, subject to review thereafter. Our terms are net 30. A finance charge of 1.5% will be imposed on the outstanding balance unpaid for more than 30 days after the shipment of materials. Equipment shall be invoiced separately from other services and shall be payable in advance of those services and project completion. Retainage not accepted. Once customer has signed quotation, your order cannot be changed or canceled. Please allow 3to4 weeks for delivery after receipt of order. Standard manufacturing design, specification, and construction apply unless noted otherwise. Customer is responsible for the identification of all underground utilities. Area must be accessible to Bobcat and other equipment necessary for installation or additional fees will be charged. Freight quote is based on customer unloading equipment and checking in all equipment for any missing parts. If product is refused by customer upon delivery for any reason (unless damaged), without prior authorization from Midwest Playscapes, Inc., the customer agrees to pay 20% restocking fee plus freight charges. Price does not include prevailing wages, unless otherwise noted. If we can be of Other Assistance, please feel free to contact us. LILY POND PARK IMPROVEMENTS CITY COUNCIL MEETING February 23rd, 2026 Lily Pond Park - 2026 Final Site Plan Otsego, MN Agenda 1] Project Overview 2] Proposed Park Design 3] Cost Estimates 4] Next Steps 1] PROJECT OVERVIEW Lily Pond Park - 2026 Final Site Plan Otsego, MN PROJECT STATUS + SCHEDULE UPDATES COMPLETEDREMAINING• June - July 2025: Community Engagement • Aug - Sept 2025: Prepare Preferred Master Plan and Cost Estimate • Oct 2025: Park Commission Meeting #3 - Final Plan was Approved • Nov 2025: Site Survey was Received • Today: Present Site Plan and Final Cost Estimate • Feb 9th: 100% Bid Set and Project Manual due to City • Today: Request Council Authorization to Bid and Potential Playground Order • March 18th: Bid Opening • March 23rd: Bid Award at City Council Meeting • May: Construction Start • Mid-August: Construction Completion Lily Pond Park - 2026 Final Site Plan Otsego, MN PROJECT GOALS • $580k Budget • Top Priorities »Tennis Court »Playground »Trails • Other Priorities Include »Basketball Court »Parking Lot »Other Site Improvements: Furnishings, Irrigation, etc. 2] PROPOSED PARK DESIGN Lily Pond Park - 2026 Final Site Plan Otsego, MN PREFERRED CONCEPT RESTORATION AREA, RESTORE TO TURF PRE-FAB RESTROOM ENCLOSURE (SEE SPEC) ON 12'X12' CONCRETE PAD HALF COURT BASKETBALL COURT WITH STRIPING (A/L302) BASKETBALL HOOP SYSTEM, SEE SPECS TENNIS/ PICKLEBALL COURT STRIPING (REF. A,B/L301) CONCRETE PATH, SEE CIVIL CONCRETE PATH, SEE CIVIL 8 FT TENNIS COURT ENTRANCE/ EXIT (NO FENCE) ALTERNATE: ZIP LINE WITH ENGINEERED WOOD FIBER, BY OTHERS PARKING LOT REPLACEMENT, SEE CIVIL RESURFACE EXISTING BITUMINOUS TRAIL EXISTING SITE FURNISHINGS ON CONCRETE PADS (TO REMAIN, UNLESS NOTED OTHERWISE) NEW CONCRETE RAMP, SEE CIVIL 8' BLACK CHAINLINK TENNIS COURT FENCE (REF. B/L300) 18" CONCRETE MAINTENANCE EDGE (REF. A/L300) TENNIS NETTING SYSTEM, SEE SPECS CRUSHED LIMESTONE WALK WITH STEEL EDGER (REF. B/L302), SEE SPECS RESTORATION AREA, RESTORE TO TURF RESTORATION AREA, RESTORE TO TURF UPDATED PLAYGROUND WITH EWF AND PIP SURFACING, BY OTHER UPDATED PLANTING AREA8'EXISTING CURBING TO REMAIN EXISTING STRUCTURE TO REMAIN BITUMINOUS COURT PAVEMENT, SEE CIVIL BITUMINOUS COURT PAVEMENT, SEE CIVIL 5'116'REMOVE ALL EXISTING PLANTS, WEEDS, AND MULCH. ADD 2" COMPOST, NEW PLANTS, AND MULCH.5'4'8'UPDATED PLAYGROUND WITH EWF AND PIP SURFACING, BY OTHERS ALTERNATE: STEEL EDGING AROUND ZIPLINE 2 7 ' EXISTING CONCRETE TO REMAIN 8 FT TENNIS COURT ENTRANCE/ EXIT (NO FENCE) 12'12'Sheet Number: 12.12.2575% CD SET DESCRIPTIONKEY Project Number: Date: Drawn by: Checked By:CLIENT:PROJECT:Gabrielle Grinde, PLA (MN) Registration No. Date 021-020 02.24.26 I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly licensed Landscape Architect under the laws of the State of Minnesota. L100 DATE 50416 9990 101st St NEOtsego, MN 55362LILYPOND PARKCITY OF OTSEGO02.24.26 HS GG, AB 800 WASHINGTON AVE N. #207 MINNEAPOLIS, MN 55401 www.hkgi.com 01.14.26100% REVIEW SET 02.24.26BID SET LANDSCAPE LAYOUTNORTH 00 30'60' LEGEND: PROPOSED CONCRETE BITUMINOUS RESURFACING PLAYGROUND SURFACING, BY OTHERS ENGINEERED WOOD FIBER (EWF), BY OTHERS REMOVE AND REPAVE EXISTING PARKING LOT NEW BITUMINOUS COURT (GREEN) NEW BITUMINOUS COURT (BLUE) EXISTING CONCRETE UPDATED PLANTING BED REMOVED FEATURES RESTORED AREA WORK LIMITS • Key Features »Update Playground »Replace Tennis Court/ Add Pickleball Striping »New Half Court Basketball »Resurface Parking Lot »Resurface Trails »Remove Existing Trail Segments »Add Zip Line (Alternate) Lily Pond Park - 2026 Final Site Plan Otsego, MN TENNIS COURT TENNIS COURT STRIPINGA L301 36' 27' 4'-6"13'-6" 3' 18' 21' 78' 42' NET O.C. 60' 120' 12'12' 21' 7'-6" TYP. 8' TYP. MEASURE TO CENTER OF LINE TENNIS COURT PLAYING AREA TO BE BLUE, SURROUNDING COURT TO BE GREEN SEE SPECS TENNIS LINES TO BE WHITE INCLUDE CENTER STRAP ON NET BITUMINOUS PAVEMENT, SEE CIVIL 8 FT BLACK CHAINLINK FENCE (REF. B/L300) 18" CONCRETE MAINTENANCE EDGE (REF. A/L300) NET POSTS, SEE SPEC 8' 8' ENTRANCE (NO GATE) SEE PICKLEBALL STRIPING DETAIL FOR DIMENSIONS (B/L301) 8' ENTRANCE (NO GATE) 8' PICKLEBALL STRIPING ON TENNIS COURTB L301 20' 10' 15' 14'44' 8' 8' 8' 44' 20'20' MEASURE TO CENTER OF LINE PICKLEBALL LINES TO BE YELLOW MEASURE TO CENTER OF LINE PICKLEBALL LINES TO BE YELLOW BITUMINOUS PAVEMENT, SEE CIVIL SEE TENNIS COURT STRIPING DETAIL FOR TENNIS LINE DIMENSIONS (A/L301) Sheet Number: 12.12.2575% CD SET DESCRIPTIONKEY Project Number: Date: Drawn by: Checked By:CLIENT:PROJECT:Gabrielle Grinde, PLA (MN) Registration No. Date 021-020 02.24.26 I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly licensed Landscape Architect under the laws of the State of Minnesota. L301 DATE 50416 9990 101st St NEOtsego, MN 55362LILYPOND PARKCITY OF OTSEGO02.24.26 HS GG, AB 800 WASHINGTON AVE N. #207 MINNEAPOLIS, MN 55401 www.hkgi.com 01.14.26100% REVIEW SET 02.24.26BID SET LANDSCAPEDETAILS TENNIS NETTENNIS NET BLACK POWDER COATED COURT FENCINGBLACK POWDER COATED COURT FENCINGCOURT LAYOUTCOURT LAYOUT ADJUSTABLE CENTER STRAPADJUSTABLE CENTER STRAP SIDEWINDER POSTSSIDEWINDER POSTS Lily Pond Park - 2026 Final Site Plan Otsego, MN BASKETBALL COURT 50'X60' BASKETBALL COURT STRIPING LAYOUT SCALE: N.T.S. A L302 BASKETBALL HOOP SYSTEM, SEE SPEC BITUMINOUS COURT, SEE CIVIL NOTES : 1.ALLOW A MINIMUM OF 3' FROM SIDELINE TO EDGE OF PAVEMENT. 2.PAINT STRIPING 2" THICK, DIMENSIONING TO CENTER OF LINES 5' 41' 4' 3'54' 5' 3' 16' 5' 12' 15' 18'-9" 6' 1'-3" 15' 7'-3" 6'16'5' BASKETBALL COURT PLAYING AREA TO BE BLUE, SURROUNDING AREA TO BE GREEN,SEE SPECS 2' MIN. 2'x2' BASKETBALL GOAL CONCRETE FOOTING (REF. E/L402) R6' R22' R5' 5" CRUSHED LIMESTONE COMPACTED, CROWN IN CENTER. 95% COMPACTED SUBGRADE (ASTM D1557) 4' GEOTEXTILE FABRIC (TURN UP AT SIDES), INCIDENTAL TO GRADING 14"X5" STEEL EDGER AT EDGE CRUSHED AGGREGATE WALK WITH STEEL EDGER SCALE: N.T.S. B L302 SALVAGED ROCK AGGREGATE 6" WOOD MULCH, INCIDENTAL, REFER TO SPECS APPLY 2 INCHES TESTED / APPROVED COMPOST AND 8" SALVAGED TOPSOIL, INCIDENTAL UNCOMPACT/LOOSEN BASE SOILS TO 12" DEPTHS EDGE CONDITION VARIES, SEE PLANS VARIES, SEE PLANS NOTES:1.REMOVE ALL EXISTING VEGETATION, WEEDS, AND MULCH.2.HAND LOOSEN ROOTS OF CONTAINERIZED MATERIAL, TYP.3.REFER TO LAYOUT SHEETS FOR EDGE CONDITION 4.VERIFY A FREE-DRAINING SUBBASE EXISTS WITH PROJECT MANAGER PRIOR TO INSTALLING SOILS 4.1.IF NOT, CONTRACTOR REQUIRED TO LOOSEN BASE MATERIALS. SEE SPECS 3"1'1'1"SPACE AS SHOWN ON PLANS PLANTING BED RENOVATIONS SCALE: N.T.S. C L302 4'-0"4'-0"CONTRACTOR TO BORE UNDERCROWN DRIPLINE OF TREE MAINTAIN FINISHED GRADE WITHTHE TREE PROTECTION FENCEUNLESS OTHERWISE INDICATEDON THE PLANSCONTRACTOR CAN EXCAVATEOPEN TRENCH OUTSIDE OFTHE DROWN DRIPLINETREE PROTECTION FENCE: HIGHDENSITY POLYETHYLENE FENCINGWITH 3.5" X 1.5" OPENINGS; COLOR:ORANGE; STEEL POSTS INSTALLEDAT 8' O.C.2' X 6' STEEL POSTS ORAPPROVED EQUALCROWN DRIPLINE OR OTHER LIMIT OF TREE PROTECTION AREA; SEE TREE PRESERVATION FENCING ON PLANS FOR ALIGNMENTADJACENT MATERIAL VARIES,REFER TO PLANSTREE PROTECTION FENCINGDL3022 FT DIAMETER BASKETBALL GOAL CONCRETE FOOTING SCALE: N.T.S.EL302 PLAN VIEW 24" DIAMETER CONCRETE FOOTINGBASKETBALL POSTEXPANSION JOINT WITH SEALANTFOOTER PER MANUFACTURERSPECIFICATIONS. CONTRACTOR TOSUBMIT SHOP DRAWINGS PRIOR TOINSTALL.2'2'NOTE:48" MIN. FROST FOOTING Sheet Number: 12.12.2575% CD SET DESCRIPTIONKEY Project Number: Date: Drawn by: Checked By:CLIENT:PROJECT:Gabrielle Grinde, PLA (MN)Registration No.Date 021-020 02.24.26I hereby certify that this plan wasprepared by me or under my directsupervision and that I am a dulylicensed Landscape Architect under thelaws of the State of Minnesota. L302 DATE 50416 9990 101st St NEOtsego, MN 55362LILYPOND PARKCITY OF OTSEGO02.24.26 HS GG, AB 800 WASHINGTON AVE N. #207MINNEAPOLIS, MN 55401www.hkgi.com 01.14.26100% REVIEW SET 02.24.26BID SET LANDSCAPEDETAILS DOUGLAS INDUSTRIES, INC.3441 S 11TH AVE. ELDRIDGE, IA 52748 TOLL FREE: 1-800-553-8907www.douglas-sports.com SELECT DESIRED GOOSENECK COMPLETE PACKAGE SYSTEM: 5-9/16 RST: 5-9/16" OD POLE, 42" X 60" STEEL BACKBOARD AND DURA GOAL I (ITEM #69450) 5-9/16 RPGR: 5-9/16" OD POLE, 42" X 60" ACRYLIC BACKBOARD AND PRESSURE FLEX GOAL (ITEM #69451) APPROX 72" TO FACE OF HARDWARE PROVIDED IN RIM OR BACKBOARD 9' 6" OR 9' 6 1/2"BACKBOARD A 24" DIA X 48" DEEP HOLE WILL REQUIRE 8-10 ONE-THIRD CUBIC FOOT BAGS OF PRE-MIX CONCRETE. ACTUAL USAGE MAY VARY DEPENDING ON HOLE SIZE AND SHAPE. SOME BENDING OF BACKBOARD BRACES MAY BE NEEDED FOR INSTALLATION. 24" DIA. MINIMUM REGULATION HEIGHT: 10'-0"(REFERENCE ONLY)BAND CLAMP PREVENTS POST FROM TURNING IN THE CONCRETE SIDE VIEWMANUFACTURERS NOTES: 1.ZINC PLATED POLE AND HARDWARE. 2.DIRECT GOAL MOUNT DESIGN IMPROVES BACKBOARD DURABILITY. 3.HEAVY-DUTY 1-5/8" BACKBOARD SUPPORT BRACES. 4. 5-9/16" O.D. SCHEDULE 40 STEEL 5. 72" SAFE PLAY AREA. 6. LIMITED LIFETIME WARRANTY. 7. 48" GROUND BURY FOR STABILITY EVEN IN DEEP FROST REGIONS. NOTES: 1.INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 2.DO NOT SCALE DRAWING. 3.THIS DRAWING IS INTENDED FOR USE BY ARCHITECTS, ENGINEERS, CONTRACTORS, CONSULTANTS AND DESIGN PROFESSIONALSBURY 48"FOR PLANNING PURPOSES ONLY. THIS DRAWING MAY NOT BE USED FOR CONSTRUCTION. 4. ALL INFORMATION CONTAINED HEREIN WAS CURRENT AT THE TIME OF DEVELOPMENT BUT MUST BE REVIEWED AND APPROVED BY THE PRODUCT MANUFACTURER TO BE CONSIDERED ACCURATE. 5. CONTRACTOR'S NOTE: FOR PRODUCT AND COMPANY INFORMATION VISIT www.CADdetails.com/info AND ENTER REFERENCE NUMBER 2763-046. FIXED BASKETBALL SYSTEMS 5-9/16" GOOSENECK PACKAGE SYSTEMS (39180M) 2763-046 REVISION DATE 07/08/2024 PROTECTED BY COPYRIGHT ©2024 CADDETAILS.COM LTD.CADdetails.com COURT LAYOUTCOURT LAYOUT BASKETBALL HOOP SYSTEMBASKETBALL HOOP SYSTEM Lily Pond Park - 2026 Final Site Plan Otsego, MN RESTROOM ENCLOSURE SCREENED PORTABLE RESTROOM ENCLOSURESCREENED PORTABLE RESTROOM ENCLOSURE Lily Pond Park - 2026 Final Site Plan Otsego, MN PLAYGROUND WHAT WE HEARD • 61% Prefer New Equipment »23% opted to refurnish/repair equipment »9% voted to keep the existing equipment • Playground Style »40% voted for Adventure/Climbing Play »33% voted for Traditional Play »12% voted for Nature Inspired Play • Top Accessible Features »Paved paths (39%) »Accessible swings (37%) »Accessible spinning play (36%) • Top Playground Design Components »Dynamic movement (64%) »Climbing components (60%) »Traditional swings (49%) »Multi-generational play (42%) »Age separation (33%) »Group swings (30%) Lily Pond Park - 2026 Final Site Plan Otsego, MN PLAYGROUND LAYOUT COZYCOCOONQUATTROSEESAW7'-6"2-BaySwingTRANSFER STATION W/ STEP 36"0,92M 60"1,53M 72"1,83M 96"2,44M4707ZZCH 4707ZZCH4707ZZCH4707ZZCH4707ZZCH4707ZZCH4707ZZCH4707ZZCHTRANSFERSTATIONTRANSFERSTATIONF.P.F.P.243896" 3150124" 3150124" 3759148"3759148" 3759148"3759148" 3455136" 3455136" 3455136" GEOCLIMBER ZIG-ZAG SLIDE POSTMOUNT DRUM VERTICLIMBER MIGHTYDESCENT SLIDE TWISTED CLIMBER CONVERGE CLIMBER HORIZONTALLOOP LADDER W/ ACCESS LADDER LEG LIFT ANYWHERE SEAT(under slide) RIBBONCLIMBER POST MOUNT WHEEL ADASTAIRS ADASTAIRS 36" 36" 5690224" 5690224" 5690224" 5690224" 3455136" 4674184" 4674184" PLAYSOLEIL(Qty. 4)EXISTINGMETALPICNICSHELTEREX.PLANTBEDEX.PLANTBEDTRANSFERSTATIONW/ STEP36"0,92M3150124"3150124"3150124"3150124"223588"223588"223588"CLIMBINGSQUAREACCESSIBLEBELLPANELPOSTMOUNTDRUM36" (0,92M) RISEVERTICAL 'S'CRAWL TUBE90°GLIDESLIDETRANSFERSTATIONW/ STEPCLIMBINGSQUAREACCESSIBLEBELLPANEL36" (0,92M) RISEVERTICAL 'S'CRAWLTUBE90°GLIDESLIDETWIST'NTURNEX.PLANTBEDS-CURVEBALANCEBEAMFLOWERCLIMBER626 SFCFH:4FT184SFCFH:8FT224SFCFH:8FT110SFCFH:8FT370SFCFH:8FTEXISTINGMETALPICNICSHELTEREX.PLANTBEDEX.PLANTBEDEX.PLANTBEDBPaper Size DESIGN OPTION AGE GROUP: TOTAL AREA: PERIMETER: DATE: SCALE:PROJECT NO: FALL HEIGHT: *PLAYGROUND SUPERVISION REQUIRED DRAWN BY: ASTM F1487- CPSC #325AS-4685-LILY POND PARK12-23-25 Tim Solomonson 5300 SqFt. 200 Ft. VARIES (MAX 7.5FT) 2-12 1114 0'5'30'10' 1/16" = 1'-0" 20' NORTH ADD ALTERNATE 1: ADA ZOOMTRAX AREA ADD ALTERNATE 2: ZIPLINE AREA BASE PROJECT: 2-12 PLAY AREA NORTH LAYOUT REFERENCE NORTH • Midwest Playscapes »Playworld • Key Features »Challengers - Adventure Mountain (Ages 5-12) »Challengers (Ages 2-5) w/ Slide Tunnel »Turf Twister »Cozy Cocoon »Quattro Seesaw »Sidewinder Cycle w/ Sidecar »Turn ‘N Twist »Flower Climber »S-Curve Balance Beam »Swing Set Lily Pond Park - 2026 Final Site Plan Otsego, MN PLAYGROUND BIRD’S-EYE VIEW LOOKING SOUTHWESTBIRD’S-EYE VIEW LOOKING SOUTHWEST BIRD’S-EYE VIEW LOOKING NORTHEASTBIRD’S-EYE VIEW LOOKING NORTHEAST Lily Pond Park - 2026 Final Site Plan Otsego, MN PLAYGROUND CHALLENGERS CHALLENGERS (AGES 5-12)(AGES 5-12) ADVENTURE MOUNTAIN ADVENTURE MOUNTAIN CHALLENGERS (AGES 2-5) W/ SLIDE AND TUNNELCHALLENGERS (AGES 2-5) W/ SLIDE AND TUNNEL Lily Pond Park - 2026 Final Site Plan Otsego, MN PLAYGROUND ZIP LINE (ALTERNATE) LIVEWIRE ZIP LINELIVEWIRE ZIP LINE 4] COST ESTIMATES Lily Pond Park - 2026 Final Site Plan Otsego, MN COST ESTIMATE PLAYGROUND $175K IS THE PLAYGROUND TARGET BUDGET Project:Otsego - Lily Pond Park Sourcewell Info:Phone:763-334-3170 Contact:Nick Jacobs Playworld Systems: #010521-LTS-8 Fax: Ship To:Bill To: Email:njacobs@otsegomn.gov Customer Name / Contract #:Date:1/6/26 Shipping Contact: tims@midwestplayscapes.com Qty Design / Item Description Unit Price Total Border/Surfacing 90 TON Container Drain Aggregate (3-4" depth) + Tile 55.00$ 4,950.00$ 166 CY Engineered Wood Fiber 25.00$ 4,150.00$ 1145 SF Poured-in-place Safety Surface 19.17$ 21,949.65$ 1145 SF Poured-in-place Aggregate Base 4.69$ 5,370.05$ Play Equipment 1 350-2204 Challengers - Adventure Mountain (Ages 5-12)66,500.00$ 66,500.00$ 1 350-2231 Challengers (Ages 2-5) w/ Slide & Tunnel 18,000.00$ 18,000.00$ 1 ZZXX1361 Turf Twister 3,750.00$ 3,750.00$ 1 ZZXX0483 Cozy Cocoon 4,531.00$ 4,531.00$ 1 ZZXX0600 Quattro Seesaw 9,734.00$ 9,734.00$ 1 ZZXX0584 Sidewinder Cycle w/ Sidecar 4,034.00$ 4,034.00$ 1 ZZXX1362 Turn 'N Twist 1,288.00$ 1,288.00$ 1 ZZXX0479 Flower Climber 2,006.00$ 2,006.00$ 1 ZZXX1020 S-Curve Balance Beam 916.00$ 916.00$ 1 ZZXX0818 Single Post Swing 1,791.00$ 1,791.00$ 1 ZZXX00819 Single Post Swing Add a Bay 1,231.00$ 1,231.00$ 2 ZZXX0260 Belt Seats 187.00$ 374.00$ 1 ZZXX0892 Accessible Swing Seat 1,631.00$ 1,631.00$ 1 ZZXX0265 Tot Swing Seat 324.00$ 324.00$ Installation 24,963.65$ Sourcewell Discount (10%)(9,811.00)$ on non-sale items Subtotal $167,682.35 Freight 7,262.48$ Tax Exempt #________________________ * Please provide certificate Sales Tax Local Sales Tax Total 174,944.83$ Any Insurance requirements above $1,000,000 General Liability will be subject to a surcharge Name: ____________________________ Signed: ___________________________ Date: _____________________________ QUOTATION - BASE PROJECT UNLESS OTHERWISE NOTED, prices shown are material only. They DO NOT include: assembly, installation, border, safety surfacing, drain tile, geotextile fabric, removal of existing equipment, site preparation, excavation or site restoration, unloading of equipment, disposal of packaging material, storage of equipment, additional insurance and bonding would be extra, unless otherwise stated above. If playground equipment or materials are stored off site, customer is responsible for transporting equipment to job site. Prices firm for 30 days, subject to review thereafter. Our terms are net 30. A finance charge of 1.5% will be imposed on the outstanding balance unpaid for more than 30 days after the shipment of materials. Equipment shall be invoiced separately from other services and shall be payable in advance of those services and project completion. Retainage not accepted. Once customer has signed quotation, your order cannot be changed or canceled. Please allow 3to4 weeks for delivery after receipt of order. Standard manufacturing design, specification, and construction apply unless noted otherwise. Customer is responsible for the identification of all underground utilities. Area must be accessible to Bobcat and other equipment necessary for installation or additional fees will be charged. Freight quote is based on customer unloading equipment and checking in all equipment for any missing parts. If product is refused by customer upon delivery for any reason (unless damaged), without prior authorization from Midwest Playscapes, Inc., the customer agrees to pay 20% restocking fee plus freight charges. Price does not include prevailing wages, unless otherwise noted. If we can be of Other Assistance, please feel free to contact us. City to Perform Equipment and EWF Removals, Container Prep., and Restoration. Assumes Reuse of Existing Container Project:Otsego - Lily Pond Park Sourcewell Info:Phone:763-334-3170 Contact:Nick Jacobs Playworld Systems: #010521-LTS-8 Fax: Ship To:Bill To: Email:njacobs@otsegomn.gov Customer Name / Contract #:Date:1/6/26 Shipping Contact: tims@midwestplayscapes.com Qty Design / Item Description Unit Price Total Border/Surfacing 62 TON Container Drain Aggregate (3-4" depth) + Tile 55.00$ 3,410.00$ 112 CY Engineered Wood Fiber 25.00$ 2,800.00$ 140 CY Container Excavation 55.00$ 7,700.00$ Play Equipment 1 ZZXX1145 LiveWire Zip Line 26,117.00$ 26,117.00$ Installation 6,137.50$ Sourcewell Discount (10%)(2,611.70)$ on non-sale items Subtotal $43,552.80 Freight 2,250.00$ Tax Exempt #________________________ * Please provide certificate Sales Tax Local Sales Tax Total 45,802.80$ Any Insurance requirements above $1,000,000 General Liability will be subject to a surcharge Name: ____________________________ Signed: ___________________________ Date: _____________________________ QUOTATION - ADD ALTERNATE 2 Spade Edge Container (No Container Edger - Grass Lawn meets EWF) UNLESS OTHERWISE NOTED, prices shown are material only. They DO NOT include: assembly, installation, border, safety surfacing, drain tile, geotextile fabric, removal of existing equipment, site preparation, excavation or site restoration, unloading of equipment, disposal of packaging material, storage of equipment, additional insurance and bonding would be extra, unless otherwise stated above. If playground equipment or materials are stored off site, customer is responsible for transporting equipment to job site. Prices firm for 30 days, subject to review thereafter. Our terms are net 30. A finance charge of 1.5% will be imposed on the outstanding balance unpaid for more than 30 days after the shipment of materials. Equipment shall be invoiced separately from other services and shall be payable in advance of those services and project completion. Retainage not accepted. Once customer has signed quotation, your order cannot be changed or canceled. Please allow 3to4 weeks for delivery after receipt of order. Standard manufacturing design, specification, and construction apply unless noted otherwise. Customer is responsible for the identification of all underground utilities. Area must be accessible to Bobcat and other equipment necessary for installation or additional fees will be charged. Freight quote is based on customer unloading equipment and checking in all equipment for any missing parts. If product is refused by customer upon delivery for any reason (unless damaged), without prior authorization from Midwest Playscapes, Inc., the customer agrees to pay 20% restocking fee plus freight charges. Price does not include prevailing wages, unless otherwise noted. If we can be of Other Assistance, please feel free to contact us.PLAYGROUND BASE BID TOTAL = $174,944.83 ZIP LINE (ALTERNATE) TOTAL = $45,802.80 Lily Pond Park - 2026 Final Site Plan Otsego, MN LILY POND PARK Owner: City of Otsego Hakanson Anderson - Cost Estimate BID SCHEDULE "A" Base Bid 1/27/26 Engineer Estimate Line Item Item Description UofM Quantity Unit Price Extension -$ 1 MOBILIZATION LS 1 25,000.00$ 25,000.00$ 2 SAW CUT ASPHALT PAVEMENT LF 177 5.00$ 885.00$ 3 SAW CUT CONCRETE CURB LF 2 100.00$ 200.00$ 4 REMOVE CONCRETE CURB LF 170 20.00$ 3,400.00$ 5 REMOVE ASPHALT PAVEMENT SY 3194 6.00$ 19,164.00$ 6 TRAIL MILLING LS 1 5,000.00$ 5,000.00$ 7 REMOVE PLAYGROUND EQUIPMENT AND SURFACING LS 1 10,000.00$ 10,000.00$ 8 REMOVE BASKETBALL HOOP AND FOOTING LS 1 1,000.00$ 1,000.00$ 9 REMOVE TENNIS COURT FENCE, NET AND ASSOCIATED FOOTINGS LS 1 4,000.00$ 4,000.00$ 10 IMPORT TOPSOIL CY 75 50.00$ 3,750.00$ 11 SITE GRADING/EXCAVATION LS 1 10,000.00$ 10,000.00$ 12 CONSTRUCTION ENTRANCE EA 1 1,500.00$ 1,500.00$ 13 AGGREGATE BASE, CLASS V TN 400 30.00$ 12,000.00$ 14 BITUMINOUS MATERIAL FOR TACK COAT GAL 140 10.00$ 1,400.00$ 15 TYPE SP 12.5 NON WEAR COURSE MIXTURE (2,B)(2" THICK)TN 168 110.00$ 18,480.00$ 16 TYPE SP 9.5 WEAR COURSE MIXTURE (2,B)(1.5" THICK)TN 470 110.00$ 51,700.00$ 17 VALLEY GUTTER LF 100 45.00$ 4,500.00$ 18 LIMESTONE AGGREGATE FOR TRAIL TN 60 50.00$ 3,000.00$ 19 TRAIL EDGING LF 710 3.00$ 2,130.00$ 20 PAINTING/STRIPING FOR COURTS LS 1 15,000.00$ 15,000.00$ 21 BASKETBALL HOOP EA 1 6,500.00$ 6,500.00$ 22 TENNIS NET AND POSTS EA 1 6,000.00$ 6,000.00$ 23 CONCRETER MAINTENANCE STRIP FOR FENCE LF 360 45.00$ 16,200.00$ 24 8' CHAIN LINK FENCE LF 345 90.00$ 31,050.00$ 25 RE_GROUT STORM MANHOLE EA 6 250.00$ 1,500.00$ 26 CONCRETE (4" THICK) SF 360 15.00$ 5,400.00$ 27 CONCRETE (6" THICK) SF 290 20.00$ 5,800.00$ 28 EROSION CONTROL - SILT FENCE LF 260 4.50$ 1,170.00$ 29 EROSION CONTROL - INLET PROTECTION EA 4 300.00$ 1,200.00$ 30 RESTORATION: SEEDING LS 1 5,000.00$ 5,000.00$ 31 PARKING LOT STRIPING LF 500 3.00$ 1,500.00$ 32 PAVEMENT MARKING HANDICAP SYMBOL EA 2 100.00$ 200.00$ 33 6' FENCE ENCLOSURE AND INSTALLATIOIN LS 1 10,000.00$ 10,000.00$ 34 IRRIGATION REPAIR ALLOWANCE LS 1 15,000.00$ 15,000.00$ 35 LANDSCAPE PLANTINGS LS 1 9,500.00$ 9,500.00$ 36 PLAYGROUND EQUIPMENT EA 1 175,000.00$ 175,000.00$ 37 DESIGN AND ENGINEEING LS 1 45,500.00$ 45,500.00$ SUB-TOTAL 528,629.00$ CONTIGENCY 10%48,000.00$ ESTIMATE TOTAL 576,629.00$ LILY POND PARK Owner: City of Otsego Hakanson Anderson - Cost Estimate BID SCHEDULE "A" Base Bid 1/27/26 Engineer Estimate Line Item Item Description UofM Quantity Unit Price Extension -$ 1 MOBILIZATION LS 1 25,000.00$ 25,000.00$ 2 SAW CUT ASPHALT PAVEMENT LF 177 5.00$ 885.00$ 3 SAW CUT CONCRETE CURB LF 2 100.00$ 200.00$ 4 REMOVE CONCRETE CURB LF 170 20.00$ 3,400.00$ 5 REMOVE ASPHALT PAVEMENT SY 3194 6.00$ 19,164.00$ 6 TRAIL MILLING LS 1 5,000.00$ 5,000.00$ 7 REMOVE PLAYGROUND EQUIPMENT AND SURFACING LS 1 10,000.00$ 10,000.00$ 8 REMOVE BASKETBALL HOOP AND FOOTING LS 1 1,000.00$ 1,000.00$ 9 REMOVE TENNIS COURT FENCE, NET AND ASSOCIATED FOOTINGS LS 1 4,000.00$ 4,000.00$ 10 IMPORT TOPSOIL CY 75 50.00$ 3,750.00$ 11 SITE GRADING/EXCAVATION LS 1 10,000.00$ 10,000.00$ 12 CONSTRUCTION ENTRANCE EA 1 1,500.00$ 1,500.00$ 13 AGGREGATE BASE, CLASS V TN 400 30.00$ 12,000.00$ 14 BITUMINOUS MATERIAL FOR TACK COAT GAL 140 10.00$ 1,400.00$ 15 TYPE SP 12.5 NON WEAR COURSE MIXTURE (2,B)(2" THICK)TN 168 110.00$ 18,480.00$ 16 TYPE SP 9.5 WEAR COURSE MIXTURE (2,B)(1.5" THICK)TN 470 110.00$ 51,700.00$ 17 VALLEY GUTTER LF 100 45.00$ 4,500.00$ 18 LIMESTONE AGGREGATE FOR TRAIL TN 60 50.00$ 3,000.00$ 19 TRAIL EDGING LF 710 3.00$ 2,130.00$ 20 PAINTING/STRIPING FOR COURTS LS 1 15,000.00$ 15,000.00$ 21 BASKETBALL HOOP EA 1 6,500.00$ 6,500.00$ 22 TENNIS NET AND POSTS EA 1 6,000.00$ 6,000.00$ 23 CONCRETER MAINTENANCE STRIP FOR FENCE LF 360 45.00$ 16,200.00$ 24 8' CHAIN LINK FENCE LF 345 90.00$ 31,050.00$ 25 RE_GROUT STORM MANHOLE EA 6 250.00$ 1,500.00$ 26 CONCRETE (4" THICK) SF 360 15.00$ 5,400.00$ 27 CONCRETE (6" THICK) SF 290 20.00$ 5,800.00$ 28 EROSION CONTROL - SILT FENCE LF 260 4.50$ 1,170.00$ 29 EROSION CONTROL - INLET PROTECTION EA 4 300.00$ 1,200.00$ 30 RESTORATION: SEEDING LS 1 5,000.00$ 5,000.00$ 31 PARKING LOT STRIPING LF 500 3.00$ 1,500.00$ 32 PAVEMENT MARKING HANDICAP SYMBOL EA 2 100.00$ 200.00$ 33 6' FENCE ENCLOSURE AND INSTALLATIOIN LS 1 10,000.00$ 10,000.00$ 34 IRRIGATION REPAIR ALLOWANCE LS 1 15,000.00$ 15,000.00$ 35 LANDSCAPE PLANTINGS LS 1 9,500.00$ 9,500.00$ 36 PLAYGROUND EQUIPMENT EA 1 175,000.00$ 175,000.00$ 37 DESIGN AND ENGINEEING LS 1 45,500.00$ 45,500.00$ SUB-TOTAL 528,629.00$ CONTIGENCY 10%48,000.00$ ESTIMATE TOTAL 576,629.00$ LILY POND PARKOwner: City of OtsegoHakanson Anderson - Cost EstimateBID SCHEDULE "A" Base Bid 1/27/26 Engineer EstimateLine Item Item Description UofM Quantity Unit Price Extension-$ 1 MOBILIZATION LS 1 25,000.00$ 25,000.00$ 2 SAW CUT ASPHALT PAVEMENT LF 177 5.00$ 885.00$ 3 SAW CUT CONCRETE CURB LF 2 100.00$ 200.00$ 4 REMOVE CONCRETE CURB LF 170 20.00$ 3,400.00$ 5 REMOVE ASPHALT PAVEMENT SY 3194 6.00$ 19,164.00$ 6 TRAIL MILLING LS 1 5,000.00$ 5,000.00$ 7 REMOVE PLAYGROUND EQUIPMENT AND SURFACING LS 1 10,000.00$ 10,000.00$ 8 REMOVE BASKETBALL HOOP AND FOOTING LS 1 1,000.00$ 1,000.00$ 9 REMOVE TENNIS COURT FENCE, NET AND ASSOCIATED FOOTINGS LS 1 4,000.00$ 4,000.00$ 10 IMPORT TOPSOIL CY 75 50.00$ 3,750.00$ 11 SITE GRADING/EXCAVATION LS 1 10,000.00$ 10,000.00$ 12 CONSTRUCTION ENTRANCE EA 1 1,500.00$ 1,500.00$ 13 AGGREGATE BASE, CLASS V TN 400 30.00$ 12,000.00$ 14 BITUMINOUS MATERIAL FOR TACK COAT GAL 140 10.00$ 1,400.00$ 15 TYPE SP 12.5 NON WEAR COURSE MIXTURE (2,B)(2" THICK)TN 168 110.00$ 18,480.00$ 16 TYPE SP 9.5 WEAR COURSE MIXTURE (2,B)(1.5" THICK)TN 470 110.00$ 51,700.00$ 17 VALLEY GUTTER LF 100 45.00$ 4,500.00$ 18 LIMESTONE AGGREGATE FOR TRAIL TN 60 50.00$ 3,000.00$ 19 TRAIL EDGING LF 710 3.00$ 2,130.00$ 20 PAINTING/STRIPING FOR COURTS LS 1 15,000.00$ 15,000.00$ 21 BASKETBALL HOOP EA 1 6,500.00$ 6,500.00$ 22 TENNIS NET AND POSTS EA 1 6,000.00$ 6,000.00$ 23 CONCRETER MAINTENANCE STRIP FOR FENCE LF 360 45.00$ 16,200.00$ 24 8' CHAIN LINK FENCE LF 345 90.00$ 31,050.00$ 25 RE_GROUT STORM MANHOLE EA 6 250.00$ 1,500.00$ 26 CONCRETE (4" THICK) SF 360 15.00$ 5,400.00$ 27 CONCRETE (6" THICK) SF 290 20.00$ 5,800.00$ 28 EROSION CONTROL - SILT FENCE LF 260 4.50$ 1,170.00$ 29 EROSION CONTROL - INLET PROTECTION EA 4 300.00$ 1,200.00$ 30 RESTORATION: SEEDING LS 1 5,000.00$ 5,000.00$ 31 PARKING LOT STRIPING LF 500 3.00$ 1,500.00$ 32 PAVEMENT MARKING HANDICAP SYMBOL EA 2 100.00$ 200.00$ 33 6' FENCE ENCLOSURE AND INSTALLATIOIN LS 1 10,000.00$ 10,000.00$ 34 IRRIGATION REPAIR ALLOWANCE LS 1 15,000.00$ 15,000.00$ 35 LANDSCAPE PLANTINGS LS 1 9,500.00$ 9,500.00$ 36 PLAYGROUND EQUIPMENT EA 1 175,000.00$ 175,000.00$ 37 DESIGN AND ENGINEEING LS 1 45,500.00$ 45,500.00$ SUB-TOTAL 528,629.00$ CONTIGENCY 10%48,000.00$ ESTIMATE TOTAL 576,629.00$ COST ESTIMATE PROJECT BASE BID $580K IS THE OVERALL TARGET BUDGET BASE BID TOTAL = $576,629 Lily Pond Park - 2026 Final Site Plan Otsego, MN COST ESTIMATE PROJECT ALTERNATES LILY POND PARK Owner: City of Otsego Hakanson Anderson - Cost Estimate BID SCHEDULE "B" Alternate Bid Items 1/27/26 Engineer Estimate Line Item Item Description UofM Quantity Unit Price Extension 38 ZIPLINEINCLUDING INSTALL AND SURFACING EA 1 46,000.00$ 46,000.00$ 39 ZIPLINE AREA EDGING LF 300 6.00$ 1,800.00$ SUB-TOTAL 47,800.00$ CONTIGENCY 10%4,800.00$ ESTIMATE TOTAL 52,600.00$ Lily Pond Park BASE BID and ALTERNATE BID ITEMS ESTIMATE TOTAL 629,229.00$ BASE BID + ALTERNATE ITEMS = $629,229 $580K IS THE OVERALL TARGET BUDGET 6] NEXT STEPS Lily Pond Park - 2026 Final Site Plan Otsego, MN NEXT STEPS • March 18th: Bid Opening • March 23rd: Bid Award at City Council Meeting • May: Construction Start • Mid-August: Construction Completion THANK YOU!