Item 3.12 Change Orders for Wellhouse 4 WTP Project Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Utilities Utility Manager Neidermeier October 27, 2025 PRESENTER(s) REVIEWED BY: ITEM #: Consent AE2S Engineer Hanson City Administrator/Finance Director Flaherty 3.12 – Change Orders for Wellhouse 4 WTP Project STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City Staff are recommending that the Council approve several Change Order Requests for the Wellhouse No. 4 Water Treatment Plant (WTP) project. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: The following table summarizes the change orders being submitted for Council consideration related to the Wellhouse No. 4 Treatment Improvements project. These were reviewed by the Public Works Subcommittee on October 15, 2025. Additional details on each change order are provided below. Change Order Request # Description Amount 011R1 Flowable fill below south addition footings $26,783.27 014R1 Reusing/modifying existing SSMH 103 ($9,788.08) 016 Process filter-to-waste valve removal ($5,266.14) 013R1 Modifications to submersible pumps and accessories to increase pump efficiency $3,982.69 010 Addition of a lintel at Door 110 $2,359.56 007 Upsizing blower pipe intake from 4" to 6" piping $2,312.56 COR 011R1 There is a portion of the building expansion footing that spans between the existing building and the completed backwash tank. The Engineer has expressed concern about differential settlement between the backfill soil beneath the building expansion footing, the adjacent backwash tank, and the undisturbed soil below the wellhouse. Due to the limited space in this area, achieving the necessary compaction would be difficult to confirm. To prevent future settlement in this critical area, it is recommended to place a controlled low strength material (CLSM) below the footings. This proposal includes all labor and materials associated with excavating, forming, and pouring the CLSM flowable fill and reflects an increase of $26,783.27 to the construction contract, along with a 2-day extension. COR 014R1 Upon inspection of the existing manhole planned for demolition and replacement with a new drop structure, the Contractor determined that the existing manhole was in excellent condition. Instead of replacement, the Contractor proposed modifying the existing structure to add a drop pipe. This proposal reflects a deduction of $9,788.08 to the construction contract for removing the cost of a new manhole. COR 016 During the submittal review for the pressure filter process piping, the filter manufacturer recommended a design modification to improve operational efficiency. This change resulted in a redundant filter to waste function. This proposal reflects a deduction of $5,266.14 to the construction contract for removing the redundant valve and associated piping. COR 013R1 During submittal review of the submersible pumps, the pump manufacturer recommended upgrading to a more durable and efficient model to better meet the specified duty points. This proposal reflects an addition of $3,982.69 to the construction contract for labor and materials associated with the pump upgrade. COR 010 During construction, it was determined that an additional door lintel was required to install Door 110 in the opening where the former overhead garage door was located. This proposal reflects an addition of $2,359.56 to the construction contract for labor and materials to add a support lintel for Door 110 installation. COR 007 During submittal review of the backwash blower, the manufacturer recommended upsizing the intake piping from 4” to 6” to ensure adequate air supply. This proposal reflects an addition of $2,312.56 to the construction contract for labor and materials to upsize approximately 25 feet of intake piping. The proposed net increase in project cost for these change orders is $20,383.86 and a 2-day extension to the construction contract. This amount represents a 0.30% increase over the bid cost and would bring the total change order net increase to 1.53% for the project. A contingency amount of 5.0% is included in the project budget and financing package. SUPPORTING DOCUMENTS ATTACHED: •Detailed proposals for Change Order Request 011R1, 014R1, 016, 013R1, 010, 007 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to approve Change Order Proposals as indicated in the table above in the amount of $20,383.86 to Market & Johnson and grant a 2-day extension to the Substantial and Final Completion dates. BUDGET INFORMATION FUNDING: BUDGETED: Fund 601 – Drinking Water Utility Yes TO: DATE: RE:Change Order Request (COR) #11 R1 ATTN: REQUESTED BY WHOM: COST OF WORK: Changes to Market & Johnson's Scope of Work (see attached breakdown)…………...$26,783.27 OVERALL CHANGE TO PROJECT $26,783.27 The Contract Time will be INCREASED by 2 working days for this change This proposal may be withdrawn by us if not accepted within 30 calendar days. Assistant Project Manager Enclosures cc: Joey Koller COMMENTS / ADD'L NOTES Sincerely, MARKET & JOHNSON, INC. M&J Project #3416 Market & Johnson, Inc. 2350 Galloway Street PO Box 630 Eau Claire, WI 54702-0630 Ph. 715.834.1213 Fax. 715.834.2331 CHANGE ORDER REQUEST (COR) Advanced Engineering and Environmental Services, LLC 6901 E Fish Lake Road Suite 184 Maple Grove, MN 55369 October 15, 2025 Otsego Wellhouse No. 4 Water Treatment Improvements Otsego, MN Ryan Hanson DESCRIPTION OF CHANGE: RFP#09 - Flowable Fill Beneath the South Addition Footings TIME: If you would like us to proceed with this work prior to a formal change order being processed, please check the accepted box, sign and return. If accepted, this will be included on a future change order. □Accepted □Not Accepted _____________________________ ______________ Signature Date Breakdown for Change Order Request (COR) #11 R1 by Market & Johnson Dated: 10/15/2025 M&J Contract Tax Exempt Purchases Owner Direct Purchases SUBCONTRACTED WORK SCOPE OF WORK $8,478.12 $8,478.12 $0.00 $0.00 SELF PERFORMED QTY U/M UNIT COST $15,143.30 $0.00 $15,143.30 0.71% $167.71 $237.89 15.00% $2,332.34 5.00% $423.91 Net Change $26,783.27 $0.00 $0.00 TOTAL OVERALL CHANGE TO PROJECT $26,783.27 Mark-up on Self Performed Work Additional G/L Insurance Required Additional Payment/Performance Bond Mark-up on Subcontracted Work Subtotal of Self Performed Work Subtotal of Subcontracted Work Market & Johnson Quad E M&J Project #3416 Otsego Wellhouse No. 4 Water Treatment Improvements Otsego, MN Quad E Companies, Inc. Lakeville, MN 612-462-0629 info@QuadECompanies.com QuadECompanies.com Quad E Companies, Inc is an affirmative action, equal opportunity employer. Quad E Companies Inc is a certified DBE/WBE Business, MN Targeted Group Wmn Owned Business (0000950860) & Central Cert Wmn Owned Business (2016-20436449) 8/27/25 COR#11 Please see the following Change Order for work completed for the Well House Project in, Otsego MN by Quad E Companies, Inc. following review from owner. Total - $8478.12 Foreman – 8hr x $104.50 = $836 Labor – 8hr x $88.22 = $705.76 Operator – 8hr x $93.36 = $746.88 Operator – 8hr x $93.36= $746.88 Skid – 8hr x $125 = $1000 Hoe – 8hr x $173.75 = $1390 Dump Truck Quad Axle– 8hr x $150= $1200 Total Cost = $7372.28 OH – 10% = $737.23 Profit - 5% = $368.61 TO: DATE: RE:Change Order Request (COR) #013 R1 ATTN: REQUESTED BY WHOM: COST OF WORK: Changes to Market & Johnson's Scope of Work (see attached breakdown)…………...$3,982.69 OVERALL CHANGE TO PROJECT $3,982.69 The Contract Time will be unchanged by zero days for this change. This proposal may be withdrawn by us if not accepted within 30 calendar days. Assistant Project Manager Enclosures cc: M&J Project #3416 Market & Johnson, Inc. 2350 Galloway Street PO Box 630 Eau Claire, WI 54702-0630 Ph. 715.834.1213 Fax. 715.834.2331 CHANGE ORDER REQUEST (COR) Advanced Engineering and Environmental Services, LLC 6901 E Fish Lake Road Suite 184 Maple Grove, MN 55369 October 14, 2025 Otsego Wellhouse No. 4 Water Treatment Improvements Otsego, MN Ryan Hanson DESCRIPTION OF CHANGE: Modifications to Submersible Pumps and Accessories TIME: COMMENTS / ADD'L NOTES Sincerely, MARKET & JOHNSON, INC. Joey Koller If you would like us to proceed with this work prior to a formal change order being processed, please check the accepted box, sign and return. If accepted, this will be included on a future change order. □Accepted □Not Accepted _____________________________ ______________ Signature Date Breakdown for Change Order Request (COR) #013 by Market & Johnson Dated: 09/03/2025 M&J Contract Tax Exempt Purchases Owner Direct Purchases SUBCONTRACTED WORK SCOPE OF WORK $3,732.00 $3,732.00 $0.00 $0.00 SELF PERFORMED QTY U/M UNIT COST $0.00 $0.00 $0.00 $0.00 0.71% $26.50 $37.59 15.00% $0.00 5.00% $186.60 Net Change $3,982.69 $0.00 $0.00 TOTAL OVERALL CHANGE TO PROJECT M&J Project #3416 Otsego Wellhouse No. 4 Water Treatment Improvements Otsego, MN General Repair Service Subtotal of Subcontracted Work $3,982.69 Mark-up on Self Performed Work Additional G/L Insurance Required Additional Payment/Performance Bond Mark-up on Subcontracted Work Subtotal of Self Performed Work General Repair Service 3535 International Dr. Vadnais Heights, MN 55110 651-766-0874 www.generalrepair.com Pump Sales and Service Premium line of Pumps and Blowers for: Industrial – Water -- Waste Water – Lift stations – Sanitary To: Market & Johnson From: Sami Kinnunen Date: 10/14/2025 Subject: Otsego Well House NO 4 Water Treatment Improvements - Change Order Details This change order outlines the differences between the submersible pumps and accessories that General Repair initially intended to supply and the final approved equipment. All changes remain in compliance with the specifications listed in Section 43 25 00. Initial Total $62,500.00 New Total $66,232.00 Total cost of Change Order $ 3,732.00 Initial Selection: SP1&2: (2) 3” AMS HOMA Pumps with 3” Auto Couplers RP1&2: (2) 4” OC HOMA Pumps with 4” Auto Couplers New Selection: SP1&2: (2) 3” OC HOMA Pumps with 3” Auto Couplers RP1&2: (2) 3” OC HOMA Pumps with 3” Auto Couplers The pumps were revised following a request from the engineer after the initial proposal was accepted, specifically to reduce the discharge diameter of the SP pumps from 4" to 3" on the HOMA models. During the reevaluation, the OC pumps were selected over the originally proposed AMS models due to their superior efficiency and performance at the required duty points. Thank you, Sami Kinnunen Company Name: DATE:9/19/2025 Completed By:(Name)PROJECT: 3416 - Otsego Wellhouse #4 (Phone)M&J's COR #:11 (Email)Vendor's # Agreement #: DESCRIPTION OF WORK: LABOR Trade ST/OT/DT RATE # OF HOURS TOTAL ST 107.49$ 18.00 1,934.82$ ST 98.08$ 6.00 588.48$ Subtotal Hours & Labor Cost 24.00 2,523.30$ MATERIALS & EQUIPMENT Items UM UNIT PRICE QUANTITY TOTAL CY 155.00$ 64.00 9,920.00$ Day 2,700.00$ 1.00 2,700.00$ Subtotal Materials & Equipment 12,620.00$ SUBCONTRACTORS (attached their breakdown) Company TOTAL Subtotal Subcontractors -$ ADDITIONAL COSTS Overhead & Profit Labor, Materials, Equipment Mark-up % = -$ Overhead & Profit Subcontractors Mark-up % = -$ Subtotal Additional Costs -$ 15,143.30$ Does this request require additional working days?Yes If Yes, # of working days?2 Does this change have lead-time dependent materials associated? No # of days? Vendor to complete this form or submit similar breakdown on your letterhead Itemize adds and deducts for the proposed change. Attach all subcontractor quotes and their breakdowns. TOTAL COST Sub's Scope of Work Concrete Pump VENDOR BREAKDOWN Pour 6.8' of flowable fill beneath south addition footing Flowable Fill Carpenter Laborer N/A Market & Johnson Joey Koller N/A TO: DATE: RE:Change Order Request (COR) #14 ATTN: REQUESTED BY WHOM: COST OF WORK: Changes to Market & Johnson's Scope of Work (see attached breakdown)…………...($9,788.08) OVERALL CHANGE TO PROJECT ($9,788.08) The Contract Time will be unchanged by zero days for this change. This proposal may be withdrawn by us if not accepted within 30 calendar days. Assistant Project Manager Enclosures cc: Joey Koller COMMENTS / ADD'L NOTES This item is not on the critical path so it does not warrant a deduct in contract days. Sincerely, MARKET & JOHNSON, INC. M&J Project #3416 Market & Johnson, Inc. 2350 Galloway Street PO Box 630 Eau Claire, WI 54702-0630 Ph. 715.834.1213 Fax. 715.834.2331 CHANGE ORDER REQUEST (COR) Advanced Engineering and Environmental Services, LLC 6901 E Fish Lake Road Suite 184 Maple Grove, MN 55369 September 22, 2025 Otsego Wellhouse No. 4 Water Treatment Improvements Otsego, MN Ryan Hanson DESCRIPTION OF CHANGE: RFP #12 - SSMH 103 TIME: If you would like us to proceed with this work prior to a formal change order being processed, please check the accepted box, sign and return. If accepted, this will be included on a future change order. □Accepted □Not Accepted _____________________________ ______________ Signature Date Breakdown for Change Order Request (COR) #14 by Market & Johnson Dated: 09/22/2025 M&J Contract Tax Exempt Purchases Owner Direct Purchases SUBCONTRACTED WORK SCOPE OF WORK ($9,171.99) ($9,171.99) $0.00 $0.00 SELF PERFORMED QTY U/M UNIT COST $0.00 $0.00 $0.00 0.00% ($65.12) ($92.37) 0.00% $0.00 0.00% ($458.60) Net Change ($9,788.08) $0.00 $0.00 TOTAL OVERALL CHANGE TO PROJECT ($9,788.08) Mark-up on Self Performed Work Additional G/L Insurance Required Additional Payment/Performance Bond Mark-up on Subcontracted Work Subtotal of Self Performed Work Subtotal of Subcontracted Work Quad E M&J Project #3416 Otsego Wellhouse No. 4 Water Treatment Improvements Otsego, MN 1 Ana Sebesta From:Joey Koller Sent:Monday, September 22, 2025 11:16 AM To:Ashley Carlson; Ana Sebesta Subject:Fw: 3416 - Otsego Wellhouse No. 4 - Request for Quote - COR#14 See email below for RFP #12 in Otsgeo. Joey Koller Assistant Project Manager Mobile: 715-563-5945 • Main: 715-834-1213 www.market-johnson.com GENERAL CONTRACTORS • CONSTRUCTION MANAGERS From: Brian Haan <brian@quadecompanies.com> Sent: Monday, September 22, 2025 11:12 AM To: Joey Koller <jokoller@market-johnson.com> Subject: FW: 3416 - Otsego Wellhouse No. 4 - Request for Quote - COR#14 Brian Haan Project Manager/Estimator Quad E Companies, Inc Earthwork, Site Utilities, Demolition, and Trucking Direct: 651-368-5471 From: Tony Diehl <Tony.Diehl@ckccontracting.com> Date: Monday, September 22, 2025 at 7:02 AM To: Brian Haan <brian@quadecompanies.com> Subject: FW: 3416 - Otsego Wellhouse No. 4 - Request for Quote - COR#14 Labor: $4,545.60 Material: $0 Equipment $4,626.39 Subcontractor: $0 2 Tony Diehl Vice President (651) 436-4160 Office (763) 228-0656 Cell 501 Maryland Ave W St. Paul, MN 55117 ckccontracting.com From: Brian Haan <brian@quadecompanies.com> Sent: Friday, September 19, 2025 11:12 AM To: Tony Diehl <Tony.Diehl@ckccontracting.com> Subject: FW: 3416 - Otsego Wellhouse No. 4 - Request for Quote - COR#14 Can you get me the price reduction for this. Thanks, Brian Haan Project Manager/Estimator Quad E Companies, Inc Earthwork, Site Utilities, Demolition, and Trucking Direct: 651-368-5471 From: Ashley Carlson <acarlson@market-johnson.com> Date: Thursday, September 11, 2025 at 9:25 AM To: Brian Haan <brian@quadecompanies.com> Cc: Joey Koller <jokoller@market-johnson.com>, Ana Sebesta <asebesta@market-johnson.com>, Cory Fedder <cfedder@market-johnson.com> Subject: 3416 - Otsego Wellhouse No. 4 - Request for Quote - COR#14 Otsego Wellhouse No. 04 Water Treatment Improvements Otsego, MN REQUEST FOR QUOTE FOR COR #14 The Architect has issued Request for Proposal (RFP) #12, which is attached, and has requested a formal proposal be submitted for this work. Please review the changes to the scope of work as noted in this RFP and submit a written proposal to our office by, 09/19/2025 noting add, deduct or no change dollar amount of this change. All proposals MUST be itemized: Labor...................................................................................... $ Material.................................................................................. $ Equipment............................................................................. $ Subcontracted Work............................................................ $ 3 COR#14 must appear on your proposal. Thank you! Ashley Carlson Organizational Program Coordinator Direct: 715-832-8931 • Main: 715-834-1213 www.market-johnson.com GENERAL CONTRACTORS • CONSTRUCTION MANAGERS TO: DATE: RE:Change Order Request (COR) #16 ATTN: REQUESTED BY WHOM: COST OF WORK: Changes to Market & Johnson's Scope of Work (see attached breakdown)…………...($5,266.14) OVERALL CHANGE TO PROJECT ($5,266.14) The Contract Time will be unchanged by zero days for this change. This proposal may be withdrawn by us if not accepted within 30 calendar days. Assistant Project Manager Enclosures cc: Joey Koller COMMENTS / ADD'L NOTES Sincerely, MARKET & JOHNSON, INC. M&J Project #3416 Market & Johnson, Inc. 2350 Galloway Street PO Box 630 Eau Claire, WI 54702-0630 Ph. 715.834.1213 Fax. 715.834.2331 CHANGE ORDER REQUEST (COR) Advanced Engineering and Environmental Services, LLC 6901 E Fish Lake Road Suite 184 Maple Grove, MN 55369 October 15, 2025 Otsego Wellhouse No. 4 Water Treatment Improvements Otsego, MN Ryan Hanson DESCRIPTION OF CHANGE: RFP#13 - Filter to Waste Valve Adjustment TIME: If you would like us to proceed with this work prior to a formal change order being processed, please check the accepted box, sign and return. If accepted, this will be included on a future change order. □Accepted □Not Accepted _____________________________ ______________ Signature Date Breakdown for Change Order Request (COR) #16 by Market & Johnson Dated: 10/15/2025 M&J Contract Tax Exempt Purchases Owner Direct Purchases SUBCONTRACTED WORK SCOPE OF WORK ($1,285.00) ($3,650.00) ($4,935.00) $0.00 $0.00 SELF PERFORMED QTY U/M UNIT COST $0.00 $0.00 $0.00 0.00% ($35.04) ($49.35) 0.00% $0.00 0.00% ($246.75) Net Change ($5,266.14) $0.00 $0.00 TOTAL OVERALL CHANGE TO PROJECT ($5,266.14) Mark-up on Self Performed Work Additional G/L Insurance Required Additional Payment/Performance Bond Mark-up on Subcontracted Work Subtotal of Self Performed Work Subtotal of Subcontracted Work DK Mechanical Kurita M&J Project #3416 Otsego Wellhouse No. 4 Water Treatment Improvements Otsego, MN Attn: Market & Johnson Date: 10-14-2025 Proposed Price Change: COR #16 RFP #13 Otsego Wellhouse No. 4 COR #16 RFP #13 DK Mechanical Contractors LLC is pleased to provide a proposal for the piping changes for the Otsego Wellhouse No. 4 COR #16 RFP #13. Scope • Process Labor Changes Excludes • Process piping provided with the filter package. • Painting • Items other than Process Piping Proposal The proposed process changes for Otsego Wellhouse No. 4 COR#16 RFP #13 is a labor deduct of $1,285.00. 1 Ana Sebesta From:Nate HAGLUND <n.haglund@kurita-water.com> Sent:Tuesday, October 14, 2025 4:19 PM To:Joey Koller; Ashley Carlson Cc:Ana Sebesta Subject:RE: [EXT]Re: [EXT]3416 - Otsego Wellhouse No. 4 - Request for Quote - COR#16 Categories:Do Now Joey, We would do a deduct of $3650 for the valve and piping changes. Let me know if any questions, if not I can get a change order over to you. Nate Haglund Project Manager Mobile 763-452-8043 | n.haglund@kurita-water.com Kurita America Inc. | www.kuritaamerica.com From: Joey Koller <jokoller@market-johnson.com> Sent: Tuesday, October 14, 2025 1:02 PM To: Nate HAGLUND <n.haglund@kurita-water.com>; Ashley Carlson <acarlson@market-johnson.com> Cc: Ana Sebesta <asebesta@market-johnson.com> Subject: [EXT]Re: [EXT]3416 - Otsego Wellhouse No. 4 - Request for Quote - COR#16 Importance: High Nate, Following up on this. I really need this back today to make it on the city's board meeting for tomorrow. Thanks, Joey Koller Assistant Project Manager Mobile: 715-563-5945 • Main: 715-834-1213 www.market-johnson.com GENERAL CONTRACTORS • CONSTRUCTION MANAGERS TO: DATE: RE:Change Order Request (COR) #10 ATTN: REQUESTED BY WHOM: COST OF WORK: Changes to Market & Johnson's Scope of Work (see attached breakdown)…………...$2,359.56 OVERALL CHANGE TO PROJECT $2,359.56 The Contract Time will be unchanged by zero days for this change. This proposal may be withdrawn by us if not accepted within 30 calendar days. Assistant Project Manager Enclosures cc: M&J Project #3416 Market & Johnson, Inc. 2350 Galloway Street PO Box 630 Eau Claire, WI 54702-0630 Ph. 715.834.1213 Fax. 715.834.2331 CHANGE ORDER REQUEST (COR) Advanced Engineering and Environmental Services, LLC 6901 E Fish Lake Road Suite 184 Maple Grove, MN 55369 October 3, 2025 Otsego Wellhouse No. 4 Water Treatment Improvements Otsego, MN Ryan Hanson DESCRIPTION OF CHANGE: RFP#06 - Added Door 110 Lintel TIME: COMMENTS / ADD'L NOTES Sincerely, MARKET & JOHNSON, INC. Joey Koller If you would like us to proceed with this work prior to a formal change order being processed, please check the accepted box, sign and return. If accepted, this will be included on a future change order. □Accepted □Not Accepted _____________________________ ______________ Signature Date Breakdown for Change Order Request (COR) #10 by Market & Johnson Dated: 10/03/2025 M&J Contract Tax Exempt Purchases Owner Direct Purchases SUBCONTRACTED WORK SCOPE OF WORK $903.10 $0.00 $950.00 $1,853.10 $0.00 $0.00 SELF PERFORMED QTY U/M UNIT COST $322.47 $0.00 $322.47 0.71% $15.45 $21.91 15.00% $53.97 5.00% $92.66 Net Change $2,359.56 $0.00 $0.00 TOTAL OVERALL CHANGE TO PROJECT M&J Project #3416 Otsego Wellhouse No. 4 Water Treatment Improvements Otsego, MN Amerect Steel Paramount Masonry Nick's Welding Subtotal of Subcontracted Work Market & Johnson $2,359.56 Mark-up on Self Performed Work Additional G/L Insurance Required Additional Payment/Performance Bond Mark-up on Subcontracted Work Subtotal of Self Performed Work VENDOR BREAKDOWN Company Name:Amerect Inc.DATE:8/20/2025 Completed By:Kyle Staffanson (Name)PROJECT:Otsego Wellhouse #4 9522289900 (Phone)M&J's COR #:10 kyle.staffanson@amerectinc.com (Email)Vendor's # Agreement #: DESCRIPTION OF WORK: Layout for (2) - L5x5x3/8" back to back CMU lintel.Saw cut bent plate into CMU. Epoxy bent plate at CMU. Install and weld angles to bent plate. LABOR Trade ST/OT/DT RATE # OF HOURS TOTAL Ironworker ST $150.00 3.00 $450.00 Ironworker Foreman ST $157.00 2.00 $314.00 Subtotal Hours & Labor Cost 5.00 $764.00 MATERIALS & EQUIPMENT Items UM UNIT PRICE QUANTITY TOTAL Saw HR $9.00 1.00 $9.00 Welding Machine HR $24.00 2.00 $48.00 Subtotal Materials & Equipment $57.00 SUBCONTRACTORS (attached their breakdown) Company Sub's Scope of Work TOTAL Subtotal Subcontractors $- ADDITIONAL COSTS Overhead & Profit Labor, Materials, Equipment Mark-up % =10.00%$82.10 Overhead & Profit Subcontractors Mark-up % =$- Subtotal Additional Costs $82.10 TOTAL COST $903.10 Does this request require additional working days?No If Yes, # of working days? Does this change have lead-time dependent materials associated? No # of days? Vendor to complete this form or submit similar breakdown on your letterhead Itemize adds and deducts for the proposed change. Attach all subcontractor quotes and their breakdowns. Company Name:DATE:9/19/2025 Completed By:(Name)PROJECT:3416 - Otsego Wellhouse #4 (Phone)M&J's COR #:10 (Email)Vendor's # Agreement #: DESCRIPTION OF WORK: LABOR Trade ST/OT/DT RATE # OF HOURS TOTAL ST 107.49$ 3.00 322.47$ Subtotal Hours & Labor Cost 3.00 322.47$ MATERIALS & EQUIPMENT Items UM UNIT PRICE QUANTITY TOTAL Subtotal Materials & Equipment -$ SUBCONTRACTORS (attached their breakdown) Company TOTAL Subtotal Subcontractors -$ ADDITIONAL COSTS Overhead & Profit Labor, Materials, Equipment Mark-up % =-$ Overhead & Profit Subcontractors Mark-up % =-$ Subtotal Additional Costs -$ 322.47$ Does this request require additional working days?No If Yes, # of working days? Does this change have lead-time dependent materials associated? No # of days? Vendor to complete this form or submit similar breakdown on your letterhead Itemize adds and deducts for the proposed change. Attach all subcontractor quotes and their breakdowns. Market & Johnson Joey Koller N/A VENDOR BREAKDOWN Pour 6.8' of flowable fill beneath south addition footing Carpenter N/A TOTAL COST Sub's Scope of Work TO: DATE: RE:Change Order Request (COR) #007 ATTN: REQUESTED BY WHOM: COST OF WORK: Changes to Market & Johnson's Scope of Work (see attached breakdown)…………...$2,312.56 OVERALL CHANGE TO PROJECT $2,312.56 The Contract Time will be unchanged by zero days for this change. This proposal may be withdrawn by us if not accepted within 30 calendar days. Assistant Project Manager Enclosures cc: M&J Project #3416 Market & Johnson, Inc. 2350 Galloway Street PO Box 630 Eau Claire, WI 54702-0630 Ph. 715.834.1213 Fax. 715.834.2331 CHANGE ORDER REQUEST (COR) Advanced Engineering and Environmental Services, LLC 6901 E Fish Lake Road Suite 184 Maple Grove, MN 55369 August 28, 2025 Otsego Wellhouse No. 4 Water Treatment Improvements Otsego, MN Ryan Hanson DESCRIPTION OF CHANGE: FO#05 - Process Piping Blower Modifications TIME: COMMENTS / ADD'L NOTES Sincerely, MARKET & JOHNSON, INC. Joey Koller If you would like us to proceed with this work prior to a formal change order being processed, please check the accepted box, sign and return. If accepted, this will be included on a future change order. □Accepted □Not Accepted _____________________________ ______________ Signature Date Breakdown for Change Order Request (COR) #007 by Market & Johnson Dated: 08/28/2025 M&J Contract Tax Exempt Purchases Owner Direct Purchases SUBCONTRACTED WORK SCOPE OF WORK $2,167.00 $2,167.00 $0.00 $0.00 SELF PERFORMED QTY U/M UNIT COST $0.00 $0.00 $0.00 $0.00 0.71% $15.39 $21.82 15.00% $0.00 5.00% $108.35 Net Change $2,312.56 $0.00 $0.00 TOTAL OVERALL CHANGE TO PROJECT M&J Project #3416 Otsego Wellhouse No. 4 Water Treatment Improvements Otsego, MN DK Mechanical Subtotal of Subcontracted Work $2,312.56 Mark-up on Self Performed Work Additional G/L Insurance Required Additional Payment/Performance Bond Mark-up on Subcontracted Work Subtotal of Self Performed Work Company Name: DATE:7/29/2025 Completed By:(Name)PROJECT: Otsego Wellhouse No. 4 WTP (Phone)M&J's COR #:7 (Email)Vendor's # Agreement #: DESCRIPTION OF WORK: LABOR Trade ST/OT/DT RATE # OF HOURS TOTAL 155.00$ 5.00 775.00$ Subtotal Hours & Labor Cost 5.00 775.00$ MATERIALS & EQUIPMENT Items UM UNIT PRICE QUANTITY TOTAL 1,195.00$ 1.00 1,195.00$ Subtotal Materials & Equipment 1,195.00$ SUBCONTRACTORS (attached their breakdown) Company TOTAL Subtotal Subcontractors -$ ADDITIONAL COSTS Overhead & Profit Labor, Materials, Equipment Mark-up % = 10.00% 197.00$ Overhead & Profit Subcontractors Mark-up % = -$ Subtotal Additional Costs 197.00$ 2,167.00$ Does this request require additional working days?No If Yes, # of working days? Does this change have lead-time dependent materials associated? No # of days? Vendor to complete this form or submit similar breakdown on your letterhead Itemize adds and deducts for the proposed change. Attach all subcontractor quotes and their breakdowns. TOTAL COST Sub's Scope of Work VENDOR BREAKDOWN Process pipe changes from Filed Order #05 COR#7. Increase blower intake piping from 4" to 6" and add 6"x4" reducer. Process Pipe Material, Fittings and Accessories Process Pipe 952-495-0114 DK Mechanical Contractors LLC Kyle Nikula kyle_nikula@dkmechanical.org