Item 3.1 Foss Swim School3601 Thurston Avenue
Anoka, MN 55303
763.231.5840
TPC@PlanningCo.com
1
PLANNING REPORT
TO: Otsego Planning Commission
FROM: D. Daniel Licht
REPORT DATE: 14 January 2026
120-DAY DATE: 11 April 2026
RE: Otsego – Foss Swim School; Preliminary Plat/Sketch Plan
TPC FILE: 101.02
BACKGROUND
Foss Swim School has submitted application to plat Outlot A, Great River Centre Otsego
Seventh Addition as one lot for commercial development. The proposed lot is subject to
preliminary plat review as it was not previously identified as a buildable lot at the time the
current outlot was established. Previously dedicated drainage and utility easements at the
perimeter of the outlot will be vacated as part of the plat process. A public hearing to consider
the preliminary plat application has been noticed for the Planning Commission meeting on 20
January 2026.
The proposed development of the subject property is illustrated on a sketch plan submitted as
supporting information with the plat application. The sketch plan illustrates development of a
9,600 square foot building to be constructed as a commercial swim school. The site plan also
illustrates a second 11,900 square foot building within the proposed lot as a future
construction. The development of the proposed lot will require future application for site and
building plan approval. This is expected to occur concurrent with application for final plat
approval.
Exhibits:
Site Location Map
Final Plat
Civil plans dated 12 December, 2025
Item 3.1
2
ANALYSIS
Comprehensive Plan. The 2023 Comprehensive Plan guides the subject property within the
Great River Centre of Otsego for commercial land use as part of the City’s primary retail,
service, and office area within the community. The platting of the subject to allow for
development of the proposed swim school allows for a commercial indoor recreation business
that will serve Otsego and the surrounding region. The proposed use is consistent with the
types of businesses planned for the area by the 2023 Comprehensive Plan.
PUD District. The City Council approved a PUD District for the Great River Centre of Otsego on
13 March 2006. The PUD District is based upon the uses and performance standards as allowed
within the B-1, Retail Business District. The B-1 District allows for the proposed swim school as a
permitted use defined as instructional classes and indoor commercial recreation. Development
of permitted commercial uses is subject to site and building plan review by the Planning
Commission and approval of the City Council in accordance with Section 11-9-3 of the Zoning
Ordinance.
Surrounding Area. The table below summarizes the existing and planned land uses
surrounding the subject property:
Direction Land Use Plan Zoning Map Existing Use
North Commercial PUD District Tires Plus
Wings Financial
Everbrook Academy
East Commercial PUD District The Village apartments
South Office B-4 District Twin City Bee Keeping
EDCO/Undeveloped
West Commercial PUD District Good Day Car Wash
The area within Great River Center bounded by 87th Street/Quaday Avenue/85th Street/Parrish
Avenue (CSAH 42) is designated as a Village Center, where development is to utilize elements of
traditional neighborhood design in both site planning and architecture. When Good Day Car
Wash was constructed, the application review noted that development of Outlot A, Great River
Centre of Otsego would be required to develop in accordance with the Village Center elements
of the Great River Centre of Otsego PUD Design Guidelines. The indoor commercial recreation
use and future retail building is more consistent with the community service type businesses
anticipated for this area of the Great River Centre and will be compatible with the day care and
apartment uses directly adjacent to the subject property.
3
Preliminary Plat. The developer has submitted a preliminary plat to plat the existing 2.97 acre
outlot into one lot.
Lot Requirements. There are no minimum lot area or width requirements for
subdivision of lots within the GRC PUD District. Lot 1, Block 1 is proposed to be 2.97
acres in area and is 305 feet in width as measured at the front setback line abutting 85th
Street. The necessary area and width of a specific lot is to be based on required setbacks
and a functional site plan in terms of access and circulation. The sketch plan, reviewed
in detail in subsequent paragraphs, illustrates a feasible development of the proposed
lot.
Right-of-Way. The subject property 85th Street and Parson Avenue. The City Engineer is
not recommending additional right-of-way dedication be required for 85th Street or
Parson Avenue.
Utilities. The subject property is within the East Sewer District established by the 2023
Comprehensive Plan. Sewer and water utilities are available at the property to serve
the proposed development as illustrated on the preliminary utility plan. The utility plan
and any related issues will be subject to review and approval by the City Engineer as
part of a future site and building plan review application.
The developer is required to pay Utility Availability Charges at the time of final plat
approval. These fees are used by the City to fund the construction of the trunk sewer
collection pipes and water distribution pipes. A preliminary calculation of the Sewer
Availability Charges (SAC) and Water Availability Charges (WAC) based on the 2026 Fee
Schedule for the proposed lot are provided below:
o WAC: 3.5 RECS/ac. x 2.97ac. x $4,596.00/REC = $47,775.42
o SAC: 3.5 RECS/ac. x 2.97ac. x $3,171.00/REC = $32,962.55
Additional utility related fees are collected at the time a building permit is issued. The
Utility Connection Fees are used by the City for the construction of the operational
elements of the sewer and water utilities such as wastewater treatment facilities, lift
stations, wells, pump houses, water towers and water treatment plants. The calculation
of the Utility Connection Fees for commercial uses is based on the schedule for
Residential Equivalent Connections development by Metropolitan Council
Environmental Services based on water use for specific activities. The 2026 schedule for
connection fees is shown below.
o Water Connection Fee: $4,596.00/REC
o Sewer Connection Fee: $9,513.00/REC
4
Stormwater. The developer has submitted a preliminary grading plan for the proposed
development of the subject site. The grading plan and all stormwater management
related issues will be subject to review and approval by the City Engineer as part of a
subsequent site and building plan review application. The subject property is not
included within a watershed district and no stormwater impact fee is required at the
time of final plat approval.
Easements. Section 10-8-12 of the Subdivision Ordinance requires dedication of 10 foot
wide drainage and utility easements at the perimeter of proposed lots, over stormwater
management facilities, and over water utility extensions. There are existing drainage
and utility easements along the north, east, and south lines of the subject property that
will be vacated and replaced by new easements dedicated with the proposed plat. The
proposed plat illustrates the required perimeter easements. Additional easements to be
recorded by document related to sewer, water or stormwater utilities may be required
as part of the site and building plan review application. All drainage and utility
easements are to be subject to review and approval by the City Engineer.
Park Dedication. The initial final plat of the Great River Centre of Otsego was credited
as having satisfied park dedication requirements through trail improvements within the
subdivision. No additional park dedication is required for approval of a final plat for the
proposed preliminary plat.
Sketch Plan. A sketch plan illustrating development of the proposed lot has been submitted
with the application for preliminary plat approval. The proposed development of the subject
property includes a 9,600 square foot building for a commercial swim school and future 11,900
square foot retail commercial building.
Setbacks. The following setbacks are required of the subject site based on the
requirements of the GRC PUD District Design Guidelines and the B-1 District. The sketch
plan complies with these requirements. Importantly, the site plan locates the proposed
swim school building at the southeast corner of the lot with the parking in-line or behind
the building as viewed from Parson Avenue. This site layout is encouraged by the GRC
PUD District design guidelines and is consistent with the location of other commercial
buildings along Parson Avenue to the north.
85th St. Parson
Ave.
North Parking
ROW Interior
30ft. 20ft. 10ft. 15ft. 5ft.
Access. The subject site abuts 85th Street, and Parson Avenue. One access is proposed
to 85th Street, which meets the intersection spacing requirements established by Section
11-21-6.B of the Zoning Ordinance. There is a second access to Parson Avenue at the
northeast corner of the proposed lot. This access is shared by easement with the Good
Day Car Wash and aligns with the access to The Village apartments to the east.
5
Off-Street Parking. The sketch plan illustrates 125 off-street parking spaces, six of
which are disability accessible.
Section 11-21-8 of the Zoning Ordinance requires instructional class and retail uses to
provide one off-street parking space for each 200 square feet of net floor area. A
preliminary calculation of required parking is provided below. The number of spaces
shown on the sketch plan exceeds the requirements of the Zoning Ordinance.
Use Gross
Area
Net Area Requirement Required
Spaces
Instructional Classes 9,600sf. 8,640sf. 1 space/200sf. 44
Retail 11,900sf. 10,710sf. 54
Total 98
The dimensions of the drive aisle and parking spaces comply with Section 11-21-7.B of
the Zoning Ordinance. Asphalt pavement and perimeter concrete curb is required by
Sections 11-21-7.C and D of the Zoning Ordinance and is subject to review and approval
of the City Engineer with application for site and building plan review.
Sidewalks/Trails. There is an existing sidewalk adjacent to the north side of 85th Street
abutting the subject property. There is also a public trail along the north line of the
subject property that connects between Parrish Avenue (CSAH 42) and Parson Avenue.
The sketch plan illustrates construction of a sidewalk along Parson Avenue from 85th
Street north to the north line of the subject property. This segment connects to the
sidewalk on the west side of Parson Avenue extending to 87th Street that was
constructed with Everbrook Academy.
There are connections to the sidewalks on 85th Street and Parson Avenue from the front
of the swim school and retail building shown on the site plan.
Buildings. No details have been provided regarding the proposed swim school building.
Architectural elevations and floorplans will be required to be submitted at the time of
site and building plan review for each building.
o Exterior Materials. The exterior design for the proposed buildings are subject to
the guidelines included in the GRC PUD District Design Guidelines booklet. The
GRC PUD District Design Guidelines would encourage large window areas on all
sides of the building and emphasis on the architectural details facing 85th Street
and Parson Avenue. Exterior materials for each building must also comply with
the exterior finish requirements established by Section 11-17-4.D.1 of the Zoning
Ordinance.
6
o Height. The GRC PUD District establishes height limitations intended to preserve
viewsheds of the SuperTarget store as the anchor of the Great River Centre of
Otsego development. The height of buildings within the proposed lot are limited
to two stories or 28 feet. Building height is measured to the deck of a flat roof or
the mean height of a pitched roof as defined by Section 11-2-2 of the Zoning
Ordinance.
Landscaping. The sketch plan does not include proposed landscaping. A landscape plan
meeting the requirements of Section 11-19-2 of the Zoning Ordinance will be required
to be submitted with application for site and building plan review. In addition to the
general landscape guidance provided in Section 11-19-2.B.2 of the Zoning Ordinance,
the landscape plan should include:
o Natural grasses or shrubs planted to screen the view of off-street parking area
from view of 85th Street and Parson Avenue.
o An irrigation system required by Section 5-2-3.C.2 of the City Code
Exterior Lighting. The design and location of exterior lighting within the subject site
must comply with Section 11-16-6 of the Zoning Ordinance. An exterior lighting plan,
including photometric measurements, is to be submitted application for site and
building plan review. All exterior lighting is to be subject to review and approval of the
Zoning Administrator.
Waste Storage. The sketch plan does not indicate locations for waste containers. Any
outdoor storage of waste containers requires an enclosure subject to the requirements
of Section 11-18-4.C of the Zoning Ordinance. If outdoor storage of waste containers is
intended, plans for the required enclosure are to be submitted with application for site
and building plan review.
Signs. The sketch plan does not include details regarding any proposed signs. Signs with
GRC PUD District Design Guidelines allow wall signs to be installed on all four sides of
principal buildings with the area of the signs limited to 15 percent of the wall area and
no individual wall sign exceeding 100 square feet. One shared freestanding sign for the
proposed lot may also be considered as part of the site and building plan review
application. A sign permit application is required to be submitted prior to placement of
any signs upon the property and is subject to review and approval of the Zoning
Administrator.
Final Plat. The developer must submit application for final plat in accordance with Section 10-
3-3.F of the Subdivision Ordinance within one year of preliminary plat approval.
7
Development Contact. Section 10-10-4.A of the Subdivision Ordinance requires the developer
to enter into a development contract at the time of final plat approval. The development
contract will be combined with a Site Improvement Performance Agreement as required by
Section 11-9-7 of the Zoning Ordinance for development of the lot. The development contract
will ensure construction of the project as approved by the City, completion of any public
improvements, establishment of required securities, and payment of applicable fees. The
development contract will be drafted by the City Attorney and is subject to approval of the City
Council.
RECOMMENDATION
The proposed preliminary plat complies with the requirements of the Subdivision Ordinance.
Platting of the proposed lot will provide for development of an indoor commercial recreation
use providing instructional classes that will increase available services to Otsego, as well as the
surrounding area. The proposed development of the site will also provide future opportunity
for increased retail spaces to accommodate other retail, service, or office uses in the area. City
staff recommends approval of the preliminary plat application as outlined below.
POSSIBLE ACTIONS
Motion to recommend City Council approval of a preliminary plat for Great River Centre of
Otsego Eighth Addition, subject to the following conditions:
1. Approval of the preliminary plat shall not guarantee access to sanitary sewer service. The
City shall only allocate sanitary sewer capacity to approved final plats with signed
development contracts to assure the City of timely development.
2. Right-of-way dedication and access to 85th Street and Parson Avenue shall be subject to
review and approval of the City Engineer.
4. Lot 1, Block 1 shall comply with the following setback requirements:
85th St. Parson
Ave.
North Parking
ROW Interior
30ft. 20ft. 10ft. 15ft. 5ft.
5. All utility issues shall be subject to review and approval of the City Engineer.
6. The developer shall pay Utility Availability Charges for the proposed lot at the time of
final plat approval in accordance with Title 8, Chapter 1 of the City Code.
7. The developer shall pay Utility Connection Fees for construction of proposed principal
uses at the time a building permit is issued, in accordance with Title 8, Chapter 1 of the
City Code.
8
8. All grading, drainage, erosion control and stormwater management issues shall be
subject to review and approval of the City Engineer.
9. All easements shall be subject to review and approval of the City Engineer.
10. Development of Lot 1, Block 1 shall require application for site and building plan review,
or other zoning applications as may be required by Zoning Ordinance, as provided for by
Section 11-9-3 of the Zoning Ordinance.
a. Access and Off-Street Parking:
(1) The design and construction of off-street parking areas shall comply with
Section 11-21-7 of the Zoning Ordinance, subject to review and approval of
the City Engineer.
(2) The off-street parking area shall provide for the number of spaces as
required by Section 11-21-8 of the Zoning Ordinance.
b. The architectural design and exterior materials for any principal and accessory
building(s) shall comply with the GRC PUD District Design Guidelines Booklet and
Section 11-17-4.D.1 of the Zoning Ordinance.
c. The height of any principal and accessory building(s) shall not exceed 28 feet as
defined by the Zoning Ordinance.
d. A landscape plan subject to review and approval of the Zoning Administrator
shall be submitted outlining proposed location, type, size, and quantities of
proposed plantings along with planting details meeting the requirements of
Section 11-19-2 of the Zoning Ordinance, and:
(1) Natural grasses or shrubs planted to screen the view of off-street parking
area from view of 85th Street and Parson Avenue.
(2) An irrigation system shall be installed as required by Section 5-2-3.C.2 of
the City Code.
e. All exterior lighting shall comply with Section 11-16-6 of the Zoning Ordinance,
subject to review and approval of the Zoning Administrator.
f. All signs shall comply with the GRC PUD District Design Guidelines booklet and
Chapter 37 of the Zoning Ordinance, subject to review and approval of the
Zoning Administrator.
9
g. Any outdoor storage of waste containers shall require an enclosure that
complies with the provisions of Section 11-18-4.C of the Zoning Ordinance,
subject to review and approval of the Zoning Administrator.
11. The developer shall enter into a development contract as required by Section 10-10-4.A
of the Subdivision Ordinance at the time of final plat approval and Section 11-9-7 of the
Zoning Ordinance related to site and building plan review approval, subject to review by
the City Attorney and approval of the City Council.
12. A final plat shall be approved within one year of City Council approval or the preliminary
plat shall be deemed void.
c. Adam Flaherty, City Administrator/Finance Director
Audra Etzel, City Clerk
Ron Wagner, City Engineer
David Kendall, City Attorney
Foss Swim Schoo
Site Location
461 ft
Overview
Legend
Highways
Interstate
State Highway
US Highway
Roads
City/Township Limits
c
t
Parcels
Torrens
GREAT RIVER CENTRE OF OTSEGOEIGHTH ADDITIONVICINITY MAP - NOT TO SCALESITEKNOW ALL PERSONS BY THESE PRESENTS: That CN Otsego Properties, LLC, a Minnesota Limited Liability Company, fee owner of the following described property situated in theCounty of Wright, State of Minnesota to-wit:Outlot A, Great River Centre of Otsego Seventh Addition, Wright County Minnesota.Has caused the same to be surveyed and platted as GREAT RIVER CENTRE OF OTSEGO EIGHTH ADDITION and does hereby dedicate to the public for public use the public waysand the drainage and utility easements as created by this plat.In witness whereof CN Otsego Properties, LLC a Minnesota limited liability company, has caused these presents to be signed by its proper officer thisday of_________________,20.___________________________________Cory Kampschroer, Chief ManagerSTATE OF MINNESOTACOUNTY OF This instrument was acknowledged before me this_____ day of_________________, 20, by Cory Kampschroer, Chief Manager of CN Otsego Properties, LLC a Minnesotalimited liability company, on behalf of the company.Notary Public SignatureNotary Printed NameNotary Public_______________County, MinnesotaMy Commission ExpiresI Kaleb J. Kadelbach do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that thisplat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on the plat have been, orwill be correctly set within one year; that all water boundaries and wetlands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, as of the date of this certificate are shown andlabeled on this plat; and all public ways are shown and labeled on this plat.Dated this__________ day of _______________________, 20._____________________________________________Kaleb J. Kadelbach, Licensed Land SurveyorMinnesota License No. 57070STATE OF MINNESOTACOUNTY OF The foregoing surveyor's certificate was acknowledged before me this_____ day of_________________, 20, by Kaleb J. Kadelbach, Land Surveyor, Minnesota LicenceNo 57070.Notary Public SignatureNotary Printed NameNotary Public_______________County, MinnesotaMy Commission ExpiresCITY COUNCIL, CITY OF OTSEGO, MINNESOTA:This plat of GREAT RIVER CENTRE OF OTSEGO EIGHTH ADDITION was approved and accepted by the City Council of the City of Otsego, Minnesota, at a regular meetingthereof held this day of, 20, and said plat is in compliance with the provisions of Minnesota Statutes, Section 505.03, Subd. 2.CITY COUNCIL, CITY OF OTSEGO, MINNESOTAMayor City ClerkWRIGHT COUNTY SURVEYORI hereby certify that in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this _____ day of ,20._______________________________________Wright County SurveyorWRIGHT COUNTY HIGHWAY ENGINEERThis plat was reviewed and recommended for approval this _____ day of , 20._______________________________________Wright County EngineerWRIGHT COUNTY LAND RECORDSPursuant to Minnesota Statutes, Section 505.021, Subd. 9, taxes payable for the year 20___ on the land hereinbefore described have been paid. Also, pursuant to Minnesota Statutes,Section 272.12, there are no delinquent taxes and transfer entered this _____ day of _______________________, 20___._______________________________________Wright County Land Records AdministratorWRIGHT COUNTY RECORDERI hereby certify that this instrument was filed in the office of the County Recorder for record on this _____ day of, 20, at o'clock ___.M. and was duly recorded in Cabinet No. ______, Sleeve ________, as Document No. ._______________________________________Wright County Recorder
Review No. 1
ENGINEERING REVIEW
Commercial Subdivision
Site Plan
for the City of Otsego
by
Hakanson Anderson
Submitted to: Honorable Mayor and City Council
cc: Adam Flaherty, City Administrator/Finance Director
Audra Etzel, City Clerk
Dan Licht, City Planner
Dave Kendall, City Attorney
Reviewed by: Ronald J. Wagner, P.E.
Date: 12/22/2025
Proposed Development: FOSS Swim School
Development Location: PID # 118377000010. A portion of Section 22, T121, R23, Q1-4.
The site is bounded by GoodDay Express Car Wash to the west, a
city storm pond to the north, Parson Avenue NE to the east and
85th Street NE to the south.
Applicant: Duane Boris
Developer: FOSS Swim School
10050 Crosstown Circle Suite 650
Eden Prairie, MN 55344
Owners of Record: Nate Pierson
CN Otsego Properties LLC
682 55th ST NE
Buffalo, MN 55313
Purpose: This is a proposed development including commercial space on
approximately 2.97+ acres in the City of Otsego, Wright County,
Minnesota. The proposed development will be served with municipal
water, sanitary sewer, storm sewer, and public streets typical of an
urban setting.
Jurisdictional Agencies: City of Otsego, Minnesota Department of Natural Resources,
(but not limited to) Minnesota Pollution Control Agency, Wright Soil and Water
Conservation District.
Permits Required: NPDES, Minnesota Department of Health (water), and
(but not limited to) Minnesota Pollution Control Agency (sanitary sewer).
PAGE 2
TABLE OF CONTENTS
INFORMATION AVAILABLE
SITE DEVELOPMENT PLANS (PRELIMINARY)
COVER SHEET
EXISTING CONDITIONS SURVEY
GENERAL NOTES
SITE DEMOLITION & EROSION CONTROL
EROSION AND SEDIMENT CONTROL DETAILS
SITE DIMENSION PLAN
SITE DETAILS
GRADING AND DRAINAGE PLAN
STORM SEWER PLAN
GRADING DETAILS
UTILITY PLAN
UTILITY DETAILS
OTHER CONSIDERATIONS
SUMMARY AND/OR RECOMMENDATIONS
PAGE 3
INFORMATION AVAILABLE
Preliminary Site Development Plans for FOSS SWIM SCHOOL,
FOSS Swim School Storm Water Plan
Additional Information
Minnesota Rules, Chapter 4410 – EAW Requirement
City of Otsego Engineering Manual
City of Otsego Zoning and Subdivision Ordinances
National Wetland Inventory Map
Great River Centre Storm Water Plan
PAGE 4
SITE DEVELOPMENT PLANS
COVER SHEET
1. City of Otsego public utilities contact shall be Kurt Neidermeier.
EXISTING CONDITIONS SURVEY
2. Show location, names, width of existing streets, building, etc. within 150’ of the
project boundary.
3. Show size and elevation for all existing utilities within 150’ of the project boundary.
4. Adjoining unsubdivided or subdivided land shall be identified by name and
ownership within 150’ of the project boundary.
5. Locations and results of soil borings, percolation tests, etc.
GENERAL NOTES
6. No comments.
SITE DEMOLITION & EROSION CONTROL
7. No comments.
EROSION AND SEDIMENT CONTROL DETAILS
8. No comments.
SITE DIMENSION PLAN
9. No comments.
SITE DETAILS
10. No comments.
GRADING AND DRAINAGE PLAN
11. Concrete Band (Ribbon Curb) is not allowed. Replace with surmountable standard
plate #704, #705 or B6 curb standard Plate #7100H.
12. A catch basin will need to be added and regrade curb for water to flow to the CB
west of future building site.
PAGE 5
STORM SEWER PLAN
13. What is the reason for STM MH 3 not connecting to STM CB 4?
14. Can the overflow structure (STM CB 14) and Outlet Structure 15 (OCS)
be combined?
15. The use of RIP RAP is not used around FES. See city detail Standard Plate #500
& 500a.
GRADING DETAILS
16. No comments.
UTILITY PLAN
17. Plans will be reviewed by city utility manager to ensure proper infrastructure and
floatable, oil, and grease capture tank and standard operation procedure are in place.
18. Indicate 6” SDR 26 for sanitary connection.
19. Indicate removal of old 6” valve and addition of new 6” valve for domestic water
service connection on Parson Ave.
20. Indicate 6” CL 52 DIP WM to be used for connection to existing water stub for
fire service.
21. Connect to existing stub for fire service with new 6” valve for testing purposes.
UTILITY DETAILS
22. Use City of Otsego Standard Plate Details as noted on detail sheet.
OTHER CONSIDERATIONS
23. Provide a traffic control plan for shoulder closure as it relates to 85th Street
ingress/egress and existing private street to the north.
24. Provide storm water profiles.
25. Provide Geotechnical Report.
SUMMARY AND/OR RECOMMENDATION
Resubmit for review and approval.