Loading...
3.10 Project Payment 70th Watermain Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner September 27, 2021 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty 3.10 – Project Payment 70th Trunk Watermain STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City Staff is recommending City Council approval of Pay Estimate #3 (Final) to Widmer Construction, LLC. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: All work for the 70th Street Trunk Watermain to Otsego Water Tower #4 project has now been completed. All testing has also passed and the project is now complete. This pay estimate includes Change Order #2 for the required Wright County right-of-way permit bonds as well as the release of the retainage. Final Payment (Pay Estimate #3) is for $18,362.67. The total construction cost was $356,803.37, which is 96.9% of the total contract amount of $368,392.99. SUPPORTING DOCUMENTS ATTACHED: • Pay Estimate #3 (Final) POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to approve Pay Estimate #3 (Final) in the amount of $18,362.67 to Widmer Construction, LLC for work completed on the 70th Street Trunk Watermain to Otsego Water Tower #4. BUDGET INFORMATION FUNDING: BUDGETED: Fund 601 – Water Utility Yes FINAL PAYMENT (PAY ESTIMATE #3) CITY OF OTSEGO 70th Street Trunk Watermain to Otsego Water Tower #4 City Improvement Project No. 20-09 Honorable Mayor & City Council City of Otsego Otsego, MN 55330 RE: 70th Street Trunk Watermain to Otsego Water Tower #4, City Project 20-09 Contractor: Widmer Construction, LLC Contract Amount: $362,842.99 Dear Honorable Mayor and Council Members: The following work has been completed on the above-referenced project by Widmer Construction, LLC Bid Schedule "A" - Streets ITEM NO. SPEC. NO.ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 1 2021.501 MOBILIZATION 1 LS $15,525.00 15,525.00$ 1.00 15,525.00$ 2 2104.502 SALVAGE AND REINSTALL CONCRETE STORM CATCH BASIN 1 EA $1,500.00 1,500.00$ -$ 3 2104.604 SALVAGE AND REINSTALL CONCRETE CABLE MAT 10 SY $75.00 750.00$ 10 750.00$ 4 2104.618 REMOVE AND REPLACE GRAVEL ROAD/FIELD DRIVEWAY 1430 SF $1.25 1,787.50$ 1,740 2,175.00$ 5 2104.618 REMOVE AND REPLACE 3" BITUMINOUS TRAIL (FULL SECTION) 1076 SF $3.00 3,228.00$ 1,220 3,660.00$ 6 2503.603 24" STEEL CASING PIPE (JACKED) 120 LF $466.00 55,920.00$ 125 58,250.00$ 7 2503.608 DIP FITTINGS 5725 LBS $5.25 30,056.25$ 6,025 31,631.25$ 8 2504.602 CONNECT TO EXISTING WATERMAIN 1 EA $7,000.00 7,000.00$ 1.00 7,000.00$ 9 2504.602 6" GATE VALVE 4 EA $1,400.00 5,600.00$ 4 5,600.00$ 10 2504.602 16" BUTTERFLY VALVE 4 EA $3,250.00 13,000.00$ 4 13,000.00$ 11 2504.602 HYDRANT 4 EA $3,577.00 14,308.00$ 4 14,308.00$ 12 2504.603 6" WATERMAIN CL 52 DIP 15 LF $38.03 570.45$ 20 760.60$ 13 2504.603 16" WATERMAIN CL 52 DIP 2065 LF $84.45 174,389.25$ 2,062 174,135.90$ 14 2563.601 TRAFFIC CONTROL 1 LS $3,318.00 3,318.00$ 1.00 3,318.00$ 15 2563.602 PORTABLE CONCRETE JERSEY BARRIER 120 LF $16.50 1,980.00$ 120 1,980.00$ 16 2573.502 STORM DRAIN INLET PROTECTION 3 EA $250.00 750.00$ 3 750.00$ 17 2573.503 SILT FENCE, TYPE MS 2160 LF $2.25 4,860.00$ 2,220 4,995.00$ 18 2574.508 FERTILIZER TYPE 1, ANALYSIS 22-10-10 720 LB $1.00 720.00$ 400 400.00$ 19 2575.504 EROSION CONTROL BLANKET (CATEGORY 3) 1336 SY $1.58 2,110.88$ 1,832 2,894.56$ 20 2575.505 SEEDING 3 ACRE $4,380.00 13,140.00$ 0.95 4,161.00$ 21 2575.508 SEEDING MIXTURE - 25-131 21 LB $4.46 93.66$ 21 93.66$ 22 2575.508 SEEDING MIXTURE - 25-141 80 LB $4.75 380.00$ 100.00 475.00$ 23 2575.508 HYDRAULIC MULCH MATRIX 2750 LB $1.60 4,400.00$ 2,744 4,390.40$ 24 2611.000 TESTING (PRESSURE, BACTERIA, AND CONDUCTIVITY) 1 LS $1,000.00 1,000.00$ 1.0 1,000.00$ 25 2390.504 TEMPORARY BITUMINOUS TRAIL, 2.0" THICK 1076 SF $4.75 5,111.00$ -$ 26 2104.618 REMOVE TEMPORARY BITUMINOUS TRAIL, 2.0" THICK 1076 SF $1.25 1,345.00$ -$ Total Bid Schedule "A" 362,842.99$ 351,253.37$ Change Order #1 ITEM NO. SPEC. NO.ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 1 2563.602 JERSEY BARRIER IMPACT ATTENUATOR SYSTEM 2 EA $2,500.00 5,000.00$ 2 5,000.00$ Total Change Order #1 5,000.00$ 5,000.00$ Change Order #2 ITEM NO. SPEC. NO.ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 1 WRIGHT COUNTY RIGHT-OF-WAY PERMIT BOND COST 1 EA $550.00 550.00$ 1 550.00$ Total Change Order #2 550.00$ 550.00$ Bid Schedule "A" 362,842.99$ 351,253.37$ Change Order #1 5,000.00$ 5,000.00$ Change Order #2 550.00$ 550.00$ TOTAL 368,392.99$ 356,803.37$ August 19, 2021 13400 90th Street Award Date: October 27, 2020 Completion Date: December 31, 2020 OT536.01 PE.xlsx PE - 1