Item 3.12 Wellhouse No 4 Water Treatment Plant Project Change Order Requests Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Utilities Utility Manager Neidermeier November 24, 2025 PRESENTER(s) REVIEWED BY: ITEM #: Consent AE2S Engineer Hanson City Administrator/Finance Director Flaherty 3.12 – Change Orders for Wellhouse 4 WTP Project STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City Staff are recommending that the Council approve two Change Order Requests for the Wellhouse No. 4 Water Treatment Plant (WTP) project. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: The following table summarizes the change orders being submitted for Council consideration related to the Wellhouse No. 4 Treatment Improvements project. Additional details on each change order are provided below. Change Order Request # Description Amount 015R1 Backwash Tank Roof Layout Modifications $18,914.39 021 Roofing Hardware Modifications $3,817.67 COR 015R1 - Backwash Tank Roof Layout Modifications During construction, it was determined that modifications to the roofing system on the Backwash Reclaim Tank were required. To ensure proper weather protection and consistency with the intended design, roof scuppers, new roof crickets, roofing around tank chimneys for hatches, and plumbing vent penetrations details were added. This additional work provides the complete roofing coverage required for proper construction and long-term performance. This proposal reflects an increase of $18,914.39 to the construction contract for labor and materials associated with the extended roofing system. Although the clarification occurred during construction, the work represents scope that, if fully detailed, would have been included in the original Contractor’s bid price. AE2S has reviewed the Contractor’s cost and considers it fair and reasonable. COR 021 - Roofing Hardware Modifications During construction, the Contractor raised concerns regarding the support system for the chemical room addition roof mono truss bearing system. They proposed switching the bearing system from hangers to a ledger board to ensure adequate securement to the existing Wellhouse split-face block wall. AE2S reviewed the suggestion and agreed that the method would provide a better support system at a marginally increased cost. This proposal reflects an increase of $3,817.67 to the construction contract for labor and materials associated with the ledger board and roofing hardware installation. The proposed net increase in project cost for these change orders is $22,732.06 to the construction contract. This amount represents a 0.33% increase over the bid cost and would bring the total change order net increase to 1.86% for the project. A contingency amount of 5.0% is included in the project budget and financing package. The Public Works Subcommittee reviewed this information at their November 19, 2025, meeting and recommended consideration of approval by the City Council. SUPPORTING DOCUMENTS ATTACHED: • Detailed proposals for Change Order Request 015R1, & 021 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to approve Change Order Proposals as indicated in the table above in the amount of $22,732.06 to Market & Johnson. BUDGET INFORMATION FUNDING: BUDGETED: Fund 601 – Drinking Water Utility Yes TO: DATE: RE:Change Order Request (COR) #15 ATTN: REQUESTED BY WHOM: COST OF WORK: Changes to Market & Johnson's Scope of Work (see attached breakdown)…………...$18,914.39 OVERALL CHANGE TO PROJECT $18,914.39 The Contract Time will be unchanged by zero days for this change. This proposal may be withdrawn by us if not accepted within 30 calendar days. Assistant Project Manager Enclosures cc: Joey Koller COMMENTS / ADD'L NOTES Sincerely, MARKET & JOHNSON, INC. M&J Project #3416 Market & Johnson, Inc. 2350 Galloway Street PO Box 630 Eau Claire, WI 54702-0630 Ph. 715.834.1213 Fax. 715.834.2331 CHANGE ORDER REQUEST (COR) Advanced Engineering and Environmental Services, LLC 6901 E Fish Lake Road Suite 184 Maple Grove, MN 55369 November 7, 2025 Otsego Wellhouse No. 4 Water Treatment Improvements Otsego, MN Ryan Hanson DESCRIPTION OF CHANGE: RFP#11 - Floor Assembly and Roof Layout Modifications TIME: If you would like us to proceed with this work prior to a formal change order being processed, please check the accepted box, sign and return. If accepted, this will be included on a future change order. □Accepted □Not Accepted _____________________________ ______________ Signature Date Breakdown for Change Order Request (COR) #15 by Market & Johnson Dated: 11/07/2025 M&J Contract Tax Exempt Purchases Owner Direct Purchases SUBCONTRACTED WORK SCOPE OF WORK $11,126.80 $11,126.80 $0.00 $0.00 SELF PERFORMED QTY U/M UNIT COST $6,031.84 $0.00 $6,031.84 0.71% $121.83 $172.80 15.00% $904.78 5.00% $556.34 Net Change $18,914.39 $0.00 $0.00 TOTAL OVERALL CHANGE TO PROJECT $18,914.39 Mark-up on Self Performed Work Additional G/L Insurance Required Additional Payment/Performance Bond Mark-up on Subcontracted Work Subtotal of Self Performed Work Subtotal of Subcontracted Work Market & Johnson Roof Tech M&J Project #3416 Otsego Wellhouse No. 4 Water Treatment Improvements Otsego, MN WE’RE ON TOP OF     October 9, 2025 Updated: 11-7-25 New Sheet Metal Details at Tank Chimneys Mr. Patrick Johnson Mr. Joey Koller Market & Johnson 2350 Galloway St Eau Claire, WI 54703 Re: Otsego Wellhouse #4 - RFP #11 Square Footage: 2,240 Sft Otsego, MN Mr. Johnson and/or Mr. Koller, We have reviewed RFP #11 for the above project and found the following changes with additional costs. SUMMARY: Item #1: - Added additional tapered insulation to direct the water to the scuppers - Increase Square Footage of EPDM required to accommodate the taller parapet blocking (By Others) - Increase the Sheet Metal Coping Cap Face dimension Item #2: - Added 2 Pipe Penetrations Item #3: - Reduced the amount of EPDM required at the 5 Raised Access Hatch locations - Added Termination Bar and Water Block at the 5 Raised Access Hatch locations - Added a 3 Piece Sheet Metal Counter Flashing system at the 5 Raised Access Hatch locations PRICING: Item #1 M = Insulation Quote Add Amount: 1 Lot x $1,687.77/Lot = $1,687.77 L = 6 Man Hours x $108.50/Hr = $ 651.00 M = 246 Sft of EPDM x $1.32/Sft = $ 324.72 M = 5.46 Gal Bonding Adhesive x $67.61/Gal = $ 369.15 L = 2 Man Hours x $108.50/Hr = $ 217.00 M = 12” Additional Coping Cap Face @ 5.76/Lft x 164 Lft = $ 944.64 L = 4 Man Hours x $125.10/Hr = $ 500.40 Item #2: M = 2 Pipe Boots x $64.35/ Boot = $ 128.70 M = .125 Gal Primer x $87.66/Gal = $ 10.95 L = 1 Man Hour x $108.50/Hr = $ 108.50 Page 1 of 2 WE’RE ON TOP OF    Item #3: M = Deduct 142.5 Sft EPDM x $1.32/Sft = <$188.10> M = Deduct 2.37 Gal Bonding x $67.61/Gal = <$160.23> L = Deduct 2 Man Hours x $108.50/Hr = <$217.00> M = 100 Lft Termination Bar and Pins x $1.18/Lft = $ 118.00 M = 10 Tbs Water Block x $8.54/Tb = $ 85.40 L = 6 Man Hours x $108.50/Hr = $ 651.00 M = 100 Lft 10” SM Rglt Flashing x $5.70/Lft = $ 570.00 M = 1 Lot Fasteners and Bits x $300.00/Lot = $ 300.00 M = 5 Tubes Caulking x $9.57/Tb = $ 47.85 L = 13 Man Hours x $125.10/Hr = $1,626.30 Cutting Reglet into Concrete – 1/8”x1” Deep $1,900.00 TOTAL COSTS: Added Materials = $4,587.18 Deducted Matierals = <$348.33> Added Cutting Reglet = $1,900.00 Total Material Amount: $6,138.28 Added Roofing Labor = $1,410.50 Added SM Labor = $2,126.70 Total Labor Amount: $3,537.20 Subtotal Material and Labor: $9,675.48 15% Overhead and Profit: $1,451.32 Total Add Amount RFP #11: $11,126.80 Please feel free to contact us with any questions that you may have. Sincerely, Brian D. Brezinka Vice President Company Name: DATE:10.19.2025 Completed By:(Name)PROJECT: 3416 - Otsego Wellhouse #4 (Phone)M&J's COR #:15 (Email)Vendor's # Agreement #: DESCRIPTION OF WORK: LABOR Trade ST/OT/DT RATE # OF HOURS TOTAL ST 107.49$ 48.00 5,159.52$ Subtotal Hours & Labor Cost 48.00 5,159.52$ MATERIALS & EQUIPMENT Items UM UNIT PRICE QUANTITY TOTAL LF 1.16$ 752.00 872.32$ Subtotal Materials & Equipment 872.32$ SUBCONTRACTORS (attached their breakdown) Company TOTAL Subtotal Subcontractors -$ ADDITIONAL COSTS Overhead & Profit Labor, Materials, Equipment Mark-up % = -$ Overhead & Profit Subcontractors Mark-up % = -$ Subtotal Additional Costs -$ 6,031.84$ Does this request require additional working days?No If Yes, # of working days? Does this change have lead-time dependent materials associated? No # of days? Vendor to complete this form or submit similar breakdown on your letterhead Itemize adds and deducts for the proposed change. Attach all subcontractor quotes and their breakdowns. Market & Johnson Joey Koller N/A VENDOR BREAKDOWN Roof Scrupper Locations and Parapet Extension 2x6 Lumber Carpenter N/A TOTAL COST Sub's Scope of Work TO: DATE: RE:Change Order Request (COR) #21 ATTN: REQUESTED BY WHOM: COST OF WORK: Changes to Market & Johnson's Scope of Work (see attached breakdown)…………...$3,817.67 OVERALL CHANGE TO PROJECT $3,817.67 The Contract Time will be unchanged by zero days for this change. This proposal may be withdrawn by us if not accepted within 30 calendar days. Assistant Project Manager Enclosures cc: M&J Project #3416 Market & Johnson, Inc. 2350 Galloway Street PO Box 630 Eau Claire, WI 54702-0630 Ph. 715.834.1213 Fax. 715.834.2331 CHANGE ORDER REQUEST (COR) Advanced Engineering and Environmental Services, LLC 6901 E Fish Lake Road Suite 184 Maple Grove, MN 55369 October 30, 2025 Otsego Wellhouse No. 4 Water Treatment Improvements Otsego, MN Ryan Hanson DESCRIPTION OF CHANGE: RFP No.14 - RFI #28 - Roofing Hardware TIME: COMMENTS / ADD'L NOTES Sincerely, MARKET & JOHNSON, INC. Joey Koller If you would like us to proceed with this work prior to a formal change order being processed, please check the accepted box, sign and return. If accepted, this will be included on a future change order. □Accepted □Not Accepted _____________________________ ______________ Signature Date Breakdown for Change Order Request (COR) #21 by Market & Johnson Dated: 10/30/2025 M&J Contract Tax Exempt Purchases Owner Direct Purchases SUBCONTRACTED WORK SCOPE OF WORK $0.00 $0.00 $0.00 SELF PERFORMED QTY U/M UNIT COST $3,270.88 $0.00 $0.00 $3,270.88 0.71% $23.22 $32.94 15.00% $490.63 5.00% $0.00 Net Change $3,817.67 $0.00 $0.00 TOTAL OVERALL CHANGE TO PROJECT M&J Project #3416 Otsego Wellhouse No. 4 Water Treatment Improvements Otsego, MN Subtotal of Subcontracted Work Market & Johnson $3,817.67 Mark-up on Self Performed Work Additional G/L Insurance Required Additional Payment/Performance Bond Mark-up on Subcontracted Work Subtotal of Self Performed Work Company Name: DATE:9/19/2025 Completed By:(Name)PROJECT: 3416 - Otsego Wellhouse #4 (Phone)M&J's COR #: (Email)Vendor's # Agreement #: DESCRIPTION OF WORK: LABOR Trade ST/OT/DT RATE # OF HOURS TOTAL ST 107.49$ 12.00 1,289.88$ Subtotal Hours & Labor Cost 12.00 1,289.88$ MATERIALS & EQUIPMENT Items UM UNIT PRICE QUANTITY TOTAL LS 1,981.00$ 1.00 1,981.00$ Subtotal Materials & Equipment 1,981.00$ SUBCONTRACTORS (attached their breakdown) Company TOTAL Subtotal Subcontractors -$ ADDITIONAL COSTS Overhead & Profit Labor, Materials, Equipment Mark-up % = -$ Overhead & Profit Subcontractors Mark-up % = -$ Subtotal Additional Costs -$ 3,270.88$ Does this request require additional working days?No If Yes, # of working days? Does this change have lead-time dependent materials associated? No # of days? Vendor to complete this form or submit similar breakdown on your letterhead Itemize adds and deducts for the proposed change. Attach all subcontractor quotes and their breakdowns. Market & Johnson Joey Koller N/A VENDOR BREAKDOWN Additional roof hardware required for RFI #28 response. Threaded Rod, Plates and Nuts Carpenter N/A TOTAL COST Sub's Scope of Work 1 Ana Sebesta From:Cory Fedder Sent:Wednesday, August 27, 2025 2:27 PM To:Joey Koller Subject:FW: Otsego Well House #4 This is what Superior Iron sent back for the threaded rod and plates. Please let me know if I should order them or not. Thanks, Cory Cory Fedder Project Superintendent Mobile: 715-210-2559 • Main: 715-834-1213 www.market-johnson.com GENERAL CONTRACTORS • CONSTRUCTION MANAGERS From: Josh Brittan <JBrittan@superioriron.com> Sent: Wednesday, August 27, 2025 2:26 PM To: Cory Fedder <cfedder@market-johnson.com> Subject: RE: Otsego Well House #4 Got it. Cost would be $1,981. Let me know and I can get my shop on it. Josh Brittan | Superior Iron LLC Project Manager C: 763-202-9565 JBrittan@SuperiorIron.com www.SuperiorIron.com From: Cory Fedder <cfedder@market-johnson.com> Sent: Wednesday, August 27, 2025 1:58 PM To: Josh Brittan <JBrittan@superioriron.com> Subject: RE: Otsego Well House #4 Plain Materials. It will have to be American steel. 2 Cory Fedder Project Superintendent Mobile: 715-210-2559 • Main: 715-834-1213 www.market-johnson.com GENERAL CONTRACTORS • CONSTRUCTION MANAGERS From: Josh Brittan <JBrittan@superioriron.com> Sent: Wednesday, August 27, 2025 1:56 PM To: Cory Fedder <cfedder@market-johnson.com> Subject: RE: Otsego Well House #4 Do these need to be galvanized or just plain material work? Josh Brittan | Superior Iron LLC Project Manager C: 763-202-9565 JBrittan@SuperiorIron.com www.SuperiorIron.com From: Cory Fedder <cfedder@market-johnson.com> Sent: Wednesday, August 27, 2025 1:08 PM To: Josh Brittan <JBrittan@superioriron.com> Subject: Otsego Well House #4 Hey Josh, I am looking for a few more items for the well house. I attached a small drawing showing the intent of the threaded rod. Please let me know if your able to make these or have any questions. Thanks, Cory 1. 44- ¼”X4”X4” plate with a 7/8” hole in the center 2. 22- ¾” threaded rod 17” long. 3. 44- ¾” nut 3 Cory Fedder Project Superintendent Mobile: 715-210-2559 Main: 715-834-1213 -www.market-johnson.com GENERAL CONTRACTORS • CONSTRUCTION MANAGERS Cory Fedder Project Superintendent Mobile: 715-210-2559 • Main: 715-834-1213 www.market-johnson.com GENERAL CONTRACTORS • CONSTRUCTION MANAGERS