Loading...
3.27 GCC CUP Amendment Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Planning City Planner Licht 13 December 2021 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty City Engineer Wagner City Attorney Kendall 3.27 – GCC CUP Amendment STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. X Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends adoption of a resolution vacating a portion of an existing drainage and utility easement, approval of revised site and building plans as well as a CUP amendment, and approval of a revised Site Improvement Performance Agreement. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? Yes Yes, held by Planning Commission 6 December 2021 BACKGROUND/JUSTIFICATION: GCC of America received approval for development of Lot 1, Block 1 Otsego Industrial Park Sixth Addition as a cement storage and transfer facility on 24 August 2020. The application included approval of a conditional use permit for six storage silos that were to be 40 feet in diameter and 96 feet in height. The developer is proposing to increase the diameter of the silos to 45 feet while maintaining the approved height. The increase in the volume of the silos requires consideration of an amendment to the approved conditional use permit. The developer is also proposing other site changes as a result of an area previously identified as wetland not being classified as such. A public hearing to consider the applications was held by the Planning Commission at their meeting on 6 December 2021. Mr. Jack Matasosky of Appro Development attended via teleconference as the applicant. There were no public comments. The Planning Commission reviewed the operations of the site regarding unloading/loading of the cement, hours, noise, and access. The Planning Commission closed the public hearing and voted 7-0 to recommend approval of the application subject to the conditions as recommended by City staff. SUPPORTING DOCUMENTS ATTACHED: ▪ Planning Report dated 1 December 2021 ▪ Findings of Fact and Decision ▪ Resolution 2021-99 vacating existing drainage and utility easements ▪ Resolution 2021-103 approving a revised SIPA ▪ Site Improvement Performance Agreement POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to approve revised site and building plans and a conditional use permit amendment subject to conditions as stated within the findings of fact and decision; adopt Resolution 2021-99 vacating existing drainage and utility easements; and adopt Resolution 2021-103 approving a revised Site Improvement Performance Agreement all for Lot 1, Block 1, Otsego Industrial Park 6th Addition. BUDGET INFORMATION FUNDING: BUDGETED: N/A N/A 3601 Thurston Avenue Anoka, MN 55303 763.231.5840 TPC@PlanningCo.com 1 PLANNING REPORT  TO:  Otsego Planning Commission  FROM:  D.Daniel Licht, AICP REPORT DATE:  1 December 2021  60‐DAY DATE:  10 January 2021  RE:  Otsego – GCC of America; CUP Amendment  TPC FILE:101.02  BACKGROUND  GCC of America received approval for development of Lot 1, Block 1 Otsego Industrial Park Sixth  Addition as a cement storage and transfer facility on 24 August 2020.  The application included  approval of a conditional use permit for six storage silos that were to be 40 feet in diameter and  96 in height.  The developer is proposing to increase the diameter of the silos to 45 feet while  maintaining the approved height.   The increase in the volume of the silos requires  consideration of an amendment to the approved conditional use permit.  The developer is also  proposing other site changes as a result of an area previously identified as wetland not being  classified as such.   A public hearing to consider the applications is to be held by the Planning  Commission at their meeting on 6 December 2021.      Exhibits:  Site Location Map Applicant Narrative Easement Vacation Exhibit Architectural plans dated 10/15/2021 (10 pages) Site Plan dated 10/27/2021 (4 sheets) Landscape Plan dated 10/27/2021 (2 sheets) Phasing Plan dated 10/27/2021 Grading Plan dated 10/27/2021 Utility Plan dated 10/27/2021 Stormwater Plan 10/27/2021 Item 3.1 2 ANALYSIS        Comprehensive Plan.  The subject site is guided by the 2012 Comprehensive Plan for  commercial uses within the West Sewer District.  The commercial designation is based upon  anticipation of construction of an interchange at I‐94 and Kadler Avenue.  MND0T, Wright  County, and the City have no timeline for when this interchange may be constructed or  whether it will be at the previously planned location.   The proposed use is being located  specifically to utilize access to the existing Burlington Northern‐Santa Fe Rail line that is parallel  to the south side of I‐94 along the north line of the subject site.  The access to rail is a unique  element of the project unavailable in areas of the City planned for industrial use.  Expansion of  industrial uses is further consistent with the City’s economic development goals to add  employment and expand tax base.  Development of the proposed use is consistent with the  2012 Comprehensive Plan.    Zoning.  The proposed use involves unloading of cement materials from a rail spur off of the  abutting BNSF rail line, temporary storage on‐site, and transport off‐site by truck.  The subject  site is zoned I‐2, General Industrial District.  The proposed cement storage and transfer site is  allowed as a permitted use in accordance with Section 11‐86‐2.E of the Zoning Ordinance.    Surrounding Uses. The table below summarizes the existing and planned land uses in the area.   The proposed industrial use of the subject site will be compatible with existing industrial and  rural uses in the area, as well as planned future commercial uses to the west and low density  residential uses south of 65th Street (CSAH 37).     Direction Land Use Plan Zoning Map Existing Use  North N/A N/A I‐94  East Industrial I‐2 District Industrial  South LD Residential A‐1 District Cultivated field  West Commercial A‐1 District Farmstead/cultivated field    Storage Silos.  There are six storage silos proposed to be located on the property where cement  materials unloaded from rail cars is to be stored.  The site plan illustrates turning movements  for semi‐tractor/trailers to access the silos for loading from the north, driving through below  the silos and exiting between the office building and storage building.    The developer is  proposing to increase the diameter of the silos from 40 feet to 45 feet, increasing their volume  and overall bulk necessitating the conditional use permit amendment to re‐evaluate the effects  of the proposed height of the structures.      The silos still planned to be 96 feet in height and the elevator legs that distribute the materials  from the rail cars to the silos are 140 feet in height at the central peak.  Structures within the I‐2  District are limited to a height of 48 feet.   Section 11‐17‐3.A of the Zoning Ordinance allows  increases in height above the district limits subject to approval of a conditional use permit  provided the following criteria are met:    3 1. Demonstrated need is established for the increase in height, and said increase will not  violate the intent and character of the zoning district in which the structure is located.     Comment:  The height of the proposed silos is based on the storage capacity needs of the  proposed use and the height of the elevator legs is necessary for the functionality of the  storage systems.    2.    The site is capable of accommodating the increased structure size.     Comment:  The subject site complies with applicable requirements for lot area, width,  setbacks and building coverage indicating the site is capable of supporting the increased  height of the silos and elevator legs.    3.    The potential increased intensity and size of use does not cause an increase in traffic  volumes beyond the capacity of the surrounding streets.     Comment:  The subject site is accessed via local industrial streets and a major collector  street with adequate capacity to accommodate traffic generated by the proposed use.     4.    Public utilities and services are adequate.     Comment:  The proposed increase height for the silos and elevator legs will not effect  public service capacity.    5.    For each additional story over the district limitation or for each additional ten feet (10')  above the maximum allowed per district, front and side yard setback requirements shall  be increased by ten percent (10%).     Comment:  The silos will be required to be setback an additional 27 feet from 65th Street  (CSAH 37) and an additional 18 feet from the east and west lot lines.      6.    The construction does not limit solar access to abutting and/or neighboring properties.     Comment:  The increased structure height will not impede solar access for surrounding  properties.      The developer also is indicating that the silos are to be constructed in phases, with initial  installation of two of the structures.  Section 11‐4‐5 of the Zoning Ordinance requires  completion of all site improvements authorized by a conditional use permit within one year of  approval except as may be extended by the City Council.   City staff recommends a condition of  approval be added to the conditional use permit allowing the phased construction of the silos  to be completed within five years.   If not completed within five years, the Zoning Ordinance  does provide the developer the ability to request an additional extension.    4 Buildings.  The approved site and building plans included a 2,134 square foot office building and  20,000 square foot storage building.   The plans and area of the control building reduced to  1,536 square feet.  There is also a 432 square foot compressor building.  The architectural plans  indicate that the office and compressor buildings are to be constructed using precast fiber  cement siding.  The proposed exterior finish material for the buildings complies with the  requirements of Section 11‐17‐4.E.1 of the Zoning Ordinance provided it is board and batten or  vertical seam style.  The office building is two stories in eight with a a pitched roof and the  compressor building is one‐story also with a pitched roof.  Both buildings are within the 48 foot  building height allowed within the I‐2 District. The proposed storage building has been  relocated to west of the rail spur, increased in area to 22,500 square feet, and is indicated as  future construction.      Rail Spur.   Integral to the proposed facility is construction of a rail spur for delivery of cement  materials via the BNSF rail line that has been rehabilitated.  The single rail extends south into  the site to an elevator for off‐loading the rail cars into the storage silos.  The spur then extends  south and branches off into three separate rails for storage of 60 rail cars initially and space for  additional rail expansion for another 40 rail cars in the future.    Landscaping.  A landscape plan for the subject site has been submitted that illustrates  installation of a berm and row of coniferous trees to be installed along the north property line.   There is a single row of evergreens to the south and west of the rail car storage area to screen  the rail cars from view of CSAH 37, existing rural residential dwellings, and future residential  development to the south of the subject site.  Requiring a double row of trees at the southern  end of the rail storage tracks would require shortening the spurs, which may be considered by  the Planning Commission.   The sizes of proposed plantings is to be increased to eight feet in  order to provide for more effective screening upon installation.       The areas of the subject site not taken up by buildings, parking/driveways, and wetlands is  proposed to be seeded with a MNDoT specification low maintenance mix.   Planting this seed  mix for a more natural grasses is allowable under Section 5‐2‐3.F of the City Code.   Establishment of the natural grasses will supersede the need for irrigation required by Section  5‐2‐3.C.2 of the City Code.     Lot Requirements:     Lot Area.  Lots within the I‐2 District are required to be a minimum of 2.0 acres in area by  Section 11‐86‐7.A of the Zoning Ordinance.  The subject site is 7.34 acres in area and  complies with the minimum area requirement of the I‐2 District.     Lot Width. Lots within the I‐2 District are required to be 200 feet in width to a public  street in accordance with Section 11‐86‐7.B of the Zoning Ordinance.   The subject site is  320 feet in width measured at 65th Street (CSAH 37).  The proposed lot complies with the  lot width requirement of the I‐2 District.  5  Building Coverage.  Section 11‐86‐8 of the Zoning Ordinance establishes a 50 percent  building coverage limit for lots within the I‐2 District.  The area of the subject site  covered by the office building, compressor building, silos, and future storage building is  approximately 33,240 square feet or 10.4 percent of the area of the subject site.  The  proposed site and building plans comply with the building coverage limits of the I‐2  District.        Setbacks.   The table below outlines the setbacks applicable to the site improvements  within the subject site.  The office building is located within the footprint of the proposed  six silos.  The site plan complies with applicable setback requirements, including the  increased setbacks required for the storage silos due to their increased height.         I‐94 East CSAH 37 West  Required 30ft 20ft. 30ft. 20ft.  Storage silos 200ft. 190ft. 1,440ft. 180ft.  Future Building 350ft. 320ft. 1,280ft. 20ft.  Rail spur/storage 0ft. 70ft. 50ft. 140ft.  Required 15ft. 5ft. 15ft. 5ft.  Parking/driveways 40ft. 35ft. na 20ft.    Off‐Street Parking.   The subject site abuts 65th Street (CSAH 37) and is accessed from a  permanent cul‐de‐sac terminus of Jansen Avenue on the east line of the subject site.      The submitted site plan identifies five designated off‐street parking stall at the office control  building.  Section 11‐21‐13 of the Zoning Ordinance requires one off street parking stall per 200  square feet of office.  The architectural plans detail a 1,536 square foot, two story office  building that would require seven off‐street parking stalls.    The site plan also illustrates 25 off‐ street parking stalls at the north, east, and south sides of the future storage building, which is  two stalls greater than required at one stall per 1,000 square feet for warehouse uses.  The  number of off‐street parking stalls complies with the requirements of the Zoning Ordinance.     The off‐street parking stalls have dimensions of nine feet by 18 feet with a two foot front over  hang as required by Section 11‐21‐7.A of the Zoning Ordinance.  The parking area and drive  aisles within the subject site are proposed to be concrete.  A concrete curb is also shown the  perimeter of the parking areas and drive aisles as required by  Section 11‐21‐7.D of the Zoning  Ordinance.       There is a temporary gravel drive aisle to the BSNF rail line parallel to the east line of the lot  that accessed the temporary load‐out facility.  The gravel drive will be required to be removed  when the temporary load out facility is removed upon completion of the permanent site  improvements.        6 Fence.  The site plan indicates that there is to be a fence at the perimeter of the subject site.   Fences for industrial uses are allowed to be up to 8 feet in height by Section 11‐19‐4.H of the  Zoning Ordinance.   A gate is to be installed across the driveway access from Jansen Avenue.   The gates must be setback from the right‐of‐way sufficient distance to allow for a semi‐ tractor/trailer to be stopped at the gate without impeding traffic on the public street as stated  by Section 11‐19‐4.H.3.c of the Zoning Ordinance.  Installation of the fence and gates requires a  fence permit prior to installation subject to review and approval of the Zoning Administrator.      Exterior Lighting.  A revised photometric lighting plan must be prepared based on the revised  site and building plans.  The revised lighting plan is be submitted with application for building  permits and must comply with Section 11‐16‐6 of the Zoning Ordinance.  The revised lighting  plan is to be subject to review and approval of the Zoning Administrator.         Signs.  The revised plans no longer indicate placement of a sign at the site entrance from Jansen  Avenue.   Installation of any signs upon the property, including painted images on any of the  silos requires a sign permit be issued, subject to review and approval of the Zoning  Administrator.    Waste Storage.  The site plan does not identify storage for waste other than a receptacle within  the electrical room of the office building.  Any outdoor storage of trash or recycling containers  will require construction of an enclosure meeting the requirements of Section 11‐18‐4.C of the  Zoning Ordinance.       Grading.   The developer has submitted plans for grading of the subject site.  The proposed rail  spur includes tracks for rail car storage that requires filling of wetlands in the southern portion  of the subject site.   A wetland impact plan was approved by the Technical Evaluation Panel that  determined areas previously identified as wetlands were not classified as such.  The developer  is proposing to utilize a portion of this area for rail car storage.   The final plat of the subject site  approved concurrent with the initial conditional use permit application provided for dedication  of drainage and utility easements as required by Section 10‐8‐12 of the Subdivision Ordinance.   The portion of the drainage and utility easement dedicated over the area now not classified as  wetlands is to be vacated as it serves no public purpose.  All grading, drainage, erosion control,  and wetland impacts are subject to review and approval of the City Engineer.    Utilities.   There are not municipal sewer and water utilities available to the subject site.  Until  municipal utilities are available, use of an on‐site septic system and well are to be used for  services.   The septic system is required to provide a primary and secondary drainfield site.   Plans for the septic system and well will be subject to review and approval of the Building  Official at the time of application for a building permit.           7 SIPA.  The City Attorney previously drafted a Site Improvement Performance Agreement for the  proposed construction on the subject site.  The SIPA is to be revised as necessary by City staff to  be consistent with the updated site and building plans.   The SIPA is to be executed prior to  approval of building permits and site improvements are required to be completed by 31  October 2022 unless extended by the City Council.    RECOMMENDATION    The proposed GCC of America site and building plans are a unique opportunity to utilize  available access to rail for an industrial business that will add employment and expand tax base.   The proposed increase in the diameter of the silos will not have a significantly alter the  characteristics of the structures related to height as approved by conditional use permit.  City  staff recommends approval of the requested applications as outlined below.      POSSIBLE ACTIONS    A. Motion to recommend approval of a conditional use permit amendment, revised site  plans, and vacation of existing drainage and utility easement, subject to the following  conditions:     1. The conditional use permit approved by the City Council on 24 August 2020  remains in full force and effect except as modified herein.     2. The site and buildings shall be developed in accordance with the plans on file  with the City except as modified herein or approved by City staff.     3. The developer shall complete installation of the six storage silos by 31 January  2026 or request an extension of the conditional use permit approval as provided  for by Chapter 4 of the Zoning Ordinance.        4. The temporary gravel drive shall be removed when the temporary load out  facility is removed upon completion of the permanent site improvements.       5. Coniferous trees shown on the landscape plan shall be increased to a minimum  height of eight feet, subject to review and approval of the Zoning Administrator.     6. Installation of any fencing shall comply with Section 11‐19‐4.H and requires a  fence permit, subject to review and approval of the Zoning Administrator.       7. A revised exterior lighting plan shall be submitted demonstrating compliance  with Section 11‐16‐6 of the Zoning Ordinance, subject to review and approval of  the Zoning Administrator.       8  8. All signs shall comply with Chapter 37 of the Zoning Ordinance and a sign permit  shall be required prior to installation of any signs upon the property, sign permit  be issued, subject to review and approval of the Zoning Administrator     9. All grading, drainage, erosion control, and wetland impacts are subject to review  and approval of the City Engineer.     10. The developer shall execute the approved Site Improvement Performance  Agreement prior to issuance of a building permit.    B. Motion to recommend the application be denied based on a finding that the request  does not comply with the requirements of the Zoning Ordinance.    C. Motion to table.      c. Adam Flaherty, City Administrator/Finance Director   Audra Etzel, City Clerk   Ron Wagner, City Engineer   David Kendall, City Attorney  Site Location Map 921 ft Overview Legend Roads CSAHCL CTYCL MUNICL PRIVATECL TWPCL Highways Interstate State Hwy US Hwy City/Township Limits c t Parcels Torrens —˛ Œº ˝ —˛ ˛˙ ˛˙ ˝ —˝— ˛ ˛—˛ ˝ —˛—˛ ˙ ˛ ¸˛ ˙ ˛ ˝¸—˛˚˝ ¸˙ ˝ ˛ ¸˛ ˝ ˝ ˝ ````````````````````````````````` ˛ ˛˝ ºŒ ˝‰¿·» —fi–¶»‰‹ †«‡»fi ¿‹» fi¿'† § ‚»‰»… § ØŒ ˛ ˚¸ ˚ ºº — ºŒ Ø ¨ ºŒ Ø –””•‰»¿fi–…»“»·–‡»†‹‰–‡ –§fi•„‚‹ w § ——˛ »“»·–‡»†‹ †‰ ˝˝¸ ˛ œ —˛ ‚»›‹†«‹ ˝‹fi»»‹ –fi‹‚ ˝‹» ‚¿›¿ ººŁ — łºŁŁ Œºº › •†…•‰¿‹»…æºæ ºŁŒ ˚˛ ˝ Ł ŒŁ ˝ ˚¸ ˝ ºº ˛ ˝˛¸ ˙ æºæ ˛˝ æºæ ˛ ˛ ˛ ˛ ˛˝ ˛˝ ˝¸ ˝˛ ˛ ˝ ˝ ººŁ ºŁŁ Œºº ·‡–fi›‰‚»†·•††»fi‡–fi›‰‚»†¿fi‰‚•‹»‰‹›‰–‡ ˝˛¸¸˛ ˛ ˛˝ ˝ ˛˝ ˝˛¸¸˛ ˛ ˝ ˝¸¸˛ ºŒºŁ ºØ ŒŒºŒºº ¶–»'·›»†„•†»»fi›‰–‡ ˛˛ ¸ ——˛ ˚— ØŒ ˛ ˚¸ ˚ ºº ºŒ Ø ¿‡¿fi–…»“»·–‡»†‹‰–‡ ˚ — ˝˚¸ ˝˝˝ غ ˝ ˛ ˙ ˚˙ ººØ ØŒ ºŒŁ ›“»«‡'»†‰‰–‡ – »›‰fi•‹•–† ¿‹» SCALE: 1/8" = 1'-0" NAME DRAWING TITLE DRAWING NUMBER DRAWING SCALE SHEET NUMBER TRUE NORTH ARROW PROJECT NORTH ARROW 12 A COLUMN LINE GRID & NUMBERS NEW COLUMN NUMBER EXISTING COLUMN NUMBER SECTION TARGET SECTION NUMBER SHEET NUMBER DETAIL TARGETS ELEVATION TARGETS ELEVATION NUMBERS SHEET NUMBER ELEVATION NUMBERS SHEET NUMBER ROOM & ROOM NUMBER TARGET 101 OFFICE ROOM NUMBER ROOM NAME DOOR TARGET WINDOW TARGET DOOR NUMBER W1 WINDOW TYPE NUMBER WALL SYMBOLS NEW DOOR EXISTING DOOR PLUMBING FIXTURE SYMBOLS STANDARD WATER CLOSET WALL-HUNG WATER CLOSET URINAL LAVATORY CUSTODIAL SINK/MOP RECEPTOR LAVATORY IN COUNTER WALL TARGET WALL TYPE TOILET ACCESSORIES TARGET ACCESSORY NUMBER (CORRESPONDS W/ NUMBER IN SPECIFICATIONS)KEYNOTE TARGET KEYNOTE NUMBER ELEVATION TARGET ELEVATION TARGET BUILDING DATUM ELEVATIONREVISION TARGET 3 REVISION NUMBER AREA OF REVISION CLOUDED HANDICAPPED ACCESSIBILITY SYMBOL ABBREVIATIONS STANDARD DRAWING SYMBOLS & @ ℄ Ø # PL ± A.F.F. ADDL. ADJ. AGG. A/C A.H.U. ALT. ALUM. A.B. ANOD. APPROX. ARCH. AUTO. BSMT. BM. BRG. BRG. BIT. BLK. BLKG. BD. BLDG. B.U.R. CAB. CPT. C.I.P. C.B. CLG. C.T. CLR. COL. COLS. CONC. C.M.U. CONF. CONST. CONST. JT. CONT. C.J. COORD. C.F. C.F.M. C.Y. DISP. DN. DS. DWG. D.F. E.W. ESMT. E.W.C. ELEC. EL. ELEV. EMER. EQ. EQUIP. E.F. EXIST./EXST EXP. EXT. AND ANGLE AT CENTER LINE (ALT+0143) DIAMETER (ALT+0140) NUMBER, POUNDS PLATE PLUS OR MINUS ABOVE FINISHED FLOOR ADDITIONAL ADJUSTABLE AGGREGATE AIR CONDITIONING AIR HANDLING UNIT ALTERNATE ALUMINUM ANCHOR BOLT ANODIZED APPROXIMATELY ARCHITECT(URAL) AUTOMATIC BASEMENT BEAM BEARING BEARING BITUMINOUS BLOCK BLOCKING BOARD BUILDING BUILT-UP ROOF CABINET CENTERLINE CARPET CAST IRON PIPE CATCH BASIN CEILING CERAMIC TILE CLEAR COLUMN COLUMNS CONCRETE CONCRETE MASONRY UNIT CONFERENCE CONSTRUCTION CONSTRUCTION JOINT CONTINUOUS CONTROL JOINT COORDINATION CUBIC FEET CUBIC FEET PER MINUTE CUBIC YARD DISPENSER DOWN DOWNSPOUT DRAWING DRINKING FOUNTAIN EACH WAY EASEMENT ELECTRIC WATER COOLER ELECTRIC ELEVATION ELEVATOR EMERGENCY EQUAL EQUIPMENT EXHAUST FAN EXISTING EXPANSION EXTERIOR FT. FRP. FIN. F.F.E. F.E. FLR. F.D. FLUOR. FTG. G.P.M. GAL. GALV. GA. G.C. GL. BLK. GL. G.M.U. GLAZ. G.F.I. GYP. BD. (GYB) HC. HDWE. HDR. H.V.A.C. HT. H.M. HYD. IN. INCL. INSUL. INT. INV. JAN. JT. JST. BRG. K. KIT. K.O. LAB. LAM. L.V.L. LAV. L.H. L.F. LL. LOC. LB. LBS. M.H. MFR. MFG. MAS. M.O. MATL. MAX. MECH. MTL. MEZZ. MIN. MISC. MTD. NOM. N.I.C. N.T.S. N.A. O.C. OPNG. O.A. O.D. OH. FEET OR FOOT FIBER REINFORCED PLASTIC FINISH FINISHED FLOOR ELEVATION FIRE EXTINGUISHER FLOOR FLOOR DRAIN FLUORESCENT FOOTING GALLONS PER MINUTE GALLONS GALVANIZED GAUGE, GAGE GENERAL CONTRACTOR GLASS BLOCK GLASS GLAZED MASONRY UNIT GLAZING GROUND FAULT INTERRUPTER GYPSUM BOARD HANDICAP(PED) HARDWARE HEADER HEATING, VENTING, AIR CONDITIONINGHEIGHT HOLLOW METAL HYDRANT INCHES INCLUDED INSULATED INTERIOR INVERT JANITOR JOINT JOIST BEARING KIPS KITCHEN KNOCK OUT LABORATORY LAMINATE LAMINATED VENEER LUMBER LAVATORY LEFT HAND LINEAL FEET LIVE LOAD LOCATION POUND POUNDS MANHOLE MANUFACTURER MANUFACTURING MASONRY MASONRY OPENING MATERIAL MAXIMUM MECHANICAL METAL MEZZANINE MINIMUM MISCELLANEOUS MOUNTED NOMINAL NOT IN CONTRACT NOT TO SCALE NOT APPLICABLE ON CENTER OPENING OUTSIDE AIR OUTSIDE DIAMETER OVERHEAD PR. PKNG. PART. PL. P.LAM. PLYWD. PVC. P.I.V. P.R.V. P/C PROP. Ä QT. R. REF. REFR. REINF. REQD. R.A. REV. R.P.M. R.H. R.O.W. R.D. RM. R.O. RB RT SAN. SCH. SLNT. SHT. SHWR. SIM. S.C. SPEC. SQ. S.F. S.Y. S.S. STD. STL. STL. JST. STN STRM. SW. SYMB. TERZ T. T.O.C. T.O.F. T.O.M. T.O.S. T.O.W. T&G TEL. TEMP. TOPO. TYP. UG. UNFIN. U.H. U.N.O. V.B. V.T.R. VERT. VEST. VL.B. V.C.T. VS VSTR. PAIR PARKING PARTITION PLATE PLASTIC LAMINATE PLYWOOD POLYVINYL CHLORIDE POST INDICATOR VALVE POWER ROOF VENTILATOR PRECAST PROPERTY PROPERTY LINE QUARRY TILE RADIUS REFERENCE REFRIGERATOR REINFORCED REQUIRED RETURN AIR REVERSED REVOLUTIONS PER MINUTE RIGHT HAND RIGHT OF WAY ROOF DRAIN ROOM ROUGH OPENING RUBBER BASE RUBBER TILE SANITARY SCHEDULE SEALANT SHEET SHOWER SIMILAR SOLID CORE SPECIFICATION/SPECIFIED SQUARE SQUARE FEET SQUARE YARD STAINLESS STEEL STANDARD STEEL STEEL JOIST STONE STORM SWITCH SYMBOL TERRAZZO TREAD TOP OF CONCRETE TOP OF FOOTING TOP OF MASONRY TOP OF STEEL TOP OF WALL TONGUE AND GROOVE TELEPHONE TEMPERED TOPOGRAPHY TYPICAL UNDERGROUND UNFINISHED UNIT HEATER UNLESS NOTED OTHERWISE VAPOR BARRIER VENT THROUGH ROOF VERTICAL VESTIBULE VINYL BASE VINYL COMPOSITION TILE VINYL SHEET VINYL STAIR TREAD, RISER W.C. W.H. WT. W.W.F. WDW. W/ W/O WD. ACT.ACOUSTICAL CEILING TILE BM.BEAM CONTR.CONTRACTOR DEMO.DEMOLITION/DEMOLISH IBC INTERNATIONAL BUILDING CODE OHD.OVERHEAD DOOR PT.PAINT(ED) R.I.ROUGH-IN U.B.C.UNIFORM BUILDING CODE V.W.C. V. VINYL WALL COVERING VOLTS WATER CLOSET WATER HEATER WEIGHT WELDED WIRE FABRIC WINDOW WITH WITHOUT WOOD Ž DIA.DIAMETER I.L.O.IN LIEU OF PDM.PEDI-MAT T.B.D.TO BE DETERMINED 2 A2-1 100 ∠ DRAWING NAME SECTION NUMBER SHEET NUMBER DRAWING INDEX Sheet Number Sheet Name A-General A0-1 COVER SHEET A0-2 CODE REVIEW PLAN B-Civil C-001 EXISTING CONDITIONS C-002 BNSF ROW EXISITNG CONDITIONS C-003 REMOVALS AND PRE-CONSTRUCTION EROSION CONTROL PLAN C-004 BNSF ROW POST CONSTRUCTION STABILIZATION PLAN C-101 OVERALL SITE PLAN C-102 SITE PLAN (SOUTH) C-103 SITE PLAN (NORTH) C-201 POST CONSTRUCTION STABILIZATION PLAN C-202 BNSF ROW POST CONSTRUCTION STABILIZATION PLAN C-203 SWPP C-301 OVERALL GRADING PLAN C-302 ENLARGED GRADING PLAN C-303 ENLARGED GRADING PLAN C-304 ENLARGED GRADING PLAN C-305 ENLARGED GRADING PLAN C-306 ENLARGED GRADING PLAN C-307 OVERALL BNSF RAIL SIDING PLAN C-308 ENLARGED RAIL SIDING PLAN C-309 ENLARGED RAIL SIDING PLAN C-310 ENLARGED RAIL SIDING PLAN C-401 OVERALL UTILITY PLAN C-402 UTILITY PLAN (NORTH) C-501 OVERALL STORM SEWER PLAN C-502 STORM SEWER PLAN (SOUTH) C-503 STORM SEWER PLAN (NORTH) C-504 STORM SEWER PROFILES C-801 CIVIL DETAILS C-802 CIVIL DETAILS C-803 CIVIL DETAILS G-001 CIVIL COVER SHEET G-002 GENERAL NOTES G-003 GENERAL NOTES L-101 LANDSCAPE PLAN L-801 LANDSCAPE NOTES & DETAILS C-Architectural A1-2 AREA PLAN A2-1 SCALE BUILDING FLOOR PLANS A2-2 COMPRESSOR BUILDING PLAN A3-1 EXTERIOR ELEVATIONS A3-2 SITE SECTION A4-1 BUILDING SECTIONS A5-1 SCHEDULES, DTLS & ELEVATIONS A5-2 DOOR SCHEDULE AND DOOR DETAILS D-Structural S1 OVERALL SITE PLAN S2 SILO PAD PLAN S3 SCALE BUILDING PLANS S4 SCALE BUILDING ROOF PLAN & DETAILS S5 COMPRESSOR BUILDING PLANS S6 LOAD OUT PIT PLAN & SECTIONS S7 CATWALK PLAN S8 STRUCTURAL NOTES S9 SPECIAL INSPECTION S10 SECTIONS S11 SECTIONS Œ ºø Łø —˛˝˝˛ ¸Œø Łø Œø ø Łø ø ø — ˛Łø Łø Œø ø Œø Øø Øø ø Łø Øø ø Ł æ Øø æ ø Œ Łø ł ł ł˝ Łø Ł Øø Œ — ˛˝˝ ˛ ¨ —˛ ˛Œø Łø Łø ˛˝˛ ˛ ˛ ˝˛æ Œø ø ø ø Łø Łø ø æØø æºø ˝˛ ºø ø ø æø æŁ ºø ø —˛ ø æŁ ø ø Ø Œø ø ł˝ł ˛ ¨ ¸ ˝ ¸˝ ˝ ˝ ¸ æ ˝ ˝ Ł ˛ ¸ ł˝ ˝ ˝˝˙ ł ˝ ˛˙ ł —˛ ˝¸˛˙ ˝˛˙ —˛˝ —˛—˝ ¸ ˝˘ ØŒŁ ˝ ˝˛¸ ˙— ˙— ˚ ł¸˝ ˛ ˛ ˝—˛˛ ¸—˙ ˛¸—˝æ˝ ˛ ł ˝ —˛ º ª ˝ ˝˛˝ ˝ ª º ˝ ˝˛˝ ˝—˛ ¸—˝ —˛ ˛ ˛˝˝ ˛ ¸ ˝ ˝˛¸¸˛ ˛ ˛ ˝˛¸ ˛ ˝ ˛ ˝˛¸ ¨˛˛ ˛ ˝ ˝ ˛˛ —¸ ˙ ¸— ˝ ºŁº ˝æ ª ºŁº ¸—˝ ˝˛ ºº ˝æº ª ¸—˝ ˛ Ł ˝æ ª Œ ¸—˝ ¸— ª Ł ¸—˝ ¸˛ ¨˝ ł˝ ¨˝ ¸ ˛ˇ¸˛ —˛ ˛ ˛ —˛˚ ˛ ˝˝ ˛¸ ˝˝ ˛¸ ¸——˛ ˚ ˛ˇø —˛ ¨— ˇ¸— œ ˝ ˛ˇ¸˛ ˝˝ —˛ Ø ¨ ˝˝ ˛˚ ˝ ø ˝—˛˛ ¸—˙ ˙— ˝ ø ˝—˛˛ ¸—˙ ˙— ø ¸ ˛˚ ˝ ł˝¸˛ ˝˛˝ — ˛˝˝ ˛˚ ¸—˙ ¸—˝ غø —˛ Œł ¨ ˛˝˝ ˛ ¨ ª ˛˝˝ ˝ ł ˝—˛ ¨ ŁºŒ ¸—˝ ª ºŒŁ ˛ ˛ˇ Ø —˛˚ —¸ ¨¸˛˝ ˛ˇ¸˛ —˛ º ˛ ˛˝ º ª ˛ˇ¸˛ —˛˚ ˚ —˛ ˛ ˛˝ Ł ª ˛ˇ¸˛ —˛˚ ˝˛˚ ˝ ª —˛˚ ˝¸˛˙ ¸ ˝ ¸˝ ˝ ˝ ¸ æ ˝ ˝ Ł ˛ ¸ ˝ ˝˝˙ ˝ ˛˙ —˛ ˝¸˛˙ ˝ ˝˛˙ —˛˝˝˛ ¸ —˛—˝ ¸ ˝˘ ˝ ˝˛¸ ˙— ˙— ˚ ł¸˝ ˛ ˛ ˝—˛˛ ¸—˙ ˛¸—˝æ˝ ˛ ¸¸— ł¸˙ ¨ ˝˝ ¨ —˛˚ ˛ ˛˝˝ ˛ ¸ ˝ ˝˛¸¸˛ ˛ ˛ ˝˛¸ ˛ ˝ ˛ ˝˛¸ ¨˛˛ ˛ ˝ ˝ ˛˛ —¸ ˙ ˝¸˛˙ —˛˝˝˛ ¸ ˛˙ ˛˙ ˝ —˝— ˛ ˛—˛ ˝ —˛—˛ ˙ ˛ ¸˛ ˙ ˛ ˝¸—˛˚˝ ¸˙ ˝ ˛ ¸˛ ˝ ˝ ˝ ````````````````````````````````` ˛ ˛˝ ºŒ ˝‰¿·» —fi–¶»‰‹ †«‡»fi ¿‹» fi¿'† § ‚»‰»… § ØŒ ˛ ˚¸ ˚ ºº — ºŒ Ø ¨ ºŒ Ø –””•‰»¿fi–…»“»·–‡»†‹‰–‡ –§fi•„‚‹ w § ——˛ »“»·–‡»†‹ †‰ ˝˝¸ ˛ œ —˛ ‚»›‹†«‹ ˝‹fi»»‹ –fi‹‚ ˝‹» ‚¿›¿ ººŁ — łºŁŁ Œºº › •†…•‰¿‹»…æºæ ºŁØ ˛˚ — Ł ŒŁ ˝ ˚¸ ˝ ºº ˛ ˝˛¸ ˙ æºæ ˛˝ æºæ æ ª ø —˛˝˝˛ ¸ — æ ª ø ˝ ¸ ˝ — æ ª ø ˝ ¸ ˛˝ ˛ — ø ø ø ø ø ø ø ø ˛ ˛ ˛ ø ø ø ø – »›‰fi•‹•–† ¿‹» ¸—ø Œø ø ø æŒø Łø Łø ø ººø ººø Łø æø ººø ººø ¸ ¸¸˛ ˝ ¸ ¸¸˛ ˝ ˛¸ ˝ ˛— Łø ºø ø ø Œø ºæŒ ºø ø ø ø ø Łø ø ˛ ˛ ˝˝ ˛˚ —˛˝ ¸˛ ¸˛˛ ¸ — ˝ ˝˛¸¸˛ ˛ Ł ¸˛ ˝— Ł ø ø ø Łø ø ˝— Ł ø ˝— Ł ø ø ø Łø ø ˝— Ł ø ˝ ˝ ˛ —˛˝ ¸˛ ¸ ˝ ˝˛¸¸˛ ˛˝ ˛ ˛ ˛¸ ˝ Œ º —˛˝ ¸˛ ˛ —˛˝ ¸˛ —˛˝˝˛ ¸ ˛ —˛˝ ¸˛ ¸ ˝ ˝˛¸¸˛ ˝— ¸ ˚˛ —˛ ˚˛ ˛ ˙ ˛˝ ˛ ˛ ˛ ˙ ˛˝ ø ˛ ˛ —˚ º Œ ˛ ˛¸ ˝ ˝ ˚ ˛ ˛¸ ˝ ˝ ˚ ˝˛˝ ˛ ˝˛˝ ˛ ˝˛˝ — ˝ ¨˛˛ ˝ ¸˛ ˝˙˝æ ¸ ˚˛ — ˝ ˝˛¸¸˛ ˛ ˝ ˛ ˛ ø ø æŁŒø Œø Łø ø ø ˝˝ ˛¸ — — ˝˝ ˚ ˛˙ ˛˙ ˝ —˝— ˛ ˛—˛ ˝ —˛—˛ ˙ ˛ ¸˛ ˙ ˛ ˝¸—˛˚˝ ¸˙ ˝ ˛ ¸˛ ˝ ˝ ˝ ````````````````````````````````` ˛ ˛˝ ºŒ ˝‰¿·» —fi–¶»‰‹ †«‡»fi ¿‹» fi¿'† § ‚»‰»… § ØŒ ˛ ˚¸ ˚ ºº — ºŒ Ø ¨ ºŒ Ø –””•‰»¿fi–…»“»·–‡»†‹‰–‡ –§fi•„‚‹ w § ——˛ »“»·–‡»†‹ †‰ ˝˝¸ ˛ œ —˛ ‚»›‹†«‹ ˝‹fi»»‹ –fi‹‚ ˝‹» ‚¿›¿ ººŁ — łºŁŁ Œºº æŁ ª ø ææ Ł ˛ — Ł ŒŁ ˝ ˚¸ ˝ ºº ˛ ˝˛¸ ˙ æºæ ˛˝ æºæ Łø ø ø Łø ˛ æŁ ª ø ˛ — ¸ ˝˝ – »›‰fi•‹•–† ¿‹» ø ¨ ø ˝˝ ˛˝˝ ˝˛ ˚˛˙ ˛ ˛ˇ¸˛ æ ˛ ˛˝ —˛ ˛Œø Łø Łø ¸ ˛ ˛˝˛ ˛ ˛ ˝˛æ Œø ø Łø ø ø Łø Łø ø æØø æºø ˝˛ ø ºø ø ˝— æ ø æø æŁ ºø ø ˝— æ ˝ ˝˛¸¸˛ ø —˛ ˝ ˝˛¸¸˛ ø æŁ ø ø Ø Œø ø ˝— ˛ ˛ — ˛æ ˛ ˛ Ł Ø Œ º º Œ Œ º ºø ºø ø ºø Œ æø ˝—¸ ˝—¸ ˝—¸ ˝—¸ ø º º — ˛ Œø ¤ ø ø ¤ ø ø ¤ ø ˝˝ ˝ ˙ ˝¸——˛ ˝˝ ˝ ˙ ˝¸——˛ º º º ¤ ˝˝ ˛˚ ¸˛˛Łø Łø Œø ø Œø Øø Øø ø Łø Øø ø Ł æ Øø æ ø Œ Łø — ˛æŁø ¤Ł ¨˛˛ ¤Ł ˝¸˝ Œ œ ¤Œ ˝ ˛ Ł æŒ ˛ ˝¸ ¸¸˝ æ ˙— ˙˛ — ¸ — ¸ ˙— —˛˚ ˛ ˝ ºø ¨ æ —˙ ˝ ºæŒ ˛ ˛ ˛ ˛ ¤Œ ˙— ˛˝˛ ¤Œ ˝¸˝ Œ —˛ ø Œ æ ˝¸ ˝¸ æ ˙— ˙˛ ˝ — ¸ —˛˚ ˛ ˝ ºø ¨ ˛— — ø ¤Ł ¨˛˛ ˛˝˛ ¤Ł ˝¸˝ Œ ¸ ˛ ˝¸ —˛˚ ˛ ˝ ºø ¨ æ —˙ ˝ ºæŒ ˛ ˛ ˛ ˛ Ł æŒ ˝¸˛ ˛˝˝ ˙— ˛ æ ˙— ˙˛ — ¸ ˛— — ø ¤Ł ¨˛˛ ˛˝˛ ¤Ł ˝¸˝ Œ ¸ ˛ ˝¸ —˛˚ ˛ ˝ ºø ¨ æ —˙ ˝ ºæŒ ˛ ˛ ˛ ˛ Ł æŒ ¤ ˝¸ Œ ¤ ˙— ˝¸ ˝¸ º æ ˙— ˙˛ ˝ — ¸ ¸ æ —˛˚ ˛ ˝ ºø ¨ ¤ ˝¸ Œ ¤ ˙— ˛˝˛ ˝¸ ˝¸ ˝¸˛ ˛˝˝ ˙— ˛ Œ æ ˙— ˙˛ ˝ — ¸ —˛ ø æ —˛˚ ˛ ˝ ºø ¨ ˛— — ø ¤ ˝¸ Œ ¤ ˙— ˛˝˛ ˝¸˛ ˛˝˝ ˙— ˛ Ø æ ˙— ˙˛ — ¸ —˛ ø —˛˚ ˛ ˝ ºø ¨ ˛— — ø ¤ ˝¸ Œ ¤ ˙— Ł æ ˙— ˙˛ — ¸ —˛ ø —˛˚ ˛ ˝ ºø ¨ Œ ˚—˛ ˛˛˛ Œ ˚—˛ ˛˛˛ ¤Œ ¨˛˛ ˛ ˛¸˝˝˝ æ ˙— ˙˛ — ¸ Œ ˚—˛ ˛˛˛ ¤Œ ¨˛˛ ˛ ˛¸˝˝˝ Œ ˚—˛ ˛˛˛ ¤ ˙— º —˛ ø ˛˝ ˛ ø ˛˚ ˝ ø ø ø ø ø Łø ˛˚ ˙ ˛˝ —˛˚ —˛ ø ºø ˝ — ˝ — ¸˝ ˝ ˛˛˛˛ ˙ ˛˝ ˛ ˝˛¸ ˝ ˛ ˝ ˛ —— ˝ ˛˝ — ¸˝˛˙ ˝˛˝ ˛˛ ˝ ˛˝—˝ ˛ ˚˛˙ ¨˝ ˝ ˝˝ —˙ ˛ ¨˝ ˝ ˛˛ ˝ ˛˝—˝ ˛ —˙ ˛ —˛˝ ˝˝ ˛ˇ¸˛ ˙ ˛¸˛˙ ¸˛˝ ˚ ¸˛˝ ˝ ˛ ˝ ¸— ˝—˝ ˛˛˝ ˝ ˚˛˙ —˛¸ ˘ ˛˚ ¸˝ ˛ ˛ ˝˛¸ ˛ ˝—˝ º ˛˛ ˝ ˛˝—˝ ˛ —˛ ¸¸˝ ˛ ˛ ˝ —˛ ˛ø˝ —˛—˛˙ ˛ ˛ ˝˝ ˙ ¸˝ ˛ ˛ ˛ ˛ ˙ ˛ —˙˝ ˛ Œ ¨˝ ¸˝ ˛ — ˝˛˚ —˛ ˝ ¸˛ ˛ ˛˛ ˝ ˛ ˝˛¸ ˛¸ ¨˝ ˇ¸— ¸ ˛ Œ ˘˛¸˝ ˛˝ ˙ —˛˝ ˛ ˝ ˚ ˛˝—˝˙ ˛ ˝˚˛˙ —˛˝ ˛˚ ˝—˝ ˛ ¨—˝¸˛ —— ˘˛¸˝ ˛˝ ˙ ˛ ¸ ¸ ˝˝˝ — ˛ ˛ ¨ ˝¸˝˝ Ø —˛˝ ˛ ˝˝˝ ˛ ˛ ¨˝ ˝ ˝ ——˛˚ ˛˝ —˛¸˛˝ ˙ ˛ ˇ¸˝ ˝ Ł ˛˛ ˝ —˛˚ ˛ ˙ ˝ ˚˚ ˝ æ˛ ˛ ˛ ˚ ˙˝ ˝ ˝˚˛˙ ˛ —˛ ˛ ˝ ˛˝ ˇ¸˝˝ ˛˝ ˛˛ ˝˝ ˚˝ ˛ ˙ ˛ ˛ ˛ ˝˛˛ — ˝˝ — ˛ ˛¸ æ˛ ˝˛˙ —˝ ˝˛ ˝˝ ˛ ˝ ˝¸˛ ˛˙ ˛˙ ˝ —˝— ˛ ˛—˛ ˝ —˛—˛ ˙ ˛ ¸˛ ˙ ˛ ˝¸—˛˚˝ ¸˙ ˝ ˛ ¸˛ ˝ ˝ ˝ ````````````````````````````````` ˛ ˛˝ ºŒ ˝‰¿·» —fi–¶»‰‹ †«‡»fi ¿‹» fi¿'† § ‚»‰»… § ØŒ ˛ ˚¸ ˚ ºº — ºŒ Ø ¨ ºŒ Ø –””•‰»¿fi–…»“»·–‡»†‹‰–‡ –§fi•„‚‹ w § ——˛ »“»·–‡»†‹ †‰ ˝˝¸ ˛ œ —˛ ‚»›‹†«‹ ˝‹fi»»‹ –fi‹‚ ˝‹» ‚¿›¿ ººŁ — łºŁŁ Œºº › •†…•‰¿‹»…æºæ ºŁ ˝ ¸ ˛ —˝ Ł ŒŁ ˝ ˚¸ ˝ ºº ˛ ˝˛¸ ˙ æºæ ˛˝ æºæ æ ª ø ˝ ¸ ˛ — ø ø ø ø ø ø ø ø æ ª ø ˝ ¸ ˝ ˛ — ˛ ˛ æ ª ø ˙—˝ æ ª ø ˚ – »›‰fi•‹•–† ¿‹» ø Łø —˛˝˝˛ ¸ ˛ —˛˝˝˛ ¨¸˝ ¸ ˛˙˛ ˝ ¸¸˛ ˛ —˛˝˝˛ ¸¸˛ ˛˙˛ ˝ ˛ ˛˙ ˛ Łø ø —˛ ˝ ˝˛¸¸˛ ˛˙ ¸¨˛˙ —˛˝˝˛ Œ º ˛˝˝ ˛ ¤ ˝˝ø Łø ¸ ¸˚˛ ø Ł ø ˛ — ˇ¸— ˝˝ ˙ ˇ¸— ˝¸——˛ ø ø ø ¤ Łø ˛˝ ˛ ø ˝ Øø ˛ ø —˛˝˝˛ ¸ —˛˝˝˛ ø ˚˛ ø Œ ˛¸˝˝ø æŁ˛Ł ˝¸ ø ˛ ˚ — ˛¸˝˝˝ ˚ ¸¸ ˝ ˚˛ ˛ ˛¸˝˝ ¸ ˛—— ¤Œ ˝ ˛ ˝ ˝ ˛ æ —˙ ˝ Ł — ¸ ˛ ˛ ˝¸Ø — ¸ º æ — ¸ ˛ ø —˛˝˝˛ ø ˛ ˝ ˝ ˝ ˛ ˛ ˚ ¸ ˛—— ¤Œ ˝ ¸ ¸˚˛ ˛ ø —˛˝˝˛ ø ˛ ˝ ˝ ˝ ˛ ˛ ˚ ¸ ˛—— ¤Œ ˝ ˛ ø —˛˝˝˛ ø ø ˛ ˝ ¸ ˛—— ¤Œ ˝ ˛ ˛ ˚ ¨˛˛ ˛ ø —˛˝˝˛ ø ø ˛ ˝ ¸ ˛—— ¤Œ ˝ ˛ ˛ ˚ ¨¸˝ ˛ ¸ ˚˛˙ ˝˘ æ ˝˛ ¨˛˛ ˛˝ ˛ ø ¸ ˚ ˝ ˝ ˛ ˛˙ ˛˙ ˝ —˝— ˛ ˛—˛ ˝ —˛—˛ ˙ ˛ ¸˛ ˙ ˛ ˝¸—˛˚˝ ¸˙ ˝ ˛ ¸˛ ˝ ˝ ˝ ````````````````````````````````` ˛ ˛˝ ºŒ ˝‰¿·» —fi–¶»‰‹ †«‡»fi ¿‹» fi¿'† § ‚»‰»… § ØŒ ˛ ˚¸ ˚ ºº — ºŒ Ø ¨ ºŒ Ø –””•‰»¿fi–…»“»·–‡»†‹‰–‡ –§fi•„‚‹ w § ——˛ »“»·–‡»†‹ †‰ ˝˝¸ ˛ œ —˛ ‚»›‹†«‹ ˝‹fi»»‹ –fi‹‚ ˝‹» ‚¿›¿ ººŁ — łºŁŁ Œºº › •†…•‰¿‹»…ææ Ø —˛˝˝˛ ¸ — Ł ŒŁ ˝ ˚¸ ˝ ºº ˛ ˝˛¸ ˙ æºæ ˛˝ æºæ æ ª ø —˛˝˝˛ ¸ ˛ — ˛ ø ø ø ø æŁ ª ø —˛˝˝˛ ¸ ˝ ø ø ø ø æ ª ø —˛˝˝˛ ˝¸ ˚ æ ª ø —˛˝˝˛ ˛ ˚ æ ª ø º —˛˝˝˛ ˝ ˚ æ ª ø Œ —˛˝˝˛ ˝ ˚ – »›‰fi•‹•–† ¿‹» ª ø Ø ˝ —˛˝˝˛ ¸ ˛˝ ˛ ø Øø ˝ ˛ Øø ˛ ˝ ˝ ˝ ˛ ˝ ˝˝ ˝˝ ˙ ˝¸——˛ ˝˛˝ ˙ ˝˛ ˝¸——˛ ø ø ¤ ø ˛ ø ˛ ø ¸˛ œ ˝—¸˝ ˛ ˚ ¸ ˛ ˛ ˇ¸— ˝˝ ¸˛˛˝ ˙ ˝˛ ˝¸——˛ ¸˛˛˝ ˙ ˝˛ ˝¸——˛ ˛˝ ˛ ø Øø ˝ ˛ Øø ˝˝ ˙ ˝¸——˛ ˛ ø ˛ ø ˛ ˚ ˝ ˝ ˛ ¸˛ œ ˝—¸ ˙— ˛— — æ ˛ ˝ ˛˝˝ ˛ ˛˝ ˛ ø Øø ˝ ˛ Øø ˛ ø ˝ ˛ ˚ ˛ ˙— ˝ ˝ ˝ ˛ ø ˛ ˚ ¸˛ œ ˝—¸˝ ˛ ˝ ˛˝˝ ˛ ˝˝ ˙ ˝¸——˛ ¸˛˛˝ ˙ ˝˛ ˝¸——˛ º Ø º º º ˛˝ ˛ ø Øø ˝ ˛ Øø ˛ ø ˛ ø ˛ ˚ ˝ ˝ ˛ ¸˛ œ ˝—¸ ˙— ˛— — ˛ ˝ ˝˝ ˙ ˝¸——˛ ¸˛˛˝ ˙ ˝˛ ˝¸——˛ æ Ł º Ø ºº º º º º ˝˛˝ — ˝ ¨˛˛ ¸ ˛˝ ˛ ˝ ˛ ˛ ˚˛ ˝¸——˛˝æ˝—¸˝ ˛˝ ˛˝ — ¸˛˛æ˝˛˝ — ˚˛ ˛˝ ¨˛˛ ¨¸˛˝ ł ˝ ˝ ˝ ˛ ˛˝˝ ˛ ˛˙ ˛˙ ˝ —˝— ˛ ˛—˛ ˝ —˛—˛ ˙ ˛ ¸˛ ˙ ˛ ˝¸—˛˚˝ ¸˙ ˝ ˛ ¸˛ ˝ ˝ ˝ ````````````````````````````````` ˛ ˛˝ ºŒ ˝‰¿·» —fi–¶»‰‹ †«‡»fi ¿‹» fi¿'† § ‚»‰»… § ØŒ ˛ ˚¸ ˚ ºº — ºŒ Ø ¨ ºŒ Ø –””•‰»¿fi–…»“»·–‡»†‹‰–‡ –§fi•„‚‹ w § ——˛ »“»·–‡»†‹ †‰ ˝˝¸ ˛ œ —˛ ‚»›‹†«‹ ˝‹fi»»‹ –fi‹‚ ˝‹» ‚¿›¿ ººŁ — łºŁŁ Œºº › •†…•‰¿‹»…æºæ ºŁ ¨˛˛ ˚˝ Ł ŒŁ ˝ ˚¸ ˝ ºº ˛ ˝˛¸ ˙ æºæ ˛˝ æºæ æ ª ø ˝ ¸ ˚ ˛ æ ª ø ˝ ¸ ˚ ˝ ø ø ø ø æ ª ø ˝ ¸ ˚ ˝¸ æ ª ø ˝ ¸ ˚ ˝ – »›‰fi•‹•–† ¿‹» ø ø ø ø ø ø ø øøøøø ˛˝ ˛ ø ˝ Øø ºæŁ ˝ Øø Øø ˝ ˛ Øø ¸ ˚˛ ø Łø ø ø æŒ ¸ ¸ ˝ ˝˝ ˛ —˛˝ ˝˛ ˝˝ ¸ ˚˛ ˛¸ ˝ ˛ ˝˝ ˝˛ ˝˝ ˛¸ ˝ ˛ ¸¨ ø ˝ ø Œ ˛ ø Œø Œ ——˛¨ ˛ ¸¸˛ ˛ ˝ ¸¸˛ ˝˛ ¸ ¸¸˛ ¸˛ ˝˙˝ ¸¸˛ ˝˛ ¸ ˛ ºººø ª ˚ Łºø Œ ˛ ºø ª ˚ Łø æŁ ˛ ºŁŒø ª ˚ ŁŁø Ø æŒ ——˛¨ ¨˝ ˛ Øø ˚ ¸˝ ˛ ¸¸˛ ˝˛ ¸˛Œø Øø ¸˛ ˝˙˝ ˛ ¸ — ¸ ˚˛¸¸˛ ¸˛ ˝˙˝ ˛ ¸¸˛ ˝˛ ¸˛ ˝˙˝ ¸ — ˛ ˝˛˝ ˛¸ ˛ ˝˛˝ ˛¸ ˛ ˛¸ ˝˛ ˛¸ ˝Œø — — — ˝ ˝˛¸¸˛ ˝˛¸¸˛ ˝ ˝¸——˛ — ˝—˛ ˝˛˝ — ˝˝ ˝˝ — ˚˛ ¸ — ˛ ø Œø Œ ø Łø Łø ø ¸˛ ˝˙˝Œø ŒŒ ¸ ˚˛ ˝ ¸ — ˛˙ ˛˙ ˝ —˝— ˛ ˛—˛ ˝ —˛—˛ ˙ ˛ ¸˛ ˙ ˛ ˝¸—˛˚˝ ¸˙ ˝ ˛ ¸˛ ˝ ˝ ˝ ````````````````````````````````` ˛ ˛˝ ºŒ ˝‰¿·» —fi–¶»‰‹ †«‡»fi ¿‹» fi¿'† § ‚»‰»… § ØŒ ˛ ˚¸ ˚ ºº — ºŒ Ø ¨ ºŒ Ø –””•‰»¿fi–…»“»·–‡»†‹‰–‡ –§fi•„‚‹ w § ——˛ »“»·–‡»†‹ †‰ ˝˝¸ ˛ œ —˛ ‚»›‹†«‹ ˝‹fi»»‹ –fi‹‚ ˝‹» ‚¿›¿ ººŁ — łºŁŁ Œºº › •†…•‰¿‹»…æºæ ºŁ ˝ ˝ Ł ŒŁ ˝ ˚¸ ˝ ºº ˛ ˝˛¸ ˙ æºæ ˛˝ æºæ ª ø ˝ ˛˝˝ ˝ ø ºø ø ø – »›‰fi•‹•–† ¿‹» æŁ ª ø ¸ — ˛˝˝ ˝ ˛˝ ˛ ø Øø ˝ ˛ Øø ø ˝˝ —˛ ˛¸˝˝ ˛ —˛ ˛ ˚ ¸¸ ˝ ˛ ø ø Œ Œø Œ ˛ ˚ ¸ ˛—— ¤Œ ˝¸˝ ˛ ¸˛ ¸˛˛˝ ˙ ˝˛ ˝¸——˛ ºæŁ ˙— ˛Ł ˝¸ —˛ ˛¸˝˝˝ æ ˝ ˝ ˛ ¸˛˙ ˝ ˝ ˛ ˛˝ ˛ ø Øø ˝ ˛ Øø ø ˙— ºæŁ ˙— ˛Ł ˝¸ —˛ ˛¸˝˝˝ æ ˝ ˝ ˛ ¸˛˙ ˝ ˝ ˛ æ ¤ Œ ˚ ˝˝ Œ — ˛ —˛ ˛ Łø Œ˛ ø ˚˛ ø ˛˛ ˛¸˝˝ ˚ ¸ ˝ æ ˙— Œ ˚—˛ ˛˛˛ ¤Ł ˝¸˝ Œ ¤Œ ˝¸˝ Œ ˝ ˛ ˛ ˝¸ æ ˝ ˝ ˝ ˛ ˝ ˛ ˚ ˛˙ ¸ ˛—— ¤Œ ˝¸˝ ˛ ˛— ˝ø — ˝ ˛— ˙— ˝˝ œ — ˝ ˝˛¸¸˛ ˛˝ ˛ ˝˘˝ Œø Œ Łø ˚˙ ˝ ˚ ˛ º ˛ ˝ ˝ æº — ˛˝ ˛ ø ˝ ˛ Øø ˛ ø Łø Øø ˝˛˝ ˙ ˝˛ ˝¸——˛ ˛˙ ˛˙ ˝ —˝— ˛ ˛—˛ ˝ —˛—˛ ˙ ˛ ¸˛ ˙ ˛ ˝¸—˛˚˝ ¸˙ ˝ ˛ ¸˛ ˝ ˝ ˝ ````````````````````````````````` ˛ ˛˝ ºŒ ˝‰¿·» —fi–¶»‰‹ †«‡»fi ¿‹» fi¿'† § ‚»‰»… § ØŒ ˛ ˚¸ ˚ ºº — ºŒ Ø ¨ ºŒ Ø –””•‰»¿fi–…»“»·–‡»†‹‰–‡ –§fi•„‚‹ w § ——˛ »“»·–‡»†‹ †‰ ˝˝¸ ˛ œ —˛ ‚»›‹†«‹ ˝‹fi»»‹ –fi‹‚ ˝‹» ‚¿›¿ ººŁ — łºŁŁ Œºº æ ª ø æºæ ºŁ ¸ ˝˝ Ł ŒŁ ˝ ˚¸ ˝ ºº ˛ ˝˛¸ ˙ æºæ ˛˝æ— æºæ æ ª ø ¸ ˛˝˝ ˝ æ ª ø ¸ ˝ æ ª ø ˝˛ ˝ – »›‰fi•‹•–† ¿‹» Œ Ł ø ø ø ¨ ø ø Œ ø ø Œ æ ˛ æ ¨ — ˚ ˝ — œ ˝ — ˝— œ ˛ ˛˛ Ł ˚ ˛ æ ˛˘ ˛ ˛ ˝˝ ˛ ˝˝˝ ˛ ˝ ˝˝ ¸˛˝˝ ˚˛˙˝˝ ˚˛˙——˛ æ ˝— ˝—˝˛ ¤ Œ ˛˛˛ ¸ ł ˝ ˝ ˝—¸ ˝ ˝˝ ˛ ˛ ˛ ˛ ˛ ˝˝ ˛ ˛ ˛ ˛ ø ø ø Œ Ł ˛˝ ˛ ø ˛—ø ˛˛˛ ˚˛ ˚˛˙ ˚˛˙ ˛ ˝ø ø Łø ˛ ˛˝ ——˛ ˝—˝˛ ˝— ˝—˝˛ ˛˝ ˛ ø Łø ˛—ø ˛ ˝ ˛ ˛˝ ——˛ ˝—˝˛ ˛˝ ˛ ø Łø ˛—ø ø º º ˝˛ ˛˝ ˛ ø ˛ ˛˝ø ŒŒø ø ø ˝˛ ˛ —˛ ˝ ¤Œ ˝¸˝ —˛ ˝ —˛ ¸ ˚ ˝ —˝ —˛ ˝ ˛ ˛˛˛ ˚ —˛ ˛ ˝ ˛¸˝˝˝ ˙˚ ˛˛— ˛ ˛˝˝ ˛˛˛ ł˛ ˚˛ ˝ ˝ ¨ ¸— ˝ ˝¸ ˝— ˝ ˝ ˛ — ¸ —¸˛—˝ ˝— ˝˝ ˝ ˚ æ˛ ˝¸˛ ˛ ˝¸˛ ˝— ˝— ˝— ˙ ˛ ¨ æŁæ ˛¸ —˝˛ ˛— ¤Ł ˛ ˛˝ ˛ Œø ø Œø ºø ˚ ˝˝ — ˚ ˛ ˝ ˝ —˝ æ ˝ ¨ ¨ ŁŁ ˝ ¸ —˛˚ ˛ — — ¸˛ —˛ ˛˝˛˚ø ¨ ø Œ ¨ Ł ¸¸ —— —˛ ˝ æ ˝˙ ˝ ¸ æ æŁ ¸ — ˝ ¸˝ œ ˝˛˝ ø ¨ Œ ¸ —˛ ˝ ˛ ˚ ˝˝ ˚ ˝˝ ˝— ˙ø Œø Œ ˛ ˝ ˛˚˝ ª ˛ ª ˛ ˚ ª ˚˙ — ª ˛— ª ˛ ˝ ª ˝ ˛ — ª —˝ ˛ ª ¸ ª ˛ ˝ ˚ ª ˚˙ ˝ ª ˛— ˝ ˙— ª ˙—˝¸ ˛ — ª — ˛ — ª —˝ ˇ¸˛˘ ª ˇ¸˛˘ ˝¸˛ ˝˝ ª ˝ ˝¸˛ ª ¸˝ ª ˚ ˝ ˛ ª ˛ ˝ ˝ ˛— ª œ ˚˝ ˛˝ ˛ ł˝˙ º ºŒ ª ˝— —¸˝ — ˚ ˚ ª ˛˝˛ ˛ ¤ ºŒ ¸ ˚ ª ˛˝˛ ˛ ¤ ß ºŁØ ˝ ¸ ß ºŒ ¸ ˚ ª ˝ Ø ˝˛ ¸ ª ª — ª ˝˛ ˝ ˝ØŒ —˝˝˚ — ª ˝˛ ˝ ˝Œº ˝ ¸ — ª ˝˛ ˝ ˝Œº ˙ ¸ ˛ ˛ ˛ ª ˝˛ ˝ ˝ØŒØ ˙˝— — ª ˛ Œ ˛ ˝ ˇ¸˛˝ — ª ˝˛ Ø Ø ¸ ł ˛˛˝ ˛ ˝—˝ ª — ˝ ˛ ˝ ª —˛¸ ˛˝ —Ł ˛ ¸ ˛ ˛˛ ª ¸˝Œ ˛˛ ˝˝ ª ˛¸ ˛˝ ª ¨ —˛˛ ˛ˇ¸ ˝ˇ¸˛ ˛˝˛ —¸ ¨¸˛˝ ª ˛ ¸ ˝ ª ˝˝˝ ˝ ˛ ¸ ˛ ˚˝ ˚˛˝ ª ˛˙ —˛˝ ª ¸˛ —˛˝ ˛— ˚˙ º ˛˙ ˛˙ ˝ —˝— ˛ ˛—˛ ˝ —˛—˛ ˙ ˛ ¸˛ ˙ ˛ ˝¸—˛˚˝ ¸˙ ˝ ˛ ¸˛ ˝ ˝ ˝ ````````````````````````````````` ˛ ˛˝ ºŒ ˝‰¿·» —fi–¶»‰‹ †«‡»fi ¿‹» fi¿'† § ‚»‰»… § ØŒ ˛ ˚¸ ˚ ºº — ºŒ Ø ¨ ºŒ Ø –””•‰»¿fi–…»“»·–‡»†‹‰–‡ –§fi•„‚‹ w § ——˛ »“»·–‡»†‹ †‰ ˝˝¸ ˛ œ —˛ ‚»›‹†«‹ ˝‹fi»»‹ –fi‹‚ ˝‹» ‚¿›¿ ººŁ — łºŁŁ Œºº › •†…•‰¿‹»…æºæ ºŁº º ˝¸˝ ˝ œ ˚˝ Ł ŒŁ ˝ ˚¸ ˝ ºº ˛ ˝˛¸ ˙ æºæ ˛˝ æºæ – »›‰fi•‹•–† ¿‹» æ ª øº ˝˝ ¸ ˝ æ ª øº ˛˝˛ ˚ æ ª øº ˛˝˛ ˚ æ ª øº ˛˝˛ ˚ æ ª øº º˛˝˛ ˚ æ ª øº ˙— ˚ ˛ ˝ ˝¸ ˛––‡ «‡»fi ˛––‡ ¿‡»·––fi •†•›‚ ¿›» •†•›‚–fi‹‚˝–«‹‚¿›‹»›‹ »•·•†„ •†•›‚ »•·•†„ »•„‚‹–‡‡»†‹› —˛ ˛ ˝ ————¸˝ ˛ ˛˝ ˚˙ ————˙— Łø Œ ˝˛æ ˝ ˚˙ ————˙— Łø ˛˝˛˝ ˛—æ— ˛—æ— ˛—æ— ˛—æ— ˙— Łø ˝˛˝ ˚˙ ————˙— Łø —˛˝˝˛ ¸ ˝ ¸˝ ˛˚˚˙ ————˙— ø — ˚˚˙ ————˙— ø ˚˚˙ ————˙— ø æ ª øº Œ ˛— ª øº Ø ˝ ˛¸— ł æ —˛ ˝ ł ˚˛˝ ł—˝˝ ¸ ł ˝— ˛¸— ł æ —˛ ˝ ł ˚˛˝ ł ¸ ł ˝— ˛¸— ł æ —˛ ˝ ł ˚˛˝ ł—˛˚˙ ¸ ł ˝— ˛¸— ł æ —˛ ˝ ł ˝ ł ˝˛˝ ˝— ˛ ł ˛˝ ł ˝— ˛ ˝˛—— ˛¸— º ł —˛ ˝ ł ˝ ł ˝˛˝ ˝— ˛ ł ˛˝ ł ˝— ˛ ˝˛—— ˝ ˝ ˝˝ ˝—˛ ˘ ˝ ˝˝ ˝˝ ˝˝ ˝¸˝ ˝¸˝ ˝¸ø Œø Œ˝ ˝¸ ˝ ˝˝ ˝¸˝ ˝¸ ˝ ˝˝ ˝¸˛˝˝ ˛ø ˚˛˝ø æ˝¸ ˝˝ ˚˛ ˛ ˛ ˛˝˝ ˛ø ˚˛˝Œø æ˝¸ ˝˝ ˚˛ ˛ ˛ ¨˛˛ ˛ ˛ — ˛ ˝— ˛ — ¸ ˛˝ ˝ ˛ ˛˝ ˝ ˝ ˝— ˙ ˛ ¸ æ —˛ ¸ ˛ ˝¸ — ˛ ¸˝ — ˛¸˛ æ ¨— ˛ æ ˝ ˛ ˝¸˛ ¸˝ ¸¸ ˝ ˛—— ˛ ˛ ˝— ¸¸ ˝ ˛— — ¤ ¸˛˛ ˛˘ ˛ — ˝˛ æŒ — ¨˛˛ ˝ ˝ ˛ ˛˝•˝˚ ˛˛˛ æ ˝— ¨˛˛ ˝ ˛ ˛˝˝˚ ˛˛˛ — ˚˛ ˛ ˙ ˝¸——˛ — ˝˛ ¨ ¸˛˛ æŒ — æ æ ˛˙ ¸˝ ˛˛ ˛ ˙ ˝ ˛ ¨ ¸˛˛ — ˝˛ æŒ — ¨˛˛ ˝ ˝ ˛ ˛˝•˝˚ ˛˛˛ ¤ ¸˛˛ ˝ æ ˛ ˛ —— º ˛ ˝˝ ˝ ˝ ˝ ˛ ˝ ¨˛˛ ˝ ˝ æŒ — ˛ ˛˝˛˝˚ ˛˛˛ ˛˘ ˛ ˝ ¸˝ ˛ ˛ ˝ — ˛˝˝ ˛ ˛ ˝˝¸˛ —˛˙ ˛ ¨˝˝ ˛ ¸˛˛ ˝ — — ˛ ˝ æ — ¸ ˛— — ¨ ¸˛˛ ¨˛˛ ˝ ˛ ˛˝˝˚ ˛˛˛ æŒ — — ˝˛ — — ˝—˛˙ ˝¸ ˝˝ ˛ ˝ ¸ ˛ ¤ ¸˛˛ ˛ ˛˝˝˚ ˛˛˛ ¨˛˛ ˝ ˚ ˝˛— ˛— — æ ˝— æŒ — — ˝˛ ˝ Œ ¸˝ ˛ ˛ ˝ ˛ ˝ ˝ ¨ ¸˛˛ ˛ ˛˝•˝˚ ˛˛˛ ˝ — ˝˛ æŒ — ˝ — ˛ ˙ ˝ ˛ ˛ ˛ œ ˝ ˛æ ˛¸˛ ˙— ˛ ¤ ¸˛˛ ˛ ˛˝˝˚ ˛˛˛ æŒ — — ˝˛ ˚ ˝˛— ˛— — ˛ ˛ ˛ ˛ ˛ ˝ ¸ ˛ ˝ ˛ œ — — ¸˛ — ˝ ¤ ¸˛˛ ˛ ˛˝˝˚ ˛˛˛ æŒ — — ˝˛ ˛ ˝ æ ˛ ˛ ˛ ˝ ˝ ˝ ¤ ¸˛˛ ˛ ˛˝˝˚ ˛˛˛ æŒ — — ˝˛ ˝ ˛ ˝ ˝ ˚ ˝˛— æ ˛ — ˛— — ˛ ˛˙ ¸ ˛˘ ˛ ˛ ¸˝ ˛˙ ˛˙ ˝ —˝— ˛ ˛—˛ ˝ —˛—˛ ˙ ˛ ¸˛ ˙ ˛ ˝¸—˛˚˝ ¸˙ ˝ ˛ ¸˛ ˝ ˝ ˝ ````````````````````````````````` ˛ ˛˝ ºŒ ˝‰¿·» —fi–¶»‰‹ †«‡»fi ¿‹» fi¿'† § ‚»‰»… § ØŒ ˛ ˚¸ ˚ ºº — ºŒ Ø ¨ ºŒ Ø –””•‰»¿fi–…»“»·–‡»†‹‰–‡ –§fi•„‚‹ w § ——˛ »“»·–‡»†‹ †‰ ˝˝¸ ˛ œ —˛ ‚»›‹†«‹ ˝‹fi»»‹ –fi‹‚ ˝‹» ‚¿›¿ ººŁ — łºŁŁ Œºº › •†…•‰¿‹»…ææ Ł º ˛ ˝¸ ˛ ˝ Ł ŒŁ ˝ ˚¸ ˝ ºº ˛ ˝˛¸ ˙ æºæ ˛˝ æºæ – »›‰fi•‹•–† ¿‹» ––fi ˝‰‚»…«·» ––fi «‡»fi ––fi ¿fi…'¿fi» fi¿‡» –‡‡»†‹›•…‹‚ »•„‚‹ ‚•‰†»›› ¿‹»fi•¿· ––fi §»§» ¿‹»fi•¿· ¿‡ »¿… ˝•·· »‹¿•· ø ø æ ˛ —˛ ø Øø æ ø Øø æ ø Øø æ ø Øø æ ø Œ Øø æ ø Łø ø Øø æ ø Øø æ Œø Łø æ º ø Øø æ ø Øø æ ø Øø æ ˛ ˙—˝ ˛˛ ˛¸—˝ ˙—˝˛ ˙—˝ æ ª øº ˛ ˝ ª øº ˝ ˛ ˝ ª øº ˛˘ — ª øº ˚˛ — ˛˚ ª øº º— ¸˝ ˛˛ ˛ ª øº Œ — —˛ ª øº ˛˘ ˛ ˛ ˛ ª øº ¸ ˛ ª øº Ø ˛æ ª øº Ł ˛ ˛ ª øº ˝ ª øº ª øº ˛˘ ˛ BURLINGTON NORTHERN RAILROADINTERSTATE 94 SB4 SB3 SB2 SB1 SB5SB18 SB6 SB8 SB7 SB11 SB10 SB17 SB9SB16SB12SB14SB15SB13 65TH STREET NE JA N S E N A V E N E SB21(P2) SB22 SB23 SB24(P3) SB20 SB19(P1)INTERSTATE 94 PROPOSED BUILDING768 GSFFFE: 970.0SB25 SB26 SB27NO PARKINGFUTURE BUILDING22,500 GSFFFE: 970.0XXXXXXXXXX XXXXXXXXXXXXXXNO PARKINGPROPOSED BUILDING432 GSFFFE: 968.25MATCHLINE: SEE SHEET 102 MATCHLINE: SEE SHEET 103NORTH STORMWATERDETENTION POND 1MIDDLE STORMWATERDETENTION POND 2SOUTH STORMWATERDETENTION POND 3SOUTH WETLAND 3MIDDLE WETLAND 2NORTH WETLAND 159610SEE INSET A ON THISSHEET C-101FOR CONTINUATIONSB2520' AVERAGE WETLAND BUFFERWETLAND BUFFER: 27.5'DATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.LICENSE NO.: 5424410/27/2021PATRICK SVEUMWARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.GOPHER STATE ONE CALLTWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGDWN BY:ISSUE DATE:PROJECT NO.:3366-0001U:\227701563\drafting\5_DESIGN\1_CAD\3 PLANSHEETS\C-101 SITE PLAN.dwg DESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:SHEET TITLE:10/29/2021 10:24:53 AM CLIENT:GCC OF AMERICA CITY OF OTSEGO WRIGHT COUNTY, MINNESOTA PROJECT TITLE:MDHCHK'D BY:PWSAPP'D BY:PWSCERTIFICATION:7500 OLSON MEMORIAL HWYSUITE 300GOLDEN VALLEY, MN 55427PHONE: 763-252-6800FAX: 952-831-126810/27/2021805/26/2020 CITY SUBMITTAL 1 08/18/2020 CITY COMMENTS REVISION 1 2 12/07/2020 CITY COMMENTS REVISION 2 3 12/21/2020 CITY COMMENTS REVISION 3 4 03/19/2021 PRELIMINARY BID SET 5 03/19/2021 ADDENDA #1 6 08/31/2021 PERMIT SET 7 R:\cad\2277\AutoCAD_STDS\Stantec-Wenck Logos\Stantec-Wenck-Color_Logo-Vertical.png10/27/2021 ADDENDA #2 8C-101OVERALL SITE PLANLOT LINEEASEMENT LINESETBACK LINERIGHT OF WAY LINEPROPERTY BOUNDARYLEGENDCURB AND GUTTERROAD CENTERLINE#PROPOSED PARKING COUNTCONCRETE PAVEMENTXXFENCERETAINING WALL [BY OTHERS]1. SEE SHEET G-002 FOR ADDITIONAL PROJECT NOTES.NOTESEXISTING SOIL BORINGPROPOSED LIGHT POLEPROPOSED LIGHTPROPOSED BOLLARDGRAVEL PAVEMENTRAIL SPUR AND BALLAST - DESIGN BY OTHERSCONCRETE SIDEWALKCONCRETE PAVEMENT - DESIGN BY OTHERSWETLAND BUFFERINSET A SB4 SB3 SB2 SB1 SB5SB18SB6 65TH STREET NE JANSEN AVE NESB21(P2)SB22 SB23 SB24(P3)XXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX29'24'93' SIDE BUILDING SETBACK: 20' PARKING SETBACK: 5'FRONT BUILDING SETBACK: 30'FRONT PARKING SETBACK: 15'MIDDLE STORMWATER DETENTION POND 2SOUTH STORMWATER DETENTION POND 3WRIGHT COUNTY R.O.W.: 50'WRIGHT COUNTY R.O.W.: 50'SOUTH WETLAND 3MIDDLE WETLAND 222' 3.3'6' 30' 29' 3.3' 15'R50'R50'R40'R25'R74'R50'115677102024232423242325262626262125252525242326252184WETLAND BUFFER: 10.3'20' AVERAGE WETLAND BUFFER40' WETLAND STRUCTURAL BUFFER26781'DATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.LICENSE NO.: 5424410/27/2021PATRICK SVEUMWARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.GOPHER STATE ONE CALLTWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGDWN BY:ISSUE DATE:PROJECT NO.:3366-0001U:\227701563\drafting\5_DESIGN\1_CAD\3 PLANSHEETS\C-101 SITE PLAN.dwg DESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:SHEET TITLE:10/29/2021 10:24:57 AM CLIENT:GCC OF AMERICA CITY OF OTSEGO WRIGHT COUNTY, MINNESOTA PROJECT TITLE:MDHCHK'D BY:PWSAPP'D BY:PWSCERTIFICATION:7500 OLSON MEMORIAL HWYSUITE 300GOLDEN VALLEY, MN 55427PHONE: 763-252-6800FAX: 952-831-126810/27/2021805/26/2020 CITY SUBMITTAL 1 08/18/2020 CITY COMMENTS REVISION 1 2 12/07/2020 CITY COMMENTS REVISION 2 3 12/21/2020 CITY COMMENTS REVISION 3 4 03/19/2021 PRELIMINARY BID SET 5 03/19/2021 ADDENDA #1 6 08/31/2021 PERMIT SET 7 R:\cad\2277\AutoCAD_STDS\Stantec-Wenck Logos\Stantec-Wenck-Color_Logo-Vertical.png10/27/2021 ADDENDA #2 8C-102SITE PLAN (SOUTH)1. SEE SHEET G-002 FOR ADDITIONAL PROJECT NOTES.NOTESKEYNOTES#1. MATCH EXISTING2. CONCRETE PAVEMENT (TYP.) - SEE DETAIL 3/C-8033. 4" WHITE PAINT STRIPE (TYP.)4. STOP SIGN - SEE DETAIL 7/C-8035. BUILDING SETBACK LINE6. PARKING SETBACK LINE7. PROPERTY LINE8. CONCRETE CURB AND GUTTER B618 - SEE DETAIL9. RAIL SPUR AND BALLAST - DESIGNED BY OTHERS10. RAIL STORAGE YARD: 60 CARS - DESIGNED BY OTHERS11. PROPOSED BUILDING : STORAGE SILO - DESIGNED BY OTHERS12. PROPOSED BUILDING : STORAGE SILO - DESIGNED BY OTHERS13. SILO FEEDER - DESIGNED BY OTHERS14. VAN ACCESSIBLE ADA STALL WITH SIGN ON BOLLARD - SEE DETAIL15. ADA AISLE - SEE DETAIL16. UNDERGROUND SEPTIC TANK AND PUMP - DESIGNED BY OTHERS17. PRIMARY SEPTIC DRAINFIELD - DESIGNED BY OTHERS18. 3' WIDE CURB CUT WITH RIPRAP - SEE DETAIL 8/C-80319. MONUMENT SIGN (10' X 8') - DESIGNED BY OTHERS20. GATE WITH KEYPAD - DESIGNED BY OTHERS21. 6' CHAIN LINK FENCE - SEE DETAIL22. DOOR LOCATIONS/ STRUCTURAL STOOP WITH LANDING - SEEARCHITECTURAL/ STRUCTURAL PLANS (TYP.)23. 20' WETLAND VEGATATION BUFFER24. 40' WETLAND STRUCTURE SETBACK25. FUTURE LIGHT POLE -DESIGNED BY OTHERS (TYP.)26. PROPOSED DRAINAGE AND UTILITY EASEMENT (TYP.)27. SECONDARY SEPTIC DRAINFIELD - DESIGNED BY OTHERS28. TRUCK SCALE AND RAMP - DESIGNED BY OTHERS29. DOMESTIC WELL - DESIGNED BY OTHERS30. GRAVEL PAVEMENT - SEE DETAIL 4/C-80331. FUTURE ADA AISLE32. FUTURE VAN ACCESSIBLE ADA PARKING STALL33. OFFICE BUILDING34. "DO NOT ENTER" SIGN - SEE DETAIL 7/C-80335. FALL ARREST STRUCTURE - DESIGN BY OTHERS36. CONCRETE SIDEWALK - SEE DETAIL 2/C-803LOT LINEEASEMENT LINESETBACK LINERIGHT OF WAY LINEPROPERTY BOUNDARYLEGENDCURB AND GUTTERROAD CENTERLINE#PROPOSED PARKING COUNTCONCRETE PAVEMENTXXFENCERETAINING WALL [BY OTHERS]EXISTING SOIL BORINGPROPOSED LIGHT POLEPROPOSED LIGHTPROPOSED BOLLARDGRAVEL PAVEMENTRAIL SPUR AND BALLAST - DESIGN BY OTHERSCONCRETE SIDEWALKCONCRETE PAVEMENT - DESIGN BY OTHERSWETLAND BUFFER BURLINGTON NORTHERN RAILROADINTERSTATE 94 SB6 SB8 SB7 SB11 SB10 SB17 SB9 SB16 SB12 SB14 SB15 SB13 SB20 SB19(P1) INTERSTATE 94 PROPOSED BUILDING768 GSFFFE: 970.0SB26 NO PARKIN GFUTURE BUILDING22,500 GSFFFE: 970.0XXXXXXXXXXXXXXXXXXXNO PARKI N GPROPOSED BUILDING432 GSFFFE: 968.2532.1'16'13'SIDE BUILDING SETBACK: 20'PARKING SETBACK: 5'REAR BUILDING SETBACK: 30'PARKING SETBACK: 15'SIDE BUILDING SETBACK: 20'PARKING SETBACK: 5'2 0 ' ( T Y P . )10' (TYP.)NORTH STORMWATER DETENTION POND 14 8 '16'NORTH WETLAND 116'12'30'16'16'16'R54.5' R60'R10'R70'R30'R60'R30.2'R42.3'R14.6'R110' R90' R100' R116'4'5'R30'R50'R40'R50'R20'R15'R15'R3.7' 16'R25'R5'22355677799881112131514161781819202423242325262626271818262625251881818182218252525252828282829213132303033343435365961024232620' AVERAGE WETLAND BUFFERWETLAND BUFFER: 24'20' AVERAGE WETLAND BUFFERWETLAND BUFFER: 18'DATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.LICENSE NO.: 5424410/27/2021PATRICK SVEUMWARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.GOPHER STATE ONE CALLTWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGDWN BY:ISSUE DATE:PROJECT NO.:3366-0001U:\227701563\drafting\5_DESIGN\1_CAD\3 PLANSHEETS\C-101 SITE PLAN.dwg DESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:SHEET TITLE:10/29/2021 10:25:02 AM CLIENT:GCC OF AMERICA CITY OF OTSEGO WRIGHT COUNTY, MINNESOTA PROJECT TITLE:MDHCHK'D BY:PWSAPP'D BY:PWSCERTIFICATION:7500 OLSON MEMORIAL HWYSUITE 300GOLDEN VALLEY, MN 55427PHONE: 763-252-6800FAX: 952-831-126810/27/2021805/26/2020 CITY SUBMITTAL 1 08/18/2020 CITY COMMENTS REVISION 1 2 12/07/2020 CITY COMMENTS REVISION 2 3 12/21/2020 CITY COMMENTS REVISION 3 4 03/19/2021 PRELIMINARY BID SET 5 03/19/2021 ADDENDA #1 6 08/31/2021 PERMIT SET 7 R:\cad\2277\AutoCAD_STDS\Stantec-Wenck Logos\Stantec-Wenck-Color_Logo-Vertical.png10/27/2021 ADDENDA #2 8C-103SITE PLAN (NORTH)1. SEE SHEET G-002 FOR ADDITIONAL PROJECT NOTES.NOTESKEYNOTES#1. MATCH EXISTING2. CONCRETE PAVEMENT (TYP.) - SEE DETAIL 3/C-8033. 4" WHITE PAINT STRIPE (TYP.)4. STOP SIGN - SEE DETAIL 7/C-8035. BUILDING SETBACK LINE6. PARKING SETBACK LINE7. PROPERTY LINE8. CONCRETE CURB AND GUTTER B618 - SEE DETAIL9. RAIL SPUR AND BALLAST - DESIGNED BY OTHERS10. RAIL STORAGE YARD: 60 CARS - DESIGNED BY OTHERS11. PROPOSED BUILDING : STORAGE SILO - DESIGNED BY OTHERS12. PROPOSED BUILDING : STORAGE SILO - DESIGNED BY OTHERS13. SILO FEEDER - DESIGNED BY OTHERS14. VAN ACCESSIBLE ADA STALL WITH SIGN ON BOLLARD - SEE DETAIL15. ADA AISLE - SEE DETAIL16. UNDERGROUND SEPTIC TANK AND PUMP - DESIGNED BY OTHERS17. PRIMARY SEPTIC DRAINFIELD - DESIGNED BY OTHERS18. 3' WIDE CURB CUT WITH RIPRAP - SEE DETAIL 8/C-80319. MONUMENT SIGN (10' X 8') - DESIGNED BY OTHERS20. GATE WITH KEYPAD - DESIGNED BY OTHERS21. 6' CHAIN LINK FENCE - SEE DETAIL22. DOOR LOCATIONS/ STRUCTURAL STOOP WITH LANDING - SEEARCHITECTURAL/ STRUCTURAL PLANS (TYP.)23. 20' WETLAND VEGATATION BUFFER24. 40' WETLAND STRUCTURE SETBACK25. FUTURE LIGHT POLE -DESIGNED BY OTHERS (TYP.)26. PROPOSED DRAINAGE AND UTILITY EASEMENT (TYP.)27. SECONDARY SEPTIC DRAINFIELD - DESIGNED BY OTHERS28. TRUCK SCALE AND RAMP - DESIGNED BY OTHERS29. DOMESTIC WELL - DESIGNED BY OTHERS30. GRAVEL PAVEMENT - SEE DETAIL 4/C-80331. FUTURE ADA AISLE32. FUTURE VAN ACCESSIBLE ADA PARKING STALL33. OFFICE BUILDING34. "DO NOT ENTER" SIGN - SEE DETAIL 7/C-80335. FALL ARREST STRUCTURE - DESIGN BY OTHERS36. CONCRETE SIDEWALK - SEE DETAIL 2/C-803LOT LINEEASEMENT LINESETBACK LINERIGHT OF WAY LINEPROPERTY BOUNDARYLEGENDCURB AND GUTTERROAD CENTERLINE#PROPOSED PARKING COUNTCONCRETE PAVEMENTXXFENCERETAINING WALL [BY OTHERS]EXISTING SOIL BORINGPROPOSED LIGHT POLEPROPOSED LIGHTPROPOSED BOLLARDGRAVEL PAVEMENTRAIL SPUR AND BALLAST - DESIGN BY OTHERSCONCRETE SIDEWALKCONCRETE PAVEMENT - DESIGN BY OTHERSWETLAND BUFFER SB4SB3SB2SB1SB5SB18SB6SB8SB7SB11SB10SB17SB9SB16SB12SB14SB15SB1365TH STREET NEJANSEN AVE NESB21(P2)SB22SB23SB24(P3)SB20SB19(P1)INTERSTATE 94PROPOSED BUILDING768 GSFFFE: 970.0SB26SB27NO PARKINGFUTURE BUILDING22,500 GSFFFE: 970.0XXXXXXXXXXXXXXXXXXXXXXXXNO PARKINGPROPOSED BUILDING432 GSFFFE: 968.25BURLINGTON NORTHERN RAILROADINTERSTATE 94(2) PS(1) PS(4) PS(2) PS(3) LL(3) LL(4) LL(2) TO(3) TO(3) TO(2) TO(5) TO(3) TO(1) PS(1) PS(1) LL(1) LL(2) LL(2) CS(4) VL(10) VL(9) CS(4) VL(3) CS(4) VL(3) CS(6) VL(5) CS(2) CS(3) TO(6) TO(3) TO(3) TO(2) LL(2) LL(2) LL(1) PS(1) PS(1) PS(1) CS(5) TODATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.LICENSE NO.: 5424410/27/2021PATRICK SVEUMWARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.GOPHER STATE ONE CALLTWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGDWN BY:ISSUE DATE:PROJECT NO.:3366-0001U:\227701563\drafting\5_DESIGN\1_CAD\3 PLANSHEETS\L-101 LANDSCAPE PLAN.dwgDESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:SHEET TITLE:10/29/2021 10:30:05 AMCLIENT:GCC OF AMERICACITY OF OTSEGOWRIGHT COUNTY, MINNESOTAPROJECT TITLE:MDHCHK'D BY:PWSAPP'D BY:PWSCERTIFICATION:7500 OLSON MEMORIAL HWYSUITE 300GOLDEN VALLEY, MN 55427PHONE: 763-252-6800FAX: 952-831-126810/27/2021805/26/2020 CITY SUBMITTAL108/18/2020 CITY COMMENTS REVISION 1212/07/2020 CITY COMMENTS REVISION 2312/21/2020 CITY COMMENTS REVISION 3403/19/2021 PRELIMINARY BID SET503/19/2021 ADDENDA #1608/31/2021 PERMIT SET7R:\cad\2277\AutoCAD_STDS\Stantec-Wenck Logos\Stantec-Wenck-Color_Logo-Vertical.png10/27/2021 ADDENDA #28L-101LANDSCAPE PLANPROPERTY LINELANDSCAPE LEGENDSETBACK LINEEASEMENT LINEPROPOSED CONIFEROUS TREEEXISTING TREE TO REMAINPROPOSED SHRUB/PERENNIAL PLANTMINNESOTA STATE SEED MIX 33-261;STORMWATER SOUTH & WESTMINNESOTA STATE SEED MIX 32-241;NATIVE CONSTRUCTIONJRN SEH SEHLICENSE NO.:DATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY LICENSED LANDSCAPEARCHITECT UNDER THE LAWS OF THESTATE OF MINNESOTA.CERTIFICATION:4559208/31/2021SARAH E. HARDING L-801DATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.LICENSE NO.: 5424410/27/2021PATRICK SVEUMWARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.GOPHER STATE ONE CALLTWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGDWN BY:ISSUE DATE:PROJECT NO.:3366-0001U:\227701563\drafting\5_DESIGN\1_CAD\3 PLANSHEETS\L-101 LANDSCAPE PLAN.dwgDESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:SHEET TITLE:10/29/2021 10:30:11 AMCLIENT:GCC OF AMERICACITY OF OTSEGOWRIGHT COUNTY, MINNESOTAPROJECT TITLE:MDHCHK'D BY:PWSAPP'D BY:PWSCERTIFICATION:7500 OLSON MEMORIAL HWYSUITE 300GOLDEN VALLEY, MN 55427PHONE: 763-252-6800FAX: 952-831-126810/27/2021805/26/2020 CITY SUBMITTAL108/18/2020 CITY COMMENTS REVISION 1212/07/2020 CITY COMMENTS REVISION 2312/21/2020 CITY COMMENTS REVISION 3403/19/2021 PRELIMINARY BID SET503/19/2021 ADDENDA #1608/31/2021 PERMIT SET7R:\cad\2277\AutoCAD_STDS\Stantec-Wenck Logos\Stantec-Wenck-Color_Logo-Vertical.png10/27/2021 ADDENDA #28LANDSCAPE NOTES &DETAILSJRN SEH SEH1. TREES AND SHRUBS SHALL BE PROVIDED IN THE QUANTITY, SIZE, GENUS, SPECIES,AND VARIETY AS CHOSEN BY THE OWNER/OWNER AS LISTED ON THE LANDSCAPEPLAN L 101.2. TREES AND SHRUBS SHALL BE HEALTHY, VIGOROUS STOCK, GROWN IN RECOGNIZEDNURSERY IN ACCORDANCE WITH GOOD HORTICULTURAL PRACTICE AND FREE OFDISEASE, INSECTS, EGGS, LARVAE, AND DEFECTS.3. OWNER RETAINS THE RIGHT TO INSPECT TREES AND SHRUBS FOR SIZE ANDCONDITION OF BALLS AND ROOT SYSTEMS, INSECTS, INJURIES, AND LATENTDEFECTS, AND TO REJECT UNSATISFACTORY OR DEFECTIVE MATERIAL AT ANY TIMEDURING PROGRESS OF WORK.4. NURSERY STOCK SHALL BE DELIVERED DIRECTLY FROM NURSERY. HEEL INIMMEDIATELY UPON DELIVERY IF NOT TO BE PLANTED WITHIN FOUR HOURS,COVERING WITH MOIST SOIL OR MULCH TO PROTECT FROM DRYING. STORE PLANTSIN SHADE AND PROTECT FROM WEATHER.5. PROTECTION FROM EXTREMES IN EXPOSURE AND ROUGH HANDLING SHALL BEPROVIDED FOR ALL PLANT MATERIALS DURING TRANSPORT AND STORAGE.6. THE CONTRACTOR SHALL NOTIFY THE OWNER 48 HOURS PRIOR TO PLANTING SOTHAT A MUTUALLY AGREEABLE TIME MAY BE ARRANGED FOR INSPECTION.7. LAY OUT INDIVIDUAL TREE AND SHRUB LOCATIONS WITH STAKES CENTERED ATPROPOSED PLANTING LOCATIONS FOR APPROVAL BY OWNER.8. DO NOT START PLANTING WORK UNTIL LAYOUT IS APPROVED BY THE OWNER.LANDSCAPE NOTES1. UPON APPROVAL OF STAKING LOCATIONS CONTRACTOR SHALL EXCAVATE PLANTINGHOLES CENTERED AT STAKED LOCATIONS.2. DIG HOLES AS DETAILED AND TO A DIAMETER A MINIMUM OF TWO TIMES THEDIAMETER OF THE ROOT BALL OR CONTAINER.3. REMOVE STICKS, RUBBISH, FOREIGN MATERIALS AND UNDESIRABLE PLANTS ANDTHEIR ROOTS. REMOVE STONES MEASURING OVER 1-1/2 INCHES IN ANYDIMENSIONS.4. SET BALLED AND BURLAPPED (B&B) STOCK ON LAYER OF COMPACTED PLANTINGSOIL MIXTURE, PLUMB AND IN CENTER OF PIT OR TRENCH WITH TOP OF ALL AT SAMEELEVATION AS ADJACENT FINISHED LANDSCAPE GRADES.5. ROOT FLARE OF THE TREE MUST BE ABOVE FINISHED GRADE.6. CUT ALL CORDS AND TWIN AND REMOVE WIRE BASKET AND BURLAP FROM TOP ANDSIDES OF BALLS; RETAIN BURLAP ON BOTTOMS.7. WHEN SET, PLACE ADDITIONAL PLANTING SOIL BACKFILL AROUND BASE AND SIDESOF BALL, AND WORK EACH LAYER TO SETTLE BACKFILL AND ELIMINATE VOIDS ANDAIR POCKETS.8. WHEN EXCAVATION IS APPROXIMATELY 2/3 FULL, WATER THOROUGHLY BEFOREPLACING REMAINDER OF BACKFILL.9. REPEAT WATERING UNTIL NO MORE IS ABSORBED. WATER AGAIN AFTER PLACINGFINAL LAYER OF BACKFILL.10. FOR CONTAINER GROWN STOCK, SAME AS FOR BALLED AND BURLAPPED STOCK,EXCEPT CUT CONTAINERS ON SIDES INTO QUARTERS WITH SHEAR. REMOVECONTAINER BEFORE SETTING PLANT SO AS NOT TO DAMAGE ROOT BALLS.11. WATER EACH PLANT WITHIN 2 HOURS OF PLANTING.12. ALL PLANTINGS TO BE MULCHED UNLESS OTHERWISE NOTED ON THE PLAN.13. PLACE 4-INCH THICKNESS OF MULCH AROUND TREES AND SHRUBS WITHIN A PERIODOF 48 HOURS AFTER THE SECOND WATERING.14. DO NOT PLACE MULCH IN DIRECT CONTACT WITH TRUNKS OR STEMS.PLANTING NOTES1. LANDSCAPE WORK WILL BE INSPECTED FOR ACCEPTANCE IN PARTS AGREEABLE TOTHE OWNER, PROVIDED WORK OFFERED FOR INSPECTION IS COMPLETE, INCLUDINGMAINTENANCE, FOR THE PORTION IN QUESTION.2. AT THE CONCLUSION OF THE ESTABLISHMENT PERIOD, WHICH WILL BE ONE YEARFOLLOWING INITIAL INSTALLATION A FINAL INSPECTION OF PLANTING WILL BE MADETO DETERMINE THE CONDITIONS OF AREAS SPECIFIED FOR LANDSCAPING.3. WHEN INSPECTED LANDSCAPE WORK DOES NOT COMPLY WITH REQUIREMENTS,REPLACE REJECTED WORK AND CONTINUE SPECIFIED MAINTENANCE UNTILRE-INSPECTED BY OWNER AND FOUND TO BE ACCEPTABLE. REMOVE REJECTEDPLANTS AND MATERIALS FROM SITE.INSPECTION AND ACCEPTANCE1. WHEN INSPECTED LANDSCAPE WORK DOES NOT COMPLY WITH REQUIREMENTS,REPLACE REJECTED WORK AND CONTINUE SPECIFIED MAINTENANCE UNTILRE-INSPECTED BY OWNER AND FOUND TO BE ACCEPTABLE. REMOVE REJECTEDPLANTS AND MATERIALS FROM SITE.2. BEGIN MAINTENANCE IMMEDIATELY AFTER PLANTING.3. MAINTAIN TREES AND BUSHES INCLUDING WATERING FOR ONE YEAR AFTERACCEPTANCE BY OWNER. IT IS CONTRACTORS RESPONSIBILITY FOR COORDINATEWATERING.4. TRIM, PRUNE, REMOVE CLIPPINGS AND DEAD OR BROKEN BRANCHES, AND TREATPRUNED AREAS AND OTHER WOUNDS.5. IT IS THE CONTRACTOR'S OPTION WHETHER OR NOT TO STAKE TREES. THECONTRACTOR IS RESPONSIBLE FOR MAINTAINING TREES IN AN UPRIGHT POSITIONTHROUGHOUT THE ONE-YEAR GUARANTEE PERIOD.MAINTENANCE NOTESTURF RESTORATION NOTESGUARANTEE AND REPLACEMENTS1. PLANT MATERIAL SHALL BE GUARANTEED FOR ONE FULL YEAR AFTER OWNERACCEPTANCE AND SHALL BE ALIVE AND IN SATISFACTORY CONDITION AT THE ENDOF THE GUARANTEE PERIOD. SUCH GUARANTEE EXCLUDES VANDALISM.2. AT THE END OF THE ONE-YEAR GUARANTEE PERIOD, INSPECTION WILL BE MADE BYTHE OWNER UPON WRITTEN NOTICE BY THE CONTRACTOR AT LEAST FIVE DAYSBEFORE THE ANTICIPATED DATE. ANY PLANT MATERIAL REQUIRED UNDER THECONTRACT THAT IS DEAD OR NOT IN SATISFACTORY CONDITION, AS DETERMINED BYTHE OWNER, SHALL BE REMOVED FROM THE SITE, AND SHALL BE REPLACED ASSOON AS CONDITIONS PERMIT DURING THE NORMAL PLANTING SEASONS.3. THE OPINION OF THE OWNER SHALL GOVERN IN ANY AND ALL DISPUTES BY THECONTRACTOR REGARDING THE CONDITION AND DISPOSITION OF UNSATISFACTORYMAINTENANCE PROCEDURES OR REJECTED PLANTS.4. ALL REPLACEMENTS SHALL BE PLANT MATERIAL OF THE SAME KIND AND SIZE ASSPECIFIED IN THE PLANT LIST. REPLACEMENT COSTS SHALL BE BORNE BY THECONTRACTOR.5. REPLACEMENT PLANTINGS REQUIRED AT THE END OF THE GUARANTEE PERIOD ARENOT TO BE GUARANTEED. THE PLANT MATERIAL IS SUBJECT TO INSPECTION ANDREJECTION BY THE OWNER BEFORE AND AFTER PLANTING.1. THE ESTABLISHMENT PERIOD FOR SEED SHALL BEGIN IMMEDIATELY AFTERINSTALLATION, WITH THE APPROVAL OF THE OWNER, AND CONTINUE UNTIL THE DATETHAT THE OWNER PERFORMS A FINAL INSPECTION.2. THE ESTABLISHMENT PERIOD FOR SEEDED AREAS IS 1 YEAR.3. SEED SHALL CONFORM TO MNDOT SPEC. 3878 SEED; SEED SPECIES COMPOSITIONSHALL BE MINNESOTA STATE SEED MIX 33-261; STORMWATER SOUTH AND WEST ANDMINNESOTA STATE SEED MIX 32-241; NATIVE CONSTRUCTION.4. FERTILIZER SHALL CONFORM TO MNDOT SPEC. 3881, TYPE 2 PHOSPHOROUS-FREE.5. FERTILIZER SHALL HAVE A FORMULA (N-P-K) AS DETERMINED BY THE RESULTS OF ASOIL TEST. CONTRACTOR TO CONDUCT SOIL TEST AND PROVIDE RESULTS ALONGWITH RECOMMENDED FERTILIZER FORMULA TO OWNER FOR REVIEW AND APPROVALPRIOR TO APPLICATION.6. SALVAGED TOPSOIL OR IMPORTED TOPSOIL SHALL CONFORM TO MNDOT SPEC.3877.2B LOAM TOPSOIL BORROW. TOPSOIL SHALL BE SCREENED, PULVERIZED, ANDCONTAIN LESS THAN 30% CLAY.7. 6" OF TOPSOIL SHALL BE PLACED IN ALL SEEDING AREAS.8. CONTRACTOR SHALL BE RESPONSIBLE FOR WATER DURING THE PLANTINGESTABLISHMENT PERIOD.CONIFEROUS TREE PLANTING1L-102NOT TO SCALEPRUNE ANY DAMAGED OR BROKEN BRANCHES. DONOT CUT LEADER.ROOT FLARE MUST BE ABOVE FINISHED GRADE.DO NOT COVER ROOT FLARE WITH MULCHDOUBLE SHRED, HARD WOOD MULCH (3") MIN.ROUGH THE SIDES OF THE HOLE SO THEY ARE NOTGLAZED FROM DIGGING.LOOSEN SIDES OF ROOT BALL AND PRUNE DAMAGED,DESICCATED, OR GIRDLING ROOTS.SET ROOT BALL ON SOIL BACKFILL SO THAT TOP OF ROOTBALL IS ABOVE FINISHED GRADE.BACKFILL AROUND THE ROOT BALL WITH LOOSE SOIL.WORK SOIL TO SETTLE AND ELIMINATE VOIDS AND AIRPOCKETS. WATER THOROUGHLY WHEN BACKFILLED 2/3FULL AND ALLOW TO SETTLE.SPECIES AS SHOW ON PLANLICENSE NO.:DATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY LICENSED LANDSCAPEARCHITECT UNDER THE LAWS OF THESTATE OF MINNESOTA.CERTIFICATION:4559208/31/2021SARAH E. HARDING SHRUB / PERENNIAL PLANTINGROCK MULCH (3") MIN.SHOVEL CUT EDGECONTAINER GROW MATERIALS SHALLHAVE ROOTS HAND LOOSENED UPONPLANTINGUNDISTURBED SUBGRADESCARIFY SIDES AND BOTTOM OF ENTIREBED WITH SPADE BY HAND TO BIND WITHPLANTING SOIL6"MIN.PREPARE SOIL FORTHE ENTIRE BEDPLANTING SOIL18" MIN.SEE PLAN2L-102NOT TO SCALE JANSEN AVE NEINTERSTATE 94PROPOSED BUILDING768 GSFFFE: 970.0N O P A R K I N G FUTURE BUILDING22,500 GSFFFE: 970.0XXXXXXXXXXXN O P A R K I N G PROPOSED BUILDING432 GSFFFE: 968.25BURLINGTON NORTHERN RAILROADINTERSTATE 940+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+0022+0023+0024+0025+0026+0026+56968 9679699669 6 9 969REMOVE EXISTING FES ANDCONNECT TO EXISTING STORM PIPEDATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.LICENSE NO.: 5424410/27/2021PATRICK SVEUMWARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.GOPHER STATE ONE CALLTWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGDWN BY:ISSUE DATE:PROJECT NO.:3366-0001U:\227701563\drafting\5_DESIGN\1_CAD\3 PLANSHEETS\C-301 GRADING PLAN.dwg DESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:SHEET TITLE:10/29/2021 10:27:14 AM CLIENT:GCC OF AMERICA CITY OF OTSEGO WRIGHT COUNTY, MINNESOTA PROJECT TITLE:MDHCHK'D BY:PWSAPP'D BY:PWSCERTIFICATION:7500 OLSON MEMORIAL HWYSUITE 300GOLDEN VALLEY, MN 55427PHONE: 763-252-6800FAX: 952-831-126810/27/2021805/26/2020 CITY SUBMITTAL 1 08/18/2020 CITY COMMENTS REVISION 1 2 12/07/2020 CITY COMMENTS REVISION 2 3 12/21/2020 CITY COMMENTS REVISION 3 4 03/19/2021 PRELIMINARY BID SET 5 03/19/2021 ADDENDA #1 6 08/31/2021 PERMIT SET 7 R:\cad\2277\AutoCAD_STDS\Stantec-Wenck Logos\Stantec-Wenck-Color_Logo-Vertical.png10/27/2021 ADDENDA #2 8C-307OVERALL BNSF RAILSIDING AND PHASINGPLANLEGEND1. SEE SHEET G-002 FOR ADDITIONAL PROJECT NOTES2. SEE SHEET C-201 FOR CONSTRUCTION LIMITS3. EXISTING SPOT ELEVATIONS AT MATCH POINTS ARE BASED ONINTERPOLATED POINT TO POINT SURVEY DATA. CONTRACTOR ISRESPONSIBLE FOR VERIFYING CONNECTION POINTS PRIOR TOINSTALLATION OF IMPROVEMENTS. CONTRACTOR SHALLNOTIFY ENGINEER IN WRITING IMMEDIATELY OF ANY FIELDDISCREPANCIES. CONTRACTOR IS RESPONSIBLE FOR MAKINGNECESSARY ADJUSTMENTS IN THE FIELD FORCONSTRUCTABILITY, REGULATORY COMPLIANCE (ADA),POSITIVE DRAINAGE, AND TO ENSURE SMOOTH TRANSITIONSTO FIELD CONDITIONS. CONTRACTOR IS RESPONSIBLE FORREWORK OF A DISCREPANCY THAT IS NOT COMMUNICATED TOTHE ENGINEER IN WRITING AT NO ADDITIONAL COST TO THEOWNER.NOTESLOT LINEEASEMENT LINEPROPERTY BOUNDARYEXISTING MINOR CONTOUREXISTING MAJOR CONTOURPROPOSED MINOR CONTOURPROPOSED MAJOR CONTOURRIPRAPTURF REINFORCEMENT MATPHASE 2A (0+00 TO 15+00)WORKING NW TO SEPHASE 3ADECOMMISSION THE EXISTING TEMPORARY LOADOUT FACILITY ONCE PHASE 2 AND 3 ARE COMPLETEDPHASE 3B (15+00 TO 26+56)WORKING SE TO NWPHASE 2BCONSTRUCT PRIVATE RAIL YARD SPURWORKING NW TO SEPHASE 1INSTALL SITE ROADS, LAYDOWN AREA FORLOAD OUT FACILITY, TRUCK SCALES AND SILOSAND CONSTRUCT FOUNDATIONSPHASE 2AINSTALL TEMPORARY BUMPSTOP AT STATION 13+50 65TH STREET NE JA N S E N A V E N E INTERSTATE 94 PROPOSED BUILDING768 GSFFFE: 970.0NO PARKINGFUTURE BUILDING22,500 GSFFFE: 970.0XXXXXXXXXX XXXXXXXXXXXXXXNO PARKIN GPROPOSED BUILDING432 GSFFFE: 968.25BURLINGTON NORTHERN RAILROADINTERSTATE 94 965965965965965965 965970 970 970 970 965965963964 970970970970970 970970970970970970 970 970 975975STORMWATERDETENTIONPOND1DO NOT DISTURB SEPTICDRAINFIELD AREASSTORMWATERDETENTION POND 2STORMWATERDETENTION POND 3DRAINAGE SWALE 3EOF=967.30DRAINAGESWALE 3EOF=967.30DRAINAGESWALE 1EOF=966.4TURFREINFORCEMENTMAT INSTALLEDAT EOF = 965.25'TURFREINFORCEMENTMATINSTALLED ATEOF = 965.0'TURFREINFORCEMENTMATINSTALLED ATEOF = 965.0'NORTHWETLAND 1MIDDLEWETLAND 2SOUTHWETLAND 3EOF=965.21MIDDLEWETLAND 2MIDDLE WETLAND 224" CMP OUTLETINV=961.78MIDDLEWETLAND 2EOF=964.0NORTH WETLAND 118" CMP OUTLETINV=959.59NORTHWETLAND 124" CMP OUTLETINV=959.75 DRAINAGESWALE 2EOF=966.49 6 4 963963 962963 963963 96 4 965 966 967 967 966 965 965 966 968968960960 965965 965965 965960960965965965961961962962962962963963964964966966965965 962962962962962962963 963 964 964966 966 965 970 961961962962963 963 963 963964964 964 96 4 964 966 967968 969 971960965970 975 975 975 975 975958959961962963964 966966966 967967967967 967967 96796896 8968968 968 969 971 9 7 2 972972 9 7 3 973 973974 974 97 4 974 974 976976 976 977 977 978 978 979 979 965963963963 964964964966966 967 968 967969 960960965966967 968 967970 969 97297197096596 6 965967967967967 969970969973970969967968967968968 9 6 8 9689 6 8 9 6 8 965 965 965 965965 965965965965965965965965970970 965966966966966966967965966960960960960960960 96596596596596596596596596596 5965965965965965965965965965965965965965965965965965965965 965965965 9709703+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00963964965965965965966965965965966966966966966966966967967967967967967968968968968968968 DRAINAGESWALE 4EOF=967.30968967 969966 969969REMOVE EXISTING FES ANDCONNECT TO EXISTING STORM PIPE 967968 EX. BLDGFFE=970.56NORTHWETLAND 1EOF=965.15C-301DATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.LICENSE NO.: 5424410/27/2021PATRICK SVEUMWARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.GOPHER STATE ONE CALLTWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGDWN BY:ISSUE DATE:PROJECT NO.:3366-0001U:\227701563\drafting\5_DESIGN\1_CAD\3 PLANSHEETS\C-301 GRADING PLAN.dwg DESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:SHEET TITLE:10/29/2021 10:26:26 AM CLIENT:GCC OF AMERICA CITY OF OTSEGO WRIGHT COUNTY, MINNESOTA PROJECT TITLE:MDHCHK'D BY:PWSAPP'D BY:PWSCERTIFICATION:7500 OLSON MEMORIAL HWYSUITE 300GOLDEN VALLEY, MN 55427PHONE: 763-252-6800FAX: 952-831-126810/27/2021805/26/2020 CITY SUBMITTAL 1 08/18/2020 CITY COMMENTS REVISION 1 2 12/07/2020 CITY COMMENTS REVISION 2 3 12/21/2020 CITY COMMENTS REVISION 3 4 03/19/2021 PRELIMINARY BID SET 5 03/19/2021 ADDENDA #1 6 08/31/2021 PERMIT SET 7 R:\cad\2277\AutoCAD_STDS\Stantec-Wenck Logos\Stantec-Wenck-Color_Logo-Vertical.png10/27/2021 ADDENDA #2 8OVERALL GRADINGPLANLOT LINEEASEMENT LINESETBACK LINERIGHT OF WAY LINESECTION LINEQUARTER LINEEXISTING EASEMENT LINEEXISTING PROPERTY LINEPROPERTY BOUNDARYLEGENDEXISTING MINOR CONTOUREXISTING MAJOR CONTOURPROPOSED MINOR CONTOURPROPOSED MAJOR CONTOUR1. SEE SHEET G-002 FOR ADDITIONAL PROJECT NOTES.2. EXISTING SPOT ELEVATIONS AT MATCH POINTS ARE BASED ONINTERPOLATED POINT TO POINT SURVEY DATA. CONTRACTOR ISRESPONSIBLE FOR VERIFYING CONNECTION POINTS PRIOR TOINSTALLATION OF IMPROVEMENTS. CONTRACTOR SHALLNOTIFY ENGINEER IN WRITING IMMEDIATELY OF ANY FIELDDISCREPANCIES. CONTRACTOR IS RESPONSIBLE FOR MAKINGNECESSARY ADJUSTMENTS IN THE FIELD FORCONSTRUCTABILITY, REGULATORY COMPLIANCE (ADA),POSITIVE DRAINAGE, AND TO ENSURE SMOOTH TRANSITIONSTO FIELD CONDITIONS. CONTRACTOR IS RESPONSIBLE FORREWORK OF A DISCREPANCY THAT IS NOT COMMUNICATED TOTHE ENGINEER IN WRITING AT NO ADDITIONAL COST TO THEOWNER.3. SEE GEOTECHNICAL REPORT AND ADDENDUMS FROM ELEMENTMATERIALS TECHNOLOGY (PROJECT EXP033458P) FORADDITIONAL INFORMATION AND REQUIREMENTS RELATED TOSOIL CORRECTIONS, ENGINEERED FILL, PAVEMENT SECTIONS,COMPACTION, INSPECTIONS AND TESTING.NOTESRIPRAPTURF REINFORCEMENT MAT 65TH STREET NEJANSEN AVE NEINTERSTATE 94PROPOSED BUILDING768 GSFFFE: 970.0NO PARKINGFUTURE BUILDING22,500 GSFFFE: 970.0XXXXXXXXXXXXXXXXXXXXXXXXNO PARKINGPROPOSED BUILDING432 GSFFFE: 968.25BURLINGTON NORTHERN RAILROADINTERSTATE 9496896896896896896596596596596596596596597097096596597097096696696696696696796796796796796796796796796796896896896896896896896896896896996996996996996996596596696696696696796796796896796596696096096096096096096596596596596596596596596596596596596596596596596596596596596596596596596596596596597097017 LF OF 4" PVC @ 2.00%PROVIDE 6" INSULATION OVER LENGTH OF PIPE65TH STREET NEJANSEN AVE NECLEANOUT1.5" HDPE DOMESTICWATER SERVICEVERIFY LOCATION,MATERIAL ANDELEVATION. PROVIDE 6"INSULATION OVERWATER SERVICESAN BLDGCONNECTION4" INV OUT -965.00VERIFY LOCATIONAND ELEVATIONPROPOSED DOMESTIC WELL DESIGNED BY OTHERSVERIFY LOCATION AND ELEVATION57 LF OF 4" PVC FORCEMAINPROVIDE 6" INSULATION OVER LENGTH OF PIPE21MATCHLINE: NOT USEDMATCHLINE: SEE SHEET 402357 LF OF 4" PVC FORCEMAINPROVIDE 6" INSULATION OVER LENGTH OF PIPESUBSURFACE SEWAGE TREATMENT SYSTEM (SSTS)DESIGNED BY OTHERS, COORDINATE WITH OWNERFOR PRELIMINARY DESIGN DETAILS. SITE VISIT ANDDESIGNER VERIFICATION REQUIRED PRIOR TO FINALSEPTIC PERMIT APPROVALCLEANOUT5 LF OF 4" PVC @ 2.00%PROVIDE 6" INSULATION OVER LENGTH OF PIPEC-4011. SEE SHEET G-002 FOR ADDITIONAL PROJECT NOTES.2. SEPTIC TANK, PUMP, AND DRAINFIELD TO BE DESIGNED BYOTHERS3. SANITARY AND WATER SERVICE SIZES AND ALIGNMENT AREPRELIMINARY. CONTRACTOR TO DETERMINE FINAL SIZING ANDALIGNMENT W/ MEP DESIGN. IN THE EVEN THE FINAL SIZE ORALIGNMENT IS DIFFERENT THAN PRELIMINARY, CONTRACTORSHALL NOTIFY THE ENGINEER AND OWNER IMMEDIATELYDATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.LICENSE NO.: 5424410/27/2021PATRICK SVEUMWARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.GOPHER STATE ONE CALLTWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGDWN BY:ISSUE DATE:PROJECT NO.:3366-0001U:\227701563\drafting\5_DESIGN\1_CAD\3 PLANSHEETS\C-401 UTILITY PLAN.dwgDESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:SHEET TITLE:10/29/2021 10:28:08 AMCLIENT:GCC OF AMERICACITY OF OTSEGOWRIGHT COUNTY, MINNESOTAPROJECT TITLE:MDHCHK'D BY:PWSAPP'D BY:PWSCERTIFICATION:7500 OLSON MEMORIAL HWYSUITE 300GOLDEN VALLEY, MN 55427PHONE: 763-252-6800FAX: 952-831-126810/27/2021805/26/2020 CITY SUBMITTAL108/18/2020 CITY COMMENTS REVISION 1212/07/2020 CITY COMMENTS REVISION 2312/21/2020 CITY COMMENTS REVISION 3403/19/2021 PRELIMINARY BID SET503/19/2021 ADDENDA #1608/31/2021 PERMIT SET7R:\cad\2277\AutoCAD_STDS\Stantec-Wenck Logos\Stantec-Wenck-Color_Logo-Vertical.png10/27/2021 ADDENDA #28OVERALL UTILITY PLANLOT LINEEASEMENT LINESETBACK LINERIGHT OF WAY LINEPROPERTY BOUNDARYLEGENDEXISTING MINOR CONTOUREXISTING MAJOR CONTOURSTORM MANHOLEFLARED END SECTIONSANITARY SEWERFMSANITARY FORCEMAINSTORM SEWERNOTESPROPOSED MINOR CONTOURPROPOSED MAJOR CONTOURPROPOSED WATER WELLSANITARY CLEANOUT1. SEPTIC TANK AND PUMPING STATION - DESIGNED BY OTHERS2. PRIMARY SEPTIC DRAINFIELD - DESIGNED BY OTHERS3. SECONDARY SEPTIC DRAINFIELD - DESIGNED BY OTHERSKEYNOTES# 65TH STREET NE JA N S E N A V E N E INTERSTATE 94 PROPOSED BUILDING768 GSFFFE: 970.0NO PARKINGFUTURE BUILDING22,500 GSFFFE: 970.0XXXXXXXXXX XXXXXXXXXXXXXXNO PARKINGPROPOSED BUILDING432 GSFFFE: 968.25BURLINGTON NORTHERN RAILROADINTERSTATE 94NORTH STORMWATERDETENTION POND 1MIDDLESTORMWATERDETENTIONPOND 2SOUTH STORMWATERDETENTION POND 3MATCHLINE: SEE SHEET 502 MATCHLINE: SEE SHEET 503 MIDDLEWETLAND2DRAINAGE SWALE 4EOF=967.30DRAINAGESWALE 3EOF=967.30DRAINAGE SWALE 2EOF=967.30DRAINAGE SWALE 1EOF=966.50TURFREINFORCEMENTMAT INSTALLEDAT EOF = 965.25'TURFREINFORCEMENTMAT INSTALLEDAT EOF = 965.00'TURF REINFORCEMENT MATINSTALLED AT EOF = 965.0'NORTHWETLAND 1SOUTHWETLAND 3EOF=965.21MIDDLEWETLAND 2MIDDLE WETLAND 224" CMP OUTLETINV=961.78MIDDLEWETLAND 2EOF=964.0NORTH WETLAND 118" CMP OUTLETINV=959.49NORTHWETLAND 1EOF=965.15 4" PVC DT 4" PVC DT1+39 0+001+00 1+930+00 1+00 0+710+00 1+060+001+000+790+000+00 1+00 2+00 3+00 4+00 5+00 6+00 7+004+00 5+00 6+00 6+59 1+40 0+00 1+00 2+160+001+002+000+00 1+00 1+402+170+001+002+000+001+00 4" PVC DT 4" PVC DT 4" PVC DT 4" PVC DTOCS-22RIM=968.0012" INV IN=964.00 (N)12" INV OUT=964.00 (S)7" ORIFICE INV=964.004' WEIR INV=966.50FES-624" INV=963.00FES-1724" INV=964.44FES-324" INV=961.00FES-2312" INV=963.00FES-1624" INV=964.00FES-2012" INV=960.00FES-1524" INV=964.70FES-1424" INV=964.00OCS-25RIM=967.0012" INV IN=964.00 (S)10" INV OUT=964.00 (N)SUMP INV=963.00FES-2410" INV=963.89FES-2112" INV=963.85FES-2612" INV=963.00OCS-19RIM=965.5012" INV IN=961.00 (SE)12" INV OUT=961.00 (NW)3.5" ORIFICE INV=961.00TOP 4' WEIR WALL ELEV=964.60FES-1812" INV=960.82FES-224" INV=959.32FES-124" INV=959.75FES-1224" INV=962.00FES-1324" INV=962.00CB MH-4RIM=965.8524" INV IN=961.85 (NE)4" INV IN=963.00 (N)4" INV IN=963.00 (SE)24" INV OUT=961.85 (SW)CB MH-5RIM=966.5024" INV IN=962.43 (NE)15" INV IN=962.43 (SE)24" INV OUT=962.43 (SW)FES-824" INV=964.44FES-724" INV=964.00CB MH-39RIM=964.4830" INV OUT=959.31 (NW)CB MH-38RIM=964.2030" INV IN=958.89 (SE)30" INV OUT=958.89 (NW)CB MH-30RIM=965.6430" INV IN=960.02 (SE)30" INV OUT=960.02 (NW)CB MH-31RIM=965.9030" INV IN=960.27 (SE)30" INV OUT=960.27 (NW)FES-915" INV=963.00FES-2830" INV=959.59CB MH-29RIM=966.7730" INV IN=959.80 (SE)30" INV OUT=959.80 (W)4' SUMP ELEV=955.80INSTALL SAFL BAFFLE OR APPROVED EQUAL12" INV OUT=957.11 (NW)FES-2718" INV=959.59CB MH-37RIM=962.5030" INV IN=958.00 (SE)30" INV OUT=958.00 (NW)FES-104" INV=963.00FES-114" INV=963.00FES-404" INV=962.00FES 4212" INV=966.20FES 4112" INV=965.60 4" PVC DT 4" PVC DT 4" PVC DT 4" PVC DTC-501DATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.LICENSE NO.: 5424410/27/2021PATRICK SVEUMWARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.GOPHER STATE ONE CALLTWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGDWN BY:ISSUE DATE:PROJECT NO.:3366-0001U:\227701563\drafting\5_DESIGN\1_CAD\3 PLANSHEETS\C-501 STORM SEWER PLAN.dwg DESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:SHEET TITLE:10/29/2021 10:28:43 AM CLIENT:GCC OF AMERICA CITY OF OTSEGO WRIGHT COUNTY, MINNESOTA PROJECT TITLE:MDHCHK'D BY:PWSAPP'D BY:PWSCERTIFICATION:7500 OLSON MEMORIAL HWYSUITE 300GOLDEN VALLEY, MN 55427PHONE: 763-252-6800FAX: 952-831-126810/27/2021805/26/2020 CITY SUBMITTAL 1 08/18/2020 CITY COMMENTS REVISION 1 2 12/07/2020 CITY COMMENTS REVISION 2 3 12/21/2020 CITY COMMENTS REVISION 3 4 03/19/2021 PRELIMINARY BID SET 5 03/19/2021 ADDENDA #1 6 08/31/2021 PERMIT SET 7 R:\cad\2277\AutoCAD_STDS\Stantec-Wenck Logos\Stantec-Wenck-Color_Logo-Vertical.png10/27/2021 ADDENDA #2 8OVERALL STORMSEWER PLANLOT LINEEASEMENT LINESETBACK LINERIGHT OF WAY LINEPROPERTY BOUNDARYLEGENDEXISTING MINOR CONTOUREXISTING MAJOR CONTOUR1. SEE SHEET G-002 FOR ADDITIONAL PROJECT NOTESNOTESSEE SHEETS 308-310DRAINTILESTORM MANHOLESTORM CATCH BASINFLARED END SECTIONSANITARY SEWERWATERMAINSTORM SEWERPROPOSED MINOR CONTOURPROPOSED MAJOR CONTOURPROPOSED WATER WELLRIPRAP 1 7 Dec 21 GCC OF AMERICA REVISED SITE/BUILDING PLAN REVIEW CONDITIONAL USE PERMIT AMENDMENT FINDINGS & DECISION APPLICANT: GCC of America, Inc. (GCC Dacotah, Inc.) APPLICATION: Request for review of revised site and building plans and amendment of a conditional use permit for structure height. CITY COUNCIL MEETING: 13 December 2021 FINDINGS: Based upon review of the application and evidence received, the Otsego City Council now makes the following findings of fact: A. The legal description of the property is Lot 1, Block 1, Otsego Industrial Park Seventh Addition, City of Otsego, County of Wright, State of Minnesota. B. The property lies within the West Sewer District and is guided for industrial uses by the 2012 Otsego Comprehensive Plan, as amended. C. The property is zoned I-2, General Industrial District. D. City Council on 24 August 2020 approved site and building plans and a conditional use permit for a cement transfer station, which is a permitted use within the I-2 District. E. The applicant is proposing revisions to the site and building plans necessitating amendment of the approved site and building plans and conditional use permit. F. The Planning Commission and City Council must take into consideration the possible effects of the request with their judgment based upon (but not limited to) the criteria outlined in Section 11-4-2.F of the Zoning Ordinance: 1. The proposed action's consistency with the specific policies and provisions of the Otsego Comprehensive Plan. Finding: Expansion of industrial uses is consistent with the City’s economic development goals to add employment and expand tax base. Development of the proposed use, as amended, is consistent with the 2012 Comprehensive Plan. 2. The proposed use's compatibility with present and future land uses of the area. Finding: The proposed industrial use of the subject site will be compatible with existing industrial and rural uses in the area, as well as planned future commercial uses to the west and low density residential uses south of 65th Street (CSAH 37). 2 3. The proposed use's conformity with all performance standards contained within the Zoning Ordinance and other provisions of the City Code. Finding: The proposed use complies with the criteria for allowance of additional building height stipulated in Section 11-17-2.A of the Zoning Ordinance. 4. Traffic generation of the proposed use in relation to capabilities of streets serving the property. Finding: The subject site is accessed by 65th Street (CSAH 37) and from the cul-de-sac terminus of Jansen Avenue. The Wright County Long Range Transportation Plan designates 65th Street (CSAH 37) as a major collector street. Existing streets serving the property have adequate capacity to accommodate the proposed use. 5. The proposed use can be accommodated by existing public services and facilities and will not overburden the City's service capacity. Finding: The proposed use will be accommodated by existing public services, facilities, and infrastructure. G. The planning report dated 1 December 2021 prepared by the City Planner, The Planning Company LLC, are incorporated herein. H. The Otsego Planning Commission conducted a public hearing at their regular meeting on 6 December 2021 to consider the application, preceded by published and mailed notice; based upon review of the application and evidence received, the public hearing was closed and the Planning Commission recommended by a 7-0 vote that the City Council approve the request based on the aforementioned findings. DECISION: Based on the foregoing information and applicable ordinances, the request is hereby APPROVED, subject to the following conditions: 1. The conditional use permit approved by the City Council on 24 August 2020 remains in full force and effect except as modified herein. 2. The site and buildings shall be developed in accordance with the plans on file with the City except as modified herein or approved by City staff. 3. The developer shall complete installation of the six storage silos by 31 January 2027 or request an extension of the conditional use permit approval as provided for by Chapter 4 of the Zoning Ordinance. 4. The temporary gravel drive shall be removed when the temporary load out facility is removed upon completion of the permanent site improvements. 5. The landscape plan shall be revised to incorporate deciduous trees at the south end of the rail storage area and increase the height of proposed coniferous trees shown on the landscape plan to a minimum height of eight feet, subject to review and approval of the Zoning Administrator. 6. Installation of any fencing shall comply with Section 11-19-4.H and requires a fence permit, subject to review and approval of the Zoning Administrator. 3 7. A revised exterior lighting plan shall be submitted demonstrating compliance with Section 11-16-6 of the Zoning Ordinance, subject to review and approval of the Zoning Administrator. 8. All signs shall comply with Chapter 37 of the Zoning Ordinance and a sign permit shall be required prior to installation of any signs upon the property, sign permit be issued, subject to review and approval of the Zoning Administrator. 9. All grading, drainage, erosion control, and wetland impacts are subject to review and approval of the City Engineer. 10. The developer shall execute the approved Site Improvement Performance Agreement prior to issuance of a building permit. MOTION BY: SECOND BY: ALL IN FAVOR: THOSE OPPOSED: ADOPTED by the City Council of the City of Otsego this 13th day of December, 2021. CITY OF OTSEGO By:________________________________ Jessica L. Stockamp, Mayor Attest: By:____________________________ Audra Etzel, City Clerk 1 CITY OF OTSEGO COUNTY OF WRIGHT STATE OF MINNESOTA RESOLUTION NO: 2021-99 APPROVING VACATION OF EXISTING DRAINAGE AND UTILITY EASEMENTS WITHIN THE OTSEGO INDUSTRIAL PARK 6TH ADDITION WHEREAS, GCC of America, Inc. (GCC Dacotah, Inc.) has initiated vacation of existing drainage and utility easements dedicated over a portion of Lot 1, Block 1, Otsego Industrial Park 6th Addition; and WHEREAS, the City Engineer has reviewed the request and determined that the existing drainage and utility easements described by Exhibit A are unnecessary for public purposes; and WHEREAS, the Planning Commission held a public hearing at their regular meeting on 6 December 2021 to consider the vacation, preceded by required published and mailed legal notice; and WHEREAS, the Planning Commission heard all parties interested therein, closed the public hearing, and voted 7-0 to recommend the City Council approve the vacation request; and WHEREAS, the Request for Council Action dated 13 December 2021 prepared by the City Planner, The Planning Company LLC, is incorporated herein; and WHEREAS, the City Council having considered all information received finds that the existing drainage and utility easements serve no useful public purpose and vacating the existing drainage and utility easements would be in the public interest. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OTSEGO, MINNESOTA: 1. That the existing drainage and utility easements described by Exhibit A are hereby vacated. 2. The City Council hereby determines that the vacation of said existing right-of-way and drainage and utility easements shall cause no damage to any abutting or nearby property owners and therefore no damages are awarded to any such property owners. 2 MOTION BY: SECOND BY: ALL IN FAVOR: THOSE OPPOSED: ADOPTED by the City Council of the City of Otsego this 13th day of December, 2021. CITY OF OTSEGO BY:______________________________ Jessica L. Stockamp, Mayor ATTEST:______________________________ Audra Etzel, City Clerk 1 CITY OF OTSEGO COUNTY OF WRIGHT STATE OF MINNESOTA RESOLUTION NO: 2021-103 APPROVING A REVISED SITE IMPROVEMENT PERFORMANCE AGREEMENT FOR GCC DACOTAH, INC. WHEREAS, GCC Dacotah, Inc. (the “developer”) is proposing development of Lot 1, Block 1, Otsego Industrial Park Sixth Addition; and WHEREAS, Section 11-9-7 of the Zoning Ordinance requires the developer to enter into a Site Improvement Performance Agreement to provide the City construction and warranty securities for the public and private improvements and to provide the City various remedies in the event that the developer breaches the terms and conditions of said agreement; and WHEREAS, site and building plans, a conditional use permit, and a Site Improvement Performance Agreement for the development were approved on 24 August 2020 by the City Council; and WHEREAS, an amendment to the conditional use permit and revisions to the site and building plans were approved on 13 December 2021 by the City Council, which necessitates revision of the Site Improvement Performance Agreement; and WHEREAS, those obligations required by the Zoning Ordinance are outlined and memorialized the attached revised Site Improvement Performance Agreement. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OTSEGO, MINNESOTA THAT: 1. The Site Improvement Performance Agreement attached hereto between the City of Otsego and GCC Dacotah, LLC is hereby approved in form subject to modification of fees, charges, and securities as approved by City staff. 2. The Mayor and City Clerk are hereby authorized to execute the Site Improvement Performance Agreement on behalf of the City of Otsego. 2 ADOPTED by the Otsego City Council this 13th day of December, 2021. MOTION BY: SECONDED BY: IN FAVOR: OPPOSED: CITY OF OTSEGO __________________________________ Jessica L. Stockamp, Mayor ATTEST: __________________________________ Audra Etzel, City Clerk 1 GCC Dacotah, Inc. 219543v1 (reserved for recording information) AMENDED AND RESTATED SITE IMPROVEMENT PERFORMANCE AGREEMENT GCC DACOTAH, INC. THIS AMENDED AND RESTATED SITE IMPROVEMENT PERFORMANCE AGREEMENT (“Agreement”) dated ____________________, 2021, by and between the CITY OF OTSEGO, a Minnesota municipal corporation (“City”) and GCC DACOTAH, INC., a South Dakota corporation (“Developer”). RECITALS A. Developer and the City of Otsego entered into a Site Improvement Performance Agreement dated December 23, 2020 (“Original Agreement”) for the property legally described as Lot 1, Block 1, Otsego Industrial Park 6th Addition, Wright County, Minnesota, according to the recorded plat thereof (“Original Property Description”); B. Following the execution of the Original Agreement, the Developer submitted revised site and building plans necessitating amendments to the approved site and building plans and conditional use permit. C. The parties desire to amend and restate the Original Agreement to reflect the changes in the site and building plans and the amendment to the conditional use permit. This Amended and Restated Site Improvement Performance Agreement supersedes the previous Site Improvement Performance Agreement. 2 GCC Dacotah, Inc. 219543v1 1. BACKGROUND. A. The Developer has submitted to the City a site plan application and conditional use permit for improvements on the property in the City of Otsego, Minnesota, legally described as Lot 1, Block 1, Otsego Industrial Park 6th Addition (hereinafter referred to as the “Subject Property”). B. The proposed site plan improvements to the above-described property includes the construction of a 768 square foot one story office building, a future 22,500 square foot storage building, two storage silos, future installation of four additional storage silos, with proposed use as a storage and transfer site involving the transport, loading, unloading, trans-loading, storage and transfer of building materials and other personal property useful for the operation of the cement transfer station and plant; including without limitation, cement, sand, and fly ash, from a rail spur to be constructed off the abutting BNSF rail line, and the transport of materials off-site by truck. Access to the property will be maintained at the permanent cul- de-sac terminus of Jansen Avenue NE within Lot 1, Block 1, Otsego Industrial Park 6th Addition (“Improvements”) C. The Developer shall install and complete the Improvements by October 31, 2022. For purposes of this agreement, the Improvements are the site improvements required by the Agreement, specifically the erosion control, storm sewer facilities, grading, wetland buffer signage, and streets within the Plat, the cul-de-sac at the terminus of Jansen Avenue, street light installation, landscaping and similar improvements; provided, however, that the Developer and the City acknowledge the construction of a 768 square foot one story office building, a 22,500 square foot storage building, and storage silos as further detailed in the first sentence of Section 1(B) is expressly excluded from the definition of Improvements under this Agreement. D. The Developer may phase construction of the office building and warehouse building shown on the approved site plan. Erection of the silo structures, which are defined as accessory structures by the Zoning Ordinance, upon the Subject Property shall occur concurrently with either the office building or warehouse pursuant to Section 11-18-2.A of the Zoning Ordinance. Completion of any structure upon the Subject property shall be in compliance with Section 9-1-2 of the City Code. 3 GCC Dacotah, Inc. 219543v1 2. CONDITIONS OF APPROVAL. This Agreement is a condition of City site plan approval and will be recorded against the subject property. 3. PLANS. The Subject Property shall be developed in accordance with the following plans which are on file with the City. The plans shall not be attached to this Agreement. If the plans vary from the written terms of this Agreement, the written terms shall control. The plans are: Plan A – Site Plan Plan B – Final Grading, Drainage and Erosion Control Plan Plan C – Utility Plan Plan D – Landscape Plan Plan E – New Building Floor Plan Plan F – New Building Elevations Plan Plan G – Lighting Photometric Plan Plan H – Traffic Control Plan No work can occur outside of the areas indicated on the plans without modifying this 4. EROSION CONTROL. Prior to initiating site grading, the erosion control plan, Plan B, shall be implemented by the Developer and inspected and approved by the City, which shall not be unreasonably denied, withheld, or delayed. The City may impose reasonable additional erosion control requirements if the existing erosion control plan is not effective. All areas disturbed by the grading operations shall be stabilized per the MPCA Stormwater Permit for Construction Activity. Seed shall be in accordance with the City’s current seeding specification which may include temporary seed to provide ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc anchored as necessary for seed retention. The parties recognize that time is of the essence in controlling erosion. If the Developer does not comply with the MPCA Stormwater Permit for Construction Activity or with the erosion control plan and schedule or supplementary instructions received from the City, the City, after a 48 hours’ written notice to the Developer, may take such action as it deems appropriate to control erosion. If the Developer does not reimburse the City for any reasonable cost the City incurred for such work within ten (10) days, the City may draw down the 4 GCC Dacotah, Inc. 219543v1 letter of credit or the cash escrow, as the case may be, to pay any costs. No development, utility or street construction will be allowed and no building permits will be issued unless the plat is in full compliance with the approved erosion control plan. The Developer is responsible for obtaining an MPCA Construction Permit for the site as well as developing a SWPPP for the site prior to issuance of a building permit. The permit requires that all erosion and sediment BMPs be clearly outlined in a SWPPP. Changes made throughout construction must be documented in the SWPPP. All basin slopes and slopes adjacent to wetlands must have erosion control blanket installed. Additional erosion control measures may be required during construction as deemed necessary by City staff. Any additional measures required shall be installed and maintained by the Developer. 5. LICENSE. Developer hereby grants the City, its agents, employees, officers and contractors a license to enter the Subject Property to perform all work and inspections deemed appropriate by the City in conjunction with site development. 6. CONSTRUCTION ACCESS. Construction traffic access and egress for grading, public utility construction, and public street construction is restricted to access the subdivision as approved by the City Engineer. 7. STORM SEWER. The Developer shall construct private storm sewer to convey the stormwater runoff from the proposed improvements to the stormwater management basin. The Developer shall install a privately owned and maintained 24 inch culvert from the south side of Jansen Avenue NE to the wetland area southwest of the subject site. Prior to the issuance of a building permit, the Developer shall enter into a private maintenance agreement for the private storm sewer and stormwater management system. The Developer shall pay a cash fee in the amount of $58,305.00 for the Storm Water Impact Fee which is calculated as follows: 16.25 Net Acres X $3,588.00 = $58,305.00 Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the building permit plans. 5 GCC Dacotah, Inc. 219543v1 8. CITY ENGINEERING ADMINISTRATION AND CONSTRUCTION OBSERVATION. The Developer shall pay a fee for consulting engineering administration following approval of the Plat. City engineering administration will include consultation with Developer and its engineer on status or problems regarding the project, monitoring during the warranty period, general administration and processing of requests for reduction in security. Fees for this service shall be the actual amount billed for those services, which are estimated to be no more than three percent (3%) of the estimated construction cost of the Improvements to be inspected, assuming normal construction and project scheduling. The Developer shall pay for construction observation performed by the City Engineer. Construction observation shall include part or full time observation, as reasonably determined by the City Engineer, of proposed street, sanitary sewer, water and storm drainage construction and will be billed on hourly rates estimated to be six and one half (6.5) percent of the estimated construction cost The escrow amount shall be submitted to the City prior to the City executing this Agreement. All administrative and legal fees related to plan review, drafting of this Agreement and any other necessary items shall be paid to the City prior to execution of this Agreement, which are in the aggregate amount of $7,598.50. Any amounts for legal and engineering not utilized from this escrow fund shall be returned to the Developer when all improvements have been completed, all financial obligations to the City satisfied, and the required "as constructed" plans have been received by the City. All other amounts listed as flat fees are non-refundable and available immediately for City use when posted. 9. DRAINAGE AND GRADING. The proposed rail spur includes installation of rail track for rail car storage that will require filling of wetlands in the southern portion of the subject site. All grading, drainage, erosion control, and wetland impacts are subject to review and approval of the City Engineer, which shall not be unreasonably denied, withheld, or delayed. The plat shall be graded in accordance with the approved grading development and erosion control plan, Plan “B”. The plan shall conform to City of Otsego specifications. Within thirty (30) days after completion of the grading and final establishment of ground cover or temporary stabilization reasonably approved by the City, which shall not 6 GCC Dacotah, Inc. 219543v1 be unreasonably denied, withheld, or delayed, the Developer shall provide the City with an “as constructed” grading plan certified by a registered land surveyor or engineer that all storm water treatment/infiltration basins and swales, have been constructed on public easements or land owned by the City. The “as constructed” plan shall include field verified elevations of the following: a) cross sections of storm water treatment/infiltration basins; b) location and elevations along all swales, wetlands, wetland mitigation areas if any, locations and dimensions of borrow areas/stockpiles, and installed “conservation area” posts; and c) lot corner elevations and building pads. The City will withhold issuance of a Certificate of Occupancy until the approved certified grading plan is on file with the City and all erosion control measures are in place as reasonably determined by the City Engineer. The soils observation and testing report, including referenced development phases and lot descriptions, shall be submitted to the Building Official for review prior to the issuance of the Certificate of Occupancy. Prior to the release of the grading and erosion control security, the “as constructed” plan for the lot must be submitted to verify that the final as-built grades and elevations of the specific lot are consistent with the approved grading plan for the development, and amendments thereto as reasonably approved by the City Engineer, which shall not be unreasonably denied, withheld, or delayed, and that all required property monuments are in place. If the final grading, erosion control and “as constructed” grading plan is not timely completed, after fifteen (15) days’ written notice to Developer, the City may enter the lot, perform the work, and draw on the letter of credit or the cash escrow, as the case may be. Upon satisfactory completion of the grading, erosion control and “as constructed” grading plan, the security, less any draw made by the City, shall be released. A certified as-built building pad survey must be submitted and approved for commercial, industrial or institutional developments prior to issuance of a building permit. The site plan improvements contain more than one (1) acre of site disturbance. Therefore, a National Pollution Discharge Elimination System General Stormwater Permit for construction activity is required from the Minnesota Pollution Control Agency. A copy of the Notice of Stormwater Permit Coverage must be submitted to the City upon receipt from the MPCA. 7 GCC Dacotah, Inc. 219543v1 Retaining walls over four feet in height shall be constructed in accordance with plans and specifications prepared by a structural or geotechnical engineer licensed by the State of Minnesota. Following construction, a certification signed by the design engineer shall be filed with the Building Official evidencing that the retaining wall was constructed in accordance with the approved plans and specifications. All retaining walls identified on the development plans and by special conditions referred to in this Agreement shall be constructed before any other building permit is issued for a lot on which a retaining wall is required to be built. All retaining walls must comply with the City’s engineering manual and the City’s zoning ordinance. 10. WETLAND REPLACEMENT AND MITIGATION. The wetland delineation conducted by Wenck Associates for the site was approved on June 9, 2020 by the City of Otsego. Wenck Associates has suggested additional areas will be delineated for the project. All wetland impacts will need to abide by the rules as stated in the Wetland Conservation Act and as approved in a future Notice of Decision for any replacement plan. Any wetland buffer areas that are disturbed, shall be seeded by the Developer with an appropriate wetland buffer mix and managed by the Developer for two years or until the wetland buffer areas are fully established, as determined by the City. The Developer shall post a $359,608.11 security for wetland mitigation. This security may be in the form of a letter of credit separate from the primary development security or in the form of a non-interest bearing cash escrow with the City. If the mitigation area is found to be unsuccessful after the mandatory five-year warranty period, the City may elect to keep the security to be used for this mitigation project or for wetland mitigation/restoration elsewhere within the City. In addition, the City may draw down the security at any time during the warranty period if the Developer fails to take corrective measures as directed by the City to perform the work recommended. Security for wetland obligations will be released when the City receives proof that Developer has ownership of the required wetland credits. The Developer shall install eighteen (18) Wetland Buffer signs at the edge of the wetland buffer. The Developer shall pay a cash fee in the amount of $4,500.00 to ensure installation of signs. The fee is calculated as follows: 8 GCC Dacotah, Inc. 219543v1 18 signs X 250.00 per sign = $4,500.00 11. STREETS. The Developer agrees to maintain the streets within the Plat until the base course bituminous surfacing has been reasonably accepted by the City, which shall not be unreasonably denied, withheld, or delayed. Should the City be required to grade the street prior to paving, the cost of such grading shall be paid by the Developer and may be drawn from the Developer’s letter of credit or cash escrow.. Should snowplowing be necessary prior to street paving, the City may plow the street prior to acceptance, and the Developer will hold harmless and indemnify the City from any and all liability claims related to such work and pay all costs associated with that work. Any plowing undertaken by the City will constitute no acceptance or evidence of acceptance of the street(s) in question. The final wear course shall not be constructed until at least one construction season after the base construction is completed and shall be delayed one more construction season if at least 75% build out is not achieved. However, the final wear course shall not be delayed for a period longer than two years after the base course is paved, regardless of build out; in which case, the Developer shall provide and escrow for fog sealing the streets in the event the final wear course is placed prior to 75% build out. Upon final completion of streets and acceptance by the City as a City street rather than a private drive, the Developer shall guarantee to the City for a period of two (2) years the streets have been constructed to City standards. The warranty period shall not commence until such time as street construction is completed and the streets are accepted as City streets by the City. The two (2) year warranty period set forth above commences upon the date on which the City accepts the streets by resolution. The warranty period for underground utilities is two years and shall commence following completion and acceptance by City Council by resolution. A minimum of 10% of the total security required under this Contract shall be retained as warranty security as specified in the section of this Contract. 12. CLEAN UP. The Developer shall clean dirt and debris from streets that has resulted from construction work by the Developer, subcontractors, their agents or assigns. Prior to any construction on the Subject Property, the Developer shall identify in writing a responsible party and schedule for erosion control, street cleaning, and street sweeping. 9 GCC Dacotah, Inc. 219543v1 13. LANDSCAPING. Landscaping shall be installed in accordance with the approved landscape plan. The Developer shall post a $83,335.87 landscaping security upon issuance of a building permit to ensure that the landscaping is installed in accordance with the approved plan. 14. DEWATERING. Due to the variable nature of groundwater levels and stormwater flows, it will be the Developer’s and the Developer’s contractors and subcontractors responsibility to satisfy themselves with regard to the elevation of groundwater in the area and the level of effort needed to perform dewatering and storm flow routing operations. All dewatering shall be in accordance with all applicable county, state, and federal rules and regulations. DNR regulations regarding appropriations permits shall also be strictly followed. 15. SPECIAL PROVISIONS. The following special provisions shall apply to this Agreement: A. Implementation of the conditions listed in the Findings of Fact approved by the City Council on December 13, 2021. B. The site plans and building construction shall be developed in accordance with plans approved by the City Council. C. The conditional use permit approved by the City Council on August 24, 2020 remains in full force and effect except as modified herein. D. The site and buildings shall be developed in accordance with the plans on file with the City except as modified herein or approved by City staff. E. The Developer shall complete the installation of six (6) storage silos by January 31, 2027 or request an extension of the conditional use permit approval as provided for by Chapter 4 of the Zoning Ordinance. F. The temporary gravel drive shall be removed when the temporary load out facility is removed upon completion of the permanent site improvements. G. The landscape plan shall be revised to incorporate deciduous trees at the south end of the rail storage area and increase the height of proposed coniferous trees shown 10 GCC Dacotah, Inc. 219543v1 on the landscape plan to a minimum height of eight (8) feet, subject to review and approval of the Zoning Administrator. H. Installation of any fencing shall comply with Section 11-19.4 H and requires a fence permit, subject to review and approval of the Zoning Administrator. I. The Developer shall submit a revised exterior lighting plan demonstrating compliance with Section 11-16-6 of the Zoning Ordinance, subject to review and approval of the Zoning Administrator. J. All signs shall comply with Chapter 37 of the Zoning Ordinance and a sign permit shall be required prior to installation of any signs upon the property, sign permit be issued, subject to review and approval of the Zoning Administrator. K. All grading, drainage, erosion control, and wetland impacts are subject to review and approval of the City Engineer. L. A building permit is required prior to commencing construction. The construction shall be completed in accordance with the approval of the Building Official and Fire Marshal. M. No direct lot access to 65th Street (CSAH 37) shall be allowed as determined by Wright County. E. Trash containers shall be stored inside the building or in a gated enclosure in compliance with Zoning Ordinance Requirements. H. Any outdoor storage of trash or recycling containers will require construction of an enclosure meeting the requirements of Section 11-18-4.C of the Zoning Ordinance and shall be subject to the approval of the Zoning Administrator. I. Any outdoor storage of trash or recycling containers shall not encroach upon required parking spaces or required loading space as required by the Zoning Ordinance. 11 GCC Dacotah, Inc. 219543v1 J. The property stored shall not include any waste, except as provided in section 11-18- 4.C of the Zoning Ordinance. K. The Developer shall install on-site and off street parking in compliance with Zoning Ordinance requirements subject to the review of the Zoning Administrator. L. The Developer shall submit as-built record drawings following the completion of this project. M. The Developer shall install a permanent cul-de-sac at the east property line where the current temporary turnaround is located at the terminus of Jansen Avenue. N. The City shall not be responsible for any costs associated with improving railroad crossings at Labeaux Avenue (CSAH 19) and 65th Street (CSAH 37) as may be required of the Developer by Wright County or any other agency as a condition of plat approval and development of the Subject Property. 16. SECURITY. To ensure compliance with the terms of this Agreement, and construction of all public improvements, and satisfaction of all other obligations, the Developer shall furnish the City with a cash escrow or Irrevocable Standby Letter of Credit with automatic renewal provisions in the amount as required under this Agreement. The issuer and form of the security (other than cash escrow) shall be subject to City approval in its reasonable discretion. The security shall be issued by a banking institution in good standing as determined by the City and approved by the City Administrator. The City shall have the ability to draw on the security at a bank or branch bank located within fifty (50) miles of the City Hall. The security shall contain an automatic renewal provision and shall not expire until all the Development is complete and fully and finally accepted by the City, and all terms of this Agreement are satisfied. The City may draw down the security, on five (5) business days written notice to the Developer, for any violation of the terms of this Agreement or without notice if the security is allowed to lapse prior to the end of the required term. If the required public improvements are not completed at least thirty (30) days prior to the expiration of the security, the City may also draw it down without notice. If the security is drawn down, the proceeds shall be used to cure the default. 12 GCC Dacotah, Inc. 219543v1 Upon receipt of proof satisfactory to the City that work has been completed and financial obligations to the City have been satisfied, with City approval not to be unreasonably withheld or delayed, the security shall be reduced from time to time in proportion to the work completed, but not below ten (10) percent which is the amount of the warranty security. For purposes of this Section, the warranty period shall be a twelve (12) month period after the applicable work has been completed, except with respect to streets, for which the warranty period shall be two years as addressed elsewhere in this Agreement. This security amount shall be submitted to the City prior to execution of the Agreement. All administrative and legal fees related to plan review, drafting of this Agreement and any other necessary items shall be paid to the City prior to execution of the Agreement, which are in the aggregate amount of $499,535.14. Upon completion of the work contemplated hereunder and expiration of the warranty period, the remaining security shall be promptly released to Developer. 17. SUMMARY OF SECURITY REQUIREMENTS. The amount of the security described above is calculated as follows: CONSTRUCTION COSTS: A. Site Grading, Erosion & Sediment Control & Wetland Protection, $40,020.00 B. Landscaping 83,335.87 C. Wetland Replacement $359,608.11 TOTAL SUBTOTAL: $482,963.98 TOTAL IRREVOCABLE LETTER OF CREDIT OR CASH ESCROW FOR SECURITY (125% OF SUBTOTAL) $603,704.98 ADDITIONAL ESCROW A. Legal Service (1.0%) ($1,500.00 minimum) $1,500.00 B. Existing Outstanding Escrow Balance for Application Review $1,765.95 C. City Construction Administration and Utility & Street Inspection (8%) or ($10,000.00 minimum) $5,000.00 TOTAL ESCROW $8,265.95 This breakdown is not a restriction on the use of the security. DEVELOPMENT WARRANTY LETTER OF CREDIT 13 GCC Dacotah, Inc. 219543v1 A. Erosion & Sedimentation Control $2,001.00 TOTAL WARRANTY LETTER OF CREDIT $2,001.00 This breakdown is not a restriction on the use of the security. 18. SUMMARY OF CASH REQUIREMENTS. The following is a summary of the cash requirements under this Agreement which must be furnished by the Developer prior to issuance of a building permit. A. Wetland Signs $4,500.00 B. City Administrative (1.0 %) or ($1,500.00 minimum) 1,500.00 C. Street & Traffic Control Signs 4,500.00 D. Storm Water Impact Fee $58,305.00 SUBTOTAL CASH REQUIREMENTS $64,805.00 19. ACKNOWLEDGEMENT. The Developer acknowledges that approval of installation of the Improvements does not constitute a guarantee by the City of any future subdivision approvals and that the Developer performs the work on the Subject Property at its own risk. 20. RESPONSIBILITY FOR COSTS. A. The Developer shall pay all costs incurred by it or the City in conjunction with the development of the Property, including but not limited to legal, planning, engineering and inspection expenses incurred in connection with approval of the site plan, the preparation of this Agreement, review of any other plans and documents. B. The Developer shall hold the City and its officers, employees, and agents harmless from claims made by itself and third parties for damages sustained or costs incurred resulting from site approval and development. The Developer shall indemnify the City and its officers, employees, and agents for all costs, damages, or expenses which the City may pay or incur in consequence of such claims, including attorneys' fees. C. The Developer shall reimburse the City for costs incurred in the enforcement of this Agreement, including engineering and attorneys' fees. 14 GCC Dacotah, Inc. 219543v1 D. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under this Agreement within thirty (30) days after receipt. Bills not paid within thirty (30) days shall accrue interest at the rate of eighteen percent (18%) per year. 21. MISCELLANEOUS. A. Third parties shall have no recourse against the City under this Agreement. B. If any portion, section, subsection, sentence, clause, paragraph, or phrase of this Agreement is for any reason held invalid, such decision shall not affect the validity of the remaining portion of this Agreement. C. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this Agreement. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by written resolution of the City Council. The City's failure to promptly take legal action to enforce this Agreement shall not be a waiver or release. D. This Agreement shall run with the land and may be recorded against the title to the Subject Property. The Developer covenants with the City, its successors and assigns, that the Developer has fee title to the Subject Property and/or has obtained consents to this Agreement, in the form attached hereto, from all parties who have an interest in the Subject Property; that there are no unrecorded interests in the Subject Property; and that the Developer will indemnify and hold the City harmless for any breach of the foregoing covenants. E. Each right, power or remedy herein conferred upon the City is cumulative and in addition to every other right, power or remedy, express or implied, now or hereafter arising, available to City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing may be exercised from time to time as often and in such order as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any other right, power or remedy. 15 GCC Dacotah, Inc. 219543v1 F. Breach of the terms of this Agreement by the Developer, including nonpayment of billings from the City, shall be grounds for denial of building permits and certificates of occupancy, and the halting of all work on the Subject Property. G. The Developer represents to the City that the development complies with all City, county, metropolitan, state, and federal laws and regulations, including but not limited to: subdivision ordinances, zoning ordinances, and environmental regulations. If the City determines that the development does not comply, the City may, at its option, refuse to allow construction or development work in the development until the Developer does comply. Upon the City’s demand, the Developer shall cease work until there is compliance. I. Grading, curbing, and one lift of asphalt shall be installed on all public and private streets prior to issuance of a permanent or temporary Certificate of Occupancy. J. If building permits are issued prior to the acceptance of public improvements, the Developer assumes all liability and costs resulting in delays in completion of public improvements and damage to public improvements caused by the City, Developer, its contractors, subcontractors, material men, employees, agents, or third parties. No sewer and water connections or inspections may be conducted and no one may occupy a building for which a building permit is issued on either a temporary or permanent basis until the streets needed for access have been paved with a bituminous surface and the utilities are reasonably accepted by the City Engineer. K. Should the Developer convey any lot or lots in the Development to a third party, the City and the owner of that lot or those lots may amend this Development Contract or other city approvals or agreements for development or use of those lots without the approval or consent of the Developer or other lot owners in the Development. Private agreements between the owners of lots within the Development for shared service or access and related matters necessary for the efficient use of the Development shall be the responsibility of the lot owners and shall not bind or restrict City authority to approve applications from any lot owner in the Development. 16 GCC Dacotah, Inc. 219543v1 22. DEVELOPER’S DEFAULT. In the event of default by the Developer as to any of the work to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall promptly reimburse the City for any expense incurred by the City, provided the Developer, except in an emergency as determined by the City, is first given notice of the work in default, not less than ten (10) days in advance. This Agreement is a license for the City to act, and it shall not be necessary for the City to seek a Court order for permission to enter the Subject Property. When the City does any such work, the City may, in addition to its other remedies, assess the cost in whole or in part. 23. NOTICES. Required notices to the Developer shall be in writing, and shall be either hand delivered to the Developer, its employees or agents, or mailed to the Developer by certified mail at the following address: GCC Dacotah, Inc. C/O Cristopher Munoz, 600 S. Cherry St., Suite 1000, Glendale, CO 80246. Notices to the City shall be in writing and shall be either hand delivered to the City Administrator, or mailed to the City by certified mail in care of the City Administrator at the following address: Otsego City Hall, 13400 90th Street NE, Otsego, Minnesota 55330. [The remainder of this page has been intentionally left blank. Signature pages follow.] 17 GCC Dacotah, Inc. 219543v1 CITY OF OTSEGO BY: ___________________________________________ Jessica L. Stockamp, Mayor (SEAL) AND __________________________________________ Audra Etzel, City Clerk STATE OF MINNESOTA ) )ss. COUNTY OF WRIGHT ) The foregoing instrument was acknowledged before me this ________ day of ______________, 2020, by Jessica L. Stockamp and by Audra Etzel, the Mayor and City Clerk of the City of Otsego, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. ______________________________________________ NOTARY PUBLIC 18 GCC Dacotah, Inc. 219543v1 DEVELOPER: GCC DACOTAH, INC. By: Cristopher Munoz Its: Secretary STATE OF ______________ ) )ss. COUNTY OF ____________ ) The foregoing instrument was acknowledged before me this ________ day of ______________, 2021, by Cristopher Munoz, the Secretary of GCC Dacotah, Inc., a South Dakota corporation, on behalf of said corporation. ______________________________________________ NOTARY PUBLIC DRAFTED BY: CAMPBELL, KNUTSON Professional Association 860 Blue Gentian Road, Suite 290 Eagan, Minnesota 55121 Telephone: 651-452-5000 DSK/smt GCC Dacotah, Inc. 207246v3 19 [BANK LETTERHEAD] IRREVOCABLE LETTER OF CREDIT No. ___________________ Date: _________________ TO: City of Otsego City Hall 13400 90th Street NE Otsego, Minnesota 55330 Dear Sir or Madam: We hereby issue, for the account of (Name of Developer) and in your favor, our Irrevocable Letter of Credit in the amount of $____________, available to you by your draft drawn on sight on the undersigned bank. The draft must: a) Bear the clause, "Drawn under Letter of Credit No. __________, dated ________________, 2_____, of (Name of Bank) "; b) Be signed by the City Administrator or Finance Director of the City of Otsego. c) Be presented for payment at (Address of Bank) , on or before 4:00 p.m. on November 30, 2_____. This Letter of Credit shall automatically renew for successive one-year terms unless, at least forty-five (45) days prior to the next annual renewal date (which shall be November 30 of each year), the Bank delivers written notice to the Otsego Finance Director that it intends to modify the terms of, or cancel, this Letter of Credit. Written notice is effective if sent by certified mail, postage prepaid, and deposited in the U.S. Mail, at least forty -five (45) days prior to the next annual renewal date addressed as follows: Otsego Finance Director, Otsego City Hall, 13400 90th Street NE, Otsego, MN 55330, and is actually received by the Finance Director at least thirty (30) days prior to the renewal date. This Letter of Credit sets forth in full our understanding which shall not in any way be modified, amended, amplified, or limited by reference to any document, instrument, or agreement, whether or not referred to herein. This Letter of Credit is not assignable. This is not a Notation Letter of Credit. More than one draw may be made under this Letter of Credit. This Letter of Credit shall be governed by the most recent revision of the Uniform Customs and Practice for Documentary Credits, International Chamber of Commerce Publication No. 600. We hereby agree that a draft drawn under and in compliance with this Letter of Credit shall be duly honored upon presentation. [NAME OF BANK] BY: ____________________________________ Its ______________________________ GCC Dacotah, Inc. 207246v3 20 (Above Space is Reserved for Recording Information) Minnesota Wetland Conservation Act Declaration of Restrictions and Covenants for Project-Specific Wetland Replacement Replacement Wetland Declarant: General Location of Replacement: Sec. , Twp. , Rge. , County of This Declaration of Restrictions and Covenants for Project-Specific Wetland Replacement Wetland (Declaration) is made this day of , by the undersigned Declarant: RECITALS A. The Declarant holds the fee title or perpetual easement on the real property described in Exhibit A, attached hereto. B. This real property is the site of a Replacement Wetland, as defined in Minnesota Rules 8420.0111, subp. 60. Exhibit B, attached hereto, is a map or survey of the subject Replacement Wetland. C. The Declarant is seeking approval of (1) a replacement plan under Minnesota Statutes section 103G.222. D. The Replacement Wetland is subject to the Wetland Conservation Act of 1991, as amended, Minnesota Statutes section 103G.222 et seq., and all other provisions of law that apply to wetlands, except that the exemptions in Minnesota Statutes section 103G.2241 do not apply to the Replacement Wetland, pursuant to Minnesota Rules 8420.0420. E. The Local Government Unit (LGU) charged with approval of the Replacement Plan is , whose address is F. All references in this instrument to Minnesota Statutes and Rules are to the Statutes and Rules currently in effect and as amended or renumbered in the future RESTRICTIONS AND COVENANTS GCC Dacotah, Inc. 207246v3 21 The Declarant makes the following declaration of restrictions and covenants for the Replacement Wetland. These restrictions and covenants shall run with the land, and bind Declarant, and Declarant's heirs, successors, and assigns: 1. The Declarant shall maintain a Replacement Wetland of the size and type specified in the replacement plan approved by the LGU and on file at the offices of the LGU. Declarant shall not make any use of the Replacement Wetland that would adversely affect the functions or values of the wetland as determined by Minnesota Rules 8420.0522, and as specified in the replacement plan. 2. Declarant shall pay the costs of maintenance, repairs, reconstruction, and replacement of the Replacement Wetland, which the LGU or the State of Minnesota through the Minnesota Board of Water and Soil Resources may deem necessary to comply with the specifications for the Replacement Wetland in the approved replacement plan. 3. Declarant grants to the LGU, the State of Minnesota, and the agents and employees of the LGU and the State of Minnesota, reasonable access to the Replacement Wetland for inspection, monitoring, and enforcement purposes. This Declaration grants no access to or entry on the lands described to the general public. 4. Declarant represents that he or she has a fee simple or easement interest in the land on which the Replacement Wetland is or will be located. Declarant represents that he or she has obtained the consent of all other parties who may have an interest in the land on which the Replacement Wetland is or will be located to the creation of the restrictions and covenants herein, and that, all such parties have agreed in writing to subordinate their interests to these restrictions and covenants, pursuant to the attached Consent and Subordination Agreement(s). 5. Declarant shall record or file this Declaration, pay all costs associated with recording or filing, and provide proof of recording or filing to the LGU. If this Declaration is given pursuant to a replacement plan, such proof shall be provided to the LGU before proceeding with construction of the Replacement Wetland. 6. Acknowledge that this Easement shall be unlimited in duration, without being re- recorded. This Easement shall be deemed to be a perpetual conservation easement pursuant to Minn. Stat. ch. 84C. 7. If the replacement plan approved by the LGU and on file at its offices requires the establishment of areas of native vegetative cover, the term “Replacement Wetland” as used in this Declaration shall also include the required areas of permanent vegetative cover, even if such areas are not wetlands. All provisions of this Declaration that apply to the Replacement Wetland shall apply equally to the required areas of native vegetative cover. In addition, the Declarant: (a) Shall comply with the applicable requirements of Minnesota Rules 8420.0526; (b) Shall, at Declarant’s cost, establish and maintain permanent vegetative cover on areas specified in the replacement plan for native vegetative cover, including any necessary planting and replanting thereof, and other conservation practices, in accordance with the replacement plan; (c) Shall not produce agricultural crops on the areas specified in the replacement plan; GCC Dacotah, Inc. 207246v3 22 (d) Shall not graze livestock on the areas specified in the replacement plan or; (e) Shall not place any materials, substances, or other objects, nor erect or construct any type of structure, temporary or permanent, on the areas specified in the replacement plan, except as provided in the replacement plan; (f) Shall, at Declarant’s cost, be responsible for weed control by complying with noxious weed control laws and emergency control of pests necessary to protect the public health on the areas specified in the replacement plan; and (g) Shall comply with any other requirements or restrictions specified in the replacement plan, including, but not limited to, haying, mowing, timber management or other vegetative alterations that do not enhance or would degrade the ecological functions and values of the replacement site. 8. This Declaration may be modified only by the joint written approval of the LGU and the State of Minnesota through the Minnesota Board of Water and Soil Resources. If the Replacement Wetland has been used to mitigate wetland losses under the Federal Water Pollution Control Act, the U.S. Army Corps of Engineers (or successor agency) must also agree to the modification in writing. Such modification may include the release of land contained in the legal description above, if it is determined that non-wetland areas have been encumbered by this Declaration, unless the approved replacement plan designates these non-wetland areas for establishment of permanent vegetative cover. 9. This Declaration may be enforced, at law or in equity, by the LGU, or by the State of Minnesota. The LGU and the State of Minnesota shall be entitled to recover an award of reasonable attorneys fees from Declarant in any action to enforce this Declaration. The right to enforce the terms of this Declaration is not waived or forfeited by any forbearance or failure to act on the part of the State or LGU. If the subject replacement area is to be used partially or wholly to fulfill permit requirements under the Federal Water Pollution Control Act or a federal farm program, then the provisions of this Declaration that run to the State or the LGU may also be enforced by the United States of America in a court of competent jurisdiction. 10. This Declaration must be recorded and proof of recording submitted to the LGU or other regulatory authority in order to be valid. __________________________________________ Signature of Declarant __________________________________________ Signature of Declarant STATE OF MINNESOTA ) ) ss. COUNTY OF ) This instrument was acknowledged before me on (date) by (name(s) of person(s). GCC Dacotah, Inc. 207246v3 23 _________________________________________ (Signature of Notarial Officer) (Title) My commission expires: Attachments: [ ] Exhibit A (legal description) [ ] Exhibit B (map or survey of Replacement Wetland) This instrument drafted by: GCC Dacotah, Inc. 207246v3 24 MINNESOTA WETLAND CONSERVATION ACT AFFIDAVIT OF LANDOWNER(S) STATE OF MINNESOTA ) ( ss. COUNTY OF _________ ) _______________________________________________, the Affiant herein, being first duly sworn, deposes and says: 1. Affiant is the owner of land described as follows, to-wit: (see attached legal description in Declaration) 2. Affiant is well-acquainted with the above-described land. 3. As of _________________, 2______, no persons were in possession of or claiming title to said land other than Affiant. 4. There have been no improvements made during the one hundred twenty (120) days prior to the above date for which any mechanics' liens might have arisen. 5. All taxes and assessments levied against the property have been paid when due, and such property is free and clear of any tax lien except for current taxes not yet due or not yet delinquent. 6. No lien for unpaid income taxes has been filed or is outstanding against the property. 7. The land described above is free of all mortgages, easements, liens and other encumbrances except as specified on the attached Form A-2 (Consent to Replacement Wetland). 8. No judgment or decree has been entered against Affiant that remains unsatisfied. 9. Affiant has not filed a bankruptcy petition nor had one filed against him under Title 11 of the United States Code. Further your Affiant sayeth not. ___________________________________ ___________________________________ Subscribed and sworn to before me this _____ day of ______________, 2____. ______________________________________ Notary Public AG:962 v1 25 GCC of America, Inc. 207246v3 CONSENT TO REPLACEMENT WETLAND WHEREAS, _________________________________________ is the fee owner(s) of the following lands: [Insert same legal description from Replacement Wetland Declaration] AND WHEREAS, the undersigned, ____________________________, has an interest in the land pursuant to: _____ Mortgage _____ Utility Easement for utility line or pipeline which runs through the Replacement Wetland _____ Drainage Easement for ditch, tile line or other drainage system which runs through the Replacement Wetland _____ Contract for Deed ____ Lien _____ Other (specify)_________________________________ which document is dated ________________________, and was recorded on ____________________ in the Office of the County Recorder for Wright County, in Book _____, Page _______, as Document No. __________________; and WHEREAS, the fee owner or Landowner as defined in Minn. Rules part 8420.0110, subp. 29 intends to restore or create a Replacement Wetland under Minn. Stat. sec. 103G.222 and Minn. Rules part 8420.0530 or Minn. Rules part 8420.0740, upon the land described above. NOW, THEREFORE, for valuable consideration, receipt of which is hereby acknowledged, the undersigned hereby consents to the creation or restoration of the Replacement Wetland. The undersigned acknowledges that its interest in the land on which the Replacement Wetland is located shall be subject to all federal, state and local laws and regulations regarding wetlands, including the Declaration of Restrictions and Covenants for Replacement Wetland that is attached hereto. 26 GCC of America, Inc. 207246v3 IN TESTIMONY WHEREOF, _______________________________________, the ________________________________ of the undersigned, has executed this document this _______ day of ___________________. ________________________________ ________________________________ Title ACKNOWLEDGEMENT STATE OF MINNESOTA ) ( ss. COUNTY OF ________ ) The foregoing instrument was acknowledged before me this _____ day of _________________, by ___________________________________________. _________________________________ Notary Public ______________________________ Notary Stamp or Seal THIS INSTRUMENT WAS DRAFTED BY: Board of Water and Soil Resources 520 Lafayette Road St. Paul, Minnesota 55155